Street Lighting and Electric System Undergrounding. Proposed Amendment to PMC Chapter 13.14 Underground Utility Districts. UG District Process. PHASE I - District Creation PHASE II - District Formation PHASE III – Design PHASE IV – Construction Street Lighting Installation - PowerPoint PPT Presentation

Transcript of Street Lighting and Electric System Undergrounding

Department of Public Works

Street Lightingand

Electric System Undergrounding

Proposed Amendment to PMC Chapter 13.14Underground Utility Districts

Department of Public Works

2

UG District Process

• PHASE I - District Creation• PHASE II - District Formation• PHASE III – Design• PHASE IV – Construction

• Street Lighting Installation• Infrastructure Installation• Private Property Conversion• Underground System Connection• Removal of Overhead Wires and Poles• Street Resurfacing Project

Department of Public Works

3

Current UG Process

• Underground Conversion (Private Property)>Owner Responsibility

Option #1 - Hire Electrical Contractor Option #2 - Owner Installation

»Submit Reimbursement Claim Form to include copies of invoices and receipts..

»Current City rebate of $3,000 or the lesser actual cost of the work for Power ONLY!

Department of Public Works

4

Program Advantage

• Underground Conversion>Option #3 – Pilot Program

Utilizing Pasadena Local First»Electrical Contractors

Right of Entry»Signed by Property Owner

UUD 04-1 Los Robles Avenue Total required underground

conversions:134

Total eligible participants: 107 Total non-eligible residents: 27

Department of Public Works

5

Example #1

Department of Public Works

6

Example #2

Department of Public Works

7

Advantages

• Pilot Program Advantages Eliminate Property Owner Financial Involvement Expedite Connection Schedule to Underground

System Expedite Removal of Overhead Wires and Poles Employment opportunities for Pasadena Local

Contractors

Department of Public Works

8

Recommendation

• Amend PMC, Chapter 13.14>The City will pay the cost to install the