STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway...

37
7 Division 7 Alamance Caswell Guilford Orange Rockingham STATE TRANSPORTATION IMPROVEMENT PROGRAM

Transcript of STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway...

Page 1: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

7

Division 7AlamanceCaswellGuilfordOrangeRockingham

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Page 2: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

ORANGE

ALAMANCE

GUILFORD

CASWELL

ROCKINGHAM

158

29

421

158

15

70

70

220

220

29311

40

4040

74

85

85

73

150

119

62

770

87

68

62

700

68

49

8662

87

57

65

86

14

62

87

54

61

119

704

Kernersville

Eden

Reidsville

Greensboro

Mebane

ChapelHill

Graham

Carrboro

HighPoint

Burlington

P-5701

AV-5711

B-5346B-4953

B-5239

B-5349

B-5719

B-4956

B-5736

B-4958

B-5717

B-5344

B-4960

B-5730

B-5356

B-5354

B-4805

B-5715

B-4964

B-4803

B-5341

B-5721

B-5352

B-5716

B-5343

B-5722

EB-5712

U-5846

U-5774B

R-2612B

U-5849

U-5854

U-5304DU-5847

U-5550

U-5169

U-5326I-5711

R-5725

U-5752I-5712 U-5843

U-5850

P-5204

U-5848

U-5306B

R-5704

U-5842

U-5841

U-5304E

U-5812

U-5304B

EB-5721

U-5852

U-5754

EB-5714

EB-5716

EB-5717 U-5844

U-5855

U-2524BC

EB-5700

I-5853

I-5811

U-5851

U-2524D

I-5735

I-5854

I-5822

U-5853

I-5789

I-5790U-5845

I-5836I-5812

I-5110

U-3615B

I-5734

R-2413B

I-5852I-5762

U-2412A

I-5855

U-5304A

U-4758

U-2525B

R-2413A

I-5821

U-2525C

I-5736

I-3306A

DRAFT STIPFY 2015-2025STI ProjectsDIVISION 7

0 5 102.5Miles

BRIDGES FUNDED THROUGH STI

STATEWIDE AVIATION

REGIONAL AVIATION

DIVISION AVIATION

DIVISION FERRYREGIONAL RAILDIVISION RAILREGIONAL TRANSITDIVISION TRANSITSAFETYTRANSITION *TRANSITION *INTERSTATE MAINTENANCESTATEWIDE HIGHWAYREGIONAL HIGHWAYDIVISON HIGHWAYDIVISION BIKE/PEDESTRIANINTERSTATE ROUTEUS ROUTENC ROUTESECONDARY ROADUNDER CONSTRUCTIONMUNICIPAL BOUNDARIESMILITARY BASENCDOT DIVISION BOUNDARYCOUNTY BOUNDARYWATER FEATURES

* Note: Reflects 108 of the Major Transition ProjectsNote: FY 2015 projects represent major projects not

let as of November 2014

Page 3: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

COUNTY

FUTURE YEARS

F

NHPB - National Highway Performance Program (Bridge)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersRR - Rail-Highway SafetyS (M) - State MatchSRTS - Safe Routes to School

FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation ProgramHFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct AttributableHP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike)

STPON - Surface Transportation Program Bridge (On System Bridge)STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary EngineeringT - State Highway Trust Funds

NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE)

SW - StatewideTRN -Transition Project

S - StructureU - Utilities

I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving

WAKE

NUMBERLENGTH (MILES)

DIVISION 00

R-0000

IDROUTE/CITY

US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY

Project termini and a general

SW

M1500

A

NHP

4000

FUNDING CATEGORY (1)

used for each project phase.

FUNDING SOURCE (2)

U

B3000R

FY 2017

C

(3) WORK TYPE (ACTIVITY)

A - Acquisition

with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

dollars.)

of a project segment indicates (Cash-Flow Funding) COMMITMENTSFUTURE

SW CBSW

One or two letter

HIGHWAY PROGRAM

UNFUNDED

NC 3 TO SR 1003SR 1003 TO NC 96

ASW

UNFUNDED

20000CRC 5000C 5000 BC B

WIDEN TO A FOUR-LANE FACILITY

A

NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN.

B

FY 2025 FY 2018

700

FY 2019

DEVELOPMENTAL PROGRAMSTATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020FY 2015 FY 2016

M

TOTAL PROJECT

COST (THOU)

NHPNHP

FUN

DS

A

PRIOR YEARS COST

(THOU)

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

U 5000NHP

C10000

FY 2021

C

FY 2023 FY 2024

FY 2022

5000

9000

APD - Appalachian Development

NHPNHP

LOCATION / DESCRIPTION NHP

NHP

I-40 TO NC 3

Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. break.

work description.

way, utility, mitigation and construction cost estimates

See Highway Funding Key

any project breaks.Category for the project andIdentifies the "STI" Funding

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

for an explanation of funding categories

Phases of implementation: ESTIMATED COST Preliminary engineering, right of

(1) FUNDING CATEGORY

PROJECT BREAKS

designation for project

LOCATION / DESCRIPTION

SR - Secondary Road

IDENTIFICATION NUMBER Assigned to each project at conception and remains with

BVarious - multiple routesNEW ROUTE or City

WORK TYPE (ACTIVITY) (3)

BOND (R) - Revenue Bond

HRRR - High Risk Rural Roads

L - LocalHSIP - Highway Safety Improvement Program

project until completion.

DIV - DivisionEX - Exempt

REG - RegionalHF - State Dollars (Non-STI)

F - Feasibility StudyCG - Construction (GARVEE)C - Construction

G - Grading and Structures

R - Right of Way

(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES

ER - Emergency Relief Funds

CMAQ - Congestion MitigationDP - Discretionary or Demonstration

FED - Federal Rail Funds

Page 4: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS

I-5836 14540.2 MILE EAST OF NC 49 TO 0.2 MILE EAST OF NC 54 IN GRAHAM. PAVEMENT REHABILITATION.

2.7SW

NHPIM C 1454 ALAMANCE I-40 / I-85

PLANNING / DESIGN IN PROGRESS

I-5309 7225 650EAST OF GUILFORD COUNTY LINE TO EAST OF NC 49. PAVEMENT REHABILITATION.

5.8

SW

NHPIM C 6575 ALAMANCE I-40 /I-85

PROJECT COMPLETE - GARVEE BOND FUNDING $12.0 MILLION; PAYBACK FY 2007 - FY 2018

I-4918 19870 16014NC 54 (MILE POST 148) IN ALAMANCE COUNTY TO WEST OF SR 1114 (BUCKHORN ROAD) IN ORANGE COUNTY. MILL AND RESURFACE.

8.3

TRN

NHP 964CG CG 964 CG 964 CG 964 ALAMANCEORANGE

I-40 / I-85

PROJECT COMPLETE - GARVEE BOND FUNDING $4.4 MILLION; PAYBACK FY 2007 - FY 2018

I-4714 11383 9511NC 49 (MILE POST 145) TO NC 54 (MILE POST 148). MILL AND RESURFACE.

2.8TRN

NHP 468CG CG 468 CG 468 CG 468 ALAMANCE I-40 / I-85

PLANNING / DESIGN IN PROGRESS

I-5711 1545 200SR 1007 (MEBANE-OAKS ROAD) IN MEBANE. INTERCHANGE IMPROVEMENTS.

SW

NHP R 160 NHP U 185 NHP C 1000

ALAMANCE I-40 / I-85

URBAN PROJECTSU-5752 930ST. MARKS CHURCH ROAD IN BURLINGTON.

INTERSECTION IMPROVEMENTS.

REG

T R 180 T C 750

ALAMANCE US 70(SOUTH CHURCH STREET)

U-5843 1163SR 1817 (GRAHAM-HOPEDALE ROAD) IN BURLINGTON. INTERSECTION IMPROVEMENTS.

0.5

DIV

T R 225 T C 938

ALAMANCE US 70(CHURCH STREET)

U-5844 7100SR 1430 (RAMADA ROAD) TO US 70 (CHURCH STREET) IN BURLINGTON. WIDEN TO MULTILANES.

1.1

DIV

T R 1900 T 5200C

ALAMANCE NC 62

UNDER CONSTRUCTION

U-5152 214 214ELMIRA STREET IN BURLINGTON. INSTALL METAL SIGN POST.

ALAMANCE NC 87(WEBB STREET)

PLANNING / DESIGN IN PROGRESS

U-3109 112589 46958NC 119 RELOCATION, I-85 TO SOUTH OF SR 1918 (MRS. WHITE ROAD) IN MEBANE. FOUR-TO-SIX-LANE FACILITY ON NEW LOCATION.

4.2 STP 10M A STP 47800C A STP 6600R B STP 813U B STP 8M B STP 10400C B

A NC 119 RELOCATION, I-40 / I-85 TO NORTH OF SR 1921 (MEBANE ROGERS ROAD). - RIGHT OF WAY IN PROGRESSB NC 119 RELOCATION, NORTH OF SR 1921 (MEBANE ROGERS ROAD) TO SOUTH OF SR 1918 (MRS. WHITE ROAD)

ALAMANCE NC 119

U-5853 24819SR 1228 (BOONE STATION DRIVE) IN BURLINGTON TO EAST LEBANON AVENUE IN ELON. WIDEN TO MULTILANES.

DIV

T 594U T 4949R T 19276C

ALAMANCE SR 1301(ST. MARKS CHURCHROAD / SOUTHWILLIAMSONAVENUE)

UNDER CONSTRUCTION

U-5538 1650 1650ACCESS ROAD FROM SR 1981 (TROLLINGWOOD-HAWFIELDS ROAD) TO INDUSTRIAL SITE. CONSTRUCT TWO-LANE ROAD ON NEW LOCATION.

1.5ALAMANCE NEW ROUTE

7-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 5: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

PART B, GARVEE BOND FUNDING $10.5 MILLION; PAYBACK FY 2011 - FY 2022

U-3110 30477 21293NEW ROUTE, US 70 TO NC 100 IN ELON. MULTI-LANES, PART ON NEW LOCATION.

2.1 STP 1148CG B CG 1148 B CG 1148 B CG 1148 B CG 1148 B CG 1148 B 1148CG B1148CG B

A US 70 TO NORTH OF SR 1309 (WESTBROOK AVENUE) - COMPLETEB IMPROVEMENTS ON SR 1311 (COOK ROAD), SR 1309 (WESTBROOK AVENUE) TO NC 100, PART ON NEW LOCATION - COMPLETETRN

ALAMANCE NEW ROUTE

FEDERAL BRIDGE PROJECTSB-5728 5635REPLACE BRIDGE NO. 112 OVER REEDY

FORK CREEK IN OSSIPEE.HF

HFB 515R HFB 5120C

ALAMANCE NC 87

PLANNING / DESIGN IN PROGRESS

B-5239 3065 200REPLACE BRIDGE NO. 126 OVER MILL RACE AND REPLACE BRIDGE NO. 119 OVER HAW RIVER.

REG

STPON 35R STPON 230U HFB C 2600

ALAMANCE NC 87

UNDER CONSTRUCTION

B-4400 1345 1345REPLACE BRIDGE NO. 160 OVER PRONG OF STINKING QUARTER CREEK.

DIV

ALAMANCE SR 1122(EULISS ROAD)

UNDER CONSTRUCTION

B-4401 1560 1560REPLACE BRIDGE NO. 161 OVER NORTH PRONG OF STINKING QUARTER CREEK.

DIV

ALAMANCE SR 1124(STAFFORD MILLROAD)

PLANNING / DESIGN IN PROGRESS

B-5342 1358 200REPLACE BRIDGE NO. 169 OVER GUM CREEK.

DIV

STPOFF 75R STPOFF 158U HFB C 925

ALAMANCE SR 1148(ANTHONY ROAD)

PLANNING / DESIGN IN PROGRESS

B-5349 1690 100REPLACE BRIDGE NO. 173 OVER LITTLE ALAMANCE CREEK IN BURLINGTON.

DIV

STPOFF R 180 STPOFF M 10 STPOFF C 1400

ALAMANCE SR 1149(HUFFMAN MILLROAD)

B-5727 2804REPLACE BRIDGE NO. 178 OVER LITTLE ALAMANCE CREEK IN BURLINGTON.

HF

HFB 250R HFB 4M HFB 2550C

ALAMANCE SR 1154 (TUCKERSTREET)

PLANNING / DESIGN IN PROGRESS

B-5347 675 100REPLACE BRIDGE NO. 170 OVER PRONG OF ALAMANCE CREEK IN ALAMANCE.

HF

HFB R 50 HFB C 525

ALAMANCE SR 1212(POND ROAD)

PLANNING / DESIGN IN PROGRESS

B-5346 947 100REPLACE BRIDGE NO. 3 OVER AN UNNAMED CREEK.

DIV

STPOFF R 77 STPOFF C 770

ALAMANCE SR 1529(DURHAM STREET)

PLANNING / DESIGN IN PROGRESS

B-5350 750 100REPLACE BRIDGE NO. 44 OVER JORDAN'S CREEK.

HF

HFB R 50 HFB C 600

ALAMANCE SR 1768(HUGHES MILLROAD)

RIGHT OF WAY IN PROGRESS

B-4953 860 285REPLACE BRIDGE NO. 64 OVER QUAKER CREEK.

DIV

STPOFF 575C ALAMANCE SR 1912(DICKEY MILL ROAD)

7-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 6: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5735 1900REPLACE BRIDGE NO. 307 OVER BACK CREEK.

HF

HFB 175R HFB 1725C

ALAMANCE SR 1936 (STONE STREETEXTENSION)

IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5107 18387 16387DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4907 17824 17824ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 7 PROJECT MITIGATION.

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION

W-5011 468 468NC 119 INTERSECTION. INSTALL ALL-WAY STOP AND CHANNELIZATION, AND IMPROVE SIGHT DISTANCE.

0.3ALAMANCE NC 49

DIVISION PURCHASE ORDER CONTRACT (DPOC) - UNDER CONSTRUCTION

W-4705 400 400SR 2142 (MT. WILLEN ROAD-SALEM CHURCH ROAD) INTERSECTION. INSTALL TRAFFIC SIGNAL AND CONSTRUCT TURN LANES ON NC 54.

