STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM TIP … · 2020-04-30 · add CoSA 2017 Bond project...
Transcript of STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM TIP … · 2020-04-30 · add CoSA 2017 Bond project...
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
CS C CoSA 5413.0
Limits From: In San Antonio on Commerce Street
Limits To: from St. Mary's Street to Santa Rosa Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $9,000,000
Construction Engineering $574,000
Contingencies: $450,000
Indirect Costs: $517,000
Preliminary Engineering: $441,000
Other Field $520,000
$11,502,000
Type of Work: TSMO: Operational
Total Project Cost:
$9,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$9,000,000
$0
Other $0
Other $0
$0 $0 $0 $9,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $9,000,000 $9,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Reduce from 4 travel lanes to 3 travel lanes with sidewalks
Status: RSR
$9,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
Bexar15 - San Antonio
Description:
CR C ARMA 5433.0
Limits From: In Bexar County on Evans Road
Limits To: From TPC Parkway/Dusty Canyon to Hanging Oak
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,500,000
Construction Engineering $479,000
Contingencies: $375,000
Indirect Costs: $431,000
Preliminary Engineering: $2,200,000
Other Field $430,000
$11,415,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$7,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
Other
$7,500,000
$0
Other $0
Other $0
$0 $0 $0 $7,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $7,500,000 $7,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Expand from 2 to 4 lanes with operational and drainage improvements
Status: RSR
$7,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
1/19 - add ARMA project to TIP/MTP for AQ purposes
Bexar15 - San Antonio
Description:
CS C,E CoSA 5421.1
Limits From: In San Antonio on West Military Dr & Ingram Road
Limits To: from W. Military Dead End to Potranco Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,000,000
Construction Engineering $638,000
Contingencies: $500,000
Indirect Costs: $574,000
Preliminary Engineering: $1,500,000
Other Field $578,000
$13,790,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$11,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$11,500,000
$0
Other $0
Other $0
$0 $0 $0 $11,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $11,500,000 $11,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Construct road extension on new alignment (0 to 4 lanes) with bike accommodation and sidewalks
Status: Non-RSR
$11,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
9/19 - ADM clarify description (acc); 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
13Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
CS C,E,R CoSA 5420.1
Limits From: In San Antonio on Prue Road
Limits To: from Babcock Road to Laureate Drive
Total Project Cost Information (TxDOT %):
ROW Purchase: $700,000
Construction Cost: $20,000,000
Construction Engineering $1,276,000
Contingencies: $1,000,000
Indirect Costs: $1,148,000
Preliminary Engineering: $3,000,000
Other Field $1,156,000
$28,280,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,700,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$23,700,000
$0
Other $0
Other $0
$0 $0 $0 $23,700,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $23,700,000 $23,700,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Expand from 2 to 4 lanes with CTL, Bike lanes and sidewalks
Status: Non-RSR
$23,700,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
Bexar15 - San Antonio
Description:
CR C BC 5547.0
Limits From: In Bexar County on Marshall Road
Limits To: from US 281 to Bulverde Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $3,707,055
Construction Engineering $222,423
Contingencies: $185,353
Indirect Costs: $148,282
Preliminary Engineering: $607,565
Other Field $0
$4,870,678
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$3,707,055
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
Other
$3,707,055
$0
Other $0
Other $0
$0 $0 $0 $3,707,055
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $3,707,055 $3,707,055
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Expand from 2 to 2 lanes with a continuous center left turn lane and/or concrete median
Status: Non-RSR
$3,707,055
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
1/19 - correct project name; 10/18 - add Bexar County project to TIP/MTP for AQ purposes
Bexar15 - San Antonio
Description:
CS C CoSA 5417.0
Limits From: In San Antonio on Commerce Street
Limits To: from Frio to Colorado
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,000,000
Construction Engineering $638,000
Contingencies: $500,000
Indirect Costs: $574,000
Preliminary Engineering: $490,000
Other Field $578,000
$12,780,000
Type of Work: TSMO: Operational
Total Project Cost:
$10,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$10,000,000
$0
Other $0
Other $0
$0 $0 $0 $10,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $10,000,000 $10,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Reconstruct roadway, add CTL, bike lanes and sidewalks
Status: RSR
$10,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
14Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
CS R CoSA 5408.3
Limits From: In San Antonio on Bulverde Road
Limits To: from Briar Crest to North of Quiet Meadow Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $200,000
Construction Cost: $9,700,000
Construction Engineering $619,000
Contingencies: $125,000
Indirect Costs: $557,000
Preliminary Engineering: $1,400,000
Other Field $561,000
$13,162,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$200,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$200,000
$0
Other $0
Other $0
$0 $0 $0 $200,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $200,000 $200,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Expand from 2 lanes and CTL to 4 lanes and CTL
Status: RSR
$200,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
1/19 - add project (ROW)
Bexar15 - San Antonio
Description:
CR C ARMA 5546.1
Limits From: In Bexar County on Foster Road
Limits To: From IH 10 to FM 1346
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,650,000
Construction Engineering $488,000
Contingencies: $382,000
Indirect Costs: $439,000
Preliminary Engineering: $2,295,000
Other Field $442,000
$11,696,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$7,650,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
Other
$7,650,000
$0
Other $0
Other $0
$0 $0 $0 $7,650,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $7,650,000 $7,650,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Expand from 2 to 4 lanes with operational and drainage improvements
Status: Non-RSR
$7,650,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
1/19 - add ARMA project to TIP/MTP for AQ purposes
Bexar15 - San Antonio
Description:
CS C,E CoSA 5419.1
Limits From: In San Antonio on Ingram Road
Limits To: from Potranco Road to Ingram Road Dead End
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,600,000
Construction Engineering $102,000
Contingencies: $20,000
Indirect Costs: $92,000
Preliminary Engineering: $160,000
Other Field $92,000
$2,066,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,760,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$1,760,000
$0
Other $0
Other $0
$0 $0 $0 $1,760,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $1,760,000 $1,760,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Construct road extension on new alignment (0 to 4 lanes) with bike accommodation and sidewalks
Status: Non-RSR
$1,760,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
9/19 - ADM clarify description (acc); 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
15Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Comal15 - San Antonio
Description:
IH 35 C TxDOT 5550.0
Limits From: 1.2 Miles South of FM 306
Limits To: FM 306
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $12,000,000
Construction Engineering $766,000
Contingencies: $155,000
Indirect Costs: $689,000
Preliminary Engineering: $588,000
Other Field $694,000
$14,892,000
Type of Work: TSMO: Operational
Total Project Cost:
$12,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$12,000,000
$0
Other $0
Other $0
$9,600,000 $2,400,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$9,600,000 $2,400,000 $0 $0 $12,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0016-04-116
Ramp revisions, intersection and frontage road operational improvements
Status: RSR
$12,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - add project, created from 0016-04-112
Comal15 - San Antonio
Description:
IH 35 C TxDOT 5551.0
Limits From: FM 306
Limits To: Hays/Comal County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $63,000,000
Construction Engineering $4,019,000
Contingencies: $813,000
Indirect Costs: $3,616,000
Preliminary Engineering: $3,087,000
Other Field $3,641,000
$78,176,000
Type of Work: TSMO: Operational
Total Project Cost:
$63,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$63,000,000
$0
Other $0
Other $0
$50,400,000 $12,600,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$50,400,000 $12,600,000 $0 $0 $63,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0016-04-117
Ramp revisions, intersection operational improvements and convert frontage road to one way operation
Status: RSR
$63,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - add project, created from 0016-04-112
Comal15 - San Antonio
Description:
IH 35 C TxDOT 5548.0
Limits From: FM 2252
Limits To: Schwab Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $25,000,000
Construction Engineering $1,595,000
Contingencies: $322,000
Indirect Costs: $1,435,000
Preliminary Engineering: $1,225,000
Other Field $1,445,000
$31,022,000
Type of Work: TSMO: Operational
Total Project Cost:
$25,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$25,000,000
$0
Other $0
Other $0
$20,000,000 $5,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$20,000,000 $5,000,000 $0 $0 $25,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0016-05-119
Ramp revisions, intersection and frontage road operational improvements
Status: RSR
$25,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - add project, created from 0016-05-114
16Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
IH 10 E,R TxDOT 5396.2
Limits From: Graytown Rd
Limits To: Guadalupe/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $18,480,000
Construction Cost: $154,000,000
Construction Engineering $6,840,000
Contingencies: $11,970,000
Indirect Costs: $3,420,000
Preliminary Engineering: $15,400,000
Other Field $6,840,000
$216,950,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$33,880,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SBPE
S102
$15,400,000
$18,480,000
Other $0
Other $0
$0 $15,400,000 $0 $0
$16,632,000 $1,848,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$16,632,000 $17,248,000 $0 $0 $33,880,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0025-02-215
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$33,880,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: None
Non-Exempt
Proj Hist:
1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
Bexar15 - San Antonio
Description:
IH 10 E,R TxDOT 5552.2
Limits From: Loop 1604
Limits To: Graytown Rd
Total Project Cost Information (TxDOT %):
ROW Purchase: $6,600,000
Construction Cost: $55,000,000
Construction Engineering $3,509,000
Contingencies: $709,000
Indirect Costs: $3,157,000
Preliminary Engineering: $5,500,000
Other Field $3,179,000
$77,654,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$12,100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SBPE
S102
$5,500,000
$6,600,000
Other $0
Other $0
$0 $5,500,000 $0 $0
$5,940,000 $660,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$5,940,000 $6,160,000 $0 $0 $12,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0025-02-219
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$12,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: None
Non-Exempt
Proj Hist:
1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
Kendall15 - San Antonio
Description:
IH 10 C TxDOT 5403.0
Limits From: Cascade Caverns/Scenic Loop
Limits To: Kendall/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $20,000,000
Construction Engineering $750,000
Contingencies: $1,400,000
Indirect Costs: $390,000
Preliminary Engineering: $1,000,000
Other Field $760,000
$24,300,000
Type of Work: TSMO: Operational
Total Project Cost:
$20,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$20,000,000
$0
Other $0
Other $0
$16,000,000 $4,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$16,000,000 $4,000,000 $0 $0 $20,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0072-06-074
Reconfigure ramps and widen frontage road (4 lanes) to convert to one way operation
Status: RSR
$20,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - move from FY 2027 to FY 2019; 3/18 - revise funding distribution; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
17Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5372.0
Limits From: Ingram Rd
Limits To: US 90
Total Project Cost Information (TxDOT %):
ROW Purchase: $12,000,000
Construction Cost: $100,000,000
Construction Engineering $6,380,000
Contingencies: $1,290,000
Indirect Costs: $5,740,000
Preliminary Engineering: $10,000,000
Other Field $5,780,000
$141,190,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$100,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
12 - CL
Other
$100,000,000
$0
Other $0
Other $0
$80,000,000 $20,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000,000 $20,000,000 $0 $0 $100,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0521-04-204
Expand from 8 to 10 lanes from Ingram to 151 & 6 to 8 lanes from 151 to 90 - add 2 new lanes, & from 6 to 6 FR lanes; reconstruct SH 151 interchange -
Status: RSR
$100,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
58
Remarks: NB 410 to WB 151 & EB 151 to SB 410
Non-Exempt
Proj Hist:
9/19 - ADM clarify descr; 1/19 - rev descr to incl FR lanes; 10/18 - rev limits, descr and funding; consolidate from 0521-04-275 and 0521-04-279; 4/18 - move from 21 to FY 19; 3/18 - rev funding distribution; 4/17 - 2017
Bexar15 - San Antonio
Description:
IH 410 E,R TxDOT 5372.2
Limits From: Ingram Rd
Limits To: US 90
Total Project Cost Information (TxDOT %):
ROW Purchase: $12,000,000
Construction Cost: $100,000,000
Construction Engineering $6,380,000
Contingencies: $1,290,000
Indirect Costs: $5,740,000
Preliminary Engineering: $10,000,000
Other Field $5,780,000
$141,190,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$22,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SBPE
S102
$10,000,000
$12,000,000
Other $0
Other $0
$0 $10,000,000 $0 $0
$10,800,000 $1,200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$10,800,000 $11,200,000 $0 $0 $22,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0521-04-204
Expand from 8 to 10 lanes from Ingram to 151 & 6 to 8 lanes from 151 to 90 - add 2 new lanes, & from 6 to 6 FR lanes; reconstruct SH 151 interchange -
Status: RSR
$22,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
58
Remarks: NB 410 to WB 151 & EB 151 to SB 410
Non-Exempt
Proj Hist:
9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
Bexar15 - San Antonio
Description:
FM 1535 E TxDOT 5310.2
Limits From: Shavano Ranch Road
Limits To: Lp 1604
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,500,000
Construction Engineering $372,000
Contingencies: $149,250
Indirect Costs: $430,500
Preliminary Engineering: $750,000
Other Field $280,500
$9,482,250
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$750,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SBPE
Other
$750,000
$0
Other $0
Other $0
$0 $750,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $750,000 $0 $0 $750,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0658-01-044
Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks
Status: RSR
$750,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
34
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add phase (Engr)
18Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
NR C AAMPO 5301.0
Limits From: Alamo Area MPO: Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $300,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$300,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$300,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STP-MM
Other
$300,000
$0
Other $0
Other $0
$300,000 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$300,000 $0 $0 $0 $300,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0915-00-195
Alamo Area Commute Solutions Program
Status: Exempt
$300,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - increase cost (from 0915-12-546 and 0915-00-196) and move to FY 2019; 4/18 - change agency and reduce cost; 4/16 - funded through STP-MM project selection process; fixed amount
Bexar15 - San Antonio
Description:
VA C TxDOT 5539.3
Limits From: Various locations in Comal and
Limits To: Bexar Counties
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,617,950
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,617,950
Type of Work: TSMO: ITS
Total Project Cost:
$1,617,950
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STP-MM
Other
$1,617,950
$0
Other $0
Other $0
$1,294,360 $323,590 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,294,360 $323,590 $0 $0 $1,617,950
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-00-211
Install advanced signal controllers, networking equipment and control software for traffic signals
Status: Exempt
$1,617,950
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
Bexar15 - San Antonio
Description:
CS E,R,C Port SA 4005.0
Limits From: On Quintana Road from Harmon Avenue
Limits To: McKenna Avenue
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,600,000
Construction Cost: $5,846,800
Construction Engineering $286,500
Contingencies: $267,200
Indirect Costs: $282,400
Preliminary Engineering: $353,200
Other Field $0
$8,636,100
Type of Work: Maint/Rehab
Total Project Cost:
$7,800,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STP-MM
Other
$7,800,000
$0
Other $0
Other $0
$6,240,000 $670,800 $889,200 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,240,000 $670,800 $889,200 $0 $7,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-12-520
