Stantec at the CIM 2017, Montreal · Doug brings over 31 years of experiencein management, project...
Transcript of Stantec at the CIM 2017, Montreal · Doug brings over 31 years of experiencein management, project...
Andrew has several years’ experience serving the natural resources sector in many capacities. His background includes both international and local projects, having served as country manager in Peru for over two years, and currently having responsibility for Stantec’s global mining clients.
Julian is actively involved in numerous mine feasibility and design projects. He provides electrical engineering expertise and technical support on feasibility studies, estimating, drawings, procurement services, installation, commissioning, and hoist systems. Julian has served in leadership roles as the Electrical Department Head and the Project Manager of numerous projects. With over 30 years of experience, his skills and expertise are an asset to mining clients.
Al’s extensive design experience and detailed knowledge of electrical systems has allows him to support the needs of Stantec’s mining clients around the world. He stays current with technological change, and develops project quality plans which outline the processes to be used to ensure expectations are met. All of his work focuses heavily on quality and continuous improvement.
Doug brings over 31 years of experience in management, project engineering, and maintenance in heavy process-related industry and mining to the Stantec team. Doug has extensive experience with high-voltage power distribution, mechanical, and process-related equipment, including troubleshooting and optimization.
Andrew Watson
for Mines
2:25 PM in Room 513ASession: Environment and Sustainability Development
Julian Fisher
AlPoole
DougHay
Mine Power Quality
Investing in Advanced Digital Technologies to Optimize Total Cost of Ownership
Resonant Grounding as an Alternative to Resistance Grounding
10:55 AM in Room 513 ESession: Engineering and Reliability Best Practices
9:20 AM in Room 516CSession: Innovation: Present & Future
11:45 AM in Room 513 ESession: Maintenance, Engineering and Reliability Best Practices
Look inside for details
of Stantec’s speakers
Stantec is a proud member of the mining community
stage of the lifecycle.
MiningLifecycle
Closure / Reclamation
Tailings and Waste
Water Supply / Management / Treatment
Exploration
Environmental Baseline & Permitting
Mine Development& Closure Planning
Process Facilities
ResourceAssessment
Feasibility Studies &Project Management
Mine FacilitiesSurface and Underground
Operations Support
Civil Infrastructure
Legacy Remediation
Safety
Tues
da
y, M
ay
2nd
, 201
7A
FTER
NO
ON
SES
SIO
NW
edne
sda
y, M
ay
3rd
, 201
7M
ORN
ING
SES
SIO
NW
edne
sda
y, M
ay
3rd
, 201
7M
ORN
ING
SES
SIO
N
Tues
da
y, M
ay
2nd
, 201
7M
ORN
ING
SES
SIO
N
Stantec at the CIM 2017, Montreal - Come meet our team at booth #719