STRATEGIC PLAN

FY 2020/2021-2024/25

www.erb.go.ugImproved and well-regulated

engineering services for National development.

THEME:

Page 2: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

2

The Engineers Registration Board Inauguration and swearing in ceremony of the 18th board plus official handover by the 17th board at ministry of works and transport on Thursday 23rd July 2020.

Page 3: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

3

Page 4: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

i iv

Eng. Dr. Isaac MutenyoChairman, Engineers Registration Board

As stipulated by the Engineers Registration Act, a central part of our mandate is to regulate the

Engineering practice in Uganda and advise government on all engineering matters and this 5-Year Plan is timely to this core of our mandate.

Historically the Board has been focusing mainly on registration of Engineers to practice in the Country but with little emphasis on the role of advising government on engineering matters. This gap has been addressed in this strategic plan and the plan contains strategies that the board shall use to advise government on engineering matters. In addition the plan caters for regulation of the entire engineering practice including

It is my distinguished pleasure to release this first 5-Year Engineers Registration Board’s Strategic plan for the period 2020/21 to 2024/25. The Plan is our high-level road map, recognizing the achievements of the Board over the last 50 years, documenting where we are (including strengths and weaknesses), casting a vision of what we aspire to achieve, and prioritizing the key result areas we hope to achieve in the next 5 years.

FOREWORD

Technicians, Technologists and Firms engaged in engineering business. The plan also intends to demystify the registration process for engineers in order to match the rate of registration with the rate of entry of engineers from engineering institutions into the market. At the moment registration rates are far below the rate of engineers entering the market.

This 5-Year Strategic Plan will provide the foundation upon which the Board and all stakeholders can build on to ensure we achieve our mandate. In developing this plan emphasis was made to the significant contribution of engineering services to national development where over 70% of the resources to achieve the results of the NDPIII are expended through engineering services. The plan has therefore been hinged on, and is

aligned to the 3rd National Development Plan (NPDIII) and Vision 2040.

I take this opportunity to thank the Ministry of Works and Transport for the continued support to the Board. It is this support that has enabled development of this plan. I appreciate the efforts of the Board members and the Secretariat for the timely effort in developing the plan. I call upon our stakeholders, particularly UIPE, UACE, the engineering fraternity, government MDAs to support the implementation of this plan.

For God and My Country

Page 5: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

Eng. Namugera RonaldRegistrar, Engineers Registration Board

This f irst , 5 -Year Strategic Plan has

been carefully prepared based on extensive analysis of the historical realities and quantitative assessment of the current conditions affecting the Engineering fraternity in Uganda. The Plan will provide a

The Engineers Registration Board (ERB) was created by the Engineers Registration Act, 1969 which was amended in 1977. The mandate of ERB is to regulate the practice of engineering in Uganda and advise government on all engineering matters. The Board commenced its operations on 1st December 1969 and recently celebrated its 50th year anniversary. Over the years, the Board has made substantial progress towards regulation of the Engineering fraternity in the country albeit without documented strategic plans.

ACKNOWLEDGMENT

ERB | STRATEGIC PLAN | 2020/2021-2024/25

sound basis for achieving our mandate in ensuring that the functions under the regulation, research, advise to government and support to the Engineering fraternity is delivered in a sustainable manner.

I take this opportunity to express my deepest gratitude to all those outside the Board who were involved in the development of this 5-year Plan at different levels. Special thanks go to the ERB’s Board and members of staf f who made invaluable contributions during the development of this plan.

I would also want to thank our partners who have been consistently

committed to support the development of the engineering fraternity. I especially acknowledge the Ministry of Works and Transport, Ministry of Local Government, UIPE, UACE, UNABCEC, and the Development Partners such as EU. My appreciation also goes to our registered engineers who number just over 1200 for the continued commitment and support to the Board activities whenever called upon.

I af f i rm my own c o m m i t m e n t a n d that of the entire ERB secretariat staff to give our unreserved effort in the implementation of this 5- Year Strategic Plan.

ii

Page 6: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

iii

MEMBERS OF THE 18TH ENGINEERS REGISTRATION BOARD

Eng. Dr. Isaac Mutenyo Chairman

Eng. Bwanga George William

Member

Eng. Dr. Tumwesigye John Kihumire

Member

Eng. Elias Bahanda Member

Eng. Sooma Ayub Member

Eng. Dr. Eleanor Wozei

Member

Eng. Namugera Ronald

Registrar

Eng. Dr. Florence Lubwama KiyimbaVice Chairman

Page 7: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

vii

FOREWORD BY THE BOARD CHAIRMAN

ACKNOWLEDGMENT

ABBREVIATIONS AND ACRONYMS

EXECUTIVE SUMMARY

1.0 INTRODUCTION

1.1 Background

1.1.1 Functions of the Engineers Registration Board

1.1.2 Composition and Powers of the Board

1.2 Rationale of the Strategic Plan

1.3 Process of developing the Strategic Plan

1.4 Structure of the Plan

2.0 SITUATION ANALYSIS

2.1 Prevailing issues informing the Strategic Plan

2.2 Challenges

3.0 SWOT ANALYSIS

3.1 Strengths

3.2 Weaknesses

3.3 Opportunities

3.4 Threats

CONTENTSi

ii

vi

01

03

05

11

04

Page 8: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

viii

4.0 THE STRATEGIC DIRECTION

4.1 Introduction

4.2 ERB’S High Level Statements

4.3 Strategic Objectives

5.0 INSTITUTIONAL ARRANGEMENT AND COMMUNICATION STRATEGY

5.1 Institutional Arrangement

5.1 Governance structure

5.3 Communication Strategy

6.0 IMPLEMENTATION AND FINANCING PLAN 6.1 Key Activities to be implemented 6.2 Implementation Schedule and Estimated Costs 6.3 Assumptions for successful implementation of the Strategic plan 6.4 Risks and Risk Mitigation Measures

7.0 MONITORING AND RESULTS FRAMEWORK

7.1Monitoring Tools

7.2 Evaluation Framework

13

16

17

34

Page 9: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

vi

ABBREVIATIONS AND ACRONYMSARB Architects Registration BoardERB Engineers Registration BoardCPD Continuous Professional DevelopmentFY Financial YearICT Information and Communication TechnologyKCCA Kampala Capital City AuthorityMAAIF Ministry of Agriculture, Animal Industry and FisheriesMOD Ministry of DefenceMoES Ministry of Education and SportsMoEMD Ministry of Energy and Mineral DevelopmentMoLHUD Ministry of Lands, Housing and Urban DevelopmentMoWE Ministry of Water and EnvironmentMoWT Ministry of Works and TransportMRA Mutual Recognition AgreementNCHE National Council for Higher EducationNDP III National Development Plan IIINPA National Planning AuthorityNWSC National Water and Sewerage CorporationR & D Research and DevelopmentSDGs United Nations Sustainable Development GoalsSRB Surveyors Registration BoardUACE Uganda Association of Consulting EngineersUCC Uganda Communications CommissionUEGCL Uganda Electricity Generation Company LimitedUETCL Uganda Electricity Transmission Company LimitedUGX Uganda ShillingsUIPE Uganda Institution of Professional EngineersUNABCEC Uganda National Association of Building and Civil Engineering ContractorsUNBS Uganda National Bureau of StandardsUPDF Uganda People’s Defence ForceUNRA Uganda National Roads AuthorityURC Uganda Railways CorporationURF Uganda Road Fund

Page 10: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

x

EXECUTIVE SUMMARY

Page 11: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

1

BackgroundThe Engineers Registration Board (ERB)

is a statutory body established through an Act of Parliament, the Engineering Registration Act 271 of 1969.

The Strategic Plan is intended to define the Engineers Registration Board’s objectives and targets that will guide its operations for the period FY 2020/21 – 2024/25. This plan will make ERB more visible, relevant and enable it monitor the conduct of all engineers and engineering practice in the country more effectively.

The Vision of ERB is “Excellent engineering services offered to society”.

The Mission of ERB is “To regulate and control engineering professionals and their activities within Uganda and to advise Government on engineering matters”.