Rehab and realign roadway, intersection and flood control improvements
Status: Non-RSR
$7,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - move from FY 2018 to FY 2019; 1/17 - move from FY 2017 to FY 2018; 4/16 - revise match (EDCP project); 1/16 - move from FY 16 to FY 17; 1/14 - included PE and ROW as funded phases; 4/12 -
19Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
NR C AAMPO 5102.0
Limits From: Alamo Area MPO: In Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$100,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STP-MM
Other
$100,000
$0
Other $0
Other $0
$80,000 $0 $20,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000 $0 $20,000 $0 $100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-12-543
Alamo Area Commute Solutions Pgm - FY 2018
Status: Exempt
$100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - move from FY 2018 to FY 2019, change agency and reduce cost; 10/15 - project has $53,400 in TDCs; 4/14 - funded through STP-MM project selection process; fixed amount
Bexar15 - San Antonio
Description:
NR C AACOG 5101.0
Limits From: Alamo Area MPO: In Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$100,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STP-MM
Other
$100,000
$0
Other $0
Other $0
$80,000 $0 $20,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000 $0 $20,000 $0 $100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-12-547
Alamo Area Commute Solutions Pgm - FY 2017
Status: Exempt
$100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - move from FY 2018 to FY 2019 and reduce cost; 10/17 - move from 17 to 18; 10/15 - project has $53,400 in TDCs which are not calculated in the funding total; 4/14 - funded through STP-MM project selection
Bexar15 - San Antonio
Description:
CR R BxCo 5106.3
Limits From: On Watson Road from FM 2790-Somerset Road
Limits To: 0.62 Mi East of Somerset Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,440,000
Construction Cost: $4,886,116
Construction Engineering $195,445
Contingencies: $342,028
Indirect Costs: $97,722
Preliminary Engineering: $739,184
Other Field $195,445
$7,895,940
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,440,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
Other
$1,440,000
$0
Other $0
Other $0
$0 $0 $0 $1,440,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $1,440,000 $1,440,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0915-12-562
Expand from 2 to 4 lanes with traffic circle at Southwest Verano Parkway, multi-use path and drainage
Status: Non-RSR
$1,440,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
26
Remarks: None
Non-Exempt
Proj Hist:
9/19 - ADM clarify limits and description; 10/18 - add phase (ROW)
20Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
VA C SARA 4977.0
Limits From: in San Antonio, from Lombrano St
Limits To: Laredo St
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,000,000
Construction Engineering $382,800
Contingencies: $77,400
Indirect Costs: $289,800
Preliminary Engineering: $294,000
Other Field $346,800
$7,390,800
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$6,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
9 - TA
3 - LC
$3,125,000
$2,875,000
Other $0
Other $0
$2,500,000 $0 $625,000 $0
$0 $0 $0 $2,875,000
$0 $0 $0 $0
$0 $0 $0 $0
$2,500,000 $0 $625,000 $2,875,000 $6,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0915-12-595
Extend the Alazan Creek section of the Greenway Trail System
Status: Exempt
$6,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - move from FY 2018 to FY 2019; 6/17 - add TA project
Bexar15 - San Antonio
Description:
VA C TxDOT 5426.0
Limits From: In San Antonio
Limits To: at TransGuide Center
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $4,000,000
Construction Engineering $240,000
Contingencies: $120,000
Indirect Costs: $200,000
Preliminary Engineering: $196,000
Other Field $240,000
$4,996,000
Type of Work: TSMO: Operational
Total Project Cost:
$4,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STP-MM
Other
$4,000,000
$0
Other $0
Other $0
$3,200,000 $800,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$3,200,000 $800,000 $0 $0 $4,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0915-12-602
Upgrade TransGuide Facility to include new operator workstations, network cabling, video monitoring wall and associated software
Status: Exempt
$4,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
9/19 - ADM clarify description; 10/17 - add project; created from 0915-12-577 ($3M) and 0915-12-580 ($1M)
Bexar15 - San Antonio
Description:
VA T VIA 3768.3
Limits From: Rapid Transit Corridor Study
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,000,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$10,000,000
Type of Work: Transit
Total Project Cost:
$10,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STP-MM
Other
$10,000,000
$0
Other $0
Other $0
$8,000,000 $0 $2,000,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,000,000 $0 $2,000,000 $0 $10,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0915-12-612
Rapid Transit Corridor Study
Status: Exempt
$10,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - consolidate 0915-00-172, 0915-12-613, -614, -616 into 0915-12-612 and move to FY 2019; 4/18 - new CSJ (project) created from 0915-00-172
21Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Comal15 - San Antonio
Description:
CS C New Braunfels 4973.0
Limits From: In New Braunfels on San Antonio St,
Limits To: Walnut, McQueeney, near Seele Elem
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,344,828
Construction Engineering $60,000
Contingencies: $19,500
Indirect Costs: $30,000
Preliminary Engineering: $74,300
Other Field $60,000
$1,588,628
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$1,344,828
Authorized Funding by Category/Share
New Braunfels
Cost of Approved Phases:
9 - TA
Other
$1,344,828
$0
Other $0
Other $0
$1,075,862 $0 $268,966 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,075,862 $0 $268,966 $0 $1,344,828
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date:
0915-17-066
Construct sidewalks, ramps & other pedestrian related infrastructure
Status: Exempt
$1,344,828
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/17 - add TA project
Comal15 - San Antonio
Description:
VA C New Braunfels 5539.1
Limits From: Various locations in New Braunfels
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $200,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$200,000
Type of Work: TSMO: ITS
Total Project Cost:
$200,000
Authorized Funding by Category/Share
New Braunfels
Cost of Approved Phases:
7 - STP-MM
Other
$200,000
$0
Other $0
Other $0
$160,000 $0 $40,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$160,000 $0 $40,000 $0 $200,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-17-068
Purchase of control software for traffic signals
Status: Exempt
$200,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
Comal15 - San Antonio
Description:
VA C New Braunfels 5539.2
Limits From: Various locations in New Braunfels
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $200,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$200,000
Type of Work: TSMO: ITS
Total Project Cost:
$200,000
Authorized Funding by Category/Share
New Braunfels
Cost of Approved Phases:
7 - STP-MM
Other
$200,000
$0
Other $0
Other $0
$160,000 $0 $40,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$160,000 $0 $40,000 $0 $200,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-17-069
Install advanced signal controllers, networking equipment and control software for traffic signals
Status: Exempt
$200,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
22Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5549.0
Limits From: IH 10 E
Limits To: Martinez Creek
Total Project Cost Information (TxDOT %):
ROW Purchase: $2,400,000
Construction Cost: $20,000,000
Construction Engineering $1,276,000
Contingencies: $258,000
Indirect Costs: $114,800
Preliminary Engineering: $2,000,000
Other Field $1,156,000
$27,204,800
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$20,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$20,000,000
$0
Other $0
Other $0
$16,000,000 $4,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$16,000,000 $4,000,000 $0 $0 $20,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
2452-04-016
Expand from 2 lanes to 4 lanes divided
Status: RSR
$20,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
50
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add project, created from 2452-04-014
Bexar15 - San Antonio
Description:
SL 1604 E,R TxDOT 5549.2
Limits From: IH 10 E
Limits To: Martinez Creek
Total Project Cost Information (TxDOT %):
ROW Purchase: $2,400,000
Construction Cost: $20,000,000
Construction Engineering $1,276,000
Contingencies: $258,000
Indirect Costs: $114,800
Preliminary Engineering: $2,000,000
Other Field $1,156,000
$27,204,800
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,400,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SBPE
S102
$2,000,000
$2,400,000
Other $0
Other $0
$0 $2,000,000 $0 $0
$1,920,000 $480,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,920,000 $2,480,000 $0 $0 $4,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
2452-04-016
Expand from 2 lanes to 4 lanes divided
Status: RSR
$4,400,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
50
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add phases (Engr, ROW)
Bexar15 - San Antonio
Description:
SH 151 E,R TxDOT 5382.2
Limits From: LP 1604
Limits To: IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $9,600,000
Construction Cost: $80,000,000
Construction Engineering $3,200,000
Contingencies: $5,600,000
Indirect Costs: $1,600,000
Preliminary Engineering: $8,000,000
Other Field $3,200,000
$111,200,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$17,600,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SBPE
S102
$8,000,000
$9,600,000
Other $0
Other $0
$0 $8,000,000 $0 $0
$7,680,000 $1,920,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$7,680,000 $9,920,000 $0 $0 $17,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
3508-01-029
Expand from 4 lane to 6 lane expressway and from 4/6 to 4/6 FR lanes including WB SH 151 to NB LP 1604 2 lane direct connector
Status: RSR
$17,600,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
49
Remarks: None
Non-Exempt
Proj Hist:
1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
23Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2019FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
SH 211 E,R BxCo 3153.2
Limits From: FM 1957 (Potranco Rd), N 2.9 MI
Limits To: Medina County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,780,000
Construction Cost: $7,000,000
Construction Engineering $340,704
Contingencies: $492,128
Indirect Costs: $383,860
Preliminary Engineering: $840,000
Other Field $0
$10,367,681
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$2,620,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
3 - LC
$840,000
$1,780,000
Other $0
Other $0
$0 $0 $0 $840,000
$0 $0 $0 $1,780,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $2,620,000 $2,620,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
3544-04-002
Construct two lane rural highway on new location
Status: RSR
$2,620,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add phases (Engr, ROW)
Bexar15 - San Antonio
Description:
SH 211 E,R BxCo 3154.2
Limits From: Medina Co. Line, 4.5 Mi N of FM 1957, N
Limits To: Medina Co. Line, 2.0 Mi S of FM 471
Total Project Cost Information (TxDOT %):
ROW Purchase: $700,000
Construction Cost: $2,600,000
Construction Engineering $126,547
Contingencies: $182,790
Indirect Costs: $142,577
Preliminary Engineering: $312,000
Other Field $0
$3,889,710
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,012,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
3 - LC
$312,000
$700,000
Other $0
Other $0
$0 $0 $0 $312,000
$0 $0 $0 $700,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $1,012,000 $1,012,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
3544-05-001
Construct two lane rural highway on new location
Status: RSR
$1,012,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add phases (Engr, ROW)
Bexar15 - San Antonio
Description:
PA 1502 E,R TxDOT 5315.4
Limits From: Lockhill Selma Road
Limits To: FM 1535-NW Military
Total Project Cost Information (TxDOT %):
ROW Purchase: $250,000
Construction Cost: $9,000,000
Construction Engineering $360,000
Contingencies: $630,000
Indirect Costs: $180,000
Preliminary Engineering: $900,000
Other Field $360,000
$11,680,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,150,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SBPE
S102
$900,000
$250,000
Other $0
Other $0
$0 $900,000 $0 $0
$200,000 $50,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$200,000 $950,000 $0 $0 $1,150,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
7774-01-001
Expand 4 to 6 lanes divided & intersection operational improvements including new turn lanes and improved signal operation at FM 1535
Status: RSR
$1,150,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
40
Remarks: None
Non-Exempt
Proj Hist:
11/19 - ADM clarify description; 10/18 - add phases (Engr, ROW)
24Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Guadalupe15 - San Antonio
Description:
IH 35 R TxDOT 4013.2
Limits From: Bexar/Guadalupe County Line
Limits To: FM 3009
Total Project Cost Information (TxDOT %):
ROW Purchase: $10,000,000
Construction Cost: $80,000,000
Construction Engineering $35,000,000
Contingencies: $0
Indirect Costs: $4,800,000
Preliminary Engineering: $35,000,000
Other Field $0
$164,800,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$10,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
S102
Other
$10,000,000
$0
Other $0
Other $0
$8,000,000 $2,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,000,000 $2,000,000 $0 $0 $10,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2019
0016-06-047
Expand from 8 ln to 14 ln expy - add 6 new express lanes, including 2 HOV-Special Use lanes & from 4 to 4 FR lanes
Status: RSR
$10,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/19 - add project (ROW phase)
Bexar15 - San Antonio
Description:
Old FM 471 C ARMA 5429.0
Limits From: FM 471 (West)
Limits To: FM 471 (East)
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $13,759,473
Construction Engineering $825,568
Contingencies: $687,974
Indirect Costs: $550,379
Preliminary Engineering: $1,573,257
Other Field $0
$17,396,651
Type of Work: TSMO: Operational
Total Project Cost:
$13,759,473
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
Other
$13,759,473
$0
Other $0
Other $0
$0 $0 $0 $13,759,473
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $13,759,473 $13,759,473
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Add continuous left turn lane with operational and drainage improvements including curb, sidewalk and bike lanes
Status: Non-RSR
$13,759,473
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - add ARMA project to TIP/MTP for AQ purposes
Bexar15 - San Antonio
Description:
CR C ARMA 5431.0
Limits From: In Bexar County on Talley Road
Limits To: from FM 1957 to Wiseman Blvd
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $20,632,739
Construction Engineering $1,237,964
Contingencies: $1,031,637
Indirect Costs: $825,310
Preliminary Engineering: $1,540,330
Other Field $0
$25,267,980
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$20,632,739
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - LC
Other
$20,632,739
$0
Other $0
Other $0
$0 $0 $0 $20,632,739
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $20,632,739 $20,632,739
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0000-00-000
Expand from 2 to 4 lanes with operational and drainage improvements including curb and sidewalk
Status: Non-RSR
$20,632,739
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add ARMA project to TIP/MTP for AQ purposes
25Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
IH 35 North R TxDOT 3477.2
Limits From: IH 410 N
Limits To: Guadalupe/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $34,923,000
Construction Cost: $715,000,000
Construction Engineering $50,000,000
Contingencies: $0
Indirect Costs: $42,900,000
Preliminary Engineering: $50,000,000
Other Field $0
$892,823,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$34,923,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
S102
Other
$34,923,000
$0
Other $0
Other $0
$31,430,700 $3,492,300 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$31,430,700 $3,192,300 $0 $0 $34,923,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2019
0016-07-113
Expand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410N & LP 1604
Status: RSR
$34,923,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 1 lane DC: NB 35 to WB 1604; EB 1604 to SB 35;2 lane DC: SB 35 to WB 1604; EB 1604 to NB 35; EB 410N to NB 35;SB 35 to WB 410N
Non-Exempt
Proj Hist:
10/19 - rev cost; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
Bexar15 - San Antonio
Description:
IH 10 C TxDOT 5396.0
Limits From: Graytown Rd
Limits To: Guadalupe/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $18,480,000
Construction Cost: $154,000,000
Construction Engineering $6,840,000
Contingencies: $11,970,000
Indirect Costs: $3,420,000
Preliminary Engineering: $15,400,000
Other Field $6,840,000
$216,950,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$154,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
12 - Strat Priority
Other
$154,000,000
$0
Other $0
Other $0
$0 $154,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $154,000,000 $0 $0 $154,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 5/2020
0025-02-215
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$154,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: May 2020 revision to FY 2019-2022 TIP
Non-Exempt
Proj Hist:
4/20 - rev cost alloc; 10/19 - move 21 to 20; 1/19 - rev descr to incl FR; 10/18 - rev limits, cost & TPC; 3/18 - move 29 to 21 and rev funding distrib; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may
Bexar15 - San Antonio
Description:
IH 10 C TxDOT 5552.0
Limits From: Loop 1604
Limits To: Graytown Rd
Total Project Cost Information (TxDOT %):
ROW Purchase: $6,600,000
Construction Cost: $55,000,000
Construction Engineering $3,509,000