ALAMANCE NC 54

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5207 3482 3482DIVISION 7 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE

WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

FEDERAL BRIDGE PROJECTSB-5734 3250REPLACE BRIDGE NO. 60 OVER MOON

CREEK.HF

HFB 300R HFB C 2950

CASWELL NC 86

7-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 7: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

UNDER CONSTRUCTION

B-5162 2358 2358REPLACE BRIDGE NO. 35 OVER NORTH FORK RATTLESNAKE CREEK.

DIV

CASWELL SR 1523(BLANCH ROAD)

B-5719 683REPLACE BRIDGE NO. 53 OVER TRIBUTARY OF DAN RIVER.

DIV

STPOFF R 33 STPOFF C 650

CASWELL SR 1527 (RIVER BENDROAD)

UNDER CONSTRUCTION

B-4725 2361 2361REPLACE BRIDGE NO. 12 OVER COUNTRY LINE CREEK.

DIV

CASWELL SR 1554(YARBOROUGHSMILL ROAD)

B-5725 2800REPLACE BRIDGE NO. 7 OVER HYCO CREEK.

HF

HFB 250R HFB 2550C

CASWELL SR 1710 (GRIERSCHURCH ROAD)

IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5107 18387 16387DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4907 17824 17824ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 7 PROJECT MITIGATION.

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION

W-5325 2154 2154NORTH OF SR 1111 (BYRDS SAWMILL ROAD) TO SOUTH OF SR 1759 (ROSCOE DAMERON ROAD). GEOMETRIC IMPROVEMENTS, PAVED SHOULDERS, AND RESURFACING.

1.1CASWELL NC 62

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5207 3482 3482DIVISION 7 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

CONGESTION MITIGATION PROJECTS

IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.

EX

CASWELLDAVIDSONFORSYTHGUILFORDMONTGOMERYRANDOLPHROCKINGHAM

VARIOUS

7-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 8: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS

PROJECT COMPLETE - GARVEE BOND FUNDING $9.3 MILLION; PAYBACK FY 2007 - FY 2018

I-4715 17291 13947SR 4121 (HIGH POINT ROAD) TO I-85 BYPASS. MILL AND RESURFACE.

9.9TRN

NHP 836CG CG 836 CG 836 CG 836 GUILFORD I-40

I-5712 2175SR 1850 (SANDY RIDGE ROAD) IN GREENSBORO. INTERCHANGE IMPROVEMENTS.SW

NHP R 300 NHP C 1875

GUILFORD I-40 / US 421

I-5812 3341 MILE EAST OF SR 3029 (YOUNGS MILL ROAD) TO 0.2 MILE EAST OF SR 3045 (MOUNT HOPE CHURCH ROAD) IN GREENSBORO. PAVEMENT REHABILITATION.

2SW

NHPIM C 334 GUILFORD I-40

I-5814 32260.4 MILE EAST OF SR 2632 (OLD SALEM ROAD) IN FORSYTH COUNTY TO 0.3 MILE WEST OF SR 1860 (MACY GROVE ROAD) IN GUILFORD COUNTY. PAVEMENT REHABILITATION.

2.4

SW

NHPIM C 3226 FORSYTHGUILFORD

I-40

I-5734 64021.3 MILES EAST OF SR 1850 (SANDY RIDGE ROAD) TO 1.1 MILES EAST OF SR 1556 (GALLIMORE DAIRY ROAD) IN GREENSBORO. PAVEMENT REHABILITATION.

3SW

NHPIM C 6402 GUILFORD I-40

I-5762 3262FORSYTH COUNTY LINE TO 1.3 MILES EAST OF SR 1850 (SANDY RIDGE ROAD). PAVEMENT REHABILITATION.

4SW

NHPIM C 3262 GUILFORD I-40

I-5811 6130.2 MILE EAST OF SR 1541 (WENDOVER AVENUE) TO 0.6 MILE EAST OF SR 4239 (PATTERSON STREET) IN GREENSBORO. PAVEMENT REHABILITATION.

2SW

NHPIM C 613 GUILFORD I-40

I-5852 5174I-40 / US 421 TO SR 2085 (BRYAN BOULEVARD) IN GREENSBORO. PAVEMENT REHABILITATION.

3.4SW

NHPIM C 5174 GUILFORD I-73

I-5735 2620RANDOLPH COUNTY LINE TO 1.2 MILES NORTH OF NC 62. PAVEMENT REHABILITATION.

2SW

NHPIM C 2620 GUILFORD I-73

COORDINATE WITH I-5767

I-5736 829FORSYTH COUNTY LINE TO SR 1300 (GREEN ROAD) IN HIGH POINT. PAVEMENT REHABILITATION.

7.1SW

NHPIM C 829 GUILFORD I-74 / US 311

UNDER CONSTRUCTION

I-5511 180 180I-40 IN FORSYTH COUNTY TO EAST OF SR 1980 (OLD PLANK ROAD) IN GUILFORD COUNTY. INSTALL SIGNAGE TO REFLECT INTERSTATE DESIGNATION.

12

TRN

FORSYTHGUILFORD

I-74 / US 311

I-5790 41760.2 MILE NORTH OF SR 3039 (NELSON FARM ROAD) TO 1.3 MILES NORTH OF SR 3029 (YOUNGS MILL ROAD) IN GREENSBORO. PAVEMENT REHABILITATION.

2.4SW

NHPIM C 4176 GUILFORD I-85

I-5789 3208SR 1113 (KIVETT DRIVE) TO 0.4 MILE NORTH OF I-85 BUSINESS IN HIGH POINT. PAVEMENT REHABILITATION.

2SW

NHPIM C 3208 GUILFORD I-85

I-5855 55310.8 MILE NORTH OF SR 3505 (PLEASANT GARDEN RD.) TO 0.2 MILE NORTH OF SR 3039 (NELSON FARM ROAD) IN GREENSBORO. PAVEMENT REHABILITATION.

3.8SW

NHPIM C 5531 GUILFORD I-85

I-5854 33910.3 MILE NORTH OF BUSINESS 85 TO 0.2 MILE NORTH OF SR 1115 (REHOBETH CHURCH ROAD). PAVEMENT REHABILITATION.

1.9SW

NHPIM C 3391 GUILFORD I-85

I-5853 9300.4 MILE NORTH OF I-85 BUSINESS TO 0.3 MILE NORTH OF I-73 / US 421. PAVEMENT REHABILITATION.

2SW

NHPIM C 930 GUILFORD I-85 / US 29 / US 70

7-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 9: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS

I-5821 6692RANDOLPH COUNTY LINE TO 1 MILE EAST OF SR 1113 (KIVETT DRIVE). PAVEMENT REHABILITATION.

5.5SW

NHPIM C 6692 GUILFORD I-85

UNDER CONSTRUCTION

I-5329 1595 1595SOUTH OF ELLERBE IN RICHMOND COUNTY TO I-85 / US 421 IN GUILFORD COUNTY. UPGRADE SIGNING TO INTERSTATE STANDARDS.

70GUILFORDMONTGOMERYRANDOLPHRICHMOND

US 220 / I-73 / I-74

COMBINED WITH R-2413A AND R-2413B FOR DESIGN-BUILD LET - UNDER CONSTRUCTION

I-5110 153391 85441NC 68 TO GREENSBORO WESTERN LOOP. SIX-LANE FREEWAY ON NEW LOCATION.

3

TRN

NHP 27150R NHP 2000U NHP 19400C C 19400

GUILFORD FUTURE I-73

RURAL PROJECTS

PLANNING / DESIGN IN PROGRESS

R-2577* 110870 2196MULTI-LANES NORTH OF US 421 / I-40 BUSINESS IN WINSTON-SALEM TO US 220 IN STOKESDALE. WIDEN TO MULTI-LANES.

18.8 NHP 3900R A R 3900 A NHP 1654U A U 1654 A T M 366 A NHP 12050C A C 12050 AT 6800R B T 36100C B T 4800R C T 25400C C

A MULTI-LANES NORTH OF US 421 / I-40 BUSINESS TO SR 1965 (BELEWS CREEK ROAD)REGB SR 1965 (BELEWS CREEK ROAD) IN FORSYTH COUNTY TO SR 2034 (ANTHONY ROAD) IN GUILFORD COUNTYC NORTH OF SR 2034 (ANTHONY ROAD) TO US 220

FORSYTHGUILFORD

US 158

R-2413* 268941 268941NC 68 AT SR 2011 (EDGEFIELD ROAD) IN GUILFORD COUNTY TO US 220-NC 68 INTERSECTION IN ROCKINGHAM COUNTY. FOUR-LANE FREEWAY, ON NEW LOCATION, NC 68 TO US 220 AND FOUR LANES ALONG US 220 TO NC 68 IN ROCKINGHAM COUNTY.

12.1

TRN A FOUR LANES AT SR 2011 (EDGEFIELD ROAD) TO SR 2127 (BROOK BANK ROAD) - COMBINED WITH I-5110 AND R-2413B FOR DESIGN-BUILD LET - UNDER CONSTRUCTIONB SR 2127 (BROOK BANK ROAD) TO HAW RIVER - COMBINED WITH I-5110 AND R-2413A FOR DESIGN-BUILD LET - UNDER CONSTRUCTIONC HAW RIVER TO NC 68-US 220 INTERSECTION - UNDER CONSTRUCTION

GUILFORDROCKINGHAM

US 220 /FUTURE I-73

R-2309 75385 75385SR 2182 (HORSEPEN CREEK ROAD) TO US 220-NC 68 CONNECTOR (R-2413) IN GREENSBORO AND SUMMERFIELD. WIDEN TO MULTI-LANES.

6.3

AA COTSWALD TERRACE NORTH OF GREENSBORO TO SR 2182 (HORSEPEN CREEK ROAD) - COMPLETEAB SR 2182 (HORSEPEN CREEK ROAD) TO NORTH OF SR 2313 (WINFREE ROAD) IN GREENSBORO - UNDER CONSTRUCTION

GUILFORD US 220

R-2612 37453 37453SR 3389 (WOODY MILL ROAD) AND SR 3418 (NEELLEY ROAD) SOUTH OF GREENSBORO. CONVERT AT-GRADE INTERSECTIONS TO INTERCHANGES.

EX A SR 3389 (WOODY MILL ROAD) INTERSECTION SOUTH OF GREENSBORO - COMPLETEB SR 3418 (NEELLEY ROAD) INTERSECTION SOUTH OF GREENSBORO - UNDER CONSTRUCTIONTRN

GUILFORD US 421

R-5725 698NC 150 INTERSECTION IN OAK RIDGE. INTERSECTION IMPROVEMENTS.

REG

NHP R 135 NHP C 563

GUILFORD NC 68

UNDER CONSTRUCTION

R-2611 31284 31284SR 2007 (BUNKER HILL ROAD) AT COLFAX TO NC 68 IN GREENSBORO. WIDEN TO MULTI-LANES.

3.6GUILFORD SR 1008(WEST MARKETSTREET)

7-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 10: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

GARVEE BOND FUNDING $105.9 M FOR SEGMENT C; PAYBACK FY 2013-2024 - GARVEE BOND FUNDING $25 M FOR SEGMENT D; PAYBACK FY 2017-2028

U-2524* 661865 450385GREENSBORO WESTERN LOOP, NORTH OF I-85 TO LAWNDALE DRIVE IN GREENSBORO. CONSTRUCT FREEWAY ON NEW LOCATION.

15 NHP 9900C BC NHP 10857CG C CG 10857 C CG 10857 C CG 10857 C CG 10857 C CG 10857 C 10857CG C10857CG C10857CG C CG 10857 C S(M) 8827C C C 8827 C NHP 5126CG DCG 2563 D CG 2563 D CG 2563 D CG 2563 D CG 2563 D 2563CG D2563CG D2563CG D CG 2563 D CG 2563 DS(M) C 29600 D NHP 15000C F

AA SOUTH OF SR 1541 (WENDOVER AVENUE) TO NORTH OF SR 1560 (SAPP ROAD) - COMPLETEAB GREENSBORO WESTERN LOOP, NORTH OF I-85 NEAR SR 1129 (GROOMETOWN ROAD) TO NORTH OF SR 4121 (HIGH POINT ROAD) - COMPLETEAC GREENSBORO WESTERN LOOP, NORTH OF SR 4121 (HIGH POINT ROAD) TO SOUTH OF I-40 - COMPLETEAE GREENSBORO WESTERN LOOP, INTERCHANGE AT PROPOSED HIGH POINT ROAD RELOCATION - UNDER CONSTRUCTIONBA GREENSBORO WESTERN LOOP, SOUTH OF I-40 TO NORTH OF SR 2147 (WEST FRIENDLY AVENUE) - COMPLETEBB GREENSBORO WESTERN LOOP, NORTH OF SR 2147 (WEST FRIENDLY AVENUE) TO NORTH OF SR 2176 (BRYAN BOULEVARD) - COMPLETEBC SR 2085 (BRYAN BOULEVARD) INTERCHANGE MODIFICATIONS, INCLUDING AUXILIARY LANES, ITS, AND INMAN ROAD BRIDGE REPLACEMENT.TRNC GREENSBORO WESTERN LOOP, NORTH OF SR 2176 (BRYAN BOULEVARD) TO US 220 (BATTLEGROUND AVENUE) - UNDER CONSTRUCTIONTRND GREENSBORO WESTERN LOOP, US 220 (BATTLEGROUND AVENUE) TO SR 2303 (LAWNDALE DRIVE) - RIGHT OF WAY IN PROGRESSSWE GREENSBORO WESTERN LOOP, ITS INSTALLATION - COMPLETEF GREENSBORO WESTERN LOOP, INTERCHANGE AT PROPOSED LEWISTON-FLEMING ROAD EXTENSION

GUILFORD I-73 / I-840 /FUTURE I-840 /US 421

PLANNING / DESIGN IN PROGRESS BY CITY OF HIGH POINT - NCDOT CENTRAL LET PROJECT

U-5169 17264 1175NC 68 (EASTCHESTER DRIVE) IN HIGH POINT. RECONSTRUCT INTERCHANGE AND APPROACHES.

DIV

NHP R 1975 NHP M 14 NHP C 7050 C 7050

GUILFORD I-74 / US 311

PLANNING / DESIGN IN PROGRESS

U-2525* 380622 109238GREENSBORO EASTERN LOOP, LAWNDALE DRIVE TO NORTH OF I-40 / I-85 IN GREENSBORO. CONSTRUCT FREEWAY ON NEW LOCATION.

