STOP, COLLABORATE, & LISTEN
Ryan French, Trelleborg Sealing Solutions2014.10.05
Encouraging Early Design Collaboration To Ensure Success
SAE INTERNATIONAL 2
STOP…
SAE INTERNATIONAL 3
collaboration/kəˌlabəˈrāSHən/noun
the action of working with someone to produce or create something
SAE INTERNATIONAL
Historical Workstream
4
SAE INTERNATIONAL
Conventional Problem Solving
5
Snowball effect…
SAE INTERNATIONAL
We need to ask ourselves…
6
1. Is this the most effective way to problem solve?
2. How can we better utilize our resources and expertise to provide the best possible solutions?
3. Can we make data-driven decisions early on that will prevent risk and potential issues?
SAE INTERNATIONAL 7
Collaborate…
SAE INTERNATIONAL
Recommended Workstream
8
SAE INTERNATIONAL 9
Main System Interfaces – Noise Resolution
SAE INTERNATIONAL
Think Outside the Box
10
Solution
data
datadata
SAE INTERNATIONAL
Example (Think Outside the Box)
11
Problem: Increase MPG on Ford F-150Inside The Box: Weight and/or Drag ReductionOutside the Box: Build an Aluminum F150
-700 lbs
SAE INTERNATIONAL 12
Listen…
SAE INTERNATIONAL
Focused Collaboration
13
1. Design For Manufacturing (DFM)• Prior to initial drawing release• Full supply base input provided (Tier 1, Friction, Insulator)• Initial prototype options evaluated early on
2. Establish Bond Process “Best Practice” • Each application/system has guidelines established• Full supply base input provided (Tier 1, Friction, Insulator)• Initial bond study (including T-pull, adhesive coverage) carried
out with prototypes from DFM review, allowing established guidelines and subsequent data to pre-certify materials
3. Establish Noise Resolution Process• With input from DFM & bonding “Best Practice”, conduct a full
system review --> understand sensitivities early on!• Full team including OEM, Tier 1, Friction, Insulator Suppliers• Allow the data to drive additional decisions, changes, next steps
SAE INTERNATIONAL
Temperature Effects on PSA’s
14
Adhesive Temperature
Adhesive
FlowCarbonization
(no recovery)
+-Optimal NVH
SAE INTERNATIONAL
Process Matters
15
Bonding Issues Fixed With Process Change =
SAE INTERNATIONAL
NVH + Shim Durability
16
0% noise result mDVP&R for Pre-Release of Insulator (project specific)+
SAE INTERNATIONAL
SAE INTERNATIONAL
Success Story
18
Chrysler KL Rear (Jeep Cherokee)
0% noise solution (dyno & vehicle sign-off)
Insulator pre-release mDVP&R
OE/Tier1/Friction/Insulator Bond Process Sign-off (multi locations)
No post-launch NVH/bond concerns (12 months in service)
SAE INTERNATIONAL 19
"If everyone is moving forward together, then success takes care of itself."
Henry Ford
SAE INTERNATIONAL
Thank you!