STP Land Application Site Operation and Maintenance

41
STP Land Application Site Operation and Maintenance

description

STP Land Application Site Operation and Maintenance. STP Land Application Site Operation and Maintenance. - PowerPoint PPT Presentation

Transcript of STP Land Application Site Operation and Maintenance

Page 1: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Page 2: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

You’ve found a suitable site, gotten the required approvals and certification from the landowner, the County, and the State, the checklist EA has been done and the new site has been added to your approved disposal site list – so now, what do you do?

You start applying. . . . . . . .

Page 3: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

How do you land apply?

Rules allow 3 different methods:

Direct Injection

Incorporation

Alkali-stabilization

Page 4: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Injection

Courtesy: Michigan DEQ – Water Bureau, Septage Program

Notice that the pumpings are injected below the soil surface

Do you notice any liquid on the surface?

Page 5: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Incorporation

Rules require tilling within 6-hours of land applying

Material must be incorporated into the soil plow layer (typically the upper 4 – 6 inches)

Page 6: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Alkali-stabilization (liming)

Rules require that pH be raised to and remain at 12 for at least 30-minutes

Page 7: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Alkali-stabilization (liming)

Liming requires use of hydrated lime to raise the pH to 12

pH meter or pH test strips can be used to measure pH

Page 8: STP Land Application Site Operation and Maintenance

pH Meters

Page 9: STP Land Application Site Operation and Maintenance

pH Meters

Page 10: STP Land Application Site Operation and Maintenance

pH Test Strips

Page 11: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Alkali-stabilization (liming)

Liming is REQUIRED FOR APPLICATION ON FROZEN GROUND unless the landowner provides the pumper a certification statement that states the landowner objects to the disposal of pH stabilized waste

Page 12: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Incorporation and Alkali-stabilization both require application via spreader bar or splash plate

Spreader bar or splash plate may be detachable

They must be used

Page 13: STP Land Application Site Operation and Maintenance
Page 14: STP Land Application Site Operation and Maintenance
Page 15: STP Land Application Site Operation and Maintenance
Page 16: STP Land Application Site Operation and Maintenance
Page 17: STP Land Application Site Operation and Maintenance
Page 18: STP Land Application Site Operation and Maintenance
Page 19: STP Land Application Site Operation and Maintenance
Page 20: STP Land Application Site Operation and Maintenance
Page 21: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Litter Removal

Rules require the removal of all non-putrescible litter within 6-hours of application

Pumpers may be required to screen all pumpings before land disposal if the Department determines that the litter control program is inadequate

Page 22: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Inadequate Litter Removal

Page 23: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Inadequate Litter Removal

Page 24: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Inadequate Litter Removal

Page 25: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Odor Management

Causes of odor problems at land application sites:

Improper VAPR

Over-application

Page 26: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Proper site management minimizes complaints

Minimize visual and odor impacts by following the rules

If in doubt, contact the Solid Waste Program

Page 27: STP Land Application Site Operation and Maintenance

STP Land ApplicationSite Operation and Maintenance

Finally……

Page 28: STP Land Application Site Operation and Maintenance

The Good,….

Page 29: STP Land Application Site Operation and Maintenance
Page 30: STP Land Application Site Operation and Maintenance
Page 31: STP Land Application Site Operation and Maintenance
Page 32: STP Land Application Site Operation and Maintenance

The Bad,….

Page 33: STP Land Application Site Operation and Maintenance
Page 34: STP Land Application Site Operation and Maintenance
Page 35: STP Land Application Site Operation and Maintenance

and the Ugly….

Page 36: STP Land Application Site Operation and Maintenance
Page 37: STP Land Application Site Operation and Maintenance
Page 38: STP Land Application Site Operation and Maintenance
Page 39: STP Land Application Site Operation and Maintenance
Page 40: STP Land Application Site Operation and Maintenance
Page 41: STP Land Application Site Operation and Maintenance

The End

Questions/Comments