12.6 T 28775C B C 28775 B C 28775 B T R 14245 C T M 214 C T C 38900 C C 38900 C 38900C C38900C C T 15000C D

A GREENSBORO EASTERN LOOP, SOUTH OF SR 3041 (CLAPP FARMS ROAD) TO US 70 RELOCATION - COMPLETEB GREENSBORO EASTERN LOOP, US 70 RELOCATION TO US 29 NORTH OF GREENSBORO - UNDER CONSTRUCTIONTRNC GREENSBORO EASTERN LOOP, US 29 NORTH OF GREENSBORO TO SR 2303 (LAWNDALE DRIVE)SWD INTERCHANGE AT PROPOSED CONE BOULEVARD EXTENSION

GUILFORD I-785 / I-840;FUTURE I-785;FUTURE I-840

U-5754 17064I-40 / BUSINESS 85 TO SOUTH OF FLORIDA STREET IN GREENSBORO. ADD LANE ON I-40 / BUSINESS 85 EASTBOUND RAMP ONTO NORTHBOUND US 29 / US 70 / US 220 AND EXTEND US 29 / US 70 / US 220 SOUTHBOUND RAMP ONTO SR 3672 (MARTIN LUTHER KING, JR. DRIVE)

0.8

REG

NHP R 548 NHP U 66 NHP 16450C

GUILFORD US 29 / US 70 / US 220(O'HENRY BOULEVARD)

UNDER CONSTRUCTION

U-5201 1000 1000I-40 / I-85 BUSINESS TO PHILLIPS AVENUE IN GREENSBORO. UPGRADE ELECTRICAL WIRING SYSTEM AND REPLACE METAL BREAKWAY POLES.

GUILFORD US 29

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF GREENSBORO

U-5306 6605 2075INTERSECTION AND SIDEWALK IMPROVEMENTS AT CONE BOULEVARD-BENJAMIN PARKWAY, WESTRIDGE ROAD, NEW GARDEN ROAD, AND BRASSFIELD ROAD INTERSECTIONS IN GREENSBORO.

NHP 430R B NHP 3100C B NHP 1000C C

A INTERSECTION WITH BENJAMIN PARKWAY / CONE BOULEVARD AND APPROACHES - RIGHT OF WAY IN PROGRESSTRNB INTERSECTION WITH WESTRIDGE ROAD AND APPROACHES - PLANNING / DESIGN IN PROGRESSREGC INTERSECTION WITH NEW GARDEN ROAD AND APPROACHES - PLANNING / DESIGN IN PROGRESSTRND INTERSECTION WITH BRASSFIELD ROAD AND APPROACHES - UNDER CONSTRUCTION

GUILFORD US 220(BATTLEGROUNDAVENUE)

U-5851 15771US 220 (WENDOVER AVENUE) TO EAST CONE BOULEVARD IN GREENSBORO. ADD LANES.

1.6

DIV

T R 3088 T U 371 T 12312C

GUILFORD SR 1001(CHURCH STREET)

7-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 11: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

U-5850 2158ELMSLEY DRIVE TO GLENDALE DRIVE IN GREENSBORO. WIDEN TO MULTLANES.

0.3

DIV

T R 467 T U 56 T 1635C

GUILFORD SR 1007(RANDLEMAN ROAD)

RIGHT OF WAY IN PROGRESS BY CITY OF GREENSBORO

U-5326 2560 700SR 1546 (COLLEGE ROAD) IN GREENSBORO. INTERSECTION IMPROVEMENTS.

DIV

T R 360 T C 1500

GUILFORD SR 1008(MARKET STREET)

U-5855 10052MONTLIEU AVENUE FROM NORTH COLLEGE DRIVE TO GREENSBORO ROAD AND GREENSBORO ROAD FROM MONTLIEU AVENUE TO I-74 / US 311 IN HIGH POINT. WIDEN ROADWAY.

DIV

T R 1737 T U 208 T 8107C

GUILFORD SR 1471(MONTLIEU AVENUE)SR 1486(GREENSBOROROAD)

U-2412 163768 106842PROPOSED US 311 BYPASS IN HIGH POINT TO SR 1424 (HILLTOP ROAD) IN GREENSBORO. WIDEN TO MULTI-LANES, PART ON NEW LOCATION.

7.8 NHP 36075C A C 12025 ASTP 8826C B

A US 311 BYPASS TO SR 4228 (VICKREY CHAPEL ROAD) - RIGHT OF WAY IN PROGRESSDIVB SR 4228 (VICKREY CHAPEL ROAD) TO SR 1424 (HILLTOP ROAD) - UNDER CONSTRUCTIONTRN

GUILFORD SR 1486(GREENSBORO ROAD) /SR 4121(HIGH POINT ROAD)

UNDER CONSTRUCTION BY CITY OF GREENSBORO

U-5322 700 700CLIFTON ROAD IN GREENSBORO. INTERSECTION IMPROVEMENTS.

GUILFORD SR 1541 / SR 2254(WENDOVER AVENUE)

U-3400 24207SR 1567 (ROBBINS COUNTRY ROAD) TO US 311 (MAIN STREET) IN ARCHDALE. WIDEN TO MULTI-LANES.

3.1

DIV

T R 8989 A T U 1691 A T M 7 T 10858C A T 1111R B T 209U B T 1342C B

A SR 1567 (ROBBINS COUNTRY ROAD) TO GUILFORD COUNTY LINE.DIVB RANDOLPH COUNTY LINE TO SR 1993 (MAIN STREET).

GUILFORDRANDOLPH

SR 1577 / SR 1004(ARCHDALE ROAD)

PLANNING / DESIGN IN PROGRESS

U-4758 25818 7518SR 1820 (SKEET CLUB ROAD) TO I-40 IN HIGH POINT. WIDEN TO MULTI-LANES.

4.4

DIV

T R 5000 T C 6650 6650C

GUILFORD SR 1818(JOHNSON STREET) /SR 1850(SANDY RIDGE ROAD)

U-3615 70399 17399US 311 TO NC 68 (EASTCHESTER DRIVE) IN HIGH POINT. WIDEN TO MULTI-LANES.

5.7 T 5700R A T 15500C A T 10600C B C 10600 B C 10600 B

A US 311 TO EAST OF SR 1818 (JOHNSON STREET). WIDEN TO FIVE-LANE FACILITY FROM US 311 TO NORTH OF US 311 AND TO FOUR-LANE MEDIAN DIVIDED FACILITY FROM NORTH OF US 311 TO EAST OF SR1818 (JOHNSON STREET).

B EAST OF SR 1818 (JOHNSON STREET) TO WEST OF NC 68 (EASTCHESTER DRIVE). WIDEN TO FOUR-LANE MEDIAN DIVIDED FACILITY. - RIGHT OF WAY IN PROGRESSTRN

GUILFORD SR 1820(SKEET CLUB ROAD)

U-5852 13416NORTHAMPTON DRIVE TO HOLDEN ROAD IN GREENSBORO. ADD LANES.

1.2

DIV

T R 855 T U 103 T 12458C

GUILFORD SR 2085(BENJAMIN PARKWAY/ BRYAN BOULEVARD)

UNDER CONSTRUCTION BY CITY OF GREENSBORO

U-5505 3041 3041ISAACSON BOULEVARD IN GREENSBORO. REALIGN FLEMING ROAD AND CONSTRUCT NEW INTERSECTION.

GUILFORD SR 2136(FLEMING ROAD)

7-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 12: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

NON-STATE-SYSTEM - LOCAL MATCH BY CITY OF GREENSBORO

U-5812 930LAWNDALE DRIVE AND PISGAH CHURCH ROAD IN GREENSBORO. INTERSECTION IMPROVEMENTS AT LAWNDALE ROAD AND PISGAH CHURCH ROAD, AT LAWNDALE ROAD AND MARTINSVILLE ROAD, AND AT MARTINSVILLE ROAD AND PISGAH CHURCH ROAD

DIV

STP R 144 L R 36 STP C 600 L C 150

GUILFORD VARIOUS

U-5157 9945 9945RESURFACING AT SELECTED LOCATIONS.

A MONTLIEU AVENUE TO US 311 BUSINESS (MAIN AVENUE) - COMPLETEB RANDOLPH COUNTY LINE TO NORTH OF SR 3485 (HARMONT DRIVE) - COMPLETEC ELM STRET TO SUMMIT AVENUE (1.5 MILES), FRIENDLY AVENUE, RADIANCE DRIVE TO ELAM AVENUE (0.7 MILE) AND SMITH STREET, BATTLEGROUND AVENUE TO EUGENE STREET (0.6

MILE) - COMPLETED SECTIONS OF HOLDEN ROAD, FLORIDA STREET, BESSEMER AVENUE, MEADOWVIEW ROAD, CONE BOULEVARD AND YANCEYVILLE STREET - UNDER CONSTRUCTION BY CITY OF

GREENSBOROE PATTON AVENUE TO JJ DRIVE;

RANDLEMAN ROAD FROM FLORIDA STREET TO FREEMAN MILL ROAD; SPRING GARDEN STREET FROM HOLDEN STREET TO MARKET STREET; MEADOWVIEW ROAD FROM RANDLEMAN ROAD TO ELM-EUGENE STREET; CONE BOULEVARD FROM SUMMIT AVENUE TO 16TH STREET; BENJAMIN PARKWAY FROM BATTLEGROUND AVENUE TO WESTMORELAND STREET - UNDER CONSTRUCTION BY CITY

GUILFORD VARIOUS

U-5021 25311GREENSBORO URBAN AREA METROPOLITAN PLANNING ORGANIZATION (GUAMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.

DIV

STPDA C 1815 C 3916 3916C3916C3916C C 3916 C 3916GUILFORD VARIOUS

NON-STATE-SYSTEM - LOCAL MATCH BY CITY OF GREENSBORO

U-5849 1844SR 4240 (WEST LEET STREET) TO SPRING GARDEN STREET IN GREENSBORO. REPLACE RAILROAD OVERPASS AND WIDEN ROADWAY.

0.2

DIV

STP R 366 L R 91 STP U 44 L U 11 STP C 1066 L C 266

GUILFORD AYCOCK STREET

IN PROGRESS BY CITY OF GREENSBORO - OPEN TO TRAFFIC

U-4750 5016 5016CURRENT TERMINUS TO CHIMNEY ROCK ROAD IN GREENSBORO. EXTEND ROADWAY, INCLUDING A GRADE SEPARATION OVER THE GREENSBORO URBAN LOOP.

GUILFORD HORNADAY ROAD

IN PROGRESS BY CITY OF GREENSBORO - OPEN TO TRAFFIC

U-5162 3433 3433LAWNDALE DRIVE TO SR 2348 (BASS CHAPEL ROAD-ELM STREET) IN GREENSBORO. WIDENING, INTERSECTION IMPROVEMENTS AND SIDEWALKS.

1.38GUILFORD LAKE JEANETTEROAD

U-5841 233FRIENDLY AVENUE IN GREENSBORO. WIDEN LINDELL ROAD (SR 2254 [WENDOVER AVENUE] OFF-RAMP) TO ADD A SECOND LEFT TURN LANE.

DIV

T R 45 T C 188

GUILFORD LINDELL ROAD

NON-STATE-SYSTEM - LOCAL MATCH BY CITY OF GREENSBORO

U-5842 930NORTH ELM STREET IN GREENSBORO. INTERSECTION IMPROVEMENTS.

0.5

DIV

STP R 144 L R 36 STP C 600 L C 150

GUILFORD PISGAH CHURCHROAD

IN PROGRESS BY CITY OF GREENSBORO - OPEN TO TRAFFIC

U-5163 2521 2521J. J. DRIVE TO VANDALIA ROAD IN GREENSBORO. MEDIAN AND SIDEWALK CONSTRUCTION.

1.89GUILFORD SOUTH ELM-EUGENE STREET

7-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 13: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1507B WESTRIDGE AVENUE TO COTSWOLD DRIVE IN GREENSBORO. WIDEN TO 6 LANES WITH MEDIAN.

1.4GUILFORD US 220(BATTLEGROUNDAVENUE)

FEDERAL BRIDGE PROJECTS

PLANNING / DESIGN IN PROGRESS

B-5356 9120 100REPLACE BRIDGE NO. 299 OVER SOUTH BUFFALO CREEK IN GREENSBORO.

SW

NHPB R 820 NHPB C 8200

GUILFORD I-40 / BUSINESS 85 /US 29 / US 70 /US 220

RIGHT OF WAY IN PROGRESS

B-5119 7358 1458REPLACE BRIDGE NO. 291 AND BRIDGE NO. 349 OVER US 29 / US 70 / US 220 IN GREENSBORO.SW

NHPB 5900C GUILFORD I-40 / BUSINESS 85(WESTBOUND)

PLANNING / DESIGN IN PROGRESS

B-5353 7610 150REPLACE BRIDGE NO. 147 OVER SR 1993 (SOUTH MAIN STREET) IN HIGH POINT.

HF

HFB R 660 HFB C 6800

GUILFORD US 29 / US 70 /BUSINESS 85

COORDINATE WITH B-5351

B-5730 3092REPLACE BRIDGE NO. 237 OVER DEEP RIVER IN HIGH POINT.

REG

NHPB R 147 NHPB C 2945

GUILFORD US 29 / US 70 /BUSINESS 85 NB

COORDINATE WITH B-5730 - PLANNING / DESIGN IN PROGRESS

B-5351 4490 150REPLACE BRIDGE NO. 242 OVER DEEP RIVER IN HIGH POINT.

HF

HFB R 390 HFB C 3950

GUILFORD US 29 / US 70 /BUSINESS 85 SB

RIGHT OF WAY IN PROGRESS - DIVISION DESIGN / CENTRAL LET

B-5736 586 125REPLACE BRIDGE NO. 38 OVER BEAVER CREEK.REG

STPON 461C GUILFORD NC 61

B-5726 470REPLACE BRIDGE NO. 135 OVER AN UNNAMED BRANCH.

HF

HFB 45R HFB 425C

GUILFORD SR 1001 (NORTH CHURCHSTREET)

B-4956 1150REPLACE BRIDGE NO. 25 OVER POLE CAT CREEK.

DIV

STPOFF 100R STPOFF C 1050

GUILFORD SR 1105(EAST STEEPLECHASE ROAD)

B-5723 2663REPLACE BRIDGE NO. 54 OVER TWO MILE CREEK IN HIGH POINT.