Motto: “For professional excellence”.The Values of ERB are:i. Professionalismii. Responsibilityiii. Integrityiv. Teamworkv. Innovationvi. Excellence

Assessments informing the Strategic Plan

Factors that have informed the Strategic Plan are that:

i. As of July 2020, Uganda had only 942 registered engineers, too few for a country with a population of 41.5 million .

ii. There is an estimated 8,000 engineers , unregistered and

operating illegally. On an annual basis, 2500 engineers are churned out every year.

iii. Government and its agencies are the major employers of engineers. It employs about 70% of all engineers in the country. Ministries MoWT, MoWE, MoEMD, MoLHUD, MoES, MAAIF, MoD/UPDF, and Agencies of UNRA, KCCA, NWSC, UEGCL, UETCL, UCC, and Local Governments. However, many vacancies in the Ministries, agencies and Local Governments remain unfilled due to unavailability of qualified registered engineers on the market.

iv. There is a substantive number of Engineers employed in the Private Sector such as ICT, Power, Construction, Production, Consultancy Firms and other Engineering related services. Majority of these are neither registered nor known to the Board.

v. Foreign contractors and consulting firms continue to import foreign engineers (often referred to as experts) in preference to local engineers citing the excuse of non-availability of local registered engineers.

vi. Currently there are no Regulations to operationalize the Engineers Registration Act 1969 and its subsequent amendment Decree No. 10 of 1977. This makes it difficult to enforce it.

vii. ERB faces severe f inancial constraints, staffing of its Secretariat is very thin and it suffers from inadequate office accommodation.

Page 12: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

2

The Strategic Plan for FY 2020/21 – 2024/25 has the following five (5)

strategic objectives:i. To ensure a conducive legal

f ramework that supp or t s engineering practice.

ii. To increase the rate of registration of engineering professionals.

iii. To enhance institutional capacity of the Board and secretariat.

iv. To promote innovation and use of affordable technologies and locally available resources.

v. To enhance partnerships and collaboration with stakeholders.

Implementation Strategy - Key Interventions

The following key interventions have been identified for implementation during the 5 year period:

i To ensure a conducive legal framework that supports engineering practice.• Amendment of the ERB Act 1969;• Preparation of ERB Regulations

ii To increase the rate of registration of engineering professionals.• Carry out the Census of all

Engineering graduates in the country;• Roll out a structured engineering

graduate training program;• Locate all unregistered engineers

that are practising in the country for more than 4 years, draw up a list and programme for fast-tracking their registration.

iii. To enhance institutional capacity of the Board and Secretariat.

• Secure permanent office for Board and Secretariat;

• Increase staff numbers in line with an institutional analysis;

• Capacity development for staff and Board

iv. To promote innovation and use of affordable technologies and locally available resources.

• Publication and exhibition of engineering innovations and research;

• Promote specialties of Engineers among key stakeholders;

• Awards for outstanding contributions in engineering.

v. To enhance partnerships and collaboration with stakeholders.

• Promote mutual recognition and networking with other Engineering bodies;

• Accreditation of engineering training and programs of study;

• Inventory of engineering services and expertise

Cost of the Strategic PlanIt is envisaged the Plan will cost a total

of UGX 32.875 billion over the 5-Year period, the biggest cost (76%) being that of constructing and furnishing an office block. These funds shall be sourced from government, donations and annual fees.

Page 13: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

3

1.0 INTRODUCTION

Page 14: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

4

1.1 BackgroundThe Engineers Registration Board (ERB)

is a statutory body established through an Act of Parliament, the Engineering Registration Act, Chapter 271 of 1969. The Act was amended by Decree No.10 of 1977. The amendment of the Bill commenced in 2013. However, by the time of developing this Plan, it had not been finalized. The Engineers Registration Board is an agency under the Ministry of Works and Transport.

1.1 .1 Functions of the Engineers Registration Board

The functions of the Board are to regulate and control engineers and their activities within Uganda and to advise the Government in relation to these functions.

1.1.2 Composition and Powers of the Board

The Board comprises seven members appointed by the Minister of Works and Transport. The Chairman and three members must be in Government service while the other three are nominated from the private sector by the Ugandan Institution of Professional Engineers (UIPE) and forwarded to the Minister for appointment. The Board exercises its powers by maintaining a register of engineers licensed to practice the engineering profession in the country. According to the Act, the Board has powers to delete or suspend from the register any engineer. The tenure of the Board is 2 years.

1.2 Rationale of the Strategic PlanIt is Government’s policy that any

Ministry, Department and Agency (MDAs) which draws money from the Consolidated Fund must be in possession of a Strategic Plan and prepare Annual Work Plans. Furthermore, the current Government development framework requires all Strategic Plans to align with the National

Development Plan 2020/21-2024/25 (NDP III). In view of this, in July 2019 the Board resolved to prepare a Strategic Plan for the period 2020/21 – 2024/25.

The Plan is intended to give a strategic direction to the Board over a 5-year period and to build capacity to contribute effectively towards the country’s infrastructure development targets in the National Development Plan (NDP III) as well as the Government’s efforts to realize its Vision 2040. It will enable the Board to assess and monitor its performance effectively.

1.3 Process of developing the Strategic Plan

A Consultant was engaged to guide the development of the Strategic Plan and it entailed:

i. Reviewing the ERA and other documents;

ii. Interviewing stakeholders;iii. Reviewing Strategic Plans of similar

organizations in the region; andiv. Studying NDP II, NDP III, Vision

2040 and the UN Sustainable Development Goals.

1.4 Structure of the PlanThe Plan has seven chapters. 1. Chapter 1 is the Introduction.

Chapter 2. 2 is the Situation Analysis while3. Chapter 3 is the SWOT Analysis.

Chapter 4. 4 outlines the Strategic Direction.5. Chapter 5 covers the Institutional

arrangement and communication strategy, then

6. Chapter 6 sets out the Implementation and Financing the Plan and Chapter

7. provides the Monitoring and Results Framework.

Page 15: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

5

2.0 SITUATION ANALYSIS

Page 16: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

6

2.1 Prevailing issues informing the Strategic Plan

i. Since its establishment in 1969, the Engineers Registration Board has registered a cumulative number of 1,247 engineers as at July 2020. Currently, the register has 923 registered engineers and 68 temporarily registered engineers . This is a small number of engineers for a country with a population of 41.5 million (2020 estimate). Tunisia with a population of 11.8 million has over 70,000 engineers on its register. Much closer here in East Africa, Rwanda with a population of 12.9 million has 991 registered engineers while Kenya with a population of 53.7 million has 2,329 and Tanzania with a population of 59.6 million has on its register 5,909 engineers.

ii. It is estimated that there are 8,000 unregistered engineering graduates in the country, who are practising engineering. This is a potential risk to the public since the quality of the services offered by these unregistered Engineers cannot be guaranteed. Furthermore, it means that the few registered engineers are overstretched as the demand for their services are far beyond the supply. It is therefore important that strategies of how to get them registered are put in place.

iii. Government or public sector remains the major employer of the country’s engineers accounting for over 70% of the registered engineers. Key employers of engineers are: Ministries of Works and Transport (MoWT); Water and Environment (MoWE); Energy and Mineral Development (MoEMD); Lands, Housing and Urban Development

(MoLHUD); Education and Sports (MoES); Agriculture, Animal Industry and Fisheries (MAAIF); Defence (UPDF) and the many Government Agencies. Government Agencies that provide employment for many engineers include Uganda National Roads Authority (UNRA); Uganda Railway Corporation (URC); National Water and Sewerage Corporation (NWSC); Uganda Electricity Generation Company Limited (UEGCL); Uganda Electricity Transmission Company (UETCL); Kampala Capital City Authority (KCCA); Uganda Road Fund (URF) and Local Governments. However, many vacancies in the ministries, agencies and Local Governments remain unfilled due to unavailability of qualified registered engineers on the market. The few cannot suffice for the entire requirements of public service. In the private sector, the major employers of engineers are the manufacturing industry, consultancy firms, civil and building works contractors, ICT, NGOs and the universities. Lately engineers are also being employed by banks, accounting firms and financial institutions. Many of these are unregistered.

iv. There are many engineers in Public Service who are able to rise through the ranks from Pupil Engineer/Engineer-on-Probation to Senior Engineer without registration, only being held back from reaching the level of Principal Engineer. Consequently, there is a large pool of senior engineers in Government with 10-15 years of service who, not anticipating to be promoted soon, have not bothered to get registered. This needs to be reviewed to require

Page 17: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

7

registration before Senior Engineer level. This should apply to the private sector as well.

v. The policy of decentralization adopted by Government in mid 1990s created many job opportunities for engineers at Local Governments. Currently there are 134 districts, 10 cities and 31 municipal authorities. District Engineers are at Assistant Commissioner level while Municipal Engineers are at Principal Engineer level. The posts are all supposed to be occupied by registered engineers but out of the 175 districts, municipal councils and cities, only 10% are filled with substantive registered engineers.

