Standard Road PlansBA Index BA-150 Changed Obstacle to Object. BA-200 Added new circle note 4 and...

85
This File contains revisions to the English version of the Standard Road Plans effective for the 04-20-21 letting. Federal and state laws prohibit employment and/or public accommodation discrimination on the basis of age, color, creed, disability, gender identity, national origin, pregnancy, race, religion, sex, sexual orientation or veteran’s status. If you believe you have been discriminated against, please contact the Iowa Civil Rights Commission at 800-457-4416 or Iowa Department of Transportation’s affirmative action officer. If you need accommodations because of a disability to access the Iowa Department of Transportation’s services, contact the agency's affirmative action officer at 800-262-0003.

Transcript of Standard Road PlansBA Index BA-150 Changed Obstacle to Object. BA-200 Added new circle note 4 and...

  • This File contains revisions to the

    English version of the

    Standard Road Plans

    effective for the 04-20-21 letting.

    Federal and state laws prohibit employment and/or public accommodation discrimination on the basis of age, color, creed, disability, gender identity, national origin, pregnancy, race, religion, sex, sexual

    orientation or veteran’s status. If you believe you have been discriminated against, please contact the Iowa Civil Rights Commission at 800-457-4416 or Iowa Department of Transportation’s affirmative

    action officer. If you need accommodations because of a disability to access the Iowa Department of Transportation’s services, contact the agency's affirmative action officer at 800-262-0003.

  • To: From:

    Subject: Revision Date:

    Holders of Standard Road Plans Design Bureau

    Revision of Standard Road Plan Manual

    INSTRUCTIONS: The attached Standard Road Plans have received approval and may be referred to in the plans by number. Questions concerning information contained on the Standard Road Plans should be directed to the Methods Section, Design Bureau, telephone (515) 239-1830 or email [email protected].

    Standard

    Road Plan Description of Revision

    4/20/2021

    **NOTE** The following revisions are effective with the 4/20/2021 letting. Projects let prior to this date may reference earlier versions of these Standard Road Plans.

    BA Index

    BA-150

    Changed Obstacle to Object.

    BA-200

    Added new circle note 4 and renumbered remaining notes.

    BA-205

    Modified note in PLAN view regarding 22" offset

    BA-225

    Modified note in PLAN view regarding max offset

    BA-250

    Removed circle note 5.

    BA-251

    Modified graphics to new cells in cell library.

    BA-252

    Removed Interim from standard

    BA-253

    Modify PLAN view for new cells in cell library

    BA-260

    Removed circle note 4.

    BA-351

    Changed Obstacle to Object.

    BA-401

    Changed Obstacle to Object.

    BA-500

    Changed Obstacle to Object.

  • BR Index

    BR-205

    Modified #4 Bars at 12" Centers to #5 Bars

    EC Index

    EC-201

    Modified trench to 10". Added circle notes 13 & 14.

    EC-204

    Modified circle note 3 and 5, title and stake placement

    EW Index

    EW-301

    Changed slope in front of guardrail from a 10 to 1 to match the slope of the adjacent shoulder. Added note 3 on Sheet 4.

    LI Index

    LI-103

    Added the HDPE handhole to the precast concrete and composite ones.

    LS Index

    LS-630

    Added NCHRP 350 TL-3 designation to title. Changed Barrier Transition Section contract item to specify BA-201.

    LS-631

    Changed Obstacle to Object.

    LS-632

    Changed Obstacle to Object.

    LS-635

    Update to new cells in the cell library.

    PM Index

    PM-240

    Modified paint lines at railroad tracks and added circle note 2.

    PM-242

    Modified paint lines at railroad tracks and added circle note 2.

    SI Index

    SI-241

    Modified paint lines at railroad tracks.

  • SW Index

    SW-102

    Added note DO NOT USE ON PRIMARY ROADWAYS

    SW-103

    Added note DO NOT USE ON PRIMARY ROADWAYS

    SW-104

    Added note DO NOT USE ON PRIMARY ROADWAYS

    SW-301

    Added manhole depth note and infiltration barrier note

    SW-302

    Added manhole depth note and infiltration barrier note

    SW-303

    Added manhole depth not.

    SW-304

    Added manhole depth note and infiltration barrier note

    SW-305

    Added manhole depth note.

    SW-306

    Void

    SW-308

    Deleted top of manhole.

    SW-401

    Added manhole depth note.