HF

HFB 240R HFB 23M HFB 2400C

GUILFORD SR 1158 (JACKSONLAKE ROAD)

UNDER CONSTRUCTION

B-4957 2330 2330REPLACE BRIDGE NO. 56 OVER RICHLAND CREEK IN HIGH POINT.

DIV

GUILFORD SR 1193(BAKER ROAD)

B-5714 2108REPLACE BRIDGE NO. 67 OVER DEEP RIVER IN HIGH POINT.

HF

HFB R 190 HFB 1918C

GUILFORD SR 1523 (DEEP RIVERROAD)

B-5731 2038REPLACE BRIDGE NO. 112 OVER HAW RIVER IN OAK RIDGE AND STOKESDALE.

HF

HFB 180R HFB 33M HFB 1825C

GUILFORD SR 2109 (EVERFIELDROAD)

7-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 14: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

UNDER CONSTRUCTION

B-4756 1720 1720REPLACE BRIDGE NO. 120 OVER REEDY FORK CREEK IN GREENSBORO.

DIV

GUILFORD SR 2128(BUNCH ROAD)

B-4958 1877REPLACE BRIDGE NO. 106 OVER REEDY FORK CREEK IN OAK RIDGE.

DIV

STPOFF 170R STPOFF 7M STPOFF C 1700

GUILFORD SR 2128(BUNCH ROAD)

PLANNING / DESIGN IN PROGRESS

B-5345 1447 200REPLACE BRIDGE NO. 456 OVER BRUSH CREEK IN GREENSBORO.

HF

HFB R 110 HFB M 12 HFB C 1125

GUILFORD SR 2136(FLEMING ROAD)

B-5732 2695REPLACE BRIDGE NO. 412 OVER NORTH BUFFALO CREEK IN GREENSBORO.

HF

HFB 245R HFB C 2450

GUILFORD SR 2526 (SUMMITAVENUE)

RIGHT OF WAY IN PROGRESS

B-4959 1400 350REPLACE BRIDGE NO. 193 OVER BUFFALO CREEK.

HF

HFB C 1050 GUILFORD SR 2719(HIGH ROCK ROAD)

PLANNING / DESIGN IN PROGRESS

B-5344 1020 100REPLACE BRIDGE NO. 161 OVER SOUTH BUFFALO CREEK.

DIV

STPOFF 120R STPOFF C 800

GUILFORD SR 2821(HARVEST ROAD)

UNDER CONSTRUCTION

B-4758 1135 1135REPLACE BRIDGE NO. 159 OVER NORTH BUFFALO CREEK.

DIV

GUILFORD SR 2824(CREEKVIEW ROAD)

PLANNING / DESIGN IN PROGRESS

B-4961 1150 100REPLACE BRIDGE NO. 208 OVER LITTLE ALAMANCE CREEK.

HF

HFB R 100 HFB C 950

GUILFORD SR 3051(KNOX ROAD)

RIGHT OF WAY IN PROGRESS

B-4960 1014 139REPLACE BRIDGE NO. 214 OVER LITTLE ALAMANCE CREEK.

DIV

STPOFF 875C GUILFORD SR 3058(JUDGE ADAMS ROAD)

B-5724 550REPLACE BRIDGE NO. 293 OVER LITTLE ALAMANCE CREEK.

HF

HFB 50R HFB 500C

GUILFORD SR 3314(WILEY LEWIS ROAD)

B-5717 3312REPLACE BRIDGE NO. 121 OVER SOUTH BUFFALO CREEK IN GREENSBORO.

DIV

NHPB R 157 NHPB M 22 NHPB 3133C

GUILFORD SR 4240(EAST LEE STREET -WESTBOUND)

COORDINATE WITH R-4707 - PLANNING / DESIGN IN PROGRESS

B-5354 4720 100REPLACE BRIDGE NO. 360 OVER US 29 IN GREENSBORO.

DIV

NHPB R 420 NHPB C 4200

GUILFORD SR 4771(REEDY FORKPARKWAY)

7-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 15: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5107 18387 16387DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

B-5718 4571REPLACE BRIDGE NO. 329 OVER I-40 / BUSINESS 85 / US 29 / US 70 / US 220 IN GREENSBORO.DIV

NHPB 218R NHPB C 4353

GUILFORD PATTON AVENUE

B-5713 3490REPLACE BRIDGE NO. 352 OVER I-40 / BUSINESS 85 IN GREENSBORO.

DIV

NHPB R 166 NHPB M 6 NHPB 3318C

GUILFORD WILLOW ROAD

MUNICIPAL BRIDGE PROJECTS

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF GREENSBORO - MUNICIPAL BRIDGE PROJECT

B-5553 825REPLACE BRIDGE NO. 98 OVER A TRIBUTARY OF HORSEPEN CREEK IN GREENSBORO.

DIV

STPOFF R 60 L R 15 STPOFF C 600 L C 150

GUILFORD BALLINGER ROAD

PLANNING / DESIGN IN PROGRESS BY CITY OF HIGH POINT - MUNICIPAL BRIDGE

B-5358 1010 200REPLACE BRIDGE NO. 428 OVER BRANCH OF RICHLAND CREEK IN HIGH POINT.

DIV

STPOFF 111R L 28R STPOFF 37M L 9M STPOFF C 500 L C 125

GUILFORD MODEL FARM ROAD

MITIGATION PROJECTS

IN PROGRESS

EE-4907 17824 17824ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 7 PROJECT MITIGATION.

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

HAZARD ELIMINATION PROJECTS

RIGHT OF WAY IN PROGRESS

W-5305 735 245SR 1129 AT SR 4019 (GROOMETOWN ROAD); NC 62 AT SR 1129 (GROOMETOWN ROAD). REALIGN BOTH INTERSECTIONS AND REMOVE ACCESS BETWEEN SR 4019 AND NC 62.

REG

HSIP 490C GUILFORD NC 62;SR 1129(GROOMETOWNROAD)

DIVISION PURCHASE ORDER CONTRACT (DPOC) - UNDER CONSTRUCTION

SF-4907D 715 715NC 68 AND SR 2269 (ALCORN ROAD) IN OAK RIDGE. CONSTRUCT TURN LANES ON ALCORN ROAD APPROACHES AND UPGRADE SIGNAL.

GUILFORD NC 68;SR 2269(ALCORN ROAD)

7-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 16: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION

W-5114 2923 2923SOUTH OF SR 2111 (EAST HARRELL ROAD) TO SR 4831 (BARTONSHIRE DRIVE) IN OAK RIDGE AND SUMMERFIELD. CONSTRUCT TURN LANES, CLOSE ACCESS TO SR 2029 (WEST HARRELL ROAD), AND RELOCATE SR 2111 INTERSECTION AND PORTION OF SR 2111.

0.52GUILFORD NC 68

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5207 3482 3482DIVISION 7 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

CONGESTION MITIGATION PROJECTS

PLANNING / DESIGN IN PROGRESS

C-5558 10101 1552CITY OF HIGH POINT SIGNAL SYSTEM EXPANSION AND UPGRADE.

EX

CMAQ 242R L 7R CMAQ C 8051 L C 249

GUILFORD VARIOUS

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF GREENSBORO

C-5555 4862 1406SIDEWALK PROJECTS AT SELECTED LOCATIONS IN GREENSBORO.

EX

CMAQ 2765C L 691C

GUILFORD VARIOUS

IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.

EX

CASWELLDAVIDSONFORSYTHGUILFORDMONTGOMERYRANDOLPHROCKINGHAM

VARIOUS

C-5609 2554PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE HIGH POINT MPO.

EX

CMAQ C 1277 C 1277 DAVIDSONFORSYTHGUILFORD

VARIOUS

C-5607 5210PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE GREENSBORO URBAN AREA MPO.EX

CMAQ C 2605 C 2605 GUILFORD VARIOUS

C-5602 170PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE BURLINGTON-GRAHAM MPO.EX

CMAQ C 85 C 85 GUILFORDORANGE

VARIOUS

UNDER CONSTRUCTION BY CITY OF GREENSBORO

C-5511 378 378RANDOLPH STREET INTERSECTION IN GREENSBORO. CONSTRUCT LEFT TURN LANES.EX

GUILFORD FLORIDA STREET

IN ACQUISITION BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

C-5561 280 280PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION VANPOOL VEHICLE REPLACEMENT / EXPANSION.EX

GUILFORD REGIONWIDE

7-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 17: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)

E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

INTERSTATE PROJECTSI-3306 175164 87031I-85 IN ORANGE COUNTY TO NC 147

(DURHAM FREEWAY / TRIANGLE EXPRESSWAY) IN DURHAM COUNTY. WIDEN TO SIX LANES AND INSTALL ITS.

20.7 NHP 40R A NHP 60R A NHP 33M A NHP 44000C A C 22000 A C 22000 A

A I-85 TO DURHAM COUNTY LINE - PLANNING / DESIGN IN PROGRESSREGB ORANGE COUNTY LINE TO NC 147 (DURHAM FREEWAY / TRIANGLE EXPRESSWAY) IN DURHAM - COMPLETE

DURHAMORANGE

I-40

I-5822 17921.6 MILES EAST OF NC 86 TO.0.8 MILE EAST OF SR 1734 (ERWIN ROAD). PAVEMENT REHABILITATION.

2.2SW

NHPIM C 1792 ORANGE I-40

PROJECT COMPLETE - GARVEE BOND FUNDING $12.0 MILLION; PAYBACK FY 2007 - FY 2018

I-4918 19870 16014NC 54 (MILE POST 148) IN ALAMANCE COUNTY TO WEST OF SR 1114 (BUCKHORN ROAD) IN ORANGE COUNTY. MILL AND RESURFACE.

8.3

TRN

NHP 964CG CG 964 CG 964 CG 964 ALAMANCEORANGE

I-40 / I-85

UNDER CONSTRUCTION

I-5312 2604 2604EAST OF I-40 TO DURHAM COUNTY LINE. PAVEMENT REHABILITATION.

7.6ORANGE I-85

URBAN PROJECTS

SCHEDULED FOR FEASIBILITY STUDY

U-5304 100717NC 86 (SOUTH COLUMBIA STREET) TO EASTOWNE DRIVE / LAKEVIEW DRIVE IN CHAPEL HILL. UPGRADE CORRIDOR.

6 T 18465R A R 18465 A R 18465 AT 2215U A U 2216 A U 2216 AT 33288C A T C 2052 B T 160R D T C 1000 D T 300R E T C 1875 E

A NC 86 (SOUTH COLUMBIA STREET) TO SR 1742 (EPHESUS CHURCH ROAD) IN CHAPEL HILL. CAPACITY IMPROVEMENTS AND POSSIBLE INTERCHANGE AT SR 1902 (MANNING DRIVE), WITH SIDEWALKS, WIDE OUTSIDE LANES AND TRANSIT ACCOMMODATIONS.

SW

B SAGE ROAD TO EAST LAKEVIEW DRIVE IN CHAPEL HILL. UPGRADE ROADWAY TO SUPERSTREET.SWC SR 1742 (EPHESUS CHURCH ROAD). INTERSECTION IMPROVEMENTS. - WORK TO BE COMPLETED UNDER U-5550.D NC 54 (RALEIGH ROAD). INTERCHANGE IMPROVEMENTS.SWE NC 54 / NC 86 INTERCHANGE. ADD LANE ON US 15 / US 501 NORTHBOUND RAMP ONTO EASTBOUND NC 54.REG

ORANGE US 15 / US 501(FORDHAMBOULEVARD)

FY 2018 PROGRAMMING REFLECTS REIMBURSEMENT TO TOWN OF CHAPEL HILL

U-5550 2170SR 1742 (EPHESUS CHURCH ROAD) IN CHAPEL HILL. INTERSECTION IMPROVEMENTS.SW

NHP C 2170 ORANGE US 15 / US 501(FORDHAM BOULEVARD)

7-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 18: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

PARTS A THROUGH F ON EXPANDED NHS

U-5774 228591US 15 / US 501 IN CHAPEL HILL TO NC 55 IN DURHAM. UPGRADE ROADWAY CORRIDOR.

9.2 NHP 6400R A NHP 17300C A NHP 4620R B NHP 554U B NHP C 13466 B C 13466 BNHP 500R C NHP C 4300 C C 4300 CNHP 3600R D NHP 9800C D NHP 450R E NHP C 1875 E NHP 160R F NHP C 1000 F T 1800R G T 800U G T 29400C G T 5900R H T 2500U H T C 6600 H C 6600 HT 2500R I T 10700U I T 33600C I T 3200R J T 12600U J T 30600C J

A US 15 / US 501. UPGRADE INTERCHANGEB US 15 / US 501 IN ORANGE COUNTY TO SR 1110 (BARBEE CHAPEL ROAD) IN DURHAM COUNTY, UPGRADE ROADWAY CORRIDOR AND CONVERT AT-GRADE INTERSECTION WITH SR 1110 TO

INTERCHANGE.REG

C SR1110 (BARBEE CHAPEL ROAD) TO I-40. UPGRADE ROADWAY CORRIDOR.REGD FALCONBBRIDGE ROAD. CONVERT AT-GRADE INTERSECTION TO INTERCHANGE.E SR 1110 (FARRINGTON ROAD). CONVERT AT-GRADE INTERSECTION TO GRADE SEPARATION.REGF I-40 / NC 54 INTERCHANGE IMPROVEMENTSSWG I-40 TO NC 751. UPGRADE ROADWAY CORRIDOR.H NC 751 TO SR 1118 (FAYETTEVILLE ROAD). UPGRADE ROADWAY CORRIDOR.DIVI SR 1118 (FAYETTEVILLE ROAD) TO SR 1106 (BARBEE ROAD). UPGRADE ROADWAY CORRIDOR.J SR 1106 (BARBEE ROAD) TO NC 55. UPGRADE ROADWAY CORRIDOR.

DURHAMORANGE

NC 54

UNDER CONSTRUCTION

U-0624 9357 9357PUREFOY ROAD TO SR 1902 (MANNING DRIVE) IN CHAPEL HILL. CORRIDOR UPGRADE TO INCLUDE BICYCLE LANES.

0.7ORANGE NC 86(SOUTH COLUMBIASTREET)

COORDINATE WITH U-5845

U-5848 5299EXISTING SR 1006 (ORANGE GROVE ROAD) TO US 70 BUSINESS) IN HILLSBOROUGH. EXTEND ORANGE GROVE ROAD ON NEW LOCATION WITH SIDEWALKS AND BICYCLE LANES.

