Status Quo report Ennshafen• Location• Port Infrastructure• History• Handling Statistics• Container Terminal data• RoRo data• Port Facilities• Infocenter Danube / Visitor Area• TG 1 – TG5• Environmental Status• Membership
Location – in the heart of Europe
Connections
Connections• Direct connection to the highway (A1
Westautobahn)• Highway connection to CZR (S 10 under
construction)• Direct railway connection (Westbahn)• Reconstruction railway to CZR
(Summerauerbahn)• Strategically favorable position on the Rhine-
Main-Danube waterway
Proprietorial Status (PPP model)
Trimodal Infrastructure CTE
Terminal Opening Hours:
24-HOUR- SERVICE from Mo, 5.00 - Sa, 5.00
TRUCK-INTERCHANGE Mo-Fr from 5.30 - 19.30
Area: 85.000 m² Quay length: 630 mTracks at the terminal: 4 tracks à 750 m
TEU (Twenty Foot Equivalent Unit):
Storage place empty/full: max. 6.000 TEUdangerous goods: max. 500 TEU
Only 1 Hub Vessel – Truck/Train/Depot
Cargo Handling Statistics CTE• Cargo handling statistcs: (in TEU) • 2004: 44.600 2005: 129.900 2006: 152.200• 2007: 179.200 2008: 191.153 2009: 158.646 • 2010: 225.000 2011: 277.023
Block trains: 1600 tonnes/train (Ø 60/week,incoming/outgoing)
Efficient Railway Infrastructure
• Shunting Station at the proprietary of Ennshafen• FREE ACCESS for ALL railway companies• entire railway system – 14,500 metres• own shunting station with 6 blocktrain- rail tracks• electrified target rail key control system
Blocktrain Connections Ennshafen• 60 blocktrains / week from/to Hamburg, Bremerhaven (GERMANY)
• national connection NINA since JANUARY 2012
Enns - Wels – St. Michael/Kapfenberg – CCG Werndorf
3 - 5x weekly transfer to CCG Werndorf – Koper
connection terminal Krems
History - milestones
• 1974: Policy decision by the ministry for the construction of the port of Enns
• 1994: beginning of commercial port operations
• 2004: Opening of the container terminal Ennshafen
• 2008: signing a cooperation contract with port of Galati
Handling Statistics – Water/Land2008: 539.617 to
2009: 531.850 to
2010: 663.013 to
2011: 608.085 to
RoRo Facility
Establishment of transeuropean liner services:
•High & Heavy cargo
•Vehicles (cars,trucks…)
•Utility vehicles
Port Facilities
• Passenger Service• Port Regulations• Quai Facilities• Storage Facilities• Customs Office• Maintenance / Repair• Logistic Centre / Visitor Centre
TG 1 - Logistics
• Ennshafen – trimodal logistic hub– Directly access to the A1 western highway – via B1
northern bypass of Enns– Direct connection to the western railway system– Situated on the waterway Danube
• Cooperations• NINA (national railway network)
TG 2 – Hinterland Connections
• Direct connection to the highway (A1 Westautobahn)• Highway connection to CZR • (S 10 under construction)• Direct railway connection (Westbahn)• Reconstruction railway to CZR (Summerauerbahn)• Strategically favorable position on the Rhine-Main-
Danube waterway • Quay length: 2.600 m• Free access to the neutral infrastructure
TG 3 – Feeder Services
• No feeder service so far• KoLEG study – national project for a combined
liner service between Ennshafen / Galati
TG 4 – RIS
• TRIUMPH –(Trimodal trans-shipment center port)national Project
Goals:
Development of a self-learning system, which forecasts the arrival of trucks and vessels and therefore allows for an optimized resource planning and transshipment at the port
Algorithms for an efficient and real-time calculation of dynamic bin
locations
Ecological and economical evaluation
Cross-linking of all involved parties
Harmonized planning of transport processes
Efficient processes at the port, especially concerning Arrival estimates Container management Vessel dispatch
TG 5 - Navigability
• The Ennshafen OÖ Ltd. together with via donau (Austria’s waterway and management and development company) guarantee a minimum of 2.7 m unloading depth the whole year on the waterway Enns and in both basins. (mentioned already above)
Environmental Status
• There are several projects in Austria concerning the protection of the Danube Habitat
Mentioned in the Status quo report
Memberships
• IGÖD – Austrian Public PORTS• GSV – Austrian association for road and
transportation• Pro Danube Austria– Infrastructure Danube– Modern Fleets– Plattform Danube International (network)
• VNL – Network Logistics
THANK YOU FOR YOUR KIND ATTENTION!