Stepping Stones to a Lean Enterprise stones to...© Lean Construction Institute Conclusion 10...
Transcript of Stepping Stones to a Lean Enterprise stones to...© Lean Construction Institute Conclusion 10...
© Lean Construction Institute
Stepping Stones to a Lean EnterpriseSundt Construction Inc.October 6th 2016
© Lean Construction Institute
Team Introductions
2
Melissa MorenoCorporate Director
Continuous Improvement
Andrew ApostolikCorporate Director Project Controls
Terri BabcockKnowledge
Management Specialist
© Lean Construction Institute
Value to Customer
3
© Lean Construction Institute
Our Challenge
4
• 57 to 42
• Generation Y…Why?
• Lean Leadership
© Lean Construction Institute
Building People
5
• Continuous Improvement Leadership Program
• CM-Lean Certification• Training vs Professional Development
© Lean Construction Institute
Building Culture
6
• 10 years of the Last Planner SystemTM on projects
• Transform Business Practice
© Lean Construction Institute
Maturity and Success Create Myopia
7
• Accessibility
• Complexity
• Ambiguity
• Inconsistency
© Lean Construction Institute
Process & Value Stream
8
Where are we
today?
© Lean Construction Institute
Solution – Application of Lean
9
• Sort – structure and organization
• Straighten – clarify value
• Shine – new interface
• Standardize – industry benchmark
• Sustain – formal governance
© Lean Construction Institute
Conclusion
10
• Maturity and Success
• Value defined by customer
• Ask the tough questions• Lean doesn’t always mean less
• Can’t improve a process that isn’t used
• Build in teaching tools
• Ownership from the top