STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

23
Richard Kerry TYPSA Country Representative - BULGARIA Management Board Member BACCRC Project Director Plovdiv-Svilengrad Railway Supervision Team (PSRST) GSM: +359 (0) 885 007 518 – Email: [email protected] PSRST - Consortium Partners: TYPSA, SYSTRA, Louis Berger, Rubicon, Trademco Project Website – plovdivsvilengradrailway.com 29 March 2012

description

STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE. 29 March 2012. Richard Kerry – TYPSA Country Representative - BULGARIA – Management Board Member BACCRC Project Director Plovdiv-Svilengrad Railway Supervision Team (PSRST) - PowerPoint PPT Presentation

Transcript of STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Page 1: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Richard Kerry – TYPSA Country Representative - BULGARIA – Management Board Member BACCRC

Project DirectorPlovdiv-Svilengrad Railway Supervision Team (PSRST)GSM: +359 (0) 885 007 518 – Email: [email protected] - Consortium Partners: TYPSA, SYSTRA, Louis Berger, Rubicon, Trademco

Project Website – plovdivsvilengradrailway.com

29 March 2012

Page 2: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

1. BACCRC

2. Project Review – Plovdiv Svilengrad

3. Considerations for Strategic Investment

4. Summary

Page 3: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE
Page 4: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Formed April 2003Formed April 2003 15 Companies 15 Companies Provision of consultancy service throughout networkProvision of consultancy service throughout network On request advice and recommendation to AuthoritiesOn request advice and recommendation to Authorities Contributing to the development of Railway in Bulgaria Contributing to the development of Railway in Bulgaria

Website: www.bakfjs.orgWebsite: www.bakfjs.org

Page 5: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

BACCRC supports sustained and continued investment BACCRC supports sustained and continued investment in the modernisation of the railway network:in the modernisation of the railway network:Within the programming period 2013 - 2020Within the programming period 2013 - 2020In parallel with the development of the roadsIn parallel with the development of the roadsIn partnership with European partnersIn partnership with European partnersTo standards equivalent to the rest of EuropeTo standards equivalent to the rest of EuropeIn conjunction with strategies for optimising railway In conjunction with strategies for optimising railway use and including: use and including:

Reducing road freightReducing road freight Improving road safety Improving road safety With positive contribution to the Environment With positive contribution to the Environment

Page 6: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE
Page 7: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE
Page 8: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

22 December 2011 – Act 15 For Phase 1 & 222 December 2011 – Act 15 For Phase 1 & 2

Page 9: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

22 December 2011 – Trial Run Prime Minister Borisov & Minister Moskovski22 December 2011 – Trial Run Prime Minister Borisov & Minister Moskovski

Page 10: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Skobelevo Halt – Phase 2Skobelevo Halt – Phase 2

Page 11: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Karadjalovo Station – Phase 2Karadjalovo Station – Phase 2

Page 12: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Parvomai Station TrackworkParvomai Station Trackwork

Page 13: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Phase 3 – Maritza BridgePhase 3 – Maritza Bridge

Page 14: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Phase 1 – Chesnigirovo HaltPhase 1 – Chesnigirovo Halt

Page 15: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Systems – Power Dispatchers SCADA display Systems – Power Dispatchers SCADA display

Page 16: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE
Page 17: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Operational Railway Linear project

Drainage Access

Adjacent River (Maritza) High water table Flooding

Changing Technology / Regulations Interfacing between contracts / other

stakeholders

Page 18: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Competitive Tenders Linear project - extensive interfacing Appreciation of ‘urgency’

Authorities Municipalities Etc

Regulatory Public Procurement Act Territorial Arrangement Act NRIC Regulauions

Page 19: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Land Acquisition Flooding – Maritza Trees Archaeology Municipalities Authorities – Coordination Accessibility Environmental

Page 20: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Lessons available from projects like Plovdiv – Svilengrad Recommendable that a Task Force is established, lead by NRIC, to capture such

lessons in a single paper Thorough, early risk identification / management

Use the lessons learnt exercise to develop a ‘checklist’ Project Risk Register - Concept to Completion Regular ‘independent’ formal risk review stages throughout project development Resolve identified risks before proceeding (programming Periods)

Balanced distribution of risks Give motivation to the person ultimately most able to resolve the risk: Eg. Land

Acquisition - Employer, Design - Contractor Use International best practice – Eg. FIDIC Forms

Page 21: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

Focus on Tender Process Invest best practice engineering/ legal expertise to prepare robust standard base

set of tender documents Implement 2 Stage – Pre-Qualification – Large Projects Implement ‘independent’ evaluation – (Funder Assistance?) Establish clearer rules for rejection of unrealistic price bids Demonstrate leadership to establish greater market confidence Ensure mechanism only allows fully capable organisations

Maintenance Assets need to be regularly and continually maintained Vital that maintenance plans and budgets are in place

Page 22: STRATEGIC INFRASTRUCTURE 2012 Railway – CONSULTANTS PERSPECTIVE

There are ambitious plans for railway development Progress is being made It is clear from experience that improvements can

be identified The implementation process needs to develop to

meet the ambitions BACCRC is ready to continue its contribution

Website: www.bakfjs.orgWebsite: www.bakfjs.org