![Page 2: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam](https://reader034.fdocuments.us/reader034/viewer/2022042413/5f2d910ad9c5150c2654b135/html5/thumbnails/2.jpg)
“Table 2” (hall D1)
Beam characterisation
X-user experiments
The X line
Igloo Hall D1
1ThomX General meeting, LAL, 13 december 2016
Table 1 (igloo)
Continuous beam monitoring
Focus device
Beam transfer
Security beam shutter
Connection pipe
![Page 3: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam](https://reader034.fdocuments.us/reader034/viewer/2022042413/5f2d910ad9c5150c2654b135/html5/thumbnails/3.jpg)
Table 1 (igloo)
Continuous beam monitoring
Focus device
Beam transfer
Security beam shutter
Connection pipe
“Table 2” (hall D1)
Beam characterisation
X-user experiments
The X line
2ThomX General meeting, LAL, 13 december 2016
![Page 4: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam](https://reader034.fdocuments.us/reader034/viewer/2022042413/5f2d910ad9c5150c2654b135/html5/thumbnails/4.jpg)
X-line inside Igloo
3
- Beam shutter
- Det. Diodes
- Det. Fluo screen
- Wire monitor
- Slits
Motorized Table
� Assembly Ok
� Mvt qualification
in progress
� Ok
� ESRF beam tests
almost all ok
Transfocator (focus device)
+ its holder
� Last call for tender submitted (lenses)
� Mecanics ok
Beam monitoring
Focus device
ThomX General meeting, LAL, 13 december 2016
![Page 5: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam](https://reader034.fdocuments.us/reader034/viewer/2022042413/5f2d910ad9c5150c2654b135/html5/thumbnails/5.jpg)
Security shutter + shieldings (X-ray hole igloo-hall D1)
Security beam shutter + shieldings
� Specifications: Radioprotection + Security + X-line
� Call for tender ok
� The realization began
Beam monitoring
Focus device
4ThomX General meeting, LAL, 13 december 2016
![Page 6: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam](https://reader034.fdocuments.us/reader034/viewer/2022042413/5f2d910ad9c5150c2654b135/html5/thumbnails/6.jpg)
Inside the experimental X-hutch (hall D1)
Highly versatile equipment
Experimental X-hutch
Beam monitoring
Focus device
� Dosimetry - Beam characterisation
� Medical Imaging - Researches for radiotherapy
� Fluorescence - Diffraction
Hexapodes, Goniometer, Monochromator, Detectors
(each one adapted to a particular analysis technique)
5ThomX General meeting, LAL, 13 december 2016
Security beam shutter
Connection pipe
![Page 7: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam](https://reader034.fdocuments.us/reader034/viewer/2022042413/5f2d910ad9c5150c2654b135/html5/thumbnails/7.jpg)
Beam monitoring
Focus device
Dosimetry - Beam characterisation
� Medical Imaging - Researches for radiotherapy
� Fluorescence - Diffraction
CdTe det.
(spectrometer)
Inside the experimental X-hutch
6ThomX General meeting, LAL, 13 december 2016
Security beam shutter
Connection pipe
![Page 8: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam](https://reader034.fdocuments.us/reader034/viewer/2022042413/5f2d910ad9c5150c2654b135/html5/thumbnails/8.jpg)
Beam monitoring
Focus device
� Dosimetry - Beam characterisation
Medical Imaging - Researches for radiotherapy
� Fluorescence - Diffraction
Very high
resolution
CCD camera
Inside the experimental X-hutch
6ThomX General meeting, LAL, 13 december 2016
Security beam shutter
Connection pipe
![Page 9: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam](https://reader034.fdocuments.us/reader034/viewer/2022042413/5f2d910ad9c5150c2654b135/html5/thumbnails/9.jpg)
Beam monitoring
Focus device
� Dosimetry - Beam characterisation
Fluorescence - Diffraction
High count rate
Si det.
(fluo) Hybrid CdTe
pixel det.
Inside the experimental X-hutch
6ThomX General meeting, LAL, 13 december 2016
� Medical Imaging - Researches for radiotherapy
Security beam shutter
Connection pipe
![Page 10: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam](https://reader034.fdocuments.us/reader034/viewer/2022042413/5f2d910ad9c5150c2654b135/html5/thumbnails/10.jpg)
Beam monitoring
Focus device
Inside the experimental X-hutch
Hexapode, Goniometer, Monochromator, Detectors
Hexapode
Detectors
Goniometer
Very complex (and expensive) devices
(detectors, optics, mecanics)
���� It is unthinkable to leave these devices for several
months in cartons while awaiting the first X-beam
���� Must be tested in situ under X-beam by the
manufacturer itself before final acceptance
7ThomX General meeting, LAL, 13 december 2016
Security beam shutter
Connection pipe
![Page 11: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam](https://reader034.fdocuments.us/reader034/viewer/2022042413/5f2d910ad9c5150c2654b135/html5/thumbnails/11.jpg)
Beam monitoring
Focus device
Inside the experimental X-hutch
Hexapode, Goniometer, Monochromator, Detectors
Hexapode
Detectors
Goniometer
2016 : Start of infrastructure works
2017 : Installation & Commissionning
� End 2017: First X-beam available
for X-users foreseen
Reminder of the ThomX schedule ���� It is unthinkable to leave these devices for several
months in cartons while awaiting the first X-beam
���� Must be tested in situ under X-beam by the
manufacturer itself before final acceptance
7ThomX General meeting, LAL, 13 december 2016
Very complex (and expensive) devices
(detectors, optics, mecanics)
Security beam shutter
Connection pipe
![Page 12: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam](https://reader034.fdocuments.us/reader034/viewer/2022042413/5f2d910ad9c5150c2654b135/html5/thumbnails/12.jpg)
Beam monitoring
Focus device
2016 : Start of infrastructure works
2017 : Installation & Commissionning
� End 2017: First X-beam available
for X-users foreseen2016 : Define and draft specifications for all devices
2017 : Calls for tender + Realizations
���� To receive the devices not before the end of 2017
Reminder of the ThomX schedule
Inside the experimental X-hutch
Hexapode, Goniometer, Monochromator, Detectors
Hexapode
Detectors
Goniometer
���� It is unthinkable to leave these devices for several
months in cartons while awaiting the first X-beam
���� Must be tested in situ under X-beam by the
manufacturer itself before final acceptance
7ThomX General meeting, LAL, 13 december 2016
Very complex (and expensive) devices
(detectors, optics, mecanics)
Security beam shutter
Connection pipe
![Page 13: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam](https://reader034.fdocuments.us/reader034/viewer/2022042413/5f2d910ad9c5150c2654b135/html5/thumbnails/13.jpg)
Beam monitoring
Focus device
2016 : Start of infrastructure works
2017 : Installation & Commissionning
� End 2017: First X-beam available
for X-users foreseen
The extension by the ANR
of the spend limit date
of the step 1 money is
absolutely necessary !
Inside the experimental X-hutch
Hexapode, Goniometer, Monochromator, Detectors
Hexapode
Detectors
Goniometer
Reminder of the ThomX schedule ���� It is unthinkable to leave these devices for several
months in cartons while awaiting the first X-beam
���� Must be tested in situ under X-beam by the
manufacturer itself before final acceptance
7ThomX General meeting, LAL, 13 december 2016
Very complex (and expensive) devices
(detectors, optics, mecanics)
Security beam shutter