STIP Project No. R-5798: Proposed Construc˙on of a Median ... · Allen Pond Road (S.R. 1749), is a...

10
Connecng people, products and places safely and efficiently with customer focus, accountability and environmental sensivity to enhance the economy and vitality of North Carolina STIP Project No. R-5798: Proposed Construcon of a Median along East Caswell Street (U.S. 74) from Graham Street to Allen Pond Road (S.R. 1749) September 11, 2018 Wadesboro, Anson County to the Public Meeng for the State Transportaon Improvement Program (STIP) Project No. R-5798. Project Team Members from the N.C. Department of Transportaon Division 10 and DRMP are pleased to be here to answer your quesons and receive your input. Maps of the area idenfying the project study area, community points of interest and traffic informaon are available for review. You can find informaon on the NCDOT Public Meeng website at: h3ps://www.ncdot.gov/news/public- meengs Welcome Quesons? Comments? Chris Haire, PE DRMP, Inc. 8000 Regency Parkway, STE 110 Cary, NC 27518 Phone: (919) 230-7857 E-mail: [email protected] Travis Preslar, PE NCDOT Project Manager Division 10 12033 E. Independence Blvd. STE H Ma3hews, NC 28105 Phone: (704) 845-1151 E-mail: [email protected] Purpose of this Public Meeng Today’s meeng is an important step in the NCDOT process for making you, the public, a part of the project development process. The purpose of the meeng is to: Present the proposed designs Discuss any concerns and ask quesons Receive your comments Project Schedule and Costs Preliminary Designs………………....…...… ….Fall 2018 Final Environmental Document……………..Fall 2018 Begin Right of Way Acquision………...Spring 2019 Begin Construcon …….......................Spring 2021 Right of Way & Ulies $ 5,500,000 Construcon $ 11,300,000 *Costs as shown in the currently adopted State Transportaon Improvement Program (STIP). Schedule and Costs are subject to change. Your Input Is Important Public involvement is an important part of the project development process. The NCDOT encourages public involvement on transportaon projects. All comments, regardless of how submi3ed (online, phone, email, or le3er), will be taken into consideraon as the project develops. The project team will explore opons to incorporate comments and address concerns where and when feasible. Comments should be submi3ed by September 26, 2018.

Transcript of STIP Project No. R-5798: Proposed Construc˙on of a Median ... · Allen Pond Road (S.R. 1749), is a...

Page 1: STIP Project No. R-5798: Proposed Construc˙on of a Median ... · Allen Pond Road (S.R. 1749), is a five-lane, undivided arterial roadway, with a 2016 average annual daily traffic

Connec�ng people, products and places safely and efficiently with customer focus, accountability

and environmental sensi�vity to enhance the economy and vitality of North Carolina

STIP Project No. R-5798: Proposed Construc�on of a

Median along East Caswell Street (U.S. 74) from

Graham Street to Allen Pond Road (S.R. 1749)

September 11, 2018 Wadesboro, Anson County

to the Public Mee ng for the State

Transporta on Improvement Program (STIP) Project No.

R-5798. Project Team Members from the N.C. Department

of Transporta on Division 10 and DRMP are pleased to be

here to answer your ques ons and receive your input. Maps

of the area iden fying the project study area, community

points of interest and traffic informa on are available for

review. You can find informa on on the NCDOT Public

Mee ng website at: h3ps://www.ncdot.gov/news/public-

mee ngs

Welcome

Ques�ons? Comments?

Chris Haire, PE DRMP, Inc.

8000 Regency Parkway, STE 110

Cary, NC 27518

Phone: (919) 230-7857

E-mail: [email protected]

Travis Preslar, PE NCDOT Project Manager

Division 10

12033 E. Independence Blvd. STE H

Ma3hews, NC 28105

Phone: (704) 845-1151

E-mail: [email protected]

Purpose of this Public Mee�ng

Today’s mee ng is an important step in the NCDOT process

for making you, the public, a part of the project development

process. The purpose of the mee ng is to:

• Present the proposed designs

• Discuss any concerns and ask ques ons

• Receive your comments

Project Schedule and Costs

Preliminary Designs………………....…...… ….Fall 2018

Final Environmental Document……………..Fall 2018

Begin Right of Way Acquisi�on………...Spring 2019

Begin Construc�on …….......................Spring 2021

Right of Way & U�li�es $ 5,500,000

Construc�on $ 11,300,000

*Costs as shown in the currently adopted State Transporta�on

Improvement Program (STIP). Schedule and Costs are subject

to change.

Your Input Is Important

Public involvement is an important part of the project

development process. The NCDOT encourages public

involvement on transporta on projects.

All comments, regardless of how submi3ed (online,

phone, email, or le3er), will be taken into considera on

as the project develops. The project team will explore

op ons to incorporate comments and address concerns

where and when feasible.

Comments should be submi3ed

by September 26, 2018.