Contingencies: $709,000
Indirect Costs: $3,157,000
Preliminary Engineering: $5,500,000
Other Field $3,179,000
$77,654,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$55,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
12 - Strat Priority
Other
$55,000,000
$0
Other $0
Other $0
$44,000,000 $11,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$44,000,000 $11,000,000 $0 $0 $55,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 2/2019
0025-02-219
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$55,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: None
Non-Exempt
Proj Hist:
1/19 - rev descr to incl FR lanes; 10/18 - add project, created from 0025-02-215
26Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Comal15 - San Antonio
Description:
SL 337 C TxDOT 5543.0
Limits From: at River Road
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,400,000
Construction Engineering $624,000
Contingencies: $728,000
Indirect Costs: $520,000
Preliminary Engineering: $509,600
Other Field $416,000
$13,197,600
Type of Work: TSMO: Operational
Total Project Cost:
$10,400,000
Authorized Funding by Category/Share
New Braunfels
Cost of Approved Phases:
7 - STP-MM
Other
$10,400,000
$0
Other $0
Other $0
$8,320,000 $2,080,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,320,000 $2,080,000 $0 $0 $10,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0216-01-057
Construct grade separation
Status: RSR
$10,400,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Part of the expansion of Loop 337; see #9111.1 and #9111.2 let in 2017
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
Bexar15 - San Antonio
Description:
FM 1535 C TxDOT 5310.0
Limits From: Shavano Ranch Road
Limits To: Lp 1604
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,500,000
Construction Engineering $372,000
Contingencies: $149,250
Indirect Costs: $430,500
Preliminary Engineering: $750,000
Other Field $280,500
$9,482,250
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$7,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STP-MM
Other
$7,500,000
$0
Other $0
Other $0
$6,000,000 $1,500,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,000,000 $1,500,000 $0 $0 $7,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0658-01-044
Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks
Status: RSR
$7,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
34
Remarks: None
Non-Exempt
Proj Hist:
10/18 - revise TPC; 4/18 - move from FY 2021 to FY 2020; 4/16 - funded through STP-MM project selection process
Bexar15 - San Antonio
Description:
CS C CoSA 5110.0
Limits From: Harry Wurzbach
Limits To: at Austin Highway
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $17,177,000
Construction Engineering $852,000
Contingencies: $342,000
Indirect Costs: $986,000
Preliminary Engineering: $842,000
Other Field $642,000
$20,841,000
Type of Work: TSMO: Operational
Total Project Cost:
$17,177,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$17,177,000
$0
Other $0
Other $0
$13,741,600 $1,477,222 $1,958,178 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$13,741,600 $1,477,222 $1,958,178 $0 $17,177,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2019
0915-12-550
Construct entrance and exit ramps between Harry Wurzbach and Austin Highway
Status: RSR
$17,177,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: An innovative intersection project
Exempt
Proj Hist:
10/19 - 19 to 20; 4/18 - 18 to 19; 14/17 - rev limits & funding; 1/17 - 19 to18 & rev funding distr; 4/16 - comb with new STP-MM proj & rev match (EDCP proj); 10/15 - rev fund; 4/14 - funded through STP-MM project
27Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
CS C UC 5325.0
Limits From: In Universal City, on E. Aviation
Limits To: Houston Drive to Aztec Way
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $8,632,561
Construction Engineering $428,175
Contingencies: $171,788
Indirect Costs: $495,509
Preliminary Engineering: $422,995
Other Field $322,858
$10,473,886
Type of Work: TSMO: Operational
Total Project Cost:
$8,632,561
Authorized Funding by Category/Share
UC
Cost of Approved Phases:
7 - STP-MM
3 - LC
$7,444,174
$1,188,387
Other $0
Other $0
$5,955,339 $0 $1,488,835 $0
$0 $0 $0 $1,188,387
$0 $0 $0 $0
$0 $0 $0 $0
$5,955,339 $0 $1,488,835 $1,188,387 $8,632,561
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2019
0915-12-578
Widen to provide operational improvements, bike lanes, sidewalks and drainage
Status: Non-RSR
$8,632,561
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/19 - move from FY 2019 to FY 2020; 1/17 - revise limits and description; 4/16 - funded through STP-MM project selection process
Bexar15 - San Antonio
Description:
CS E Converse 5319.2
Limits From: On Rocket/Schaeffer, from E. Norris
Limits To: Lp 1604
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,430,481
Construction Engineering $269,352
Contingencies: $108,067
Indirect Costs: $311,710
Preliminary Engineering: $266,094
Other Field $203,100
$6,588,804
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$266,094
Authorized Funding by Category/Share
Converse
Cost of Approved Phases:
3 - LC
Other
$266,094
$0
Other $0
Other $0
$0 $0 $0 $266,094
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $266,094 $266,094
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
0915-12-582
Expand from 2 to 4 lane roadway with continuous center turn lane, sidewalks and bike lane/multi-use path
Status: Non-RSR
$266,094
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add phase (Engr)
Bexar15 - San Antonio
Description:
VA C Converse 4972.0
Limits From: In Converse, from Converse Park N
Limits To: to FM 78
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,382,725
Construction Engineering $88,200
Contingencies: $17,800
Indirect Costs: $66,800
Preliminary Engineering: $67,800
Other Field $79,900
$1,703,225
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$1,382,725
Authorized Funding by Category/Share
Converse
Cost of Approved Phases:
9 - TA
3 - LC
$1,365,440
$17,285
Other $0
Other $0
$1,092,352 $0 $273,088 $0
$0 $0 $0 $17,285
$0 $0 $0 $0
$0 $0 $0 $0
$1,092,352 $0 $273,088 $17,285 $1,382,725
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-594
Construct multi use path
Status: Exempt
$1,382,725
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/19 - move from FY 2019 to FY 2020; 4/18 - move from FY 2018 to FY 2019; 6/17 - add TA project
28Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
VA C CoSA 5425.0
Limits From: In City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $90,000
Contingencies: $45,000
Indirect Costs: $75,000
Preliminary Engineering: $73,500
Other Field $90,000
$1,873,500
Type of Work: TSMO: ITS
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2019
0915-12-601
Intelligent Transportation Systems - Enhancements; Upgrade Traffic Signal Controllers
Status: Exempt
$1,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/19 - move from FY 2019 to FY 2020; 4/18 - move from FY 2018 to FY 2019; 1/18 - update project description; 10/17 - add project; created from 0915-12-580
Bexar15 - San Antonio
Description:
VA T VIA 5580.1
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,553,334
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$7,553,334
Type of Work: Transit
Total Project Cost:
$7,553,334
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$6,866,667
$686,667
Other $0
Other $0
$5,493,334 $0 $1,373,333 $0
$0 $0 $0 $686,667
$0 $0 $0 $0
$0 $0 $0 $0
$5,493,334 $0 $1,373,333 $686,667 $7,553,334
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 8/2019
0915-12-672
VIA Fleet Replacement Program. Purchase 14 CNG buses. FY 2020
Status: Exempt
$7,553,334
NOX lbs/day
36.092
VOC lbs/day
3.761
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
Bexar15 - San Antonio
Description:
VA T VIA 5581.1
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,037,144
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$7,037,144
Type of Work: Transit
Total Project Cost:
$7,037,144
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$6,345,477
$691,667
Other $0
Other $0
$5,076,382 $0 $1,269,095 $0
$0 $0 $0 $691,667
$0 $0 $0 $0
$0 $0 $0 $0
$5,076,382 $0 $1,269,095 $691,667 $7,037,144
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 8/2019
0915-12-673
VIA Bus Frequency Program. Purchase 9 CNG buses. Increase service on #7 and #552 routes. FY 2020
Status: Exempt
$7,037,144
NOX lbs/day
4.156
VOC lbs/day
3.709
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
29Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2020FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
FM 2252 C TxDOT 5324.0
Limits From: at Evans Road
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,500,000
Construction Engineering $479,000
Contingencies: $97,000
Indirect Costs: $431,000
Preliminary Engineering: $368,000
Other Field $434,000
$9,309,000
Type of Work: TSMO: Operational
Total Project Cost:
$7,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STP-MM
2 - Metro Corridor
$4,200,000
$1,812,430
Other $0
Other $0
$3,360,000 $840,000 $0 $0
$2,640,000 $660,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 $0
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
1433-01-029
Improvements include widening of Cibolo Creek bridge to allow for intersection operational improvements including turn lanes
Status: RSR
$7,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
1/20 - let in 1/20 not 2021; 11/19 - ADM clarify description; 10/18 - revise funding distribution; 4/17 - move from FY 2019 to FY 2021 and revise funding; 1/17 - revise funding distribution; 4/16 - funded through
Bexar15 - San Antonio
Description:
SL 1604 E TxDOT 3913.2
Limits From: SH 16
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $185,500,000
Construction Engineering $8,200,000
Contingencies: $14,400,000
Indirect Costs: $4,100,000
Preliminary Engineering: $18,500,000
Other Field $8,200,000
$238,900,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$18,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SBPE
Other
$18,500,000
$0
Other $0
Other $0
$14,800,000 $3,700,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$14,800,000 $3,700,000 $0 $0 $18,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2019
2452-02-083
Expand from 4 to 10 lane expressway - including 2 HOV-special use lanes, & from 4 to 4 FR lanes
Status: RSR
$18,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Reference #4049 and #5556
Non-Exempt
Proj Hist:
10/19 - revise cost, limits, description and move from FY 2019 to FY 2020; reference #4049 and #5556; 1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
Bexar15 - San Antonio
Description:
PA 1502 C TxDOT 5315.0
Limits From: Lockhill Selma Road
Limits To: FM 1535-NW Military
Total Project Cost Information (TxDOT %):
ROW Purchase: $250,000
Construction Cost: $9,000,000
Construction Engineering $360,000
Contingencies: $630,000
Indirect Costs: $180,000
Preliminary Engineering: $900,000
Other Field $360,000
$11,680,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$9,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STP-MM
2 - Metro Corridor
$8,000,000
$1,000,000
Other $0
Other $0
$6,400,000 $1,600,000 $0 $0
$800,000 $200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$7,200,000 $1,800,000 $0 $0 $9,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 11/2018
7774-01-001
Expand from 4 to 6 lanes divided & intersection operational improvements including new turn lanes and improved signal operation at FM 1535
Status: RSR
$9,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
40
Remarks: None
Non-Exempt
Proj Hist:
11/19 - ADM clarify description; 10/18 - revise description & TPC; 3/18 - revise CSJ from 1502-03-003 and decrease cost; 4/17 - move from FY 18 to FY 20, revise funding and limits; 4/16 - funded through STP-MM
30Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
FM 1518 E TxDOT 5309.3
Limits From: FM 78
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $8,194,000
Construction Cost: $44,780,000
Construction Engineering $2,687,000
Contingencies: $3,135,000
Indirect Costs: $2,239,000
Preliminary Engineering: $2,194,000
Other Field $1,791,000
$65,020,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$2,194,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
Other
$2,194,000
$0
Other $0
Other $0
$0 $2,194,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $2,194,000 $0 $0 $2,194,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0465-02-027
Expand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$2,194,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add E phase; 4/18 - move from FY 2021 to FY 2023 and combine with STP-MM selected project; 4/16 - funded through STP-MM project selection process
Bexar15 - San Antonio
Description:
FM 1560 E TxDOT 5391.3
Limits From: Galm/Shaenfield
Limits To: SH 16
Total Project Cost Information (TxDOT %):
ROW Purchase: $11,800,000
Construction Cost: $19,750,000
Construction Engineering $900,000
Contingencies: $1,500,000
Indirect Costs: $400,000
Preliminary Engineering: $1,900,000
Other Field $900,000
$37,150,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$1,900,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
Other
$1,900,000
$0
Other $0
Other $0
$0 $1,900,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $1,900,000 $0 $0 $1,900,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-021
Expand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks
Status: Non-RSR
$1,900,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add E phase' 4/18 - funded through the 19-22 STP-MM Call for Projects; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
Bexar15 - San Antonio
Description:
SL 1604 E TxDOT 4049.2
Limits From: IH 10
Limits To: US 281
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $187,800,000
Construction Engineering $8,300,000
Contingencies: $14,600,000
Indirect Costs: $4,100,000
Preliminary Engineering: $18,800,000
Other Field $8,300,000
$241,900,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$18,800,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SWPE
Other
$18,800,000
$0
Other $0
Other $0
$15,040,000 $3,760,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$15,040,000 $3,760,000 $0 $0 $18,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-02-128
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 frontage roads
Status: RSR
$18,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 10/19 - add project (E); spin off of 2452-02-083 (MPO #3913); no impact to conformity
Non-Exempt
Proj Hist:
10/19 - add project (E); spin off of 2452-02-083 (MPO #3913); no impact to conformity
31Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
CS C CoSA 5423.0
Limits From: In San Antonio on Alamo/Commerce/Losoya Intersection
Limits To: from Commerce to Market
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,000,000
Construction Engineering $128,000
Contingencies: $100,000
Indirect Costs: $115,000
Preliminary Engineering: $98,000
Other Field $116,000
$2,557,000
Type of Work: TSMO: Operational
Total Project Cost:
$2,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$2,000,000
$0
Other $0
Other $0
$0 $0 $0 $2,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $2,000,000 $2,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Close Alamo Street to vehicle traffic
Status: RSR
$2,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
Bexar15 - San Antonio
Description:
CS C CoSA 5414.0
Limits From: In San Antonio on North Main & Soledad
Limits To: from Pecan Street to Navarro Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,000,000
Construction Engineering $383,000
Contingencies: $300,000
Indirect Costs: $344,000
Preliminary Engineering: $294,000
Other Field $347,000
$7,668,000
Type of Work: TSMO: Operational
Total Project Cost:
$6,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$6,000,000
$0
Other $0
Other $0
$0 $0 $0 $6,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $6,000,000 $6,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 7 to 4 travel lanes with CTL, bike lanes, sidewalks and traffic circle at Navarro
Status: RSR
$6,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
Bexar15 - San Antonio
Description:
CS C CoSA 5407.0
Limits From: In San Antonio on Fredericksburg Road
Limits To: From N. Flores to Woodlawn
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,300,000
Construction Engineering $338,000
Contingencies: $68,000
Indirect Costs: $304,000
Preliminary Engineering: $260,000
Other Field $306,000
$6,576,000
Type of Work: TSMO: Operational
Total Project Cost:
$5,300,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$5,300,000
$0
Other $0
Other $0
$0 $0 $0 $5,300,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $5,300,000 $5,300,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 4 to 2 lanes, upgrade drainage, add new traffic signals and provide sidewalks
Status: RSR
$5,300,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
32Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
CS C CoSA 5408.1
Limits From: In San Antonio on Bulverde Road
Limits To: from Briar Crest to North of Quiet Meadow Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $200,000
Construction Cost: $9,700,000
Construction Engineering $619,000
Contingencies: $125,000
Indirect Costs: $557,000
Preliminary Engineering: $1,400,000
Other Field $561,000
$13,162,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$9,700,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$9,700,000
$0
Other $0
Other $0
$0 $0 $0 $9,700,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $9,700,000 $9,700,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Expand from 2 lanes and CTL to 4 lanes and CTL
Status: RSR
$9,700,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
Bexar15 - San Antonio
Description:
CS C CoSA 5409.0
Limits From: In San Antonio on N. New Braunfels
Limits To: from Houston Street to Burleson
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $4,500,000
Construction Engineering $287,000
Contingencies: $58,000
Indirect Costs: $258,000
Preliminary Engineering: $220,000
Other Field $260,000
$5,583,000
Type of Work: TSMO: Operational
Total Project Cost:
$4,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$4,500,000
$0
Other $0
Other $0
$0 $0 $0 $4,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $4,500,000 $4,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 4 travel lanes to 2 travel lanes with a CTL and sidewalks
