Status of the ThomX X-line

[email protected]

ThomX General meeting

13 december 2016, LAL Orsay

Page 2: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam

“Table 2” (hall D1)

Beam characterisation

X-user experiments

The X line

Igloo Hall D1

1ThomX General meeting, LAL, 13 december 2016

Table 1 (igloo)

Continuous beam monitoring

Focus device

Beam transfer

Security beam shutter

Connection pipe

Page 3: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam

Table 1 (igloo)

Continuous beam monitoring

Focus device

Beam transfer

Security beam shutter

Connection pipe

“Table 2” (hall D1)

Beam characterisation

X-user experiments

The X line

2ThomX General meeting, LAL, 13 december 2016

Page 4: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam

X-line inside Igloo

3

- Beam shutter

- Det. Diodes

- Det. Fluo screen

- Wire monitor

- Slits

Motorized Table

� Assembly Ok

� Mvt qualification

in progress

� Ok

� ESRF beam tests

almost all ok

Transfocator (focus device)

+ its holder

� Last call for tender submitted (lenses)

� Mecanics ok

Beam monitoring

Focus device

ThomX General meeting, LAL, 13 december 2016

Page 5: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam

Security shutter + shieldings (X-ray hole igloo-hall D1)

Security beam shutter + shieldings

� Specifications: Radioprotection + Security + X-line

� Call for tender ok

� The realization began

Beam monitoring

Focus device

4ThomX General meeting, LAL, 13 december 2016

Page 6: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam

Inside the experimental X-hutch (hall D1)

Highly versatile equipment

Experimental X-hutch

Beam monitoring

Focus device

� Dosimetry - Beam characterisation

� Medical Imaging - Researches for radiotherapy

� Fluorescence - Diffraction

Hexapodes, Goniometer, Monochromator, Detectors

(each one adapted to a particular analysis technique)

5ThomX General meeting, LAL, 13 december 2016

Security beam shutter

Connection pipe

Page 7: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam

Beam monitoring

Focus device

Dosimetry - Beam characterisation

� Medical Imaging - Researches for radiotherapy

� Fluorescence - Diffraction

CdTe det.

(spectrometer)

Inside the experimental X-hutch

6ThomX General meeting, LAL, 13 december 2016

Security beam shutter

Connection pipe

Page 8: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam

Beam monitoring

Focus device

� Dosimetry - Beam characterisation

Medical Imaging - Researches for radiotherapy

� Fluorescence - Diffraction

Very high

resolution

CCD camera

Inside the experimental X-hutch

6ThomX General meeting, LAL, 13 december 2016

Security beam shutter

Connection pipe

Page 9: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam

Beam monitoring

Focus device

� Dosimetry - Beam characterisation

Fluorescence - Diffraction

High count rate

Si det.

(fluo) Hybrid CdTe

pixel det.

Inside the experimental X-hutch

6ThomX General meeting, LAL, 13 december 2016

� Medical Imaging - Researches for radiotherapy

Security beam shutter

Connection pipe

Page 10: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam

Beam monitoring

Focus device

Inside the experimental X-hutch

Hexapode, Goniometer, Monochromator, Detectors

Hexapode

Detectors

Goniometer

Very complex (and expensive) devices

(detectors, optics, mecanics)

���� It is unthinkable to leave these devices for several

months in cartons while awaiting the first X-beam

���� Must be tested in situ under X-beam by the

manufacturer itself before final acceptance

7ThomX General meeting, LAL, 13 december 2016

Security beam shutter

Connection pipe

Page 11: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam

Beam monitoring

Focus device

Inside the experimental X-hutch

Hexapode, Goniometer, Monochromator, Detectors

Hexapode

Detectors

Goniometer

2016 : Start of infrastructure works

2017 : Installation & Commissionning

� End 2017: First X-beam available

for X-users foreseen

Reminder of the ThomX schedule ���� It is unthinkable to leave these devices for several

months in cartons while awaiting the first X-beam

���� Must be tested in situ under X-beam by the

manufacturer itself before final acceptance

7ThomX General meeting, LAL, 13 december 2016

Very complex (and expensive) devices

(detectors, optics, mecanics)

Security beam shutter

Connection pipe

Page 12: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam

Beam monitoring

Focus device

2016 : Start of infrastructure works

2017 : Installation & Commissionning

� End 2017: First X-beam available

for X-users foreseen2016 : Define and draft specifications for all devices

2017 : Calls for tender + Realizations

���� To receive the devices not before the end of 2017

Reminder of the ThomX schedule

Inside the experimental X-hutch

Hexapode, Goniometer, Monochromator, Detectors

Hexapode

Detectors

Goniometer

���� It is unthinkable to leave these devices for several

months in cartons while awaiting the first X-beam

���� Must be tested in situ under X-beam by the

manufacturer itself before final acceptance

7ThomX General meeting, LAL, 13 december 2016

Very complex (and expensive) devices

(detectors, optics, mecanics)

Security beam shutter

Connection pipe

Page 13: Status of the ThomXX-line · The X line Igloo Hall D1 ThomXGeneral meeting, LAL, 13 december2016 1 Table 1(igloo) Continuous beam monitoring Focus device Beam transfer Security beam

Beam monitoring

Focus device

2016 : Start of infrastructure works

2017 : Installation & Commissionning

� End 2017: First X-beam available

for X-users foreseen

The extension by the ANR

of the spend limit date

of the step 1 money is

absolutely necessary !

Inside the experimental X-hutch

Hexapode, Goniometer, Monochromator, Detectors

Hexapode

Detectors

Goniometer

Reminder of the ThomX schedule ���� It is unthinkable to leave these devices for several

months in cartons while awaiting the first X-beam

���� Must be tested in situ under X-beam by the

manufacturer itself before final acceptance

7ThomX General meeting, LAL, 13 december 2016

Very complex (and expensive) devices

(detectors, optics, mecanics)

Security beam shutter

Connection pipe