vi. Projects advertised by MDAs (through public procurement procedures) demand that the bidders submit along with their bids technical staff, among them, registered engineers. Contractors, both local and foreign, cannot find registered engineers on the market let alone afford to maintain them on their pay roll permanently. Foreign contractors and consulting firms use this as an excuse to import foreign experts, many of them much less qualified than the local unregistered engineers. The highest number of unregistered engineers are found in the manufacturing (industry) sub-sector, consulting firms and the universities.

vii. The construction industry in the country provides plenty of employment opportunities for local engineers, but it is poorly regulated. The Uganda Construction Industry

Commission (UCICO) Bill which had reached advanced stages towards becoming a law that would have streamlined activities in the industry has been lying on the shelf since 2018. Since the construction industry is a major employer of engineers, ERB needs an appropriate legal provision to support the regulation of the industry.

viii. Even after registering, many of the engineers just melt away. They do not stick to the profession or keep active in UIPE or ERB activities. For example; of the first group of 200 engineers that got registered between 1971 and 1977, only 13 engineers are still on the register. With the exception of the few who have died, the rest are either no longer in the engineering practice or no longer pay annual fees. Even then, they no longer attend UIPE or ERB functions. The next 100 engineers who were registered between 1980 and 1990, only 38 are still on the register. Out of the next group from Registration No. 301 to No. 400, only 62 are still on the register. The Board needs to devise means of keeping the engineers engaged full time in professional practice and in its own activities especially mentoring young engineers.

2.2 Challengesi. The first Board was appointed in

January 1970. It had three British citizens. They had been drawn from the consulting field. In 1971, a year later, General Idi Amin overthrew the elected Milton Obote government. Gen. Idi Amin ushered in a reign of terror which lasted until 1979.

Page 18: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

8

Following the expulsion of Asians in 1972, the economy collapsed along with the construction industry. Foreign technical expertise fled either due to loss of business or to security of their lives or both. Local expertise followed suit soon after. By the end of 1977, there were 201 engineers on the ERB register but some 60% of them had already fled or been killed. The 4th, 5th and 6th Boards managed to register only 6 engineers from 1977-1980. A state of instability and further economic decline persisted to mid-1990s. By 1993 when the economy picked up again, there was not much engineering business to talk about.

ii. The position of the Registrar on the Board has always been occupied by a very senior engineer. Both Eng. Owaraga and Eng. G.N. Karugonjo when they were registrars were Engineers–in–Chief. Eng. P.M.O Onen was City Engineer and Surveyor. Eng. P. Ssebbowa was Chief Electrical Engineer etc. The registrars did not have a secretariat but instead relied on one or two of their junior staff to carry out the secretariat work. They therefore could not have been effective. The first secretariat administrator was recruited by the 9th Board in 1991. The 5th and 6th Boards from 1979-1982 did not even have a Registrar.

iii. At the time the Engineers Registration Act was established in 1969, save for the works mandated to the East African Common Services

(East African Railways & Harbours, (EAR&H), East African Posts and Telecommunications (EAP&T) and East African Civil Aviation (EACA)), Uganda Electricity Board (UEB), Kampala City Council and the Local Governments, all public works were mandated to the Ministry of Works. This is the reason why the Engineer–in–Chief; Chief Architect; Chief Structural Engineer, Chief Mechanical Engineer, Chief Electrical Engineer and the Chief Quantity Surveyor were located in the Ministry. Currently, engineering practice is dispersed in many government ministries, specialized agencies and in the private sector. It is not easy to identify where the ultimate authority in the very many engineering fields currently lies. With the engineering practice expanding beyond Transport Infrastructure there is an emergence of other disciplines such as Information and Communication Technology (ICT). There should, therefore, be provisions that allow the Board to link up with all other sectors to regulate and control the practice of their engineers.

iv. Financing. The Government has not been giving Engineers Registration Board adequate resources. Its activities are run on contributions from registered engineers and subventions from the Ministry of Works and Transport. In the last five years, the ERB’s income is as shown in Table 1 below.

Page 19: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

9

FINANCIAL YEAR

BUDGETED(UGX)

RECEIVED(UGX)

PORTION FROM GoU/MoWT

2013/14 260,017,051 94,686,175 -

2014/15 561,257,275 111,591,649 -

2015/16 586,025,350 399,757,913 50,000,000

2016/17 604,082,500 491,516,178 30,150,000

2017/18 806,029,000 790,843,733 70,000,000

2018/19 1,430,300,000 932,451,753 130,000,000

v. Office Accommodation. The Engineers Registration Board is currently housed in the UNRA office premises at Kyambogo. The space is too small to accommodate its small secretarial staff and the Board. Efforts to secure space at the Ministry of Works and Transport have not yielded any results.

vi. Staffing. The mandate of the Board includes overseeing and controlling engineers’ practice across the whole country. Its total secretarial staff is only 5. The current Organization Structure of the Board is as shown as in Fig. 1. The current structure of

the ERB is as shown in Figure 1 below. With such few staff, the limited funds and no transport facilities, the Board finds it very difficult to carry out much of its mandate.

vii. Emerging Disciplines in the Profession. There are many disciplines of engineering that have emerged recently such as: environmental engineering, petroleum engineering, computer engineering, aeronautics, m e ch at ro nic s en gin e er in g , biomedical engineering, robotics engineering, geology and several others. ERB needs to development criteria for assessing applications from these disciplines for registration.

Table 1: Revenue of the ERB for Years 2013-2019

Page 20: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

10

3.0 SWOT ANALYSIS

Page 21: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25ERB | STRATEGIC PLAN | 2020/2021-2024/25

For ERB to be able to realise its strength and opportunities, internal weaknesses and threats, it was necessary to do a SWOT analysis.

The SWOT analysis for the organization is as shown below.

SWOT

3.1 STRENGTHSi. The ERB is established by law, the Engineers Registration Act of 1969;

ii. As a Government Agency, ERB can benefit from direct Government financing;

iii. Engineers now appreciate the importance and relevance to register for engineering

practice, hence ERB has over the last 5 years registered a steady increase in applications

for registration; iv. ERB has very close collaboration with UIPE

especially in assessment of applications;v. Existing networks with regulatory bodies in

the region.

3.3 OPPORTUNITIESi) Increasing demand of professional

engineers in public and private sectors;ii) Growing diversity of engineering fields in

the economy;iii) Government reservation scheme for public

infrastructure projects development which will provide more employment opportunities

for local professional engineers;iv) Increasing number of universities offering

engineering programs;v) Increasing number of university

engineering graduates;vi) Increased focus of government in national

engineering programs;vii) A vibrant economy and growing

engineering industry.

3.2 WEAKNESSESi) The lack of regulations to operationalize

the ERA; ii) Poorly regulated and monitored foreign

engineers practicing in the country;iii) There is ignorance amongst the general public on the role and importance of ERB;

iv) Limited data on the numbers, and places of employment, of engineers in the country;

v) Inadequate human, financial and logistical resources to enable the institution implement

activities pertaining to its mandate;

3.4 THREATSi) Delay in issuance of regulations;

ii) Non-accredited programs for engineering undergraduates being offered by universities;

iii) A weak and poorly regulated local construction industry;

iv) Overlapping mandates with other regulators.

11

Page 22: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

12

ERB | STRATEGIC PLAN | 2020/2021-2024/25

12

4.0 THE STRATEGIC DIRECTION

Page 23: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

13

4.1 Introduction The theme of this 5 Year Strategic Plan is: improved and well-regulated engineering services for national development. The Plan will run from FY 2020/21 to FY 2024/25.

ERB’S High Level Statements

Motto“For Professional

Excellence” as reflected in the ERB

Logo.

Vision“Excellent engineering

services offered to society”.

Goal“To have a better

regulated and controlled engineering profession within the

country”.

Mission“To regulate and control

engineering professionals and their activities

within Uganda and to advise Government on engineering matters”.

4.2 Values The values of ERB are:

Professionalism: Espouse the highest moral ethical behavior and be at the forefront of integrity; and Responsibility: Treat all individuals with dignity and respect, judge impartially, critique fairly and encourage without reservation;Integrity: Value differences and recognize that multiple perspectives enhance creativity;

ERB | STRATEGIC PLAN | 2020/2021-2024/25

Teamwork: Support team members in performance of their roles;Innovation: Innovate, demonstrate a willingness to risk and persist in the face of challenges to achieve the seemingly impossible;Excellency: Have continuous desire and persistence to seek new knowledge and push professional frontiers towards excellence.