Status: Non-RSR
$4,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
Bexar15 - San Antonio
Description:
CS C CoSA 5410.0
Limits From: In San Antonio on Rittiman Road
Limits To: from IH 35 to Castle Cross Drive
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,100,000
Construction Engineering $134,000
Contingencies: $27,000
Indirect Costs: $120,000
Preliminary Engineering: $103,000
Other Field $121,000
$2,605,000
Type of Work: TSMO: Operational
Total Project Cost:
$2,100,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$2,100,000
$0
Other $0
Other $0
$0 $0 $0 $2,100,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $2,100,000 $2,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Extend right turn lane from Rittiman to IH 35
Status: Non-RSR
$2,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
33Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
CS C CoSA 5415.0
Limits From: In San Antonio on Santa Rosa Street
Limits To: from Cesar Chavez Blvd to Martin Street
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $8,500,000
Construction Engineering $542,000
Contingencies: $425,000
Indirect Costs: $488,000
Preliminary Engineering: $416,000
Other Field $491,000
$10,862,000
Type of Work: TSMO: Operational
Total Project Cost:
$8,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$8,500,000
$0
Other $0
Other $0
$0 $0 $0 $8,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $8,500,000 $8,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 6 lanes with CTL to 4 lanes with CTL, bike accommodation and sidewalks
Status: RSR
$8,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 9/19 - ADM clarify description (acc); 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
Bexar15 - San Antonio
Description:
CS C CoSA 5416.0
Limits From: In San Antonio on South Alamo Street
Limits To: from Market Street to Cesar Chavez Blvd
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $9,000,000
Construction Engineering $574,000
Contingencies: $450,000
Indirect Costs: $517,000
Preliminary Engineering: $441,000
Other Field $520,000
$11,502,000
Type of Work: TSMO: Operational
Total Project Cost:
$9,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
3 - LC
Other
$9,000,000
$0
Other $0
Other $0
$0 $0 $0 $9,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $9,000,000 $9,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0000-00-000
Reduce from 6 lanes with CTL to 4 lanes with CTL, bike accommodation and sidewalks
Status: RSR
$9,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - add CoSA 2017 Bond project to TIP/MTP for AQ purposes
Comal15 - San Antonio
Description:
IH 35 C TxDOT 5553.0
Limits From: at FM 725
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,000,000
Construction Engineering $383,000
Contingencies: $78,000
Indirect Costs: $344,000
Preliminary Engineering: $294,000
Other Field $347,000
$7,446,000
Type of Work: TSMO: Operational
Total Project Cost:
$6,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$6,000,000
$0
Other $0
Other $0
$4,800,000 $1,200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,800,000 $1,200,000 $0 $0 $6,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0016-05-120
Intersection operational improvements including turn lanes
Status: RSR
$6,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
11/19 - ADM clarify description; 10/18 - add project, created from 0016-05-114
34Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Guadalupe15 - San Antonio
Description:
IH 35 C,E TxDOT 4013.0
Limits From: Bexar/Guadalupe County Line
Limits To: FM 3009
Total Project Cost Information (TxDOT %):
ROW Purchase: $10,000,000
Construction Cost: $80,000,000
Construction Engineering $35,000,000
Contingencies: $0
Indirect Costs: $4,800,000
Preliminary Engineering: $35,000,000
Other Field $0
$164,800,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$150,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
12 - CL
$51,000,000
$29,000,000
3 - DB $70,000,000
Other $0
$40,800,000 $10,200,000 $0 $0
$23,200,000 $5,800,000 $0 $0
$56,000,000 $14,000,000 $0 $0
$0 $0 $0 $0
$120,000,000 $30,000,000 $0 $0 $150,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0016-06-047
Expand from 8 ln to 14 ln expy - add 6 new express lanes, including 2 HOV-Special Use lanes; from 4 to 4 FR lanes
Status: RSR
$150,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
47
Remarks: None
Exempt
Proj Hist:
10/19 - move from 20 to 21 and rev cost; 1/19 - rev descr to incl FR lanes; 10/18 - move from 25 to 20; rev limits, descr and cost; 4/18 - move from FY 2020 to FY 2025 (out of TIP); 10/13 - revise description;
Bexar15 - San Antonio
Description:
IH 35 North C,E TxDOT 3477.0
Limits From: IH 410 N
Limits To: Guadalupe/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $34,923,000
Construction Cost: $715,000,000
Construction Engineering $50,000,000
Contingencies: $0
Indirect Costs: $42,900,000
Preliminary Engineering: $50,000,000
Other Field $0
$892,823,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$815,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
4 - Connectivity
$261,400,000
$100,600,000
3-DB/11 - Distr Discr
$103,000,000
12 - CL $350,000,000
$209,120,000 $52,280,000 $0 $0
$80,480,000 $20,120,000 $0 $0
$82,400,000 $20,600,000 $0 $0
$280,000,000 $70,000,000 $0 $0
$652,000,000 $163,000,000 $0 $0 $815,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0016-07-113
Expand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410N & LP 1604
Status: RSR
$815,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
42
Remarks: 1 lane DC: NB 35 to WB 1604; EB 1604 to SB 35; 2 lane DC: SB 35 to WB 1604; EB 1604 to NB 35; EB 410N to NB 35;SB 35 to WB 410N
Non-Exempt
Proj Hist:
10/19 - move from FY 20 to 21 and rev cost; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes; 10/18 - 25 to 20, rev descr and TPC; 4/18 - move from 20 to 25 (out of TIP); 10/13 - revise limits and
Bexar15 - San Antonio
Description:
SL 368 C CoSA 5313.0
Limits From: Burr Road
Limits To: IH 35
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $14,000,000
Construction Engineering $694,400
Contingencies: $278,600
Indirect Costs: $803,600
Preliminary Engineering: $686,000
Other Field $523,600
$16,986,200
Type of Work: TSMO: Operational
Total Project Cost:
$14,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
1 - Prvnt Mnt/Rehab
$9,000,000
$5,000,000
Other $0
Other $0
$7,200,000 $1,800,000 $0 $0
$4,000,000 $1,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$11,200,000 $2,800,000 $0 $0 $14,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0016-08-034
Reduce from 6 to 4 travel lanes; roadway rehabilitation, bicycle and pedestrian facilities
Status: RSR
$14,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: Road diet project
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/19 - revise project sponsor; 9/19 - ADM clarify description; 4/17 - revise funding; 4/16 - funded through STP-MM project selection process
35Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
SS 536 C CoSA 5536.2
Limits From: at San Antonio River
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,000,000
Construction Engineering $120,000
Contingencies: $140,000
Indirect Costs: $100,000
Preliminary Engineering: $98,000
Other Field $80,000
$2,538,000
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$2,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$2,000,000
$0
Other $0
Other $0
$1,600,000 $0 $400,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,600,000 $0 $400,000 $0 $2,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0253-06-037
Construct bicycle and pedestrian bridge
Status: Exempt
$2,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5542.0
Limits From: FM 2536 - Pearsall Road
Limits To: Valley Hi Drive
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $19,100,000
Construction Engineering $850,000
Contingencies: $1,500,000
Indirect Costs: $400,000
Preliminary Engineering: $1,900,000
Other Field $850,000
$24,600,000
Type of Work: TSMO: Operational
Total Project Cost:
$19,100,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
1 - Prvnt Mnt/Rehab
$8,100,000
$11,000,000
Other $0
Other $0
$6,480,000 $1,620,000 $0 $0
$8,800,000 $2,200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$15,280,000 $3,820,000 $0 $0 $19,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 5/2020
0521-05-148
Operational improvements, including ramp revisions, intersection improvements and reconstruct frontage roads
Status: RSR
$19,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: May 2020 revision to FY 2019-2022 TIP; also included in FY 2021-2023 TIP
Exempt
Proj Hist:
4/20 - move from FY 2020 to FY 2021 and revise cost; 4/19 - increase cost and revise decription; 4/18 - funded through the 19-22 STP-MM Call for Projects
Bexar15 - San Antonio
Description:
IH 410 C TxDOT 5371.0
Limits From: at IH 10 E
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000,000
Construction Engineering $4,000,000
Contingencies: $7,000,000
Indirect Costs: $2,000,000
Preliminary Engineering: $4,800,000
Other Field $4,000,000
$121,800,000
Type of Work: TSMO: Interchange
Total Project Cost:
$100,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
4 - Connectivity
$50,000,000
$25,000,000
12 - CL $25,000,000
Other $0
$45,000,000 $5,000,000 $0 $0
$22,500,000 $2,500,000 $0 $0
$22,500,000 $2,500,000 $0 $0
$0 $0 $0 $0
$90,000,000 $10,000,000 $0 $0 $100,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0521-06-138
Construct direct connectors: Phase 1 - Priority Connectors - NB 410 to EB 10; WB 10 to SB 410
Status: RSR
$100,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/20 - rev descr and move FY 21 to FY 25; 9/19 - ADM clarify description; 3/18 - revise funding distribution; 4/17 - add project
36Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
FM 1535 C TxDOT 5323.0
Limits From: Lp 1604
Limits To: Huebner Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $9,600,000
Construction Engineering $400,000
Contingencies: $750,000
Indirect Costs: $200,000
Preliminary Engineering: $960,000
Other Field $425,000
$12,335,000
Type of Work: TSMO: Operational
Total Project Cost:
$9,600,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
1 - Prvnt Mnt/Rehab
$6,500,000
$3,100,000
Other $0
Other $0
$5,200,000 $1,300,000 $0 $0
$2,480,000 $620,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$7,680,000 $1,920,000 $0 $0 $9,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 5/2020
0658-01-045
Construct 2 way left turn lane, bike lanes and sidewalks
Status: RSR
$9,600,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: May 2020 revision to FY 2019-2022 TIP; also included in FY 2021-2023 TIP
Exempt
Proj Hist:
4/20 - revise cost; 4/18 - move from FY 2020 to FY 2021; 4/16 - funded through STP-MM project selection process
Bexar15 - San Antonio
Description:
FM 471 E, R TxDOT 5377.2
Limits From: Old FM 471
Limits To: Medina County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $2,520,000
Construction Cost: $21,000,000
Construction Engineering $840,000
Contingencies: $1,470,000
Indirect Costs: $420,000
Preliminary Engineering: $2,100,000
Other Field $840,000
$29,190,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,620,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SWPE
SWROW
$2,100,000
$2,520,000
Other $0
Other $0
$0 $2,100,000 $0 $0
$2,016,000 $504,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$2,016,000 $2,604,000 $0 $0 $4,620,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0849-01-055
Expand from 2 to 4 lane divided with bike lanes and sidewalks
Status: RSR
$4,620,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2019 to FY 2021; 10/18 - add phases (Engr, ROW)
Bexar15 - San Antonio
Description:
VA C TxDOT 5544.1
Limits From: Various locations within
Limits To: Bexar, Comal and Kendall counties
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$2,500,000
Type of Work: TSMO: Safety Service Pat
Total Project Cost:
$2,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$2,500,000
$0
Other $0
Other $0
$2,000,000 $167,500 $332,500 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$2,000,000 $167,500 $332,500 $0 $2,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-212
Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall Counties-FY 2019
Status: Exempt
$2,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/19 - move from FY 2019 to FY 2020; 10/18 - revise funding distribution; 4/18 - funded through the 19-22 STP-MM Call for Projects
37Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
VA C TxDOT 5544.2
Limits From: Various locations within
Limits To: Bexar, Comal and Kendall counties
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$5,500,000
Type of Work: TSMO: Safety Service Pat
Total Project Cost:
$5,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$5,500,000
$0
Other $0
Other $0
$4,400,000 $368,500 $731,500 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,400,000 $368,500 $731,500 $0 $5,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-213
Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall Counties-FY 2020
Status: Exempt
$5,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - revise cost (+$1M from #5316.3); 10/18 - revise funding distribution; 4/18 - funded through the 19-22 STP-MM Call for Projects
Bexar15 - San Antonio
Description:
VA C TxDOT 5544.3
Limits From: Various locations within
Limits To: Bexar, Comal and Kendall counties
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$5,500,000
Type of Work: TSMO: Safety Service Pat
Total Project Cost:
$5,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$5,500,000
$0
Other $0
Other $0
$4,400,000 $368,500 $731,500 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,400,000 $368,500 $731,500 $0 $5,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-214
Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall Counties-FY 2021
Status: Exempt
$5,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - revise cost (+$1M from #5316.3); 10/18 - revise funding distribution; 4/18 - funded through the 19-22 STP-MM Call for Projects
Bexar15 - San Antonio
Description:
CR C BxCo 3988.0
Limits From: On Bulverde Road from Marshall Road
Limits To: Wilderness Oak
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $8,097,480
Construction Engineering $401,635
Contingencies: $463,986
Indirect Costs: $554,677
Preliminary Engineering: $396,777
Other Field $0
$9,914,555
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$8,097,480
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$8,097,480
$0
Other $0
Other $0
$6,477,984 $0 $1,619,496 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,477,984 $0 $1,619,496 $0 $8,097,480
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-509
Reconstruct and expand from 2 to 4 lanes with shoulder, pedestrian ramps, curb, bridge construction and drainage improvements
Status: RSR
$8,097,480
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
33
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move 20 to 21; 9/19 - ADM clarify descr; 4/19 - 19 to 20 and rev proj sponsor; 4/18 - 18 to 19; 1/17 - 17 to 18; 4/15 - 15 to 16 and update descr; 1/14 - 14 to 15; 4/13 - 13 to 14 and rev funding cats; 4/12 - funded
38Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
CS C LV 3992.0
Limits From: SH 16 - Bandera Road
Limits To: Crystal Hills Park
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $933,000
Construction Engineering $59,525
Contingencies: $65,963
Indirect Costs: $63,911
Preliminary Engineering: $45,717
Other Field $0
$1,168,116
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$933,000
Authorized Funding by Category/Share
Leon Valley
Cost of Approved Phases:
7 - STBG
Other
$933,000
$0
Other $0
Other $0
$746,400 $0 $186,600 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$746,400 $0 $186,600 $0 $933,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-514
Construction of a hike and bike trail along Huebner Creek
Status: Exempt
$933,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move FY 20 to FY 21; 10/18 - move from FY 19 to FY 20; 4/17 - move from FY 17 to FY 19; 10/15 - move from FY 15 to FY 17 and revise limits; 4/14 - revise limits and move from FY 14 to FY 15; 4/12 - funded
Bexar15 - San Antonio
Description:
CS C BxCo 5105.0
Limits From: On Galm Road, from FM 471 (Culebra Road)
Limits To: Government Canyon State Park
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,323,351
Construction Engineering $363,238
Contingencies: $145,735
Indirect Costs: $353,718
Preliminary Engineering: $1,181,757
Other Field $273,893
$9,641,692
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$7,323,351
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
12S - STP-MM Rec
$3,223,351
$4,100,000
Other $0
Other $0
$2,578,681 $0 $644,670 $0
$3,280,000 $0 $820,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$5,858,681 $0 $1,464,670 $0 $7,323,351
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-544
Expand from 2 to 4 lanes, including drainage improvements, bike & pedestrian amenities
Status: Non-RSR
$7,323,351
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
44
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 4/19 - move from FY 2019 to FY 2020; 10/18 - revise TPC; 4/18 - move from FY 2018 to FY 2019; 1/16 - revise funding; 4/14 - funded through STP-MM project
Bexar15 - San Antonio
Description:
CR C BxCo 5106.0
Limits From: On Watson Road from FM 2790-Somerset Road
Limits To: 0.62 Mi East of Somerset Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,440,000
Construction Cost: $4,886,116
Construction Engineering $195,445
Contingencies: $342,028
Indirect Costs: $97,722
Preliminary Engineering: $739,184
Other Field $195,445
$7,895,940
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,886,116
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$4,886,116
$0
Other $0
Other $0
$3,908,893 $0 $977,223 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$3,908,893 $0 $977,223 $0 $4,886,116
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-562
Expand from 2 to 4 lanes with traffic circle at Southwest Verano Parkway, multi-use path and drainage
Status: Non-RSR
$4,886,116
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
26