0.4

DIV

T R 1067 T U 128 T 4104C

ORANGE SR 1006(ORANGE GROVE ROAD)

U-5854 775SR 1913 (BENNETT ROAD) IN CHAPEL HILL. CONSTRUCT ROUNDABOUT AND RELATED SAFETY IMPROVEMENTS.

DIV

T R 150 T C 625

ORANGE SR 1008(MT. CARMELCHURCH ROAD)

COORDINATE WITH U-5848

U-5845 26240I-40 TO ENO RIVER IN HILLSBOROUGH. WIDEN TO MULTILANES.

2.6

DIV

T 1952R T 234U T 24054C

ORANGE SR 1009(SOUTH CHURTON STREET)

7-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 19: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

U-5847 775SR 1771 / SR 1927 (MERRITT MILL ROAD) / BREWER LANE INTERSECTION IN CHAPEL HILL AND CARRBORO. INTERSECTION IMPROVEMENTS.

DIV

T R 150 T C 625

ORANGE SR 1010(WEST FRANKLIN STREET /EAST MAIN STREET)

UNDER CONSTRUCTION

U-3306 19377 19377NC 86 (MARTIN LUTHER KING, JR. BOULEVARD) TO SR 1734 (ERWIN ROAD) IN CHAPEL HILL. CORRIDOR UPGRADE, PART ON NEW LOCATION.

2.8ORANGE SR 1733(WEAVER DAIRYROAD)

U-5846 775SR 1780 (ESTES DRIVE) IN CARRBORO. CONSTRUCT ROUNDABOUT.

DIV

T R 150 T C 625

ORANGE SR 1772(GREENSBORO STREET)

UNDER CONSTRUCTION

U-2803 9061 9061ROCK HAVEN ROAD TO BRIDGE NO. 88 IN CARRBORO. WIDEN TO ADD BICYCLE LANES, SIDEWALKS, AND TURN LANES WITH A CENTER MEDIAN.

0.6ORANGE SR 1919(SMITH LEVEL ROAD)

DIVISION DESIGN / CENTRAL LET; STPDA PARTICIPATION FOR PART B NOT TO EXCEED $6.3 MILLION PENDING MPO APPROVAL

EB-4707 13010 2110US 15-501 IN ORANGE COUNTY TO SR 1116 (GARRETT ROAD) IN DURHAM COUNTY. BICYCLE, PEDESTRIAN, AND TRANSIT IMPROVEMENTS; AND CONSTRUCTION OF ROUNDABOUT.

2.7

TRN

L 2650R A L C 3100 A STPDA 3920C B L 980C B S 250C B

A US 15-501 IN ORANGE COUNTY TO SR 1113 (POPE ROAD) IN DURHAM COUNTYTRNB SR 1113 (POPE ROAD) TO SR 1116 (GARRETT ROAD) - RIGHT OF WAY IN PROGRESSTRN

DURHAMORANGE

SR 2220(OLD CHAPEL HILL ROAD)SR 1838(OLD DURHAM ROAD)

UNDER CONSTRUCTION BY TOWN OF CARRBORO

EL-5103 76 76CARRBORO, INSTALL BUS SHELTERS AT SELECTED LOCATIONS.

ORANGE VARIOUS

IN PROGRESS

U-4727 14716 12377DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATION (DCHCMPO) PLANNING ALLOCATION AND UNIFIED WORK PROGRAM.

DIV

STPDA 1871PE L 468PE

CHATHAMDURHAMORANGE

VARIOUS

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF CHAPEL HILL - IN PROGRESS

U-5543 94 94VARIABLE MESSAGE SIGNS FOR TRAFFIC MANAGEMENT ON MAJOR CORRIDORS IN CHAPEL HILL.REG

DURHAMORANGE

VARIOUS

U-5023 21748DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATION (DCHCMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.

DIV

STPDA 4365C4365C4288C C 4365 C 4365CHATHAMDURHAMORANGE

VARIOUS

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF HILLSBOROUGH

U-5549 156DOWNTOWN ACCESS IMPROVEMENTS IN HILLSBOROUGH. CONSTRUCT CURB RELOCATIONS AND ADA-COMPLIANT INTERSECTION IMPROVEMENTS, AND REMOVE ON-STREET PARKING.

DIV

STPDA C 125 L C 31

ORANGE VARIOUS

FEASIBILITY STUDIES

FEASIBILITY STUDY IN PROGRESS

FS-1205A NC 86 IN ORANGE COUNTY TO SR 1728 (WADE AVENUE) IN WAKE COUNTY. CONSTRUCT MANAGED LANES.

23DURHAMORANGEWAKE

I-40

7-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 20: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PLANNING / DESIGN IN PROGRESS

B-4962 6800 200REPLACE BRIDGE NO. 46 OVER ENO RIVER.

HF

HFB R 600 HFB C 6000

ORANGE US 70 BYPASS

PLANNING / DESIGN IN PROGRESS

B-5348 1145 100REPLACE BRIDGE NO. 85 OVER PHIL'S CREEK.

HF

HFB R 95 HFB C 950

ORANGE SR 1005(OLD GREENSBOROROAD)

B-5733 1955REPLACE BRIDGE NO. 39 OVER BOOKER CREEK IN CHAPEL HILL.

HF

HFB 180R HFB C 1775

ORANGE SR 1010 (EASTFRANKLIN STREET)

B-5720 1265REPLACE BRIDGE NO. 11 OVER ENO RIVER.

HF

HFB 115R HFB 1150C

ORANGE SR 1336 (HALLS MILLROAD)

IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5107 18387 16387DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4907 17824 17824ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 7 PROJECT MITIGATION.

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

HAZARD ELIMINATION PROJECTS

RIGHT OF WAY IN PROGRESS

W-5143 455 130NORTH OF INTERSECTION WITH SR 1332 (HIGHLAND FARM ROAD). IMPROVE HORIZONTAL ALIGNMENT OF CURVE TO PROVIDE A MINIMUM OF 60 MPH DESIGN SPEED.

TRN

HSIP 325C ORANGE SR 1004 (EFLAND-CEDAR GROVE ROAD)

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5207 3482 3482DIVISION 7 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

CONGESTION MITIGATION PROJECTS

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF CHAPEL HILL - IN PROGRESS

C-5179 2558 220NC 86 (MARTIN LUTHER KING, JR. BOULEVARD) TO CASWELL DRIVE IN CHAPEL HILL. CONSTRUCT FIVE FOOT SIDEWALKS AND FIVE FOOT BIKE LANES.NC 86 (MARTIN LUTHER KING, JR. BOULEVARD) TO ELLIOTT ROAD IN CHAPEL HILL. CONSTRUCT TEN FOOT MULTIUSE PATH.

EX

CMAQ R 240 L R 60 CMAQ C 1630 L C 408

ORANGE SR 1750(NORTH ESTESDRIVE)

C-5618 450PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE TRIANGLE AREA RPO.

EX

CMAQ C 225 C 225 CHATHAMORANGE

VARIOUS

7-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 21: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025CONGESTION MITIGATION PROJECTS

C-5602 170PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE BURLINGTON-GRAHAM MPO.EX

CMAQ C 85 C 85 GUILFORDORANGE

VARIOUS

C-5605 5030PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE DURHAM / CHAPEL HILL / CARRBORO MPO.

EX

CMAQ C 2515 C 2515 CHATHAMDURHAMORANGE

VARIOUS

C-5565 4422TRIANGLE J COUNCIL OF GOVERNMENTS TRANSPORTATION DEMAND MANAGEMENT PROGRAM - PHASE II.

EX

CMAQ 482I A I 572 A I 620 A I 640 A L 430I A I 496 A I 579 A I 603 A

A DEVELOP FLEXIBLE WORK SCHEDULES IN CAMPO AREA.EXB DEVELOP FLEXIBLE WORK SCHEDULES IN DCHC AREA.

CHATHAMDURHAMFRANKLINGRANVILLEJOHNSTONORANGEWAKE

VARIOUS

IN PROGRESS

C-5111 250 250INSTALL TWO STATE MAINTAINED E-85 FUELING SITES IN CHARLOTTE AND HILLSBOROUGH.EX

MECKLENBURGORANGE

CHARLOTTEHILLSBOROUGH

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF CARRBORO

C-5181 320CONSTRUCT A 100 FOOT BRIDGE AND 650 FOOT PAVED TRAIL IN CARRBORO TO FILL GAP BETWEEN THE UPPER BOLIN TRAIL AND TWIN CREEKS GREENWAY AND IMPLEMENT PROGRAM TO SUPPORT NON-VEHICLE TRIPS TO MORRIS GROVE ELEMENTRY SCHOOL.

EX

CMAQ C 247 L C 61 CMAQ I 10 L I 2

ORANGE JONES CREEK GREENWAY

UNDER CONSTRUCTION BY ORANGE COUNTY

C-4932A 20 20PARK AND RIDE FACILITY IN TOWN OF HILLSBOROUGH, INSTALL BUS SHELTERS AND BIKE RACKS.

EX

ORANGE ORANGE COUNTYPARK-AND-RIDELOT

IN PROGRESS BY ORANGE COUNTY

C-4932B 436 436PARK AND RIDE FACILITY IN TOWN OF HILLSBOROUGH. PROVIDE OPERATING ASSISTANCE FOR THREE YEARS.

EX

ORANGE ORANGE COUNTYPARK-AND-RIDELOT

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF HILLSBOROUGH - IN PROGRESS

C-5184 610 60RIVERWALK TRAIL, PHASE III IN HILLSBOROUGH. CONSTRUCT A PAVED OFF-ROAD TAIL ALONG ENO RIVER CONNECTING RIVER PARK, GOLD PARK AND THE OCCONEECHEE MOUNTAIN STATE NATURAL AREA, AND CONSTRUCT SIDEWALK TO PROVIDE PEDESTRIAN AND BICYCLE CONNECTIONS TO THE GREENWAY.

EX

CMAQ 80R L 20R CMAQ C 360 L C 90

ORANGE RIVERWALK TRAIL

IN PROGRESS BY TRIANGLE J COUNCIL OF GOVERNMENTS

C-4924 3697 3697TRIANGLE J COUNCIL OF GOVERNMENTS (COG). DEVELOP A FLEXIBLE WORK SCHEDULE FOR EMPLOYEES AND ORGANIZATIONS IN TRIANGLE OZONE NON-ATTAINMENT AREA FOR THREE YEARS.EX A DEVELOP FLEXIBLE WORK SCHEDULES FOR EMPLOYEES IN CAPITAL AREA MPO (CAMPO) - IN PROGRESSEX

B DEVELOP FLEXIBLE WORK SCHEDULES FOR EMPLOYEES IN DURHAM-CHAPEL HILL-CARRBORO (DCHC) - IN PROGRESSEX

DURHAMORANGEWAKE

TRIANGLE JCOUNCIL OFGOVERNMENTS

7-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 22: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (LOCAL PROJECTS)

PLANNING, DESIGN, RIGHT OF WAY AND CONSTRUCTION BY TOWN OF CHAPEL HILL - IN PROGRESS

EL-4601 1141 1141EASTERN SECTION, US 15-501 AT SR 1994 (CULBRETH ROAD TO SR 1919 (SMITH LEVEL ROAD) IN CHAPEL HILL. TEN FOOT MULTI-USE ASPHALT PATH INCLUDING ACCESS TO MERRITT PASTURE.

ORANGE MORGAN CREEKGREENWAY

RURAL PROJECTSR-2413* 268941 268941NC 68 AT SR 2011 (EDGEFIELD ROAD) IN

GUILFORD COUNTY TO US 220-NC 68 INTERSECTION IN ROCKINGHAM COUNTY. FOUR-LANE FREEWAY, ON NEW LOCATION, NC 68 TO US 220 AND FOUR LANES ALONG US 220 TO NC 68 IN ROCKINGHAM COUNTY.

12.1

TRN A FOUR LANES AT SR 2011 (EDGEFIELD ROAD) TO SR 2127 (BROOK BANK ROAD) - COMBINED WITH I-5110 AND R-2413B FOR DESIGN-BUILD LET - UNDER CONSTRUCTIONB SR 2127 (BROOK BANK ROAD) TO HAW RIVER - COMBINED WITH I-5110 AND R-2413A FOR DESIGN-BUILD LET - UNDER CONSTRUCTIONC HAW RIVER TO NC 68-US 220 INTERSECTION - UNDER CONSTRUCTION

GUILFORDROCKINGHAM

US 220 /FUTURE I-73

R-5704 775SR 1998 (WENTWORTH STREET) / SR 1001 (SANDY CROSS ROAD). CONSTRUCT ROUNDABOUT AND REMOVE TRAFFIC SIGNAL.

REG

T R 150 T C 625

ROCKINGHAM NC 87

URBAN PROJECTSU-3326* 94001 94001SOUTH SCALES STREET TO NC 14 IN

REIDSVILLE. WIDEN TO MULTI-LANES.5.6

A SOUTH SCALES STREET TO SR 2686 (RICHARDSON DRIVE) - UNDER CONSTRUCTIONB SR 2686 (RICHARDSON DRIVE) TO NC 14 - UNDER CONSTRUCTION

ROCKINGHAM US 29 BUSINESS / US158 (FREEWAY DRIVE)

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1507A SR 2066 (KINGS HIGHWAY) IN EDEN. CONVERT AT-GRADE INTERSECTION TO INTERCHANGE.

ROCKINGHAM NC 14(VAN BUREN ROAD)

FEDERAL BRIDGE PROJECTS

UNDER CONSTRUCTION

B-4621 9858 9858REPLACE BRIDGE NO. 150 OVER US 220 BUSINESS.

SW

ROCKINGHAM US 220(NORTHBOUND)

PLANNING / DESIGN IN PROGRESS

B-5352 2790 200REPLACE BRIDGE NO. 131 OVER NORFOLK SOUTHERN RAILROAD.

SW

NHPB R 240 NHPB C 2350

ROCKINGHAM US 220(NORTHBOUND)

PLANNING / DESIGN IN PROGRESS

B-5343 1218 200REPLACE BRIDGE NO. 169 OVER CASCADE CREEK.

REG

STPON 93R HFB C 925

ROCKINGHAM US 311 / NC 770

B-5729 8470REPLACE BRIDGE NO. 134 OVER DAN RIVER IN EDEN.