Page 2: STIP Project No. R-5798: Proposed Construc˙on of a Median ... · Allen Pond Road (S.R. 1749), is a five-lane, undivided arterial roadway, with a 2016 average annual daily traffic

Connec�ng people, products and places safely and efficiently with customer focus, accountability

and environmental sensi�vity to enhance the economy and vitality of North Carolina

STIP Project No. R-5798: Proposed Construc�on of a

Median along East Caswell Street (U.S. 74) from

Graham Street to Allen Pond Road (S.R. 1749)

September 11, 2018 Wadesboro, Anson County

Project Purpose and Need

NCDOT STIP Project No. R-5798 is proposing to

construct a median along East Caswell Street (U.S.

74), from Graham Street to Allen Pond Road (S.R.

1749), in Wadesboro, Anson County, North Carolina.

The proposed construc�on of a concrete median is

needed to improve access management along the

Strategic Highway Corridor of East Caswell Street

(U.S. 74 ) and improve mobility and safety.

Project Descrip�on

The NCDOT proposes to construct a concrete median

along East Caswell Street (U.S. 74), from Graham

Street to Allen Pond Road (S.R. 1749), in Wadesboro,

Anson County, North Carolina.

The proposed project is included in the 2018-2027

STIP as Project No. R-5798. Right-of-Way acquisi on

is scheduled in fiscal year (FY) 2019 and construc on

in FY 2021.

Project Purpose

East Caswell Street (U.S. 74 ), from Graham Street to

Allen Pond Road (S.R. 1749), is a five-lane, undivided

arterial roadway, with a 2016 average annual daily

traffic (AADT) of 24,000 to 34,000. Traffic signals

within the project limits exist currently at the

intersec ons of Green Street, North Washington

Street, Family Dollar Shopping Center, Food Lion

Shopping Center and U.S. 52.

A five-year accident analysis report (October 1, 2013 to

September 30, 2017), was completed within the project

study limits. During the five-year analysis, a total of 313

crashes were recorded, with two of the crashes iden fied

as fatali es. The three highest crash types recorded were

the combina on of slow or stop and turn rear-ends (80),

angle (65) and the combina on of same direc on and

opposite direc on sideswipes.

Project Vicinity Map

Page 3: STIP Project No. R-5798: Proposed Construc˙on of a Median ... · Allen Pond Road (S.R. 1749), is a five-lane, undivided arterial roadway, with a 2016 average annual daily traffic

R5798_rdy_phm.dgn 8/28/2018 2:01:42 PM

Page 4: STIP Project No. R-5798: Proposed Construc˙on of a Median ... · Allen Pond Road (S.R. 1749), is a five-lane, undivided arterial roadway, with a 2016 average annual daily traffic
Page 5: STIP Project No. R-5798: Proposed Construc˙on of a Median ... · Allen Pond Road (S.R. 1749), is a five-lane, undivided arterial roadway, with a 2016 average annual daily traffic

R5798_rdy_phm.dgn 8/28/2018 2:12:42 PM

Page 6: STIP Project No. R-5798: Proposed Construc˙on of a Median ... · Allen Pond Road (S.R. 1749), is a five-lane, undivided arterial roadway, with a 2016 average annual daily traffic
Page 7: STIP Project No. R-5798: Proposed Construc˙on of a Median ... · Allen Pond Road (S.R. 1749), is a five-lane, undivided arterial roadway, with a 2016 average annual daily traffic
Page 8: STIP Project No. R-5798: Proposed Construc˙on of a Median ... · Allen Pond Road (S.R. 1749), is a five-lane, undivided arterial roadway, with a 2016 average annual daily traffic

Fold Here

NCDOT—Environmental Analysis Unit

AFn: Caitlyn Ridge, PE

1598 Mail Service Center

Raleigh, NC 27699-1548

Page 9: STIP Project No. R-5798: Proposed Construc˙on of a Median ... · Allen Pond Road (S.R. 1749), is a five-lane, undivided arterial roadway, with a 2016 average annual daily traffic

Connec�ng people, products and places safely and efficiently with customer focus, accountability

and environmental sensi�vity to enhance the economy and vitality of North Carolina

STIP Project No. R-5798: Proposed Construc�on of a

Median along East Caswell Street (U.S. 74) from

Graham Street to Allen Pond Road (S.R. 1749)

September 11, 2018 Wadesboro, Anson County

COMMENT SHEET (please print)

NAME:

______

ADDRESS:

_______

EMAIL:

_________

COMMENTS and/or QUESTIONS:

____________________________________________________________________________________________

Comments may be mailed or emailed by September 26, 2018:

Chris Haire, PE

DRMP, Inc.

8000 Regency Parkway, STE 110

Cary, NC 27518

[email protected]

Page 10: STIP Project No. R-5798: Proposed Construc˙on of a Median ... · Allen Pond Road (S.R. 1749), is a five-lane, undivided arterial roadway, with a 2016 average annual daily traffic

Chris Haire, PE

DRMP, Inc.

8000 Regency Parkway, Suite 110

Cary, NC 27518

Fold Here

______________________

______________________

______________________