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 9/19 - ADM clarify limits and description; 1/19 - move from FY 2019 to FY 2020; 10/18 - revise TPC; 4/14 - funded through STP-MM project selection process
39Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
VA C CoSA 5305.0
Limits From: In City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,000,000
Construction Engineering $99,000
Contingencies: $40,000
Indirect Costs: $115,000
Preliminary Engineering: $98,000
Other Field $75,000
$2,427,000
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$2,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$2,000,000
$0
Other $0
Other $0
$1,600,000 $0 $400,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,600,000 $0 $400,000 $0 $2,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-579
Construct citywide pedestrian and bicycle improvements
Status: Exempt
$2,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - move from FY 19 to FY 20; 10/17 - reduce project cost by $1M to fund 0915-12-603; 4/16 - funded through STP-MM project selection process
Bexar15 - San Antonio
Description:
VA C CoSA 5306.0
Limits From: In City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $90,000
Contingencies: $45,000
Indirect Costs: $75,000
Preliminary Engineering: $73,500
Other Field $90,000
$1,873,500
Type of Work: TSMO: ITS
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-580
Intelligent Transportation System - Enhancements to include controller hardware and software and CCTV cameras
Status: Exempt
$1,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/19 - move from FY 2019 to FY 2020; 9/19 - ADM clarify description; 10/17 - reduce cost from $4M to $1.5M and move from FY 2020 to FY 2019; 4/16 - funded
Bexar15 - San Antonio
Description:
CR C BxCo 5304.0
Limits From: In Bexar County, on Talley Road
Limits To: From Wiseman Blvd to Tamaron Pass
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $20,917,924
Construction Engineering $1,255,000
Contingencies: $1,464,000
Indirect Costs: $1,046,000
Preliminary Engineering: $1,025,000
Other Field $837,000
$26,544,924
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$20,917,924
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$19,417,924
$1,500,000
Other $0
Other $0
$15,534,339 $0 $3,883,585 $0
$0 $0 $0 $1,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$15,534,339 $0 $3,883,585 $1,500,000 $20,917,924
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-581
Expand from 2 lane to 4 lane divided roadway with medians, curbs, bicycle facilities, pedestrian improvements, operational improvements and drainage
Status: Non-RSR
$20,917,924
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 4/18 and 4/16 - funded through STP-MM project selection processes
40Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
CS C Converse 5319.0
Limits From: On Rocket/Schaeffer, from E. Norris
Limits To: Lp 1604
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,430,481
Construction Engineering $269,352
Contingencies: $108,067
Indirect Costs: $311,710
Preliminary Engineering: $266,094
Other Field $203,100
$6,588,804
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$5,430,481
Authorized Funding by Category/Share
Converse
Cost of Approved Phases:
7 - STBG
Other
$5,430,481
$0
Other $0
Other $0
$4,344,385 $0 $1,086,096 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,344,385 $0 $1,086,096 $0 $5,430,481
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-582
Expand from 2 to 4 lane roadway with continuous center turn lane, sidewalks and bike lane/multi-use path
Status: Non-RSR
$5,430,481
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
40
Remarks: None
Non-Exempt
Proj Hist:
4/18 - move from FY 2020 to FY 2021; 4/16 - funded through STP-MM project selection process
Bexar15 - San Antonio
Description:
CR C ARMA 5317.0
Limits From: In Bexar County, on Blanco Rd
Limits To: From West Oak Estates to Borgfeld
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $14,661,235
Construction Engineering $727,197
Contingencies: $291,759
Indirect Costs: $841,555
Preliminary Engineering: $718,401
Other Field $548,330
$17,788,477
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$14,661,235
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$14,661,235
$0
Other $0
Other $0
$11,728,988 $0 $2,932,247 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$11,728,988 $0 $2,932,247 $0 $14,661,235
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-585
Expand from a 2 to 4 lane divided roadway with raised median, bike lanes, sidewalks, curbs and drainage
Status: RSR
$14,661,235
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
30
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from 20 to 21; 10/19 - move from FY 2019 to FY 2020; 4/17 - revise funding; 1/17 - TIP: add project; MTP: move from FY 2023 to FY 2019; 4/16 - funded through STP-MM project selection process
Bexar15 - San Antonio
Description:
CS C CoSA 4974.0
Limits From: In San Antonio, on Zarzamora
Limits To: From Fredericksburg Rd to Loop 13
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,000,000
Construction Engineering $319,000
Contingencies: $64,500
Indirect Costs: $241,500
Preliminary Engineering: $245,000
Other Field $289,000
$6,159,000
Type of Work: Pedestrian
Total Project Cost:
$5,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
9 - TA
3 - LC
$4,500,000
$500,000
Other $0
Other $0
$3,600,000 $0 $900,000 $0
$0 $0 $0 $500,000
$0 $0 $0 $0
$0 $0 $0 $0
$3,600,000 $0 $900,000 $500,000 $5,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-596
Construct sidewalks, remove unused utility poles, and implement pedestian detection ITS
Status: RSR
$5,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/17 - add TA project
41Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
CS C CoSA 5428.0
Limits From: In City of San Antonio on Judson Road
Limits To: from Independence to IH 35
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $60,000
Contingencies: $30,000
Indirect Costs: $50,000
Preliminary Engineering: $49,000
Other Field $60,000
$1,249,000
Type of Work: Pedestrian
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-603
Construct sidewalk along west side of Judson Road
Status: Exempt
$1,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/19 - move from FY 2019 to FY 2020; 4/18 - move from FY 2018 to FY 2019; 10/17 - add project; configured from $1M from 0915-12-579
Bexar15 - San Antonio
Description:
CS C CoSA 5434.0
Limits From: in San Antonio on Presa Street
Limits To: from W. Boyer to SE Military Drive (Lp 13)
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $10,000,000
Construction Engineering $600,000
Contingencies: $300,000
Indirect Costs: $500,000
Preliminary Engineering: $490,000
Other Field $600,000
$12,490,000
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$10,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
3 - LC
$9,000,000
$1,000,000
Other $0
Other $0
$7,200,000 $0 $1,800,000 $0
$0 $0 $0 $1,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$7,200,000 $0 $1,800,000 $1,000,000 $10,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2018
0915-12-604
Bike and Pedestrian Corridor enhancements to implement Complete Streets
Status: Exempt
$10,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 2 travel lanes throughout the corridor
Exempt
Proj Hist:
9/19 - ADM clarify description; 4/18 - move from FY 2019 to FY 2021; 10/17 - add project per CoSA, funding is from 0025-02-204; 4/16 - revise match (EDCP project); 4/14 - funded through STP-MM project
Bexar15 - San Antonio
Description:
CS C CoSA 5545.1
Limits From: In San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,000,000
Type of Work: Planning
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-609
Multimodal planning study on one arterial to accommodate travel modes including higher capacity transit
Status: Exempt
$1,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/19 - move from FY 2019 to FY 2020; 4/18 - funded through the 19-22 STP-MM Call for Projects
42Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
CS C CoSA 5536.1
Limits From: In San Antonio
Limits To: Along San Pedro Avenue
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $60,000
Contingencies: $70,000
Indirect Costs: $50,000
Preliminary Engineering: $49,000
Other Field $40,000
$1,269,000
Type of Work: Pedestrian
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-610
Construct sidewalks and pedestrian infrastructure
Status: Exempt
$1,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 4/19 - move from FY 2019 to FY 2020; 4/18 - funded through the 19-22 STP-MM Call for Projects
Bexar15 - San Antonio
Description:
VA C CoSA 5545.2
Limits From: In San Antonio
Limits To: at various locations
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $3,000,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$3,000,000
Type of Work: Planning
Total Project Cost:
$3,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
7 - STBG
Other
$3,000,000
$0
Other $0
Other $0
$2,400,000 $0 $600,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$2,400,000 $0 $600,000 $0 $3,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-611
Multimodal planning study on three arterials to accommodate travel modes including higher capacity transit
Status: Exempt
$3,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - funded through the 19-22 STP-MM Call for Projects
Bexar15 - San Antonio
Description:
VA C TxDOT 5570.0
Limits From: Various locations on
Limits To: IH 35 S and IH 37 S
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,400,000
Construction Engineering $270,000
Contingencies: $540,000
Indirect Costs: $216,000
Preliminary Engineering: $264,000
Other Field $162,000
$6,852,000
Type of Work: TSMO: ITS
Total Project Cost:
$5,400,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
Other
$5,400,000
$0
Other $0
Other $0
$4,860,000 $540,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,860,000 $540,000 $0 $0 $5,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-664
Install ITS equipment on IH 35 South and IH 37 South Corridors
Status: Exempt
$5,400,000
NOX lbs/day
91.029
VOC lbs/day
16.777
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
43Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
VA C TxDOT 5578.0
Limits From: In Bexar County
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $75,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$75,000
Type of Work: TSMO: Training
Total Project Cost:
$75,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
Other
$75,000
$0
Other $0
Other $0
$60,000 $15,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$60,000 $15,000 $0 $0 $75,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-665
Traffic Incident Management Training Program
Status: Exempt
$75,000
NOX lbs/day
4.365
VOC lbs/day
0.507
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
Bexar15 - San Antonio
Description:
VA C CoSA 5573.1
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,500,000
Type of Work: TSMO: Traffic Signals
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-667
Traffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 2020
Status: Exempt
$1,500,000
NOX lbs/day
31.360
VOC lbs/day
8.557
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
Bexar15 - San Antonio
Description:
VA C CoSA 5574.1
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $50,000
Contingencies: $100,000
Indirect Costs: $30,000
Preliminary Engineering: $49,000
Other Field $30,000
$1,259,000
Type of Work: TSMO: ITS
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-668
Install ITS equipment on congested corridors in the City of San Antonio - FY 2020
Status: Exempt
$1,000,000
NOX lbs/day
13.272
VOC lbs/day
15.587
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
44Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
VA C CoSA 5575.1
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $250,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$250,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$250,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$250,000
$0
Other $0
Other $0
$200,000 $0 $50,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$200,000 $0 $50,000 $0 $250,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-669
City of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 2020
Status: Exempt
$250,000
NOX lbs/day
10.140
VOC lbs/day
4.947
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
Bexar15 - San Antonio
Description:
VA C CoSA 5576.1
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $150,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$150,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$150,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$150,000
$0
Other $0
Other $0
$120,000 $0 $30,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$120,000 $0 $30,000 $0 $150,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-670
City of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 2020
Status: Exempt
$150,000
NOX lbs/day
0.152
VOC lbs/day
499.810
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
Bexar15 - San Antonio
Description:
VA C UTSA 5577.1
Limits From: University of Texas at San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $129,225
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$129,225
Type of Work: TSMO: TDM Program
Total Project Cost:
$129,225
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC (UTSA)
$113,041
$16,184
Other $0
Other $0
$90,433 $0 $22,608 $0
$0 $0 $0 $16,184
$0 $0 $0 $0
$0 $0 $0 $0
$90,433 $0 $22,608 $16,184 $129,225
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-671
Make UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 2020
Status: Exempt
$129,225
NOX lbs/day
0.922
VOC lbs/day
0.628
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 6/19 - added through CMAQ project call
45Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
VA C CoSA 5574.2
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,000,000
Construction Engineering $50,000
Contingencies: $100,000
Indirect Costs: $30,000
Preliminary Engineering: $49,000
Other Field $30,000
$1,259,000
Type of Work: TSMO: ITS
Total Project Cost:
$1,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,000,000
$0
Other $0
Other $0
$800,000 $0 $200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$800,000 $0 $200,000 $0 $1,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-674
Install ITS equipment on congested corridors in the City of San Antonio - FY 2021
Status: Exempt
$1,000,000
NOX lbs/day
13.272
VOC lbs/day
15.587
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
Bexar15 - San Antonio
Description:
VA C CoSA 5573.2
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,500,000
Type of Work: TSMO: Traffic Signals
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-675
Traffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 2021
Status: Exempt
$1,500,000
NOX lbs/day
31.360
VOC lbs/day
8.557
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
Bexar15 - San Antonio
Description:
VA C CoSA 5575.2
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $250,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$250,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$250,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$250,000
$0
Other $0
Other $0
$200,000 $0 $50,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$200,000 $0 $50,000 $0 $250,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-676
City of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 2021
Status: Exempt
$250,000
NOX lbs/day
10.140
VOC lbs/day
4.947
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
46Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
VA C CoSA 5576.2
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $150,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$150,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$150,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$150,000
$0
Other $0
Other $0
$120,000 $0 $30,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$120,000 $0 $30,000 $0 $150,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-677
City of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 2021
Status: Exempt
$150,000
NOX lbs/day
0.152
VOC lbs/day
499.810
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
Bexar15 - San Antonio
Description:
VA C UTSA 5577.2
Limits From: University of Texas at San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $129,225
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$129,225
Type of Work: TSMO: TDM Program
Total Project Cost:
$129,225
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC (UTSA)
$113,042
$16,183
Other $0
Other $0
$90,434 $0 $22,608 $0
$0 $0 $0 $16,183
$0 $0 $0 $0
$0 $0 $0 $0
$90,434 $0 $22,608 $16,183 $129,225
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-678
Make UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 2021
Status: Exempt
$129,225
NOX lbs/day
0.922
VOC lbs/day
0.628
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
Bexar15 - San Antonio
Description:
VA T VIA 5580.2
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,553,334
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$7,553,334
Type of Work: Transit
Total Project Cost:
$7,553,334
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$6,866,667
$686,667
Other $0
Other $0
$5,493,334 $0 $1,373,333 $0
$0 $0 $0 $686,667
$0 $0 $0 $0
$0 $0 $0 $0
$5,493,334 $0 $1,373,333 $686,667 $7,553,334
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-679
VIA Fleet Replacement Program. Purchase 14 CNG buses. FY 2021
Status: Exempt
$7,553,334
NOX lbs/day
36.092
VOC lbs/day
3.761
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
47Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
VA T VIA 5581.2
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,181,429
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$2,181,429
Type of Work: Transit
Total Project Cost:
$2,181,429
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$1,489,762
$691,667
Other $0
Other $0
$1,191,810 $0 $297,952 $0
$0 $0 $0 $691,667
$0 $0 $0 $0
$0 $0 $0 $0
$1,191,810 $0 $297,952 $691,667 $2,181,429
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-680
VIA Bus Frequency Program. Increase service on #7 and #552 routes. FY 2021
Status: Exempt
$2,181,429
NOX lbs/day
4.156
VOC lbs/day
3.709
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
Guadalupe15 - San Antonio
Description:
CS C Seguin 5322.0
Limits From: In Seguin, on Rudeloff Rd.