HF

HFB 770R HFB C 7700

ROCKINGHAM NC 700

B-5737 5280REPLACE BRIDGE NO. 108 OVER NC 14 / NC 87 / NC 770 IN EDEN.

HF

HFB 480R HFB C 4800

ROCKINGHAM NC 700

PLANNING / DESIGN IN PROGRESS

B-4802 1355 100REPLACE BRIDGE NO. 18 OVER HAW RIVER.

HF

HFB R 110 HFB M 20 HFB C 1125

ROCKINGHAM SR 1002(SCALESVILLE ROAD)

UNDER CONSTRUCTION

B-4623 1715 1715REPLACE BRIDGE NO. 47 OVER HOGAN'S CREEK.

DIV

ROCKINGHAM SR 1128(SARDIS CHURCHROAD)

7-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 23: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5716 5351REPLACE BRIDGE NO. 140 OVER DAN RIVER IN MADISON.

DIV

STPOFF R 255 STPOFF 2548C2548C

ROCKINGHAM SR 1138 (LINDSEYBRIDGE ROAD)

B-5722 1790REPLACE BRIDGE NO. 277 OVER BEAVER CREEK.

DIV

STPOFF R 85 STPOFF C 1705

ROCKINGHAM SR 1169 (ISLANDDRIVE)

PLANNING / DESIGN IN PROGRESS

B-5341 1655 100REPLACE BRIDGE NO. 110 OVER WOLF ISLAND CREEK.

DIV

STPOFF 35U STPOFF 70R STPOFF C 1450

ROCKINGHAM SR 1767(MAYFIELD ROAD)

B-5355 2945REPLACE BRIDGE NO. 106 OVER WOLF ISLAND CREEK.

HF

HFB R 270 HFB C 2675

ROCKINGHAM SR 1902(DIBRELL ROAD)

RIGHT OF WAY IN PROGRESS

B-4803 2182 482REPLACE BRIDGE NO. 97 OVER WOLF ISLAND CREEK.

DIV

STPOFF 1700C ROCKINGHAM SR 1925(WORSHAM MILLROAD)

PLANNING / DESIGN IN PROGRESS

B-4624 1323 127REPLACE BRIDGE NO. 80 OVER WOLF ISLAND CREEK.

HF

HFB R 220 HFB M 1 HFB C 975

ROCKINGHAM SR 1929(ESTES ROAD)

B-5721 3310REPLACE BRIDGE NO. 124 OVER MAYO RIVER IN MADISON.

DIV

STPOFF 158R STPOFF 3152C

ROCKINGHAM SR 2177 (DAN VALLEYROAD)

B-5715 1461REPLACE BRIDGE NO. 17 OVER HAW RIVER.

DIV

STPOFF 69R STPOFF 19M STPOFF 1373C

ROCKINGHAM SR 2351(WITTY ROAD)

PLANNING / DESIGN IN PROGRESS

B-4805 850 100REPLACE BRIDGE NO. 9 OVER PRONG OF TROUBLESOME CREEK.

DIV

STPOFF R 75 STPOFF C 675

ROCKINGHAM SR 2406(IRON WORKS ROAD)

PLANNING / DESIGN IN PROGRESS

B-4807 1861 100REPLACE BRIDGE NO. 6 OVER HAW RIVER.

HF

HFB R 140 HFB M 21 HFB C 1600

ROCKINGHAM SR 2426(CUNNINGHAM MILLROAD)

PLANNING / DESIGN IN PROGRESS

B-4964 1342 100REPLACE BRIDGE NO. 85 OVER SOUTHERN RAILROAD.

DIV

STPOFF 47U STPOFF 95R STPOFF C 1100

ROCKINGHAM SR 2600(MIZPAH CHURCHROAD)

B-5357 660REPLACE BRIDGE NO. 78 OVER AN UNNAMED CREEK.

HF

HFB R 60 HFB C 600

ROCKINGHAM SR 2715(HAMPTON ROAD)

7-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 24: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5107 18387 16387DIVISION 7 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4907 17824 17824ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 7 PROJECT MITIGATION.

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION - DIVISION PURCHASE ORDER CONTRACT (DPOC)

W-5003 311 311SR 2422 (MONROETON ROAD) / SR 2426 (CUNNINGHAM MILL ROAD). WIDEN FOR LEFT TURN LANES AND INSTALL TRAFFIC SIGNAL.

ROCKINGHAM US 158

DIVISION PURCHASE ORDER CONTRACT (POC) - PLANNING / DESIGN IN PROGRESS

W-5142 645 100SR 1110 (ELLISBORO ROAD) SOUTH OF MADISON. FIRST MEDIAN OPENING SOUTH OF INTERSECTION, PROVIDE A LIMITED MOVEMENT CROSSOVER, CONSTRUCT A BULB-OUT AND UPGRADE TWO LEFT-TURN LANES.

TRN

HSIP 20R HSIP 525C

ROCKINGHAM US 220

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5207 3482 3482DIVISION 7 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ALAMANCECASWELLGUILFORDORANGEROCKINGHAM

VARIOUS

CONGESTION MITIGATION PROJECTS

IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.

EX

CASWELLDAVIDSONFORSYTHGUILFORDMONTGOMERYRANDOLPHROCKINGHAM

VARIOUS

7-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 25: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

COUNTY ID

FUTURE YEARS

F

RR - Rail-Highway SafetyRTAP - Rural Transit Assistance ProgramS - State I - ImpementationS (M) - State Match O - OperationsSMAP - Operating Assistance and State Maintenance Oc - OPS Funded CapitalSRTS - Safe Routes to School PE - Preliminary EngineeringSTAT - State PL - Planning / DesignSTHSR - Stimulus High Speed Rail R - Right-of-WaySTPDA - Surface Transportation Program - Direct AttributableSTPE - Surface Transportation Program, EnhancementsSTPEB - Surface Transportation Program, Enhancements (Bike)T - State Highway Trust FundsT2001 - State Rail FundsTAP - Transportation Alternatives ProgramTIGER DISC - TIGER Discretionary Grants

HP - Federal-Aid High PriorityJARC - Job Assistance and Reverse Commute (3037)

(1) FUNDING CATEGORY

DURHAM AREA

SR - Secondary Road

TRANSIT PARTNERROUTE / CITY /

NUMBER

TA-4738

LOCATION / DESCRIPTION

PASSENGER AMENITIES - BUS STOP TRANSIT AUTHORITY

DIV

SHELTERS, BENCHES, SHOP EQUIPMENTSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

CP

BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET

ESTIMATED COST Preliminary engineering, right of

C10000

dollars.)

of a project segment indicates (Cash-Flow Funding)Mitigation, Utilities or Construction.

way, utility, mitigation and construction cost estimates

(2) FUNDING SOURCES KEY

O - OtherL - Local

initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

work description. CPProject termini and a general

conception and remains with

9000

PROJECT BREAKS

CP

Various - multiple routes

A

5000

FY 2022

C

CP 3000CP

BCP 5000 B

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FY 2023 FY 2024FY 2021

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020

TOTAL PROJECT

COST (THOU)

FUZFUZ

FUN

DS

A

PRIOR YEARS COST

(THOU)

ACP 700

FY 2015 FY 2016

4000CP

FY 2025

5000

BB

CP CP 5000B

UNFUNDED

NON HIGHWAY PROGRAM

ADIV

FY 2017 FY 2018

BSHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

WORK TYPE (ACTIVITY) (3)Phases of implementation:

DIV C

20000

COMMITMENTSFUTURE

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

Preliminary engineering, Right of Way, UNFUNDED

BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE

with proposed work type or activity beginning in the

break.

One or two letter

CP

A

for an explanation of funding categories

FUNDING CATEGORY (1)

DIV

DIVISION 00

DEVELOPMENTAL PROGRAM

DURHAM

FY 2019

TRANSIT PARTNERROUTE / CITY /

NEW ROUTE or CityTRANSIT PARTNER

IDENTIFICATION NUMBER Assigned to each project at

US or NC RoutesI - Interstate

project until completion.

C - City

FEPD - Elderly and Persons with Disablity (5310)

FMOD - Fixed Guideway Modifications

designation for project

any project breaks.Category for the project and

LOCATION / DESCRIPTION

used for each project phase.

FUNDING SOURCE (2)

Identifies the "STI" Funding

See Highway Funding Key

FSPR - State Planning and Research

FNF - New Freedom ProgramFNS - New Starts - Capital (5309)

FMPL - Metropolitan Planning (5303)

FED - Federal Rail Funds

FLAP - Federal Lands Access Program

FUZ - Urbanized Area Formula Program (5307)

CMAQ - Congestion Mitigation

FF - Federal Ferry

FNU - Non Urbanized Area Formula Program (5311)

(3) WORK TYPE (ACTIVITY)

C - ConstructionAD - Administrative

CP - Capital

A - AcquisitionHF - State Dollars (Non-STI)REG - RegionalSW - Statewide

DIV - Division

DP - Discretionary or DemonstrationFBUS - Capital Program - Bus Earmark (5309)

Page 26: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

NON HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025AVIATION PROJECTS

AV-5737 1200OBTAIN NAVIGATION EASEMENTS AND CLEAR OBSTRUCTIONS IN THE RUNWAY 24 APPROACH.

DIV

T R 1080 L R 120

ALAMANCE BURLINGTON-ALAMANCEREGIONAL AIRPORT(BUY)

AV-5768 6500ACQUIRE RUNWAY PROTECTION ZONE, DEMOLISH STRUCTURES AND CLEAR APPROACHES.DIV

T 5850R L 650R

ALAMANCE BURLINGTON-ALAMANCEREGIONAL AIRPORT (BUY)

PUBLIC TRANSPORTATION PROJECTSTM-6147 122OPERATING

HF

JARC 61O L 61O

ALAMANCE ALAMANACE COUNTYTRANSPORTATION

TQ-6788 228OPERATING

HF

FEPD 114O L 114O

ALAMANCE ALAMANACE COUNTYTRANSPORTATION

TO-5136 11817 3647OPERATING ASSISTANCE

HF

SMAP 1634O O 817 O 817 O 817 O 817 O 817 817O817O817O ALAMANCEGUILFORD

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TO-5134 2634 600OPERATING ASSISTANCE

HF

FUZ 434O O 200 O 200 O 200 O 200 O 200 200O200O200O ALAMANCEGUILFORD

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TS-5115 39 19SAFETY & SECURITY - MIN. 1% SET ASIDE

HF

FUZ 4CP CP 2 CP 2 CP 2 CP 2 CP 2 2CP2CP2CP ALAMANCEFORSYTHGUILFORD

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

added per FY 2011 allocations

TP-5117 312 52PLANNING ASSISTANCE - BURLINGTON-GRAHAM

HF

FMPL 52CP CP 26 CP 26 CP 26 CP 26 CP 26 26CP26CP26CP ALAMANCE PIEDMONT AUTHORITYFORREGIONAL TRANSPORTATION

TM-5134 2400 400OPERATING ASSISTANCE

HF

JARC 400O O 200 O 200 O 200 O 200 O 200 200O200O200O ALAMANCE PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TA-6116 1875 233CAPITAL

HF

FNU 1642CP STCP

ALAMANCE ALAMANACE COUNTYTRANSPORTATION

TK-6103 4978 1428ADMINISTRATION

HF

FNU 702O O 356 O 356 O 356 O 356 O 356 356O356O356O FNU

ALAMANCE ALAMANACE COUNTYTRANSPORTATION

PASSENGER RAIL PROJECTS

IN PROGRESS

P-4405 21625 11673PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN RALEIGH AND CHARLOTTE.

TRN

STHSR 64PE STHSR 712R R 474 STHSR 3000C C 3000 C 941 O 881C C 880

ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGEROWANWAKE

VARIOUS

7-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 27: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

NON HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PASSENGER RAIL PROJECTS

ADDITIONAL PROJECT FUNDING INCLUDES ANTICIPATED $6.6 MILLION / YR LEGISLATIVE APPROPRIATION FROM STATE HIGHWAY FUND, TO BE USED FOR OPERATIONS

P-2918 120583 113083TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.

EX

CMAQ 3750O O 3750

A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESSB PURCHASE 2 USED LOCOMOTIVES - COMPLETEC EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESSD EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETEE PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESSF CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESSG PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESSH CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESSI EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS

ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE

PIEDMONT CORRIDOR

UNDER CONSTRUCTION

P-5205 11605 11605GRAHAM TO HAW RIVER. SIDING AND CURVE REALIGNMENT.TRN

ALAMANCE PIEDMONT CORRIDOR

PUBLIC TRANSPORTATION PROJECTSTA-9003 16CAPITAL - PURCHASE OF SERVICE

HF

FEPD 12CP L 2CP S 2CP

CASWELL CASWELL COUNTY

TA-6175 199 28CAPITALHF

FNU 171CP CASWELL CASWELL COUNTY

TK-6116 1568 448ADMINISTRATION

HF

FNU 224O O 112 O 112 O 112 O 112 O 112 112O112O112O FNU

CASWELL CASWELL COUNTY

AVIATION PROJECTSAV-5701 20000RUNWAY 5R-23L EXTENSION PROGRAM

SW

O C 19500 T C 500

GUILFORD PIEDMONT TRIADINTERNATIONALAIRPORT (GSO)

AV-5708 15500CONSTRUCT TAXIWAY OVER FUTURE I-73 EAST OF SR 2085 (BRYAN BOULEVARD).

SW

O 15000C T 500C

GUILFORD PIEDMONT TRIADINTERNATIONALAIRPORT (GSO)

AV-5707 15900CONSTRUCT TAXIWAY G.

SW

O C 15400 T C 500

GUILFORD PIEDMONT TRIADINTERNATIONALAIRPORT (GSO)

AV-5715 10000RUNWAY 5R-23L GROUP VI UPGRADE.

SW

O C 9500 T C 500

GUILFORD PIEDMONT TRIADINTERNATIONALAIRPORT (GSO)

7-32 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 28: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

NON HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025AVIATION PROJECTS

AV-5718 3000HIGH SPEED TAXIWAY TO RUNWAY 5R-23L.

SW

O C 2500 T C 500

GUILFORD PIEDMONT TRIADINTERNATIONALAIRPORT (GSO)

AV-5711 8000SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM (SMGCS) UPDATE.