Page 24: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

14

4.3 Strategic Objectives In order to realize its vision and mission, and effectively address its current challenges, the ERB will pursue five (5) strategic objectives outlined below:

ERB | STRATEGIC PLAN | 2020/2021-2024/25

14

Strategic Objective No.1 is to ensure a conducive

legal framework that supports engineering practice. To support

preparation of regulations to operationalize the

Engineers Registration Act, Chapter 271 of 1969

and align the Act to other related laws. To make provision for regulation of companies and firms engaged in engineering

practice.

Strategic Objective No.2 is to increase the rate of

registration of engineering professionals and firms. To increase the rate of

registration to match the engineers on the market,

the turnout from education institutions, and foreign engineers practicing in

Uganda.

Strategic Objective No.4 is to promote the use of

affordable technologies and locally available resources

and expertise through research and innovation.

The country should prioritize use of locally produced

materials and maximise use of local expertise.

Strategic Objective No.3 is to enhance the

institutional, financial and logistical capacity of the Board and its Secretariat. The Board’s Secretariat is understaffed, to improve Human Resource at the

Secretariat, improve funding and secure office

accommodation.

Strategic Objective No.55 is to enhance partnerships

and collaboration with key stakeholders. ERB will continue working closely

with key stakeholders particularly other regulatory

bodies, government ministries, agencies and training institutions at national, regional and

international levels.

Page 25: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

15

5.0 INSTITUTIONAL ARRANGEMENT & COMMUNICATION STRATEGY

Page 26: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

16

5.1 Institutional ArrangementThe Engineers Registration Board is a 7-member Board of Directors with 4 members drawn from the Government and the other 3 from the private sector. The Registrar serves as the 8th member and Secretary to the Board. The Board oversees the activities of the lean secretariat which is headed by the Registrar, although there are proposals to expand the structure.

The proposed Strategic Plan brings along with it more activities that had hitherto been shelved. It is clear that the current structure is not adequate for the institution to implement the proposed Strategic Plan.

It is proposed that the structure be reviewed and revised to realign it with the responsibilities envisaged in the Strategic Plan.

5.2 Governance structureThe Board makes decisions which are implemented by the secretariat. The Board operates through Committees and Panels.

• The current arrangement is that we have the Board and the Secretariat headed by the Registrar, the Board is engaged in some duties of the Secretariat due to the lean structure.

• The desire is to separate the Board from the Executive and have it headed by a Registrar appointed by the Board.

• Some activities are implemented through Consultancies (outsourcing).

• Co-opting on Committees and Panels

• The Board functions through Committees and Panels

5.3 Communication Strategy The Communication from Board to its stakeholders is done by either the Chairman or the Registrar.The Chairman communicates politically as and when need arises. The Registrar does the day to day routine communications and all the Technical communications on behalf of the Board and Secretariat.

Page 27: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

17

6.0 IMPLEMENTATION AND FINANCING PLAN

Page 28: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

18

6.1 Key Activities to be implemented

It is envisaged that the Strategic Plan will be implemented in collaboration with key relevant ministries, agencies, local governments, academic institutions, business and professional associations, development partners and the private sector.

The Plan has many activities which will be undertaken to achieve the strategic objectives as indicated here below.

Table 2: Key Activities to be implemented

Strategic Objective No. 1

Key Activities

To ensure a conducive legal framework that supports engineering practice.

1.1 Hold meetings with the sector towards amendment of the ERB Act.

1.2 Draft Regulations to the Engineers Registration Act, (1969); including Registration of

• Engineers • Incorporated Engineers• Technicians, • Technologist, and• Engineering Firms. 1.3 Identify areas of collaboration, inconsistency or

overlapping mandates with other laws. (NBRB, National Physical Planning Board, UCCICO, URSB, etc.).

1.4 Identify and include regulatory areas that were intended to be under the UCCICO Bill.

1.5 Review, update and gazette the Engineers Scale of Fees.

1.6 Prepare a guideline for credit point system for renewal of annual practicing licences.

1.7 Roll out and Implement Credit Point system for renewal of PLs

1.8 Annually gazette the list of Engineers eligible to practice Engineering.

1.9 Annually Publish the list of Engineers Eligible to practice Engineering in the Local Daily papers.

1.10 Develop the Engineers Smart Identification System and Cards

Page 29: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

19

Strategic Objective No. 2

Key Activities

To increase the rate of registration of engineering professionals and firms.

2.1 Engage engineering Educational institutions to include a Course material for Professional Development in engineering.

2.2 Develop Course materials for Professional Development in engineering for Entry and Exit classes for Educational institutions.

2.3 Deliver the Course materials under 2.1 by Engineers Registration Board.

2.4 Carry out Engineers’ Census. (Public Service, ICT, Engineering Consultancy Firms, Contractors).

2.5 Develop and implement an action plan for registration of the engineers identified. Draw up a program for fast-tracking their registration.

2.6 Carry out a Census of Foreign Engineers practicing in Uganda.

2.7 Register foreign engineers who are registrable and inform Immigration to take action on those who are not registrable. Advise Government on foreign engineers whose competencies are available locally.

2.8 Carry out an inventory of firms engaged in engineering services.

2.9 Develop an action plan to register those firms that are registrable and advise Government on Firms that are not registrable.

2.10 Develop the ERB Accreditation for all courses and the trainers for CPD trainings.

2.11 Developing guidelines for conducting Structured Graduate engineering training program.

2.12 To conduct outreaches to different engineering entities. 2.13 Institute an annual Engineers Enhancement Program

with a tracking system with their employers. 2.14 Collaborate with NCHE to accredit, monitor and

evaluate engineering programmes for training institutions in the country.

2.15 Assess, accredit, monitor and recognize Assessors.2.16 Review the registration process to improve its efficiency.2.17 Regular Media Publicity on ERB’s regulation function

(TVs, Radio, Print Media)

Page 30: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

20

Strategic Objective No. 3

Key Activities

To enhance institutional, financial and logistical capacity of the Board and its Secretariat.

3.1 Request for increased budget allocation from Ministry of Works and Transport.

3.2 Enhance fees collection by instituting an accounting and revenue collection software.

3.3 Diversity resource base. Preparation of proposals to Development partners. Structured engineers training3.4 Solicit for financial support from other ministries and

agencies.3.5 Review the Human Resource manual and structure every

2 years to keep it up to date.3.6 Review Human Resource Competency annually. 3.7 Review the performance of the Board annually. 3.8 Develop ERB property at Namanve Industrial Park.

(Laboratory, Training Centre, Exhibition Hall, Innovation Centre).

3.9 Acquire medium term adequate office accommodation (through renting) for ERB Secretariat.

3.10 Acquire logistics for ERB Secretariat (furniture, Computers, laptops)

3.11 Acquire Transport Vehicle for the Board3.12 Acquire document management system

Strategic Objective No. 4

Key Activities

To promote the use of affordable technologies and locally available resources and expertise through research and innovation.

4.1 Develop a data base of engineers and their areas of competence for special assignments.

4.2 Annual publication of the Engineers’ Journal.4.3 Hold Annual World Engineering Day (4th March) for

sustainable development to recognize the contribution of engineers to society, showcase new innovations and technologies.

4.4 Recognize and award engineers for their outstanding contributions.

4.5 Collaborate with relevant institutions on promotion of local technologies such as labor based technology (LBT) in construction.

Page 31: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

21

Strategic Objective No. 5

Key Activities

To enhance partnerships and collaboration with key stakeholders.

5.1 Collaboration and benchmarking good practices with the Boards of the East African sister states as provided by the Mutual Recognition Agreement (MRA) which ERB has accented to.

5.2 Establish/consolidate structured relationships with key local/regional and international stakeholders.

5.3 Participate in activities organized by other national, regional and international regulatory bodies.

5.4 Build synergies with other Regulatory bodies and Government ministries.

5.5 Maintain membership in regional and international engineering bodies.

5.6 Maintain collaboration with other engineering institutions like UACE, UNABSEC).

5.7 Enter MoUs to operationalize 2.1.

Page 32: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

22

6.2 Implementation Schedule and Estimated Costs

The Plan will be implemented over a period of 5 years and the estimated cost is UGX 32,875,000,000 (Shillings Thirty-two billion eight hundred seventy five million).