Limits To: From SH 46 to Huber Rd.
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,316,658
Construction Engineering $313,306
Contingencies: $125,701
Indirect Costs: $263,576
Preliminary Engineering: $309,516
Other Field $236,243
$7,565,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$6,316,658
Authorized Funding by Category/Share
Seguin
Cost of Approved Phases:
7 - STBG
Other
$6,316,658
$0
Other $0
Other $0
$5,053,326 $0 $1,263,332 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$5,053,326 $0 $1,263,332 $0 $6,316,658
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-46-045
Expand from 2 to 4 lanes with center turn lane, bicycle and pedestian facilities
Status: Non-RSR
$6,316,658
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
40
Remarks: None
Exempt
Proj Hist:
4/16 - funded through STP-MM project selection process
Guadalupe15 - San Antonio
Description:
VA C Seguin 4976.0
Limits From: in Seguin from Vaughan Bridge
Limits To: to Max Starcke Park East
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,801,246
Construction Engineering $178,700
Contingencies: $36,100
Indirect Costs: $135,300
Preliminary Engineering: $137,300
Other Field $162,000
$3,450,646
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$2,801,246
Authorized Funding by Category/Share
Seguin
Cost of Approved Phases:
9 - TA
3 - LC
$2,773,234
$28,012
Other $0
Other $0
$2,218,587 $0 $554,647 $0
$0 $0 $0 $28,012
$0 $0 $0 $0
$0 $0 $0 $0
$2,218,587 $0 $554,647 $28,012 $2,801,246
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-46-046
Extend Walnut Springs multi use trail, including retaining walls, hand and guard rails and below grade crossing
Status: Exempt
$2,801,246
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 1/19 - move from FY 2019 to FY 2020; 6/17 - add TA project
48Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Guadalupe15 - San Antonio
Description:
CS C Schertz 4975.0
Limits From: in Schertz on Woodland Oaks Dr,
Limits To: Savannah Dr & Live Oak Rd
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,158,266
Construction Engineering $73,900
Contingencies: $15,000
Indirect Costs: $56,000
Preliminary Engineering: $56,800
Other Field $67,000
$1,426,966
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$1,158,266
Authorized Funding by Category/Share
Schertz
Cost of Approved Phases:
9 - TA
Other
$1,158,266
$0
Other $0
Other $0
$926,613 $0 $231,653 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$926,613 $0 $231,653 $0 $1,158,266
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-46-050
Construct sidewalks, bike lanes and off-road trail
Status: Exempt
$1,158,266
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 4/19 - move from FY 2019 to FY 2020; 10/18 - administratively revise CSJ from 0915-17-065 to 0915-46-050; 4/18 - move from FY 2018 to FY 2019; 6/17 - add TA
Comal15 - San Antonio
Description:
FM 1103 C TxDOT 4970.0
Limits From: IH 35
Limits To: Guadalupe C/L
Total Project Cost Information (TxDOT %):
ROW Purchase: $870,000
Construction Cost: $2,000,000
Construction Engineering $89,000
Contingencies: $455,000
Indirect Costs: $44,000
Preliminary Engineering: $200,000
Other Field $89,000
$3,747,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$2,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
1 - Prvnt Mnt/Rehab
11 - Distr Discr
$700,000
$800,000
3 - LC $500,000
Other $0
$560,000 $140,000 $0 $0
$640,000 $160,000 $0 $0
$0 $0 $0 $500,000
$0 $0 $0 $0
$1,200,000 $300,000 $0 $500,000 $2,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1268-01-013
Expand from 2 to 4 lanes with medians, turn lanes, sidewalk and bike lanes
Status: Non-RSR
$2,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
22
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 20 to FY 21; 10/19 - revise cost/funding; 9/19 - ADM clarify description; 4/17 - move from FY 2019 to FY 2020; 1/17 - move from FY 2018 to FY 2019; 10/15 - add project
Guadalupe15 - San Antonio
Description:
FM 1103 C TxDOT 4971.0
Limits From: Comal C/L
Limits To: Rodeo Way
Total Project Cost Information (TxDOT %):
ROW Purchase: $3,285,000
Construction Cost: $37,500,000
Construction Engineering $1,666,000
Contingencies: $2,915,000
Indirect Costs: $833,000
Preliminary Engineering: $3,750,000
Other Field $1,666,000
$51,615,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$37,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
1 - Prvnt Mnt/Rehab
11 - Distr Discr
$18,111,852
$11,922,500
3 - LC $7,465,648
Other $0
$14,489,482 $3,622,370 $0 $0
$9,538,000 $2,384,500 $0 $0
$0 $0 $0 $7,465,648
$0 $0 $0 $0
$24,027,482 $6,006,870 $0 $7,465,648 $37,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1268-02-027
Expand from 2 to 4 lanes with medians, turn lanes, sidewalk and bike lanes
Status: Non-RSR
$37,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
33
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/19 - rev cost/funding; 9/19 - ADM clarify description; 4/17 - move from FY 2019 to FY 2020 and rev funding; 1/17 - move from FY 2018 to FY 2019 and rev funding; 10/15 -
49Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
FM 2252 E TxDOT 5329.2
Limits From: Evans Road
Limits To: Comal/Bexar County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $500,000
Construction Engineering $32,000
Contingencies: $7,000
Indirect Costs: $29,000
Preliminary Engineering: $50,000
Other Field $29,000
$647,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$50,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SWPE
Other
$50,000
$0
Other $0
Other $0
$0 $50,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $50,000 $0 $0 $50,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1433-01-028
Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, bike lanes and sidewalk
Status: RSR
$50,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/18 - add phase (Engr)
Bexar15 - San Antonio
Description:
FM 1516 E,R TxDOT 5379.2
Limits From: FM 78
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $10,754,000
Construction Cost: $23,500,000
Construction Engineering $940,000
Contingencies: $1,645,000
Indirect Costs: $470,000
Preliminary Engineering: $1,151,500
Other Field $940,000
$39,400,500
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$11,905,500
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
SWROW
$1,151,500
$10,754,000
Other $0
Other $0
$0 $1,151,500 $0 $0
$8,603,200 $2,150,800 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$8,603,200 $3,302,300 $0 $0 $11,905,500
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1477-01-043
Expand from 2 to 4 lane divided with bike lanes and sidewalks
Status: RSR
$11,905,500
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/18 - add phases (Engr, ROW)
Bexar15 - San Antonio
Description:
FM 1560 E,R TxDOT 5311.2
Limits From: FM 471
Limits To: Galm/Shaenfield
Total Project Cost Information (TxDOT %):
ROW Purchase: $12,257,333
Construction Cost: $12,100,000
Construction Engineering $600,160
Contingencies: $240,790
Indirect Costs: $694,540
Preliminary Engineering: $1,210,000
Other Field $452,540
$27,555,363
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$13,467,333
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
SWROW
$1,210,000
$12,257,333
Other $0
Other $0
$0 $1,210,000 $0 $0
$9,805,866 $2,451,467 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$9,805,866 $3,661,467 $0 $0 $13,467,333
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-020
Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$13,467,333
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/18 - add phases E & R
50Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
SL 1604 E,R TxDOT 9110.4
Limits From: Macdona-Lacoste Rd
Limits To: US 90 W
Total Project Cost Information (TxDOT %):
ROW Purchase: $4,800,000
Construction Cost: $40,000,000
Construction Engineering $2,552,000
Contingencies: $516,000
Indirect Costs: $2,296,000
Preliminary Engineering: $4,000,000
Other Field $2,312,000
$56,476,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$8,800,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
SWROW
$4,000,000
$4,800,000
Other $0
Other $0
$0 $4,000,000 $0 $0
$3,840,000 $960,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$3,840,000 $4,960,000 $0 $0 $8,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-01-066
Expand from 2 lanes to 4 lane divided
Status: RSR
$8,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2019 to FY 2021; 10/18 - add phases (Engr, ROW)
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 3913.0
Limits From: SH 16
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $185,500,000
Construction Engineering $8,200,000
Contingencies: $14,400,000
Indirect Costs: $4,100,000
Preliminary Engineering: $18,500,000
Other Field $8,200,000
$238,900,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$185,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
Other
$185,500,000
$0
Other $0
Other $0
$148,400,000 $37,100,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$148,400,000 $37,100,000 $0 $0 $185,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-02-083
Expand from 4 to 10 lane expressway - including 2 HOV-special use lanes, & from 4 to 4 FR lanes
Status: RSR
$185,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
42
Remarks: Reference #4049 and #5556
Non-Exempt
Proj Hist:
10/19 - move from 19 to 21 and revise cost, limits and description; see #4049 and #5556; 1/19 - rev descr to incl FR lanes; 10/18 - 20 to 21, rev descr & fund, move to TxDOT; 4/17 - rev limits, descr, cost (has
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 5332.0
Limits From: at FM 2696 - Blanco Road
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $40,600,000
Construction Engineering $1,800,000
Contingencies: $3,100,000
Indirect Costs: $900,000
Preliminary Engineering: $4,100,000
Other Field $1,800,000
$52,300,000
Type of Work: TSMO: Operational
Total Project Cost:
$40,600,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
Other
$40,600,000
$0
Other $0
Other $0
$32,480,000 $8,120,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$32,480,000 $8,120,000 $0 $0 $40,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-02-117
Intersection operational improvements including construction of a diverging diamond interchange (DDI)
Status: RSR
$40,600,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
11/19 - ADM* clarify description; 10/19 - rev cost; 10/18 - move 22 to 21; 3/18 - incr cost from $30M; 10/17 - move 20 to 22; 4/17 - TIP: add project; MTP - move 27 to 20; 4/16 - funded in 17-20 TIP Call for Projects
51Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 4049.0
Limits From: IH 10
Limits To: US 281
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $187,800,000
Construction Engineering $8,300,000
Contingencies: $14,600,000
Indirect Costs: $4,100,000
Preliminary Engineering: $18,800,000
Other Field $8,300,000
$241,900,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$187,800,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
Other
$187,800,000
$0
Other $0
Other $0
$150,240,000 $37,560,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$150,240,000 $37,560,000 $0 $0 $187,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-02-128
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 frontage roads
Status: RSR
$187,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
42
Remarks: 10/19 - add project; spin off of 2452-02-083 (MPO #3913); no impact to conformity
Non-Exempt
Proj Hist:
10/19 - add project; spin off of 2452-02-083 (MPO #3913); no impact to conformity
Medina15 - San Antonio
Description:
SH 211 C BxCo 3152.0
Limits From: Bexar C/L, 2.0 Mi S of FM 471, N
Limits To: FM 471 (Culebra Rd)
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,100,000
Construction Cost: $4,400,000
Construction Engineering $214,157
Contingencies: $309,338
Indirect Costs: $241,283
Preliminary Engineering: $233,193
Other Field $0
$6,497,971
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,400,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - PTF
Other
$4,400,000
$0
Other $0
Other $0
$0 $0 $0 $4,400,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $4,400,000 $4,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3544-03-002
Construct two lane rural highway on new location
Status: Exempt
$4,400,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/19 - move from FY 2019 to FY 2020; 4/18 - move from FY 2018 to FY 2019; 10/17 - move from FY 2017 to FY 2018; 4/15 - move from FY 2015 to FY 2016; Pass
Bexar15 - San Antonio
Description:
SH 211 C BxCo 3153.0
Limits From: FM 1957 (Potranco Rd), N 2.9 MI
Limits To: Medina County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,780,000
Construction Cost: $7,000,000
Construction Engineering $340,704
Contingencies: $492,128
Indirect Costs: $383,860
Preliminary Engineering: $840,000
Other Field $0
$10,836,692
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$7,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - PTF
Other
$7,000,000
$0
Other $0
Other $0
$0 $0 $0 $7,000,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $7,000,000 $7,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3544-04-002
Construct two lane rural highway on new location
Status: RSR
$7,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/19 - move from FY 2019 to FY 2020; 4/18 - move from FY 2018 to FY 2019; 10/17 - move from FY 2017 to FY 2018; 4/15 - move from FY 2015 to FY 2016; Pass
52Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2021FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
SH 211 C BxCo 3154.0
Limits From: Medina Co. Line, 4.5 Mi N of FM 1957, N
Limits To: Medina Co. Line, 2.0 Mi S of FM 471
Total Project Cost Information (TxDOT %):
ROW Purchase: $700,000
Construction Cost: $2,600,000
Construction Engineering $126,547
Contingencies: $182,790
Indirect Costs: $142,577
Preliminary Engineering: $137,796
Other Field $0
$3,889,710
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$2,600,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - PTF
Other
$2,600,000
$0
Other $0
Other $0
$0 $0 $0 $2,600,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $2,600,000 $2,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3544-05-001
Construct two lane rural highway on new location
Status: RSR
$2,600,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/19 - move from FY 19 to FY 20; 10/18 - revise TPC; 4/18 - move from FY 18 to FY 19;10/17 - move from FY 17 to FY 18; 4/15 - move from FY 15 to FY 16; Pass through
Medina15 - San Antonio
Description:
SH 211 C BxCo 3155.0
Limits From: Bexar C/L, 2.9 MI N of FM 1957, N
Limits To: Bexar C/L, 4.5 MI N of FM 1957
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,000,000
Construction Cost: $4,100,000
Construction Engineering $199,555
Contingencies: $288,246
Indirect Costs: $224,832
Preliminary Engineering: $217,293
Other Field $0
$6,029,926
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$4,100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
3 - PTF
Other
$4,100,000
$0
Other $0
Other $0
$0 $0 $0 $4,100,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $4,100,000 $4,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3544-06-001
Construct two lane rural highway on new location
Status: Exempt
$4,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
5/20 - move from FY 2020 to FY 2021; 10/19 - move from FY 2019 to FY 2020; 4/18 - move from FY 2018 to FY 2019; 10/17 - move from FY 2017 to FY 2018; 4/15 - move from FY 2015 to FY 2016; Pass
53Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
US 90 E TxDOT 5381.2
Limits From: 0.8 Miles W of IH 410
Limits To: IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $1,000,000
Construction Cost: $10,000,000
Construction Engineering $400,000
Contingencies: $700,000
Indirect Costs: $200,000
Preliminary Engineering: $490,000
Other Field $400,000
$13,190,000
Type of Work: Added Capacity: Non-Toll
Total Project Cost:
$890,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SWPE
Other
$890,000
$0
Other $0
Other $0
$0 $890,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $890,000 $0 $0 $890,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0024-08-138
Expand from 4 lane divided to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$890,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add E phase to TIP; 1/19 - rev descr to incl FR lanes; 4/18 - correct funding distribution; 4/17 - add project
Bexar15 - San Antonio
Description:
FM 1518 R TxDOT 5309.2
Limits From: FM 78
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $8,194,000
Construction Cost: $44,780,000
Construction Engineering $2,687,000
Contingencies: $3,135,000
Indirect Costs: $2,239,000
Preliminary Engineering: $2,194,000
Other Field $1,791,000
$65,020,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$8,194,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWROW
Other
$8,194,000
$0
Other $0
Other $0
$6,555,200 $1,638,800 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,555,200 $1,638,800 $0 $0 $8,194,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0465-02-027
Expand from 2 to 4 lanes with raised median or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$8,194,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add R phase to TIP: 4/18 - move from FY 2021 to FY 2023 and combine with STP-MM selected project; 4/16 - funded through STP-MM project selection process
Bexar15 - San Antonio
Description:
FM 1560 R TxDOT 5391.2
Limits From: Galm/Shaenfield
Limits To: SH 16
Total Project Cost Information (TxDOT %):
ROW Purchase: $11,800,000
Construction Cost: $19,750,000
Construction Engineering $900,000
Contingencies: $1,500,000
Indirect Costs: $400,000
Preliminary Engineering: $1,900,000
Other Field $900,000
$37,150,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$11,800,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWROW
Other
$11,800,000
$0
Other $0
Other $0
$9,440,000 $2,360,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$9,440,000 $2,360,000 $0 $0 $11,800,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-021
Expand from 2 lanes to 4 lanes with turn lanes, bike accommodation and sidewalks
Status: Non-RSR
$11,800,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add R phase to TIP; 4/18 - funded through the 19-22 STP-MM Call for Projects; 4/17 - add project to MTP with Prop 1/Prop 7; portion of project may have already been in the MTP
54Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
US 90 E TxDOT 5380.2
Limits From: SH 211
Limits To: 0.8 Miles W of IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $7,500,000
Construction Cost: $110,000,000
Construction Engineering $7,018,000
Contingencies: $5,500,000
Indirect Costs: $6,314,000
Preliminary Engineering: $5,390,000
Other Field $6,358,000
$148,080,000
Type of Work: Added Capacity: Non-Toll
Total Project Cost:
$12,408,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
SWPE
Other
$12,408,000
$0
Other $0
Other $0
$0 $12,408,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $12,408,000 $0 $0 $12,408,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0024-07-059
Expand from 4 lane divided to 6 lane expressway and 4 FR lanes (LP 1604 to SH 211)
Status: RSR
$12,408,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
5/20 - add E phase to TIP; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes and update cost; 4/18 - correct funding distribution; 4/17 - add project
Bexar15 - San Antonio
Description:
IH 35 North C,E TxDOT 61.2
Limits From: IH 410 S
Limits To: IH 410 N
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $538,700,000
Construction Engineering $50,000,000
Contingencies: $0
Indirect Costs: $32,000,000
Preliminary Engineering: $50,000,000
Other Field $0
$670,700,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$638,700,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
12 - Strat Priority
12 - CL
$369,000,000
$133,000,000
6 - Structures $36,700,000
3 - DB $100,000,000
$295,200,000 $73,800,000 $0 $0
$106,400,000 $26,600,000 $0 $0
$33,030,000 $3,670,000 $0 $0
$80,000,000 $20,000,000 $0 $0
$514,630,000 $124,070,000 $0 $0 $638,700,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0017-10-168
Expand from 8 ln to 14 ln expy - add 6 new express lanes incl 2 HOV-special use lns, & from 4/6 to 4/6 FR lanes & DCs at IH 410 S & IH 410 N
Status: RSR
$638,700,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
58
Remarks: 1 lane DC: NB 35 to WB 410N; 2 lane DC: NB 410S to NB 35; SB 35 to SB 410S; EB 410N to SB 35
Non-Exempt
Proj Hist:
5/20 - move from 21 to 22; 10/19 - move 25 to 21 & rev cost; 9/19 - ADM clarify descr; 1/19 - rev descr to incl FR lanes; 10/18 - rev descr & cost; 4/18 - move from 20 to 25 (out of TIP); 10/13 - revise description; 4/13 -
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5395.0
Limits From: Bexar/Guadalupe County Line
Limits To: FM 465
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $150,000,000
Construction Engineering $6,700,000
Contingencies: $11,600,000
Indirect Costs: $3,300,000
Preliminary Engineering: $15,000,000
Other Field $6,700,000
$193,300,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$150,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
12 - Strat Priority
Other
$150,000,000
$0
Other $0
Other $0
$120,000,000 $30,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$120,000,000 $30,000,000 $0 $0 $150,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0025-03-097
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$150,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: Move from MTP to TIP; no impact to conformity; see companion project #4008
Exempt
Proj Hist:
5/20 - move 21 to 22; 10/19 - move 28 to 21, rev funding & limits; 1/19 - rev descr to incl FR lanes & update cost; 10/18 - move 29 to 28; 6/18 - correct fund distrib; 4/17 - add proj to MTP with P1/P7; portion of project
55Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
IH 10 C TxDOT 5556.0
Limits From: at Loop 1604 North
Limits To: -
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $279,400,000
Construction Engineering $12,400,000
Contingencies: $21,700,000
Indirect Costs: $6,200,000
Preliminary Engineering: $27,900,000
Other Field $12,400,000
$360,000,000
Type of Work: TSMO: Operational
Total Project Cost:
$279,400,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
2 - Metro Corridor
4 - Connectivity
$245,400,000
$17,000,000
12 - CL $17,000,000
Other $0
$196,320,000 $49,080,000 $0 $0
$13,600,000 $3,400,000 $0 $0
$13,600,000 $3,400,000 $0 $0
$0 $0 $0 $0
$223,520,000 $55,880,000 $0 $0 $279,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0072-08-144
Construct Direct Connectors - 1 lane DC - NB 10 to EB 1604; EB 1604 to NB 10; SB 10 to WB 1604; WB 1604 to SB 10;
Status: RSR
$279,400,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: 2 lane - NB 10 to WB 1604; EB 1604 to SB 10; SB 10 to EB 1604 & WB 1604 to NB 10
Exempt
Proj Hist:
10/19 - move from FY 2026 to FY 2022, revise funding, revise CSJ from 2452-02-127; 9/19 - ADM clarify description; 1/19 - update cost; 10/18 - add project
Comal15 - San Antonio
Description:
SH 46 C TxDOT 9114.2
Limits From: US 281
Limits To: Bentwood Dr
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $14,000,000
Construction Engineering $560,000
Contingencies: $980,000
Indirect Costs: $280,000
Preliminary Engineering: $686,000
Other Field $560,000
$17,066,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$14,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$14,000,000
$0
Other $0
Other $0
$11,200,000 $2,800,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$11,200,000 $2,800,000 $0 $0 $14,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0215-01-044
Expand from 2 lanes to 6 lanes with raised median or CLTL
Status: RSR
$14,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
27
Remarks: None
Exempt
Proj Hist:
3/18 - move from FY 2020 to FY 2022 and revise funding distribution; 4/17 - revise limits and funding; added w/ 12/8/14 adoption of the MTP
Comal15 - San Antonio
Description:
SH 46 C TxDOT 9114.1
Limits From: Farhills Dr
Limits To: US 281
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $26,000,000
Construction Engineering $1,040,000
Contingencies: $1,820,000
Indirect Costs: $520,000
Preliminary Engineering: $1,274,000
Other Field $1,040,000
$31,694,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$26,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
4 - Connectivity
Other
$26,000,000
$0
Other $0
Other $0
$20,800,000 $5,200,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$20,800,000 $5,200,000 $0 $0 $26,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0215-07-027
Expand from 2 lanes to 6 lanes with raised median or CLTL
Status: RSR
$26,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
26
Remarks: None
Exempt
Proj Hist:
3/18 - move from FY 2020 to FY 2022 and revise funding distribution; 4/17 - revise limits and funding; added w/ 12/8/14 adoption of the MTP
56Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
SH 16 C TxDOT 5571.0
Limits From: 0.3 Mi West of FM 1560/Leslie Rd
Limits To: LP 1604
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $8,600,000
Construction Engineering $430,000
Contingencies: $516,000
Indirect Costs: $430,000
Preliminary Engineering: $421,000
Other Field $258,000
$10,655,000
Type of Work: TSMO: Operational
Total Project Cost:
$8,600,000
Authorized Funding by Category/Share
Helotes
Cost of Approved Phases:
5 - CMAQ
Other
$8,600,000
$0
Other $0
Other $0
$6,880,000 $1,720,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,880,000 $1,720,000 $0 $0 $8,600,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0291-10-114
Operational improvements including implementation of median U-turns and R-cut intersections
Status: RSR
$8,600,000
NOX lbs/day
10.097
VOC lbs/day
6.945
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
11/19 - ADM clarify description; 6/19 - added through CMAQ project call
Guadalupe15 - San Antonio
Description:
IH 10 C TxDOT 5385.0
Limits From: FM 464
Limits To: SH 123
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $200,000,000
Construction Engineering $8,000,000
Contingencies: $14,000,000
Indirect Costs: $4,000,000
Preliminary Engineering: $9,800,000
Other Field $8,000,000
$243,800,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$200,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
12 - Strat Priority
$50,000,000
$150,000,000
Other $0
Other $0
$45,000,000 $5,000,000 $0 $0
$135,000,000 $15,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$180,000,000 $20,000,000 $0 $0 $200,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0535-01-074
Expand from 4 lane to 6 lane expressway and from 4 to 4 FR lanes
Status: RSR
$200,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: See also 0535-01-077 and 0535-01-078 as spin offs to original project
Exempt
Proj Hist:
5/20 - move from FY 2021 to FY 2022 and rev limits; 1/19 - rev descr to incl FR lanes; 10/18 - move from FY 2025 to FY 2021 and increase cost; 4/18 - correct funding distribution; 4/17 - add project
Bexar15 - San Antonio
Description:
FM 471 C TxDOT 5377.0
Limits From: Old FM 471
Limits To: Medina County Line
Total Project Cost Information (TxDOT %):
ROW Purchase: $2,520,000
Construction Cost: $21,000,000
Construction Engineering $840,000
Contingencies: $1,470,000
Indirect Costs: $420,000
Preliminary Engineering: $2,100,000
Other Field $840,000
$29,190,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$21,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
3 - LC
$10,500,000
$10,500,000
Other $0
Other $0
$8,400,000 $2,100,000 $0 $0
$0 $0 $0 $10,500,000
$0 $0 $0 $0
$0 $0 $0 $0
$8,400,000 $2,100,000 $0 $10,500,000 $21,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0849-01-055
Expand from 2 to 4 lane divided with bike lanes and sidewalks
Status: RSR
$21,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: None
Non-Exempt
Proj Hist:
10/18 - revise TPC
57Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Medina15 - San Antonio
Description:
FM 471 C TxDOT 5378.0
Limits From: Medina County Line
Limits To: SH 211
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $375,000
Construction Engineering $15,000
Contingencies: $26,000
Indirect Costs: $8,000
Preliminary Engineering: $18,000
Other Field $15,000
$457,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$375,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$375,000
$0
Other $0
Other $0
$300,000 $75,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$300,000 $75,000 $0 $0 $375,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0849-02-045
Expand from 2 to 4 lane divided with bike lanes and sidewalks
Status: Non-RSR
$375,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
23
Remarks: None
Exempt
Proj Hist:
3/18 - revise funding distribution
Bexar15 - San Antonio
Description:
NR C AAMPO 5303.1
Limits From: Alamo Area MPO: Bexar, Comal
Limits To: Guadalupe & partial Kendall County
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $100,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$100,000