SW

O C 7500 T C 500

GUILFORD PIEDMONT TRIADINTERNATIONALAIRPORT (GSO)

BICYCLE AND PEDESTRIAN PROJECTS

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF JAMESTOWN - IN PROGRESS

EB-5519 850EXISTING SIDEWALK NEAR JAMESTOWN MUNICIPAL BUILDING TO YORKLEIGH LANE NEAR GUILFORD TECHNICAL COMMUNITY COLLEGE JAMESTOWN CAMPUS/RAGSDALE HIGH SCHOOL COMPLEX IN JAMESTOWN. CONSTRUCT SIDEWALK.

TRN

STPEB 850C GUILFORD SR 4121 (EAST MAINSTREET)

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF JAMESTOWN

EB-5517 1200EXISTING SIDEWALK TO PIEDMONT ENVIRONMENTAL CENTER ENTRANCE IN HIGH POINT AND JAMESTOWN. CONSTRUCT PEDESTRIAN BRIDGE OVER EAST FORK OF DEEP RIVER.

TRN

STPEB 1200C GUILFORD NEW PEDESTRIAN BRIDGEAND APPROACHES

PLANNING, DESIGN, RIGHT OF WAY AND CONSTRUCTION BY OTHERS - IN PROGRESS

EL-5101 23442 12489PEDESTRIAN AND BICYCLE PROJECTS IN THE GREENSBORO URBAN AREA METROPOLITAN PLANNING ORGANIZATION (GUAMPO).

DIV

STPDA 268R L 67R STPDA 3949C C 1027 C 3518 L 987C C 257 C 880

GUILFORD VARIOUS

TAP FUNDING INCLUDES UNPROGRAMMED BALANCE - PROGRAMMING SUBJECT TO MPO APPROVAL

U-5532 10273 35GREENSBORO URBAN AREA MPO: BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP) – ELIGIBLE PROJECTS

DIV

TAP 64R R 20 R 10 R 10 L 16R R 6 R 3 R 3 STPDA 359C C 1203 C 356 C 3169 TAP 540C C 608 C 305 C 305 L 225C C 453 C 165 C 868 TAP C 155 C 155 C 155 C 155 C 155 155C155C155C C 155 C 155

GUILFORD VARIOUS

EB-5700 500PHASES B, C, AND D - CONSTRUCT GREENWAY ALONG MURROW BOULEVARD AND FISHER AVENUE IN GREENSBORO, FROM SR 4240 (EAST LEE STREET) TO NORTH ELM STREET ON EAST SIDE, AND FROM NORTH ELM STREET TO GREENE STREET ON SOUTH SIDE.

1.3

DIV

STPEB C 400 L C 100

GUILFORD DOWNTOWN GREENWAY

EB-5717 170MURROW BOULEVARD TO BESSEMER AVENUE IN GREENSBORO. CONSTRUCT SIDEWALK ON NORTH SIDE.

1

DIV

SRTS C 170 GUILFORD EAST LINDSAYSTREET

EB-5716 204SOUTH OF MEADOWVIEW ROAD TO SPRING GARDEN ROAD IN GREENSBORO. CONSTRUCT SIDEWALK ON WEST SIDE.

0.8DIV

SRTS C 204 GUILFORD HOLDEN ROAD

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF GREENSBORO - IN PROGRESS

EB-5518 460 110BATTLEGROUND AVENUE TO MENDENHALL STREET IN GREENSBORO. REMOVE THROUGH LANE ON HILL STREET AND CONSTRUCT MULTI-USE PATH.

0.7

TRN

STPEB 350C GUILFORD LATHAM PARKGREENWAY

EB-5714 144SR 2751 (CHURCH STREET) TO SR 2523 (YANCEYVILLE STREET) IN GREENSBORO. CONSTRUCT SIDEWALK ON BOTH SIDES WHERE NONE EXISTS.

0.9DIV

SRTS C 144 GUILFORD LEES CHAPEL ROAD

7-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 29: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

NON HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS

EB-5712 286SR 1398 (FREEMAN MILL ROAD) TO FLORIDA STREET IN GREENSBORO. CONSTRUCT SIDEWALKS ON WEST SIDE AND ON EAST SIDE FROM EXISTING SIDEWALK TO FLORIDA STREET.

0.6DIV

SRTS C 286 GUILFORD LOVETT STREET

PUBLIC TRANSPORTATION PROJECTSTA-5132 4775 1410EXPANSION BUSES

HF

FUZ 1346CP CP 673 CP 673 CP 673 GUILFORD GREENSBORO TRANSITAUTHORITY

TA-5124 1630 460EXPANSION BUS

HF

FNF 234CP CP 117 CP 117 CP 117 CP 117 CP 117 117CP117CP117CP GUILFORD GREENSBORO TRANSITAUTHORITY

see amendment #1 of 2012-2018 STIP

TG-5105 1815 1185ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETCHF

FUZ 130CP CP 65 CP 65 CP 65 CP 61 CP 61 61CP61CP61CP GUILFORD GREENSBORO TRANSITAUTHORITY

see amendment #1 to 2012-2018 STIP

TG-4957 8610 2538OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE

HF

FUZ 1210Oc Oc 594 Oc 594 Oc 594 Oc 616 Oc 616 616Oc616Oc616Oc GUILFORD GREENSBORO TRANSITAUTHORITY

see amendment #1 to 2012-2018 STIP

TG-4759 58487 20482PREVENTIVE MAINTENANCE

DIV

FUZ 7002Oc Oc 3501 Oc 3501 Oc 3501 Oc 3750 Oc 3750 3750Oc3750Oc3750Oc L 350OC STPDA 1400OC

GUILFORD GREENSBORO TRANSITAUTHORITY

TG-5101A 6631 2256OPERATING ASSISTANCE

HF

FUZ 1575O O 875 O 875 O 875 FUZ 175CP

GUILFORD GREENSBORO TRANSITAUTHORITY

TG-5105B 136 50ROUTINE CAPITAL - BUS SHELTERS

EX

CMAQ 86CP GUILFORD GREENSBORO TRANSITAUTHORITY

TM-4705 4188 1188OPERATING ASSISTANCE

HF

JARC 600O O 300 O 300 O 300 O 300 O 300 300O300O300O GUILFORD GREENSBORO TRANSITAUTHORITY

TM-5308 305TRANSIT ENHANCEMENTS

HF

FUZ 98CP CP 49 CP 49 CP 49 L 24CP CP 12 CP 12 CP 12

GUILFORD GREENSBORO TRANSITAUTHORITY

TM-5312 1285316 OPERATING - GTA SUPPLEMENTAL SERVICE TO GTCC JAMESTOWN CAMPUS

HF

JARC 64O L 64O

GUILFORD GREENSBORO TRANSITAUTHORITY

TI-6103 12802 3566INTERCITY BUS - GREENSBORO TO BOONE

HF

FNU 2196O O 880 O 880 O 880 O 880 O 880 880O880O880O FORSYTHGUILFORDWATAUGAWILKESYADKIN

COACH AMERICA

TA-4767 4617 1817REPLACEMENT - PARATRANSIT VEHICLE

EX

CMAQ 666CP FBUS 553CP CP 553 CP 553 L 124CP CP 62 CP 62 S 117CP CP 55 CP 55 STPDA

GUILFORD GREENSBORO TRANSITAUTHORITY

7-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 30: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

NON HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TA-4771 12807 1986HYBRID REPLACEMENT BUSES

EX

CMAQ 3708CP CP 2544 CP 567 FBUS 1108CP CP 664 CP 554 L 479CP CP 286 CP 64 CP 58 S 426CP CP 254 CP 57 CP 52

GUILFORD GREENSBORO TRANSITAUTHORITY

TO-4971 79471 12111OPERATING ASSISTANCE - FIXED ROUTE

HF

FUZ 5612O O 2956 O 2656 O 2956 O 1335 O 1335 1335O1335O1335O O 1335 L 2956O O 1328 O 1628 O 1328 O 3150 O 3150 3150O3150O3150O O 3150 SMAP 3256O O 1628 O 1628 O 1628 O 1815 O 1815 1815O1815O1815O O 1815

GUILFORD GREENSBORO TRANSITAUTHORITY

TO-5125 4885 2443OPERATING ASSISTANCE - PRIORITY SERVICE

EX

CMAQ 2442Oc GUILFORD GREENSBORO TRANSITAUTHORITY

TO-6139 1868 426ELDERLY AND DISABLED OPERATING

HF

FEPD 215O O 97 O 97 O 97 O 215 L 215O O 97 O 97 O 97 O 215

GUILFORD GREENSBORO TRANSITAUTHORITY

TO-6140 168 24ADMINISTRATIVE OVERSIGHT OF 5310 FUNDS

HF

FEPD 48O O 24 O 24 O 24 O 24 GUILFORD GREENSBORO TRANSITAUTHORITY

TO-5101B 1128 376OPERATING ASSISTANCE - ADDED SUNDAY

EX

CMAQ 752Oc GUILFORD GREENSBORO TRANSITAUTHORITY

TO-5101C 1854 618OPERATING ASSISTANCE - ROUTE #12 MODIFIED

EX

CMAQ 1236Oc GUILFORD GREENSBORO TRANSITAUTHORITY

TO-5101D 684 228OPERATING ASSISTANCE - ROUTE #15

EX

CMAQ 456Oc GUILFORD GREENSBORO TRANSITAUTHORITY

TP-5101 2005 518PLANNING ASSISTANCE - 5303

HF

FMPL 278CP CP 139 CP 139 CP 139 CP 139 CP 139 236CP139CP139CP GUILFORD GREENSBORO TRANSITAUTHORITY

TP-4712 2502 126PLANNING ASSISTANCE

HF

FUZ 376CP CP 250 CP 250 CP 250 CP 250 CP 250 250CP250CP250CP GUILFORD GREENSBORO TRANSITAUTHORITY

TQ-6783 8835310 CAPITAL PROJECTS

HF

FEPD 354CP CP 118 CP 118 CP 118 L 88CP CP 29 CP 29 CP 29

GUILFORD GREENSBORO TRANSITAUTHORITY

TQ-7000 132 24ADMINISTRATIVE OVERSIGHT OF 5310

HF

FEPD 66AD AD 21 AD 21 GUILFORD GREENSBORO TRANSIT AUTHORITY

see amendment #1 for 2012-2018 STIP

TS-4758 843 233SAFETY & SECURITY - MIN. 1% SET ASIDE

HF

FUZ 122CP CP 61 CP 61 CP 61 CP 61 CP 61 61CP61CP61CP GUILFORD GREENSBORO TRANSITAUTHORITY

TA-6551 53CAPITAL - EXPANSION VEHICLE

HF

FEPD 43CP L 5CP S 5CP

GUILFORD SENIOR RESOURCES OFGUILFORD

TQ-6793 202OPERATING

HF

FEPD 101O L 101O

GUILFORD GUILFORD COUNTYTRANSPORTATION

TO-4790 47708 12938OPERATING ASSISTANCE

HF

FUZ 7250O O 3640 O 3650 O 3660 O 2404 O 2404 2404O2404O2404O SMAP 870O O 435 O 435 O 435 O 475 O 475 475O475O475O

DAVIDSONGUILFORDRANDOLPH

HIGH POINT TRANSITSYSTEM

7-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 31: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

NON HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TP-5104 616 176PLANNING ASSISTANCE - 5303

HF

FMPL 88CP CP 44 CP 44 CP 44 CP 44 CP 44 44CP44CP44CP GUILFORD HIGH POINT TRANSITSYSTEM / HI-TRAN

TS-5113 220 60SAFETY & SECURITY - MIN. 1% SET ASIDE

HF

FUZ 32CP CP 16 CP 16 CP 16 CP 16 CP 16 16CP16CP16CP DAVIDSONGUILFORDRANDOLPH

HIGH POINT TRANSITSYSTEM / HI-TRAN

TM-6139 634OPERATING ASSISTANCE

HF

JARC 317O L 317O

FORSYTHGUILFORD

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TO-5134 2634 600OPERATING ASSISTANCE

HF

FUZ 434O O 200 O 200 O 200 O 200 O 200 200O200O200O ALAMANCEGUILFORD

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TO-5136 11817 3647OPERATING ASSISTANCE

HF

SMAP 1634O O 817 O 817 O 817 O 817 O 817 817O817O817O ALAMANCEGUILFORD

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TO-5134B 1800OPERATING ASSISTANCE

HF

FUZ 900O L 900O

FORSYTHGUILFORD

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TO-5134C 700OPERATING Assistance

HF

FUZ 700O FORSYTHGUILFORD

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TS-5115 39 19SAFETY & SECURITY - MIN. 1% SET ASIDE

HF

FUZ 4CP CP 2 CP 2 CP 2 CP 2 CP 2 2CP2CP2CP ALAMANCEFORSYTHGUILFORD

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TA-6522 750 375PURCHASE VANS

REG

L 75CP STPDA 300CP

FORSYTHGUILFORD

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TG-6173 375ROUTINE CAPITAL

HF

FUZ 300CP L 75CP

FORSYTHGUILFORD

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TG-5226 1312 500PREVENTIVE MAINTENANCE

REG

STPDA 812CP FORSYTHGUILFORD

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TG-6173B 188ROUTINE CAPITAL

HF

FUZ 150CP L 38CP

FORSYTHGUILFORD

PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TM-5313 10006316 OPERATING - PART: CAREER EXPRESS DEVIATED FIXED ROUTE SERVICE

HF

JARC 250O O 250 L 250O O 250

GUILFORD PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION

TG-4814 3206 916ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC ($40K CAPITAL COST OF CONTRACTING)HF

FUZ 458CP CP 229 CP 229 CP 229 CP 229 CP 229 229CP229CP229CP DAVIDSONGUILFORDRANDOLPH

HIGH POINT TRANSITSYSTEM / HI TRAN

TA-6263 439 290CAPITAL

HF

FNU 149CP GUILFORD GUILFORD COUNTYTRANSPORTATION

TK-6132 3174 906ADMINISTRATION

HF

FNU 452O O 227 O 227 O 227 O 227 O 227 227O227O227O FNU

GUILFORD GUILFORD COUNTYTRANSPORTATION

7-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 32: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

NON HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FREIGHT RAIL PROJECTS

"OTHER" FUNDS REFLECT NORFOLK SOUTHERN CORPORATION PARTICIPATION

P-5700 1700NORFOLK SOUTHERN "ROUNDHOUSE" PROPERTY. CONSTRUCT PARKING LOT WITH SPACE FOR INTERNATIONAL CONTAINERS, INCLUDING SECURITY FENCE, POLE-MOUNTED LIGHTING, AND PAVED ENTRANCE.