The Development expenditure accounts for 76% of the resource equivalent to UGX 25,000,000,000 (Shillings Twenty Five billion) and this shall be channeled towards the development of the Engineers Tower and associated facilities at Namanve Site.

The operations of the Board in implementation of its regulation function over the 5 year period account for 24% of the resources which is equivalent to 7,875,000,000 (Shillings Seven Billion Eight hundred seventy five million) which shall be approximately UGX 1,575,000,000 (Shillings One billion five hundred seventy five million) per year over the 5 – year period.

Page 33: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

23

S/N

KEY

ACTI

VIT

IES

Targ

et D

ate

(Qua

rter

dur

ing

Fina

ncia

l Yea

r)CO

ST

(UG

X M

illio

n)20

20/2

120

21/2

220

22/2

320

23/2

420

24/2

5

Qua

rter

12

34

12

34

12

34

12

34

12

34

SO N

o. 1:

To

ensu

re a

con

duci

ve le

gal f

ram

ewor

k th

at su

ppor

ts e

ngin

eerin

g pr

actic

e.

1.1H

old

mee

tings

with

the

sect

or to

war

ds

amen

dmen

t of t

he E

RB A

ct.

200.

0

1.2D

raft

Reg

ulat

ions

to th

e En

gine

ers

Regi

stra

tion

Act

, (19

69)

100.

0

1.3Id

entif

y ar

eas o

f col

labo

ratio

n, in

cons

iste

ncy

or o

verla

ppin

g m

anda

tes w

ith o

ther

la

ws

50.0

1.4Id

entif

y an

d in

clud

e re

gula

tory

are

as th

at

wer

e in

tend

ed to

be

unde

r the

UCC

ICO

Bill

.50

.0

1.5Re

view

, upd

ate

and

gaze

tte

the

Engi

neer

s Sc

ale

of F

ees.

50.0

1.6Pr

epar

e a

guid

elin

e fo

r cre

dit p

oint

syst

em fo

r re

new

al o

f ann

ual p

ract

icin

g lic

ence

s50

.0

1.7Ro

ll ou

t and

Impl

emen

t Cre

dit P

oint

syst

em

for r

enew

al o

f PLs

200.

0

1.8A

nnua

lly g

azet

te th

e lis

t of E

ngin

eers

elig

ible

to

pra

ctic

e En

gine

erin

g40

0.0

1.9A

nnua

lly P

ublis

h th

e lis

t of E

ngin

eers

Elig

ible

to

pra

ctic

e En

gine

erin

g in

the

Loca

l Dai

ly

pape

rs

500.

0

Tabl

e 3:

Impl

emen

tatio

n Sc

hedu

le a

nd E

stim

ated

Cos

ts

Page 34: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

24

S/N

KEY

ACTI

VIT

IES

Targ

et D

ate

(Qua

rter

dur

ing

Fina

ncia

l Yea

r)CO

ST

(UG

X M

illio

n)20

20/2

120

21/2

220

22/2

320

23/2

420

24/2

5

Qua

rter

12

34

12

34

12

34

12

34

12

34

1.10

Dev

elop

the

Engi

neer

s Sm

art I

dent

ifica

tion

Syst

em a

nd C

ards

100.

0

TOTA

L Fo

r SO

No.

117

00

SO 2

: To

incr

ease

the

rate

of r

egis

trat

ion

of e

ngin

eerin

g pr

ofes

sion

als a

nd fi

rms

2.1

Enga

ge e

ngin

eerin

g Ed

ucat

iona

l ins

titut

ions

to

incl

ude

a Co

urse

mat

eria

l for

Pro

fess

iona

l D

evel

opm

ent i

n en

gine

erin

g.

10.0

2.2

Dev

elop

Cou

rse

mat

eria

ls fo

r Pro

fess

iona

l D

evel

opm

ent i

n en

gine

erin

g fo

r Ent

ry a

nd E

xit

clas

ses f

or E

duca

tiona

l ins

titut

ions

.

50.0

2.3

Del

iver

the

Cour

se m

ater

ials

und

er 2

.1 by

En

gine

ers R

egis

trat

ion

Boar

d.18

0.0

2.4

Carr

y ou

t Eng

inee

rs’ C

ensu

s.

200.

0

2.5

Dev

elop

and

impl

emen

t an

actio

n pl

an fo

r re

gist

ratio

n of

the

engi

neer

s ide

ntifi

ed.

Dra

w u

p a

prog

ram

for f

ast-

trac

king

thei

r re

gist

ratio

n

50.0

2.6

Carr

y ou

t a C

ensu

s of F

orei

gn E

ngin

eers

pr

actic

ing

in U

gand

a.10

0.0

Page 35: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

25

S/N

KEY

ACTI

VIT

IES

Targ

et D

ate

(Qua

rter

dur

ing

Fina

ncia

l Yea

r)CO

ST

(UG

X M

illio

n)20

20/2

120

21/2

220

22/2

320

23/2

420

24/2

5

Qua

rter

12

34

12

34

12

34

12

34

12

34

2.7

Regi

ster

fore

ign

engi

neer

s who

are

regi

stra

ble

and

info

rm Im

mig

ratio

n to

take

act

ion

on th

ose

who

are

not

regi

stra

ble.

Adv

ise

Gov

ernm

ent o

n fo

reig

n en

gine

ers w

hose

co

mpe

tenc

ies a

re a

vaila

ble

loca

lly.

10.0

2.8

Carr

y ou

t an

inve

ntor

y of

firm

s eng

aged

in

engi

neer

ing

serv

ices

.50

.0

2.9

Dev

elop

an

actio

n pl

an to

regi

ster

thos

e fir

ms

that

are

regi

stra

ble

and

advi

se G

over

nmen

t on

Firm

s tha

t are

not

regi

stra

ble.

5.0

2.10

Dev

elop

the

ERB

Acc

redi

tatio

n fo

r all

cour

ses

and

the

trai

ners

for C

PD tr

aini

ngs.

100.

0

2.11

Dev

elop

ing

polic

y &

guid

elin

es fo

r con

duct

ing

Stru

ctur

ed G

radu

ate

engi

neer

ing

trai

ning

pr

ogra

m.

10.0

2.12

To c

ondu

ct o

utre

ache

s to

diff

eren

t en

gine

erin

g en

titie

s. 18

0.0

2.13

Inst

itute

an

annu

al E

ngin

eers

Enh

ance

men

t Pr

ogra

m w

ith a

trac

king

syst

em w

ith th

eir

empl

oyer

s.

100.

0

Page 36: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

26

S/N

KEY

ACTI

VIT

IES

Targ

et D

ate

(Qua

rter

dur

ing

Fina

ncia

l Yea

r)CO

ST

(UG

X M

illio

n)20

20/2

120

21/2

220

22/2

320

23/2

420

24/2

5

Qua

rter

12

34

12

34

12

34

12

34

12

34

2.14

Colla

bora

te w

ith N

CHE

to a

ccre

dit,

mon

itor

and

eval

uate

eng

inee

ring

prog

ram

mes

for

trai

ning

inst

itutio

ns in

the

coun

try.

100.

0

2.15

Ass

ess,

accr

edit,

mon

itor a

nd re

cogn

ize

Ass

esso

rs.

50.0

2.16

Revi

ew th

e re

gist

ratio

n pr

oces

s to

impr

ove

its

effic

ienc

y.0.

0

2.17

Regu

lar M

edia

Pub

licity

on

ERB’

s reg

ulat

ion

func

tion

(TV

s, Ra

dio,

Prin

t Med

ia)

500.

0

TOTA

L Fo

r SO

No.

216

95

Stra

tegi

c O

bjec

tive

No.

3: T

o en

hanc

e in

stitu

tiona

l, fin

anci

al a

nd lo

gist

ical

cap

acity

of t

he B

oard

and

its S

ecre

taria

t.

3.1

Requ

est f

or in

crea

sed

budg

et a

lloca

tion

from

M

inis

try

of W

orks

and

Tra

nspo

rt.

0

3.2

Enha

nce

fees

col

lect

ion

by in

stitu

ting

an

acco

untin

g an

d re

venu

e co

llect

ion

soft

war

e.50

.0

3.3

Div

ersi

ty re

sour

ce b

ase.

i. Pr

epar

atio

n of

pro

posa

ls t

o D

evel

opm

ent

part

ners

.ii.