Type of Work: TSMO: Rideshare
Total Project Cost:
$100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$100,000
$0
Other $0
Other $0
$80,000 $0 $20,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$80,000 $0 $20,000 $0 $100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-197
Alamo Area Commute Solutions Pgm - FY 2022
Status: Exempt
$100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/18 - change agency and reduce cost; 4/16 - funded through STP-MM project selection process; project has $53,400 in TDCs which are not calculated in the funding total; fixed amount
Bexar15 - San Antonio
Description:
VA C TxDOT 5579.0
Limits From: Various locations within
Limits To: Bexar, Comal and Kendall counties
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $5,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$5,500,000
Type of Work: TSMO: Safety Service Pat
Total Project Cost:
$5,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$4,950,000
$550,000
Other $0
Other $0
$3,960,000 $990,000 $0 $0
$0 $0 $0 $550,000
$0 $0 $0 $0
$0 $0 $0 $0
$3,960,000 $990,000 $0 $550,000 $5,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-00-227
Safety service patrol on controlled access highways in Bexar, Comal and Kendall Counties
Status: Exempt
$5,500,000
NOX lbs/day
4.365
VOC lbs/day
0.507
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
58Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
VA C TxDOT 5316.3
Limits From: Various locations in Bexar County
Limits To: on state system
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,073,444
Construction Engineering $451,000
Contingencies: $91,000
Indirect Costs: $406,000
Preliminary Engineering: $346,600
Other Field $409,000
$8,777,044
Type of Work: Pedestrian
Total Project Cost:
$7,073,444
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$6,273,444
$800,000
Other $0
Other $0
$5,018,755 $1,254,689 $0 $0
$0 $0 $0 $800,000
$0 $0 $0 $0
$0 $0 $0 $0
$5,018,755 $1,254,689 $0 $800,000 $7,073,444
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-576
Construct curb ramps, sidewalks and other pedestrian related infrastructure
Status: Exempt
$7,073,444
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
10/18 - move from FY 2019 to FY 2022 and reduce cost; 4/18 - move from FY 2022 to FY 2019; 4/16 - funded through STP-MM project selection process
Bexar15 - San Antonio
Description:
CS C BxCo 5318.0
Limits From: In Bexar County, on Crestway
Limits To: From Kitty Hawk Rd to FM 1976
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,791,571
Construction Engineering $386,462
Contingencies: $155,052
Indirect Costs: $447,236
Preliminary Engineering: $381,787
Other Field $291,405
$9,453,513
Type of Work: Bicycle/Pedestrian
Total Project Cost:
$7,791,571
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
Other
$7,791,571
$0
Other $0
Other $0
$6,233,257 $0 $1,558,314 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$6,233,257 $0 $1,558,314 $0 $7,791,571
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-584
Reconstruct to provide operational improvements including bike lanes and sidewalks
Status: Non-RSR
$7,791,571
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
4/19 - revise description; 4/16 - funded through STP-MM project selection process
Bexar15 - San Antonio
Description:
VA C CoSA 5572.0
Limits From: Various locations in San Antonio
Limits To: on Hamilton Wolfe and Ewing Halsell
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $6,000,000
Construction Engineering $180,000
Contingencies: $300,000
Indirect Costs: $240,000
Preliminary Engineering: $294,000
Other Field $180,000
$7,194,000
Type of Work: Bicycle
Total Project Cost:
$6,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$6,000,000
$0
Other $0
Other $0
$4,800,000 $0 $1,200,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$4,800,000 $0 $1,200,000 $0 $6,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-666
Construct cycle track on Hamilton Wolff Rd from Babcock to Ewing Halsell. And on Ewing Halsell from Hamilton Wolff to Sid Katz
Status: Exempt
$6,000,000
NOX lbs/day
0.132
VOC lbs/day
0.090
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
59Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
VA C CoSA 5573.3
Limits From: Various locations within
Limits To: the City of San Antonio
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $1,500,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$1,500,000
Type of Work: TSMO: Traffic Signals
Total Project Cost:
$1,500,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$1,500,000
$0
Other $0
Other $0
$1,200,000 $0 $300,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$1,200,000 $0 $300,000 $0 $1,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-681
Traffic signal optimization on congested corridors in the City of San Antonio. Data collection and implementation of updated signal timing plans. FY 2022
Status: Exempt
$1,500,000
NOX lbs/day
31.360
VOC lbs/day
8.557
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
Bexar15 - San Antonio
Description:
VA C CoSA 5575.3
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $250,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$250,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$250,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$250,000
$0
Other $0
Other $0
$200,000 $0 $50,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$200,000 $0 $50,000 $0 $250,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-682
City of San Antonio Travel Demand Management Program. To support efforts in vanpool, carpool, telecommuting and education. FY 2022
Status: Exempt
$250,000
NOX lbs/day
10.140
VOC lbs/day
4.947
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
Bexar15 - San Antonio
Description:
VA C CoSA 5576.3
Limits From: In the City of San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $150,000
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$150,000
Type of Work: TSMO: TDM Program
Total Project Cost:
$150,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
5 - CMAQ
Other
$150,000
$0
Other $0
Other $0
$120,000 $0 $30,000 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$120,000 $0 $30,000 $0 $150,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-683
City of San Antonio Vehicle Emissions Reductions Program. Series of targeted outreach and education programs. Gas cap replacement program. FY 2022
Status: Exempt
$150,000
NOX lbs/day
0.152
VOC lbs/day
499.810
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
60Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
VA C UTSA 5577.3
Limits From: University of Texas at San Antonio
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $129,225
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$129,225
Type of Work: TSMO: TDM Program
Total Project Cost:
$129,225
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC (UTSA)
$113,042
$16,183
Other $0
Other $0
$90,434 $0 $22,608 $0
$0 $0 $0 $16,183
$0 $0 $0 $0
$0 $0 $0 $0
$90,434 $0 $22,608 $16,183 $129,225
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-684
Make UTSA Walkable Program. Support UTSA's efforts to establish programs to increase alternate forms of transportation. FY 2022
Status: Exempt
$129,225
NOX lbs/day
0.922
VOC lbs/day
0.628
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
Bexar15 - San Antonio
Description:
VA T VIA 5580.3
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $7,553,332
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$7,553,332
Type of Work: Transit
Total Project Cost:
$7,553,332
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$6,866,666
$686,666
Other $0
Other $0
$5,493,333 $0 $1,373,333 $0
$0 $0 $0 $686,666
$0 $0 $0 $0
$0 $0 $0 $0
$5,493,333 $0 $1,373,333 $686,666 $7,553,332
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-685
VIA Fleet Replacement Program. Purchase 14 CNG buses. FY 2022
Status: Exempt
$7,553,332
NOX lbs/day
36.092
VOC lbs/day
3.761
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
Bexar15 - San Antonio
Description:
VA T VIA 5581.3
Limits From: In VIA service area
Limits To: .
Total Project Cost Information (TxDOT %):
ROW Purchase: $0
Construction Cost: $2,181,427
Construction Engineering $0
Contingencies: $0
Indirect Costs: $0
Preliminary Engineering: $0
Other Field $0
$2,181,427
Type of Work: Transit
Total Project Cost:
$2,181,427
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
5 - CMAQ
3 - LC
$1,489,761
$691,666
Other $0
Other $0
$1,191,809 $0 $297,952 $0
$0 $0 $0 $691,666
$0 $0 $0 $0
$0 $0 $0 $0
$1,191,809 $0 $297,952 $691,666 $2,181,427
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
0915-12-686
VIA Bus Frequency Program. Increase service on #7 and #552 routes. FY 2022
Status: Exempt
$2,181,427
NOX lbs/day
4.156
VOC lbs/day
3.709
CMP Score
N/A
Remarks: None
Exempt
Proj Hist:
6/19 - added through CMAQ project call
61Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
FM 1516 C TxDOT 5379.0
Limits From: FM 78
Limits To: IH 10
Total Project Cost Information (TxDOT %):
ROW Purchase: $10,754,000
Construction Cost: $23,500,000
Construction Engineering $940,000
Contingencies: $1,645,000
Indirect Costs: $470,000
Preliminary Engineering: $1,151,500
Other Field $940,000
$39,400,500
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$23,500,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
3 - LC
$11,750,000
$11,750,000
Other $0
Other $0
$9,400,000 $2,350,000 $0 $0
$0 $0 $0 $11,750,000
$0 $0 $0 $0
$0 $0 $0 $0
$9,400,000 $2,350,000 $0 $11,750,000 $23,500,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
1477-01-043
Expand from 2 to 4 lane divided with bike lanes and sidewalks
Status: RSR
$23,500,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
41
Remarks: None
Non-Exempt
Proj Hist:
10/18 - revise TPC; 3/18 - revise funding distribution; 4/17 - 2017 UTP revisions
Bexar15 - San Antonio
Description:
FM 1560 C TxDOT 5311.0
Limits From: FM 471
Limits To: Galm/Shaenfield
Total Project Cost Information (TxDOT %):
ROW Purchase: $12,257,333
Construction Cost: $12,100,000
Construction Engineering $600,160
Contingencies: $240,790
Indirect Costs: $694,540
Preliminary Engineering: $1,210,000
Other Field $452,540
$27,555,363
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$12,100,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
7 - STBG
3 - LC
$10,580,000
$1,520,000
Other $0
Other $0
$8,464,000 $2,116,000 $0 $0
$0 $0 $0 $1,520,000
$0 $0 $0 $0
$0 $0 $0 $0
$8,464,000 $2,116,000 $0 $1,520,000 $12,100,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2230-01-020
Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and sidewalks
Status: Non-RSR
$12,100,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
31
Remarks: None
Non-Exempt
Proj Hist:
10/18 - revise TPC; 4/16 - funded through STP-MM project selection process
Bexar15 - San Antonio
Description:
SL 1604 C TxDOT 9110.2
Limits From: Macdona-Lacoste Rd
Limits To: US 90 W
Total Project Cost Information (TxDOT %):
ROW Purchase: $4,800,000
Construction Cost: $40,000,000
Construction Engineering $2,552,000
Contingencies: $516,000
Indirect Costs: $2,296,000
Preliminary Engineering: $4,000,000
Other Field $2,312,000
$56,476,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$40,000,000
Authorized Funding by Category/Share
Other
Cost of Approved Phases:
2 - Metro Corridor
Other
$40,000,000
$0
Other $0
Other $0
$32,000,000 $8,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$32,000,000 $8,000,000 $0 $0 $40,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-01-066
Expand from 2 lanes to 4 lanes divided
Status: RSR
$40,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
47
Remarks: None
Non-Exempt
Proj Hist:
10/18 - revise cost, TPC and limits; 3/18 - revise funding distribution; 4/17 - revise project; added w/ 12/8/14 adoption of the MTP
62Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
Bexar15 - San Antonio
Description:
SL 1604 E,R TxDOT 3786.2
Limits From: US 281
Limits To: Redland Road
Total Project Cost Information (TxDOT %):
ROW Purchase: $3,600,000
Construction Cost: $58,000,000
Construction Engineering $2,600,000
Contingencies: $4,500,000
Indirect Costs: $1,300,000
Preliminary Engineering: $5,800,000
Other Field $2,600,000
$78,400,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$9,400,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
SWPE
SWROW
$5,800,000
$3,600,000
Other $0
Other $0
$4,640,000 $1,160,000 $0 $0
$2,880,000 $720,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$7,520,000 $1,880,000 $0 $0 $9,400,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
2452-03-113
Expand from 4 to 10 lane expressway - including 2 HOV - special use lanes & from 4 to 4 FR lanes
Status: RSR
$9,400,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
N/A
Remarks: None
Non-Exempt
Proj Hist:
10/19 - move from FY 2021 to FY 2024 and revise funding; 1/19 - rev descr to incl FR lanes; 10/18 - add phases (Engr, ROW)
Bexar15 - San Antonio
Description:
SH 151 C TxDOT 5382.0
Limits From: LP 1604
Limits To: IH 410
Total Project Cost Information (TxDOT %):
ROW Purchase: $9,600,000
Construction Cost: $80,000,000
Construction Engineering $3,200,000
Contingencies: $5,600,000
Indirect Costs: $1,600,000
Preliminary Engineering: $8,000,000
Other Field $3,200,000
$111,200,000
Type of Work: Added Capacity: Non Toll
Total Project Cost:
$80,000,000
Authorized Funding by Category/Share
San Antonio
Cost of Approved Phases:
4 - Connectivity
Other
$80,000,000
$0
Other $0
Other $0
$72,000,000 $8,000,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$72,000,000 $8,000,000 $0 $0 $80,000,000
Total
Local ContribStateFederal Local
Funding Categories
Totals
Last Revision Date: 7/2020
3508-01-029
Expand from 4 lane to 6 lane expressway and from 4/6 to 4/6 FR lanes including WB SH 151 to NB LP 1604 2 lane direct connector
Status: RSR
$80,000,000
NOX lbs/day
N/A
VOC lbs/day
N/A
CMP Score
49
Remarks: None
Non-Exempt
Proj Hist:
5/20 - move from FY 2021 to FY 2022; 9/19 - ADM clarify description; 1/19 - rev descr to incl FR lanes; 10/18 - move from 24 to 21, rev TPC; 4/18 - correct funding distribution; 4/17 - add project
63Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.
ALAMO AREA METROPOLITAN PLANNING ORGANIZATION
2022FY
TxDOT District County CSJ Hwy Phase Project Sponsor MPO Proj ID No.
Year of Expenditure
Cost
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
City
TIP PROJECTS FY 2019-2022
64Phase: C=Construction, E=Engineering, R=ROW, T=Transfer
Emissions reductions are provided for CMAQ projects only.