DIV

T C 850 O C 850

GUILFORD NORFOLK SOUTHERNMAINLINE

PASSENGER RAIL PROJECTS

IN PROGRESS

P-4405 21625 11673PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN RALEIGH AND CHARLOTTE.

TRN

STHSR 64PE STHSR 712R R 474 STHSR 3000C C 3000 C 941 O 881C C 880

ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGEROWANWAKE

VARIOUS

UNDER CONSTRUCTION

P-5204 9212 9212GRADE SEPARATION AND ROAD REALIGNMENT, CARMON ROAD CROSSING CLOSURE AND MCLEANSVILLE ROAD CROSSING CLOSURE.

TRN

GUILFORD PIEDMONT CORRIDORSR 2819(MCLEANSVILLEROAD)

ADDITIONAL PROJECT FUNDING INCLUDES ANTICIPATED $6.6 MILLION / YR LEGISLATIVE APPROPRIATION FROM STATE HIGHWAY FUND, TO BE USED FOR OPERATIONS

P-2918 120583 113083TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.

EX

CMAQ 3750O O 3750

A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESSB PURCHASE 2 USED LOCOMOTIVES - COMPLETEC EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESSD EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETEE PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESSF CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESSG PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESSH CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESSI EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS

ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE

PIEDMONT CORRIDOR

BICYCLE AND PEDESTRIAN PROJECTS

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS; TAP FUNDING REFLECTS UNPROGRAMMED BALANCE - PROGRAMMING SUBJECT TO MPO APPROVAL

U-4726 12233 6047DURHAM-CHAPEL HILL-CARRBORO (DCHC) MPO. BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP) – ELIGIBLE PROJECTS.

DIV

STPDA 304PE L 76PE STPDA 2076C C 353 L 519C C 88 TAP C 277 C 277 C 277 C 277 C 277 277C277C277C C 277 C 277

CHATHAMDURHAMORANGE

VARIOUS

7-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 33: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

NON HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS

PLANNING, DESIGN, RIGHT OF WAY AND CONSTRUCTION BY TOWN OF CARRBORO - IN PROGRESS

EL-4828 2068 784WESTERN SECTION, SR 1919 (SMITH LEVEL ROAD) TO UNIVERSITY LAKE IN CARRBORO. CONSTRUCT GREENWAY AND CONNECTIONS.

TRN

STPDA 298C A L 74C A TAP 730C B L 182C B

A PHASE 1TRNB PHASE 2TRN

ORANGE MORGAN CREEKGREENWAY

EB-5721 558CLELAND DRIVE TO WILLOW DRIVE IN CHAPEL HILL. UPGRADE EXISTING OFF-ROAD PATH AND CONSTRUCT NEW SECTION OF PATH.

0.7

DIV

SRTS 89PE SRTS 469C

ORANGE ORANGE COUNTYBICYCLE ROUTE 1

PUBLIC TRANSPORTATION PROJECTSTA-5148 224VANPOOL VANS - REPLACEMENT (8)

HF

FBUS 178CP L 46CP

DURHAMORANGEWAKE

TRIANGLE TRANSITAUTHORITY

TA-5154 269REPLACEMENT PARATRANSIT VEHICLES

DIV

L 54CP STPDA 215CP

DURHAMORANGE

TRIANGLE TRANSITAUTHORITY

TA-5123B 19546 11710EXPANSION BUS

HF

FUZ 1352CP CP 1621 CP 1621 CP 1621 1621CP DURHAMORANGE

TRIANGLE TRANSITAUTHORITY

TG-5251 277ROUTINE CAPITAL

HF

FBUS 222CP L 55CP

DURHAMORANGEWAKE

TRIANGLE TRANSITAUTHORITY

see March 2012 handout 2012-2018 STIP

TG-4821B 24490 5373ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC INCLUDES ADA, PM AND SERVICE VEHICLES

HF

FUZ 3548CP CP 1849 CP 1909 CP 1966 CP 1969 CP 1969 1969CP1969CP1969CP DURHAMORANGE

TRIANGLE TRANSITAUTHORITY

TM-5311 470SUNDAY ROUTES (400, 700, & 800)

HF

JARC 235O L 235O

DURHAMORANGEWAKE

TRIANGLE TRANSITAUTHORITY

TA-4748 4421 1820REPLACEMENT - PARATRANSIT VEHICLEHF

FUZ 1025CP CP 197 CP 197 CP 197 CP 197 CP 197 197CP197CP197CP ORANGE CHAPEL HILL TRANSIT

TA-4979 4061 1685REPLACEMENT VANHF

FUZ CP 792 CP 792 792CP ORANGE CHAPEL HILL TRANSIT

TA-4726 51141 29334REPLACEMENT BUS - ARTICULATED

HF

FBUS FUZ 2423CP CP 2423 CP 2423 CP 2423 CP 2423 CP 2423 2423CP2423CP2423CP

ORANGE CHAPEL HILL TRANSIT

TA-5143 200PURCHASE SUPPORT AND PARATRANSIT VEHICLES

HF

FBUS 160CP L 20CP S 20CP

ORANGE CHAPEL HILL TRANSIT

TA-4726A 22353 REPLACEMENT BUSES.

DIV

STPDA 973A A 720 L 362A A 180

ORANGE CHAPEL HILL TRANSIT

TD-5271 50RENOVATE BUS RELATED FACILITIESHF

FBUS 50CP ORANGE CHAPEL HILL TRANSIT

7-38 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 34: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

NON HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TD-4710B 878 878FACILITY - PARK & RIDEHF

FUZ ORANGE CHAPEL HILL TRANSIT

TG-5249 70ROUTINE CAPITAL - RESURFACE PARK & RIDE LOTS

HF

FUZ 56CP L 14CP

ORANGE CHAPEL HILL TRANSIT

TG-5248 100ROUTINE CAPITAL-RESURFACE PARK & RIDE LOTS

HF

FBUS 80CP L 20CP

ORANGE CHAPEL HILL TRANSIT

TG-5247 71ROUTINE CAPITAL - RESURFACE PARK & RIDE LOTS

HF

FUZ 57CP L 7CP S 7CP

ORANGE CHAPEL HILL TRANSIT

TG-5227 329ROUTINE CAPITAL - PURCHASE BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SUPPORT VEHICLES, REPLACE/REPAIR LIFTS

HF

FBUS 263CP L 66CP

ORANGE CHAPEL HILL TRANSIT

TG-4732A 3920 1220ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC

HF

FUZ 540CP CP 540 CP 540 CP 540 540CP ORANGE CHAPEL HILL TRANSIT

TG-4732B 888 300ROUTINE CAPITAL - SERVICE VEHICLEHF

FUZ 196CP CP 196 196CP ORANGE CHAPEL HILL TRANSIT

TG-4731B 28557 4849PREVENTIVE MAINTENANCEHF

FUZ 5112Oc Oc 2931 Oc 3181 Oc 3431 Oc 3681 Oc 1343 1343Oc1343Oc1343Oc ORANGE CHAPEL HILL TRANSIT

TM-5132 414 216OPERATING ASSISTANCE

HF

JARC 99O L 99O

ORANGE CHAPEL HILL TRANSIT

TM-5305 136OPERATING - NIGHT SERVICE

HF

JARC 68O L 68O

ORANGE CHAPEL HILL TRANSIT

TM-5306 144OPERATING ASSISTANCE - CONTINUATION OF SERVICE HOUR EXTENSIONA

HF

JARC 72O L 72O

ORANGE CHAPEL HILL TRANSIT

TO-5133 50081 14381OPERATING ASSISTANCEHF

SMAP 7140O O 3570 O 3570 O 3570 O 3570 O 3570 3570O3570O3570O ORANGE CHAPEL HILL TRANSIT

TQ-5104 216EZ RIDER SENIOR SHUTLEHF

FEPD 216O ORANGE CHAPEL HILL TRANSIT

TS-5106 506 239SAFETY & SECURITY - MIN. 1% SET ASIDEHF

FUZ 55CP CP 35 CP 35 CP 35 CP 35 CP 18 18CP18CP18CP ORANGE CHAPEL HILL TRANSIT

TT-6107 80PURCHASE MOBILE DATA TERMINALS

DIV

L 16CP STPDA 64CP

ORANGE CHAPEL HILL TRANSIT

TA-6526 5CAPITAL

HF

FEPD 3CP L 1CP S 1CP

ORANGE ORANGE COUNTYDEPARTMENT OF AGING

TN-5102 1764 504OPERATING ASSISTANCE - NEW FREEDOM - URBAN

HF

FNF 252O O 126 O 126 O 126 O 126 O 126 126O126O126O DURHAMORANGE

DURHAM AREA TRANSITAUTHORITY

7-39 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 35: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

NON HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TE-5205 977986UNC HOSPITALS IN CHAPEL HILL TO NC 55 (ALSTON AVENUE) IN DURHAM. CONSTRUCT LIGHT RAIL SYSTEM.

17.1

REG

FBUS R 6613 A R 6612 A T R 3306 A R 3306 A L R 3306 A R 3306 A FBUS C 24812 A 24811C A24811C A24811C A T C 12405 A 12404C A12405C A12405C A L C 12405 A 12404C A12405C A12405C A FBUS R 14759 B R 14758 B R 14758 B T R 7379 B R 7379 B R 7379 B L R 7379 B R 7379 B R 7379 B FBUS 221503C B C 110752 BT 110750C B C 55375 BL 110750C B C 55375 B

A UNC HOSPITALS IN CHAPEL HILL TO DURHAM COUNTY LINEREGB ORANGE COUNTY LINE TO NC 55 (ALSTON AVENUE) IN DURHAM.REG

DURHAMORANGE

DURHAM-ORANGELIGHT RAIL LINE

TQ-6165 150MOBILITY MANAGEMENT

HF

FEPD 120CP L 15CP S 15CP

ORANGE ORANGE COUNTYDEPARTMENT OF AGING

TQ-3002 163SENIOR TRANSPORTATION EXPANSION, ASSESSMENT AND MOBILITY MANAGER INCLUDING PURCHASE OF SERVICEHF

FEPD 163CP ORANGE ORANGE COUNTYDEPARTMENT OF AGING

TA-6554 482CAPITALHF

FNU 482CP ORANGE ORANGE PUBLIC TRANSIT

TD-5155 771 REPLACEMENT LTV (25') AND RADIO, VEHICLE LETTERING AND LOGOS, AND ON-BOARD CAMERA.DIV

STPDA A 62 L A 15

ORANGE ORANGE PUBLIC TRANSIT

TK-6151 2600 742ADMINISTRATION

HF

FNU 370O O 186 O 186 O 186 O 186 O 186 186O186O186O FNU

ORANGE ORANGE PUBLIC TRANSIT

TA-4818B 6491 3605REPLACEMENT BUS

HF

FUZ 962CP CP 962 962CP DURHAMORANGE

TRIANGLE TRANSITAUTHORITY

added unfunded $1.5B to match 2040 estimates

TE-4903A 1502000 2000FIXED GUIDEWAY - LIGHT RAIL SERVICE- CARY/RALEIGH

HF

FED CP 500000 500000CP500000CP DURHAMORANGEWAKE

TRIANGLE TRANSITAUTHORITY

see March 2012 handout 2012-2018 STIP

TP-4732A 8429 1256PLANNING ASSISTANCE

HF

FUZ 1332PL PL 696 PL 717 PL 738 PL 738 PL 738 738PL738PL738PL DURHAMORANGE

TRIANGLE TRANSITAUTHORITY

TS-5119 353 215SAFETY & SECURITY - MIN. 1% SET ASIDE

HF

FUZ 34CP CP 22 CP 19 CP 19 CP 19 CP 19 2CP2CP2CP DURHAMORANGE

TRIANGLE TRANSITAUTHORITY

7-40 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 36: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

NON HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PASSENGER RAIL PROJECTS

IN PROGRESS

P-4405 21625 11673PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN RALEIGH AND CHARLOTTE.

TRN

STHSR 64PE STHSR 712R R 474 STHSR 3000C C 3000 C 941 O 881C C 880

ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGEROWANWAKE

VARIOUS

"OTHER" FUNDING REFLECTS PARTICIPATION BY TRIANGLE TRANSIT

P-5701 7200MILEPOST 41.7 IN HILLSBOROUGH. CONSTRUCT PLATFORM, PASSENGER RAIL STATION BUILDING, SITE ACCESS, UTILITIES AND PARKING.DIV

T C 3315 C 3315 O C 285 C 285

ORANGE NORFOLK SOUTHERNH LINE

ADDITIONAL PROJECT FUNDING INCLUDES ANTICIPATED $6.6 MILLION / YR LEGISLATIVE APPROPRIATION FROM STATE HIGHWAY FUND, TO BE USED FOR OPERATIONS

P-2918 120583 113083TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.

EX

CMAQ 3750O O 3750

A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESSB PURCHASE 2 USED LOCOMOTIVES - COMPLETEC EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESSD EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETEE PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESSF CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESSG PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESSH CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESSI EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS

ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE

PIEDMONT CORRIDOR

PUBLIC TRANSPORTATION PROJECTSTA-6525 190CAPITAL

HF

FEPD 152CP L 19CP S 19CP

ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.

TA-6548 128CAPITAL - EXPANSION VEHICLES

HF

FEPD 102CP L 13CP S 13CP

ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.

TA-9000 108CAPITAL - PURCHASE OF SERVICE

HF

FEPD 86CP L 11CP S 11CP

ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.

TA-6135 907 369CAPITAL

HF

FNU 538CP ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.

TK-6159 2474 706ADMINISTRATION

HF

FNU 352O O 177 O 177 O 177 O 177 O 177 177O177O177O FNU

ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.

7-41 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 37: STATE TRANSPORTATION IMPROVEMENT PROGRAM · COUNTY FUTURE YEARS F NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance)

NON HIGHWAY PROGRAMDIVISION 7

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TQ-6164 492OPERATING ASSISTANCE

HF

FEPD 246O L 246O

ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.

TQ-6785 250OPERATING

HF

FEPD 125O L 125O

ROCKINGHAM ROCKINGHAM COUNTYCOUNCIL ON AGING, INC.

7-42 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project