Str

uctu

red

engi

neer

s tr

aini

ng

50.0

Page 37: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

27

S/N

KEY

ACTI

VIT

IES

Targ

et D

ate

(Qua

rter

dur

ing

Fina

ncia

l Yea

r)CO

ST

(UG

X M

illio

n)20

20/2

120

21/2

220

22/2

320

23/2

420

24/2

5

Qua

rter

12

34

12

34

12

34

12

34

12

34

3.4

Solic

it fo

r fina

ncia

l sup

port

from

oth

er

min

istr

ies a

nd a

genc

ies.

0

3.5

Revi

ew th

e H

uman

Res

ourc

e m

anua

l and

st

ruct

ure

ever

y 2

year

s to

keep

it u

p to

dat

e.10

.0

3.6

Revi

ew H

uman

Res

ourc

e Co

mpe

tenc

y an

nual

ly.

20.0

3.7

Revi

ew th

e pe

rfor

man

ce o

f the

Boa

rd

annu

ally

and

Tra

inin

g of

Mem

bers

200.

0

3.8

Dev

elop

ERB

pro

pert

y at

Nam

anve

Indu

stria

l Pa

rk. (

Labo

rato

ry, T

rain

ing

Cent

re, E

xhib

ition

H

all, I

nnov

atio

n Ce

ntre

).

25,0

00

3.9

Acq

uire

med

ium

term

ade

quat

e of

fice

acco

mm

odat

ion

(thr

ough

rent

ing)

for E

RB

Secr

etar

iat.

1500

.0

3.10

Acq

uire

logi

stic

s for

ERB

Sec

reta

riat (

furn

iture

, Co

mpu

ters

, lapt

ops)

250.

0

3.11

Acq

uire

Tra

nspo

rt V

ehic

le fo

r the

Boa

rd25

0.0

Page 38: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

28

S/N

KEY

ACTI

VIT

IES

Targ

et D

ate

(Qua

rter

dur

ing

Fina

ncia

l Yea

r)CO

ST

(UG

X M

illio

n)20

20/2

120

21/2

220

22/2

320

23/2

420

24/2

5

Qua

rter

12

34

12

34

12

34

12

34

12

34

3.12

Acq

uire

doc

umen

t man

agem

ent s

yste

m50

0.0

TOTA

L Fo

r SO

No.

327

,830

SO N

o. 4

: To

prom

ote

the

use

of a

ffor

dabl

e te

chno

logi

es a

nd lo

cally

ava

ilabl

e re

sour

ces a

nd e

xper

tise

thro

ugh

rese

arch

and

inno

vatio

n.

4.1

Dev

elop

a d

ata

base

of e

ngin

eers

and

thei

r ar

eas o

f com

pete

nce

for s

peci

al a

ssig

nmen

ts.

0.0

4.2

Ann

ual p

ublic

atio

n of

the

Engi

neer

s’ Jo

urna

l.25

0.0

4.3

Hol

d A

nnua

l Wor

ld E

ngin

eerin

g D

ay (4

th

Mar

ch) f

or su

stai

nabl

e de

velo

pmen

t to

reco

gniz

e th

e co

ntrib

utio

n of

eng

inee

rs

to so

ciet

y, sh

owca

se n

ew in

nova

tions

and

te

chno

logi

es.

300.

0

4.4

Reco

gniz

e an

d aw

ard

engi

neer

s for

thei

r ou

tsta

ndin

g co

ntrib

utio

ns.

50.0

4.5

Colla

bora

te w

ith re

leva

nt in

stitu

tions

on

prom

otio

n of

loca

l tec

hnol

ogie

s suc

h as

labo

r ba

sed

tech

nolo

gy (L

BT) i

n co

nstr

uctio

n.

200.

0

TOTA

L Fo

r SO

No.

460

0.0

Page 39: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

29

S/N

KEY

ACTI

VIT

IES

Targ

et D

ate

(Qua

rter

dur

ing

Fina

ncia

l Yea

r)CO

ST

(UG

X M

illio

n)20

20/2

120

21/2

220

22/2

320

23/2

420

24/2

5

Qua

rter

12

34

12

34

12

34

12

34

12

34

Stra

tegi

c O

bjec

tive

No.

5: T

o en

hanc

e pa

rtne

rshi

ps a

nd c

olla

bora

tion

with

key

stak

ehol

ders

.

5.1

Colla

bora

tion

and

benc

hmar

king

goo

d pr

actic

es w

ith th

e Bo

ards

of t

he E

ast A

fric

an

sist

er st

ates

as p

rovi

ded

by th

e M

utua

l Re

cogn

ition

Agr

eem

ent (

MRA

) whi

ch E

RB h

as

acce

nted

to.

200.

0

5.2

Esta

blis

h/co

nsol

idat

e st

ruct

ured

rela

tions

hips

w

ith k

ey lo

cal/

regi

onal

and

inte

rnat

iona

l st

akeh

olde

rs.

200.

0

5.3

Part

icip

ate

in a

ctiv

ities

org

aniz

ed b

y ot

her n

atio

nal, r

egio

nal a

nd in

tern

atio

nal

regu

lato

ry b

odie

s.

400.

0

5.4

Build

syne

rgie

s with

oth

er R

egul

ator

y bo

dies

an

d G

over

nmen

t min

istr

ies.

50.0

5.5

Mai

ntai

n m

embe

rshi

p in

regi

onal

and

in

tern

atio

nal e

ngin

eerin

g bo

dies

.50

.0

5.6

Mai

ntai

n co

llabo

ratio

n w

ith o

ther

eng

inee

ring

inst

itutio

ns li

ke N

BRB,

UAC

E, U

NA

BCEC

).

Ente

r MoU

s to

oper

atio

naliz

e th

e co

llabo

ratio

n

100.

0

5.7

Ente

r MoU

s to

oper

atio

naliz

e th

e co

llabo

ratio

n0.

0

TOTA

L Fo

r SO

No.

510

00

Page 40: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

30

Summary of Costs of Strategic Objectives

Page 41: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

The summary of costs of Strategic Objectives is shown in Table 4 below.

Strategic Objective

Cost (UGX Million)

1 1,750

2 1,695

3 27,830

4 600

5 1,000

GRAND TOTAL

32,875

Table 4: Summary of Costs of Strategic Objectives

ERB | STRATEGIC PLAN | 2020/2021-2024/25

6.3 Assumptions for successful implementation of the Strategic plani. Continued Government fundingii. Political stabilityiii. Political goodwill and buy iniv. Adequate resources; human and financialv. Effective communication strategyvi. Strategic collaboration with other regulatory bodies and stakeholdersvii. Improved systems and processesviii. Adoption of ways of doing business in light of COVID-19 and its long-

term after effects

6.4 Risks and Risk Mitigation MeasuresDuring implementation of the Plan, some risks are envisaged. Major risks include:

i. Delays in gazetting the Regulations to the Engineers Registration Act;ii. Overlapping mandates with other statutory bodies or government

agencies;iii. Failure to mobilise enough resources from Government and other

stakeholders;iv. Challenges posed by unforeseen circumstance or pandemics that

curtail organization of physical meetings, visits and exhibitions; andv. Delays by the Minister to appoint members of the Board.

31

Page 42: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

32

S/N Risk Rank Mitigation Measure

i Delays in gazetting the Regulations to the Engineers Registration Act;

High i. Board to expedite preparation of the draft regulations;

ii. Continuous engagement with the Minister after submitting the draft

ii Overlapping mandate with other statutory bodies or government agencies;

Low i. Carry out a regulatory impact assessment;

ii. Engage Solicitor General to initiate remedial measures in case of identified overlaps

iii Failure to mobilise enough resources from Government and other stake-holders;

High i. ERB to lobby Parliament (Infrastructure committee) and MoWT for more funding;

ii. ERB to approach development partners to fund some of its activities

iv Challenges posed by unforeseen circumstance or pandemics (e.g COVID-19) that curtail organization of physical meetings, visits and exhibitions; and

High i. Foster use of information and communication technologies in sharing ideas and information

ii. Enforce Standard Operating Procedures (SOPs) of Ministry of Health at ERB Secretariat

v Delays by the Minister to appoint Board

Low i. Insert a clause in the Regulations to allow an extension of tenure of the Board in case of a delay by the Minister to appoint a new Board.

ii. Have staggered Board appointments

Table 5: Risks and Mitigation Measures Matrix

Page 43: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

33

7.0 MONITORING AND RESULTS FRAMEWORK

Page 44: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

34

The Board will have the overall responsibility of monitoring and evaluation of the implementation of the Strategic Plan. This will be accomplished through use of monitoring tools and an evaluation framework. Monitoring tools and evaluation framework are described in the following sections.

7.1 Monitoring ToolsMonitoring of implementation of the Strategic Plan will largely be based on information generated during the implementation of the Plan. Tools to support generation and capture of data will include:

i. Annual work plans and budgets;ii. Performance Targets;iii. Performance Reports; andiv. Performance Appraisal forms for

Board members and staff.

7.2 Evaluation FrameworkImplementation of the Strategic Plan will be evaluated using data generated from the monitoring tools. Evaluation will be carried out at different levels to provide for ample time for corrective actions. Performance evaluation will be done as follows:i. Programmes will be evaluated by

a responsible Board Committee on a quarterly basis and within 45 days after completion. Programme reports will be submitted to the Board for review.

ii. The Registrar will be evaluated by the Board.

iii. All staff performance will be evaluated by their respective supervisors on a bi-annual basis and evaluation reports will be submitted to the Registrar for review within 45 days.

iv. Performance of the Secretariat will be evaluated by the Registrar on a bi-annual basis and evaluation reports will be submitted to the Board for review at Board meetings of the subsequent month.

v. Board performance will be evaluated by the Minister on an annual basis.

vi. Annual Board Reports will be submitted by the Registrar at the Annual Sector Performance Review Conference.

vii. The Strategic Plan performance will be reviewed by the Board at Mid-Term and Full-Term and the review reports including recommendations integrated in subsequent Strategic Plan.

The Monitoring and Results Framework is summarized in Table 6 below.

Page 45: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

35

Stra

tegi

c O

bjec

tive

Key

Activ

ities

Perf

orm

ance

In

dica

tor

Freq

uenc

y of

M

onito

ring

Resp

onsi

bilit

y

SO1 T

o en

sure

a c

ondu

cive

le

gal f

ram

ewor

k th

at su

ppor

ts

engi

neer

ing

prac

tice.

1.1

Hol

d m

eetin

gs w

ith th

e se

ctor

tow

ards

am

endm

ent o

f the

ERB

Act

.N

umbe

r of

mee

tings

hel

dQ

uart

erly

Cha

irman

1.2

Dra

ft R

egul

atio

ns to

the

Engi

neer

s Re

gist

ratio

n A

ct, (

1969

). D

raft

re

gula

tion

docu

men

t

Qua

rter

lyC

/TC

1.3

Iden

tify

area

s of

col

labo

ratio

n,

inco

nsis

tenc

y or

ove

rlapp

ing

man

date

s w

ith o

ther

law

s.

RIA

Rep

ort

Qua

rter

lyC

/TC

1.4

Iden

tify

and

incl

ude

regu

lato

ry a

reas

th

at w

ere

inte

nded

to b

e un

der t

he

UC

CIC

O B

ill.

Repo

rt

Mar

202

1C

/TC

1.5 R

evie

w, u

pdat

e an

d ga

zett

e th

e En

gine

ers

Scal

e of

Fee

s.St

atut

ory

Inst

rum

ent

July

202

1C

hairm

an

SO2

To in

crea

se th

e ra

te o

f re

gist

ratio

n of

eng

inee

ring

prof

essi

onal

s and

firm

s.

2.1

Enga

ge e

ngin

eerin

g Ed

ucat

iona

l in

stitu

tions

to in

clud

e a

Cou

rse

mat

eria

l for

Pr

ofes

sion

al D

evel

opm

ent i

n en

gine

erin

g.

Num

ber o

f m

eetin

gs h

eld

Twic

e a

year

Regi

stra

r

2.2

Dev

elop

and

revi

ew C

ours

e m

ater

ials

fo

r Pro

fess

iona

l Dev

elop

men

t in

engi

neer

ing

for E

ntry

and

Exi

t cla

sses

for

Educ

atio

nal i

nstit

utio

ns.

Cou

rse

mat

eria

l O

nce

a ye

arC

/Pan

els

2.3

Del

iver

the

Cou

rse

mat

eria

ls u

nder

2.1

by E

ngin

eers

Reg

istr

atio

n Bo

ard.

Num

ber o

f Le

ctur

es

Onc

e a

year

Regi

stra

r

Tabl

e 6:

Mon

itorin

g an

d Re

sult

s Fra

mew

ork

Page 46: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

36

Stra

tegi

c O

bjec

tive

Key

Activ

ities

Perf

orm

ance

In

dica

tor

Freq

uenc

y of

M

onito

ring

Resp

onsi

bilit

y

SO2

To in

crea

se th

e ra

te o

f re

gist

ratio

n of

eng

inee

ring

prof

essi

onal

s and

firm

s.

2.4

Car

ry o

ut E

ngin

eers

’ Cen

sus.

Cen

sus

Re-

port

Qua

rter

lyRe

gist

rar

2.5

Dev

elop

and

impl

emen

t an

actio

n pl

an

for r

egis

trat

ion

of th

e en

gine

ers

iden

tified

. D

raw

up

a pr

ogra

m fo

r fas

t-tr

acki

ng th

eir

regi

stra

tion

Act

ion

plan

, N

umbe

r of

engi

neer

s re

gist

ered

Qua

rter

lyRe

gist

rar

2.6

Car

ry o

ut a

Cen

sus

of F

orei

gn E

ngin

eers

pr

actic

ing

in U

gand

a.C

ensu

s Re

-po

rtQ

uart

erly

Regi

stra

r

2.7

Reg

iste

r for

eign

eng

inee

rs w

ho a

re

regi

stra

ble

and

info

rm Im

mig

ratio

n to

take

ac

tion

on th

ose

who

are

not

regi

stra

ble.

A

dvis

e G

over

nmen

t on

fore

ign

engi

neer

s w

hose

com

pete

ncie

s ar

e av

aila

ble

loca

lly.

Num

ber

of fo

reig

n en

gine

ers

regi

ster

ed

Qua

rter

lyRe

gist

rar

2.8

Car

ry o

ut a

n in

vent

ory

of fi

rms

enga

ged

in e

ngin

eerin

g se

rvic

es.

Inve

ntor

y re

port

Qua

rter

lyRe

gist

rar

2.9

Dev

elop

an

actio

n pl

an to

regi

ster

th

ose

firm

s th

at a

re re

gist

rabl

e an

d ad

vise

Gov

ernm

ent o

n Fi

rms

that

are

not

re

gist

rabl

e.

Num

ber o

f re

gist

ered

fir

ms

Qua

rter

lyRe

gist

rar

2.10

Dev

elop

the

ERB

Acc

redi

tatio

n G

uide

lines

for P

rofe

ssio

nal D

evel

opm

ent

Cou

rses

and

for t

rain

ers.

Gui

delin

es

Qua

rter

ly

C/T

C

Page 47: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

37

Stra

tegi

c O

bjec

tive

Key

Activ

ities

Perf

orm

ance

In

dica

tor

Freq

uenc

y of

M

onito

ring

Resp

onsi

bilit

y

SO2

To in

crea

se th

e ra

te o

f re

gist

ratio

n of

eng

inee

ring

prof

essi

onal

s and

firm

s.

2.11

Dev

elop

pol

icy

& g

uide

lines

for

cond

uctin

g St

ruct

ured

Gra

duat

e en

gine

erin

g tr

aini

ng p

rogr

am.

Gui

delin

es

Qua

rter

ly

C/T

C

2.12

To

cond

uct o

utre

ache

s to

diff

eren

t en

gine

erin

g en

titie

s. N

umbe

r of

outr

each

esQ

uart

erly

Cha

irman

2.13

Ins

titut

e an

ann

ual E

ngin

eers

En

hanc

emen

t Pro

gram

with

a tr

acki

ng

syst

em w

ith th

eir e

mpl

oyer

s.

Repo

rt

Onc

e a

year

C/T

C

2.14

Col

labo

rate

with

NC

HE

to a

ccre

dit,

mon

itor a

nd e

valu

ate

engi

neer

ing

prog

ram

mes

for t

rain

ing

inst

itutio

ns in

the

coun

try.

Repo

rts

Qua

rter

lyC

/Pan

els

2.15

Ass

ess,

accr

edit,

mon

itor a

nd

reco

gniz

e A

sses

sors

.Re

port

sQ

uart

erly

C/T

C

2.16

Rev

iew

the

regi

stra

tion

proc

ess

to

impr

ove

its e

ffici

ency

.Re

port

Qua

rter

lyV

/Cha

irman

2.17

Reg

ular

Med

ia P

ublic

ity o

n ER

B’s

regu

latio

n fu

nctio

n (T

Vs,

Radi

o, P

rint

Med

ia)

Repo

rtQ

uart

erly

Regi

stra

r

Page 48: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

38

Stra

tegi

c O

bjec

tive

Key

Activ

ities

Perf

orm

ance

In

dica

tor

Freq

uenc

y of

M

onito

ring

Resp

onsi

bilit

y

SO3

To e

nhan

ce in

stitu

tiona

l, fin

anci

al a

nd lo

gist

ical

ca

paci

ty o

f the

Boa

rd a

nd it

s Se

cret

aria

t.

3.1

Requ

est f

or in

crea

sed

budg

et a

lloca

tion

from

Min

istr

y of

Wor

ks a

nd T

rans

port

. Bu

dget

A

lloca

tion

Qua

rter

lyC

hairm

an

3.2

Enh

ance

fees

col

lect

ion

by in

stitu

t-in

g an

acc

ount

ing

and

reve

nue

colle

ctio

n so

ftw

are.

Fees

col

lect

ed

Mon

thly

Regi

stra

r

3.3

Div

ersi

ty re

sour

ce b

ase.

i. Pr

epar

atio

n of

pro

posa

ls to

D

evel

opm

ent p

artn

ers

ii. St

ruct

ured

eng

inee

rs tr

aini

ng

Num

ber o

f Pr

opos

als

Num

ber o

f St

ruct

ured

tr

aini

ngs

Qua

rter

lyC

/TC

3.4

Sol

icit

for fi

nanc

ial s

uppo

rt fr

om o

ther

m

inis

trie

s an

d ag

enci

es.

Supp

ort

rece

ived

Q

uart

erly

Cha

irman

3.5

Rev

iew

the

Hum

an R

esou

rce

man

ual

and

stru

ctur

e ev

ery

2 ye

ars

to k

eep

it up

to

date

.

HR

man

ual

upda

ted

Two

year

sRe

gist

rar

3.6

Rev

iew

Hum

an R

esou

rce

Com

pete

ncy

annu

ally

. Pe

rform

ance

re

port

Ann

ually

Regi

stra

r

3.7

Rev

iew

the

perfo

rman

ce o

f the

Boa

rd

annu

ally

. Pe

rform

ance

re

port

Ann

ually

Min

iste

r

3.8

Dev

elop

ERB

pro

pert

y at

Nam

anve

In

dust

rial P

ark.

(Lab

orat

ory,

Trai

ning

Cen

tre,

Ex

hibi

tion

Hal

l, Inn

ovat

ion

Cen

tre)

.

Reso

urce

s re

ceiv

ed

Qua

rter

lyC

hairm

an

Page 49: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

39

Stra

tegi

c O

bjec

tive

Key

Activ

ities

Perf

orm

ance

In

dica

tor

Freq

uenc

y of

M

onito

ring

Resp

onsi

bilit

y

SO3

To e

nhan

ce in

stitu

tiona

l, fin

anci

al a

nd lo

gist

ical

ca

paci

ty o

f the

Boa

rd a

nd it

s Se

cret

aria

t.

3.9

Acq

uire

med

ium

term

ade

quat

e of

fice

acco

mm

odat

ion

(thro

ugh

rent

ing)

for E

RB

Secr

etar

iat.

Offi

ce

acco

mm

oda-

tion

Qua

rter

lyC

/FA

3.10

Acq

uire

logi

stic

s fo

r ERB

Sec

reta

riat

(furn

iture

, Com

pute

rs, la

ptop

s)D

ocum

ent

man

agem

ent

syst

em

Qua

rter

lyC

/FA

3.11

Acq

uire

Tra

nspo

rt V

ehic

le fo

r the

Boa

rd

3.12

Acq

uire

doc

umen

t man

agem

ent

syst

em

SO4

To p

rom

ote

the

use

of

affo

rdab

le te

chno

logi

es a

nd

loca

lly a

vaila

ble

reso

urce

s and

ex

pert

ise

thro

ugh

rese

arch

and

in

nova

tion.

4.1

Dev

elop

a d

ata

base

of e

ngin

eers

and

th

eir a

reas

of c

ompe

tenc

e fo

r spe

cial

as

sign

men

ts.

Dat

a ba

se

Qua

rter

lyRe

gist

rar

4.2

Ann

ual p

ublic

atio

n of

the

Engi

neer

s’ Jo

urna

l.En

gine

ers

Jour

nal

Ann

ually

C

/Edi

toria

l C

omm

ittee

4.3

Hol

d A

nnua

l Wor

ld E

ngin

eerin

g D

ay

(4th

Mar

ch) f

or s

usta

inab

le d

evel

opm

ent

to re

cogn

ize

the

cont

ribut

ion

of e

ngin

eers

to

soc

iety

, sho

wca

se n

ew in

nova

tions

and

te

chno

logi

es.

Con

fere

nce

Ann

ually

C/F

orum

C

omm

ittee

4.4

Rec

ogni

ze a

nd a

war

d en

gine

ers

for

thei

r out

stan

ding

con

trib

utio

ns.

Num

ber o

f Aw

ards

Ann

ually

C/T

C

Page 50: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

40

Stra

tegi

c O

bjec

tive

Key

Activ

ities

Perf

orm

ance

In

dica

tor

Freq

uenc

y of

M

onito

ring

Resp

onsi

bilit

y

4.5

Col

labo

rate

with

rele

vant

inst

itutio

ns

on p

rom

otio

n of

loca

l tec

hnol

ogie

s su

ch a

s la

bor b

ased

tech

nolo

gy (L

BT) i

n co

nstr

uc-

tion.

Num

ber o

f in

stitu

tions

Q

uart

erly

Regi

stra

r

SO5

To e

nhan

ce p

artn

ersh

ips

and

colla

bora

tion

with

key

st

akeh

olde

rs.

5.1

Col

labo

ratio

n an

d be

nchm

arki

ng g

ood

prac

tices

with

the

Boar

ds o

f the

Eas

t Afri

-ca

n si

ster

sta

tes

as p

rovi

ded

by th

e M

utua

l Re

cogn

ition

Agr

eem

ent (

MRA

) whi

ch E

RB

has

acce

nted

to.

Repo

rts

Qua

rter

lyRe

gist

rar

5.2

Est

ablis

h/co

nsol

idat

e st

ruct

ured

re

latio

nshi

ps w

ith k

ey lo

cal/

regi

onal

and

in

tern

atio

nal s

take

hold

ers.

MoU

sQ

uart

erly

Cha

irman

5.3

Par

ticip

ate

in a

ctiv

ities

org

aniz

ed b

y ot

her n

atio

nal, r

egio

nal a

nd in

tern

atio

nal

regu

lato

ry b

odie

s.

Repo

rts

Ann

ually

Regi

stra

r

5.4

Bui

ld s

yner

gies

with

oth

er R

egul

ator

y bo

dies

and

Gov

ernm

ent m

inis

trie

s.Re

port

sQ

uart

erly

Regi

stra

r

5.5

Mai

ntai

n m

embe

rshi

p in

regi

onal

and

in

tern

atio

nal e

ngin

eerin

g bo

dies

.M

embe

rshi

p A

nnua

llyRe

gist

rar

Page 51: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

41

ERB And Kiira Motors Corporation Information And Stakeholder Engagement Visit To The Kiira Vehicle Plant Site, At The Jinja Industrial And Business Park On Saturday 17th October 2020.

The Engineers Registration Board Inauguration And Swearing In Ceremony Of The 18th Board Plus Official Handover By The 17th Board At Ministry Of Works And Transport On Thursday 23rd July 2020.

Training Of Ministry Of Local Government Unregistered Engineers Employed In The District And Municipalities

Training Of Ministry Of Local Government Unregistered Engineers Employed In The District And Municipalities

ERB And Kiira Motors Corporation Information And Stakeholder Engagement Visit To The Kiira Vehicle Plant Site

Page 52: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

42

Karuma Hydro Power Plant (intake)

Page 53: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

43

Page 54: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

44

Karuma Hydro Power Plant - inspection of switch yard by ERB

Page 55: STRATEGIC PLAN - Engineers Registration Board

ERB | STRATEGIC PLAN | 2020/2021-2024/25

45

Page 56: STRATEGIC PLAN - Engineers Registration Board

+256 414 288 771

Phone Number

[email protected] [email protected]

E-mail & Web

Plot 2, Gloucester Avenue, Kyambogo | P.O. Box 29267, Kampala.

Our Office

@erbuganda