    SW-404

    Added manhole depth note

    SW-405

    Added manhole depth note

    SW-513

    Modified circle notes 1, 3, 4 and 8.

    WM Index

    WM-201

    Added general note for bid items.

  • SECTION

    Barriers BANO. DATE TITLE

    Void Concrete BarriersBA-100 04-21-20 44" Concrete Median Barrier (Full Section)BA-101 10-21-14 44" Concrete Median Barrier Width TransitionBA-102 04-21-20 44" Concrete Barrier (Half Section)BA-103 04-21-20 34" Concrete Barrier (Half Section)BA-104 10-15-19 34" Concrete Barrier for use with Reinforced Paved ShoulderBA-105 10-15-19 34" to 44" Concrete Barrier Transition SectionBA-106 10-21-14 Reinforced Paved Shoulder for Concrete BarrierBA-107 10-15-19 Concrete Barrier End SectionBA-108 10-17-17 Concrete Barrier Tapered End Section BA-150 04-20-21 Side Obstacle Protection with Concrete Barrier and Guardrail

    Void Steel Beam GuardrailBA-200 04-20-21 Steel Beam Guardrail ComponentsBA-201 04-18-17 Steel Beam Guardrail Barrier Transition Section (MASH TL-3)BA-202 10-20-15 Steel Beam Guardrail Bolted End AnchorBA-203 10-15-19 Steel Beam Guardrail W-Beam End AnchorBA-204 10-15-19 Steel Beam Guardrail Thrie-Beam End AnchorBA-205 04-20-21 Steel Beam Guardrail Tangent End Terminal (MASH TL-3)BA-206 10-15-19 Steel Beam Guardrail Flared End Terminal For Cable ConnectionBA-210 04-19-16 Guardrail Post Adaptor UnitBA-211 10-21-14 Steel Beam Guardrail Long - Span System for Post Conflicts BA-221 04-18-17 Steel Beam Guardrail Barrier Transition Section (MASH TL-2)BA-225 04-20-21 Steel Beam Guardrail Tangent End Terminal (MASH TL-2)BA-250 04-20-21 Steel Beam Guardrail Installation at Concrete Barrier or Bridge End Post (MASH TL-3)BA-251 04-20-21 Steel Beam Guardrail Installation at Side Object (Two-Way Protection)BA-252 04-20-21 Steel Beam Guardrail Installation at Side Object (One-Way Protection)BA-253 04-20-21 Steel Beam Guardrail Installation at Railroad SignalBA-260 04-20-21 Steel Beam Guardrail Installation at Concrete Barrier or Bridge End Post (MASH TL-2)

    04/20/21

  • SECTION

    Barriers BANO. DATE TITLE

    Void Cable GuardrailBA-351 04-20-21 High Tension Cable Guardrail

    VoidVoid Temporary Barrier Rails

    BA-401 04-20-21 Temporary Barrier Rail (Precast Concrete)

    Void Crash CushionsBA-500 04-20-21 Temporary Crash Cushions Sand Barrel

    04/20/21

  • 1

    2

    3

    4

    5

    A

    A

    PCC Paved Shoulder

    LEGEND

    Reinforced PCC Paved Shoulder

    Concrete Barrier

    BA-102

    End Section

    BA-107

    Transition Section

    BA-105

    L2

    10'

    min.

    2'

    10'

    PLAN

    ELEVATION

    SECTION A-A

    Roadway Pavement

    Transition Section

    BA-105

    End Section

    BA-107

    112-9

    BA-106

    108-18B

    Possible Tabulations:

    Reinforced Paved Shoulder

    PCC Paved Shoulder

    Steel Beam Guardrail items

    Concrete Barrier items

    Possible Contract Items:

    112-9

    108-18B

    10'' Preferred minimum

    BA-106

    PV-101

    BA-250

    PV-101

    .Refer to

    Refer to project typicals.

    .See

    “C” Joint; match existing roadway joints when possible.

    .Refer to

    .existing, use “BT-3” joint. See “L-2” or “KT-2” joint. When roadway pavement is

    PV-101

    BA-250

    PV-101

    Steel Beam Guardrail

    L

    2

    one-way protection

    ends here for

    Concrete Barrier

    Steel Beam Guardrail2

    TRAFFIC

    ADJACENT

    L

    Roadway Pavement

    TRAFFIC3

    13

    17''

    2''

    1

    4

    5

    Side Object

    Side Object

    Object

    Side

    BA-150

    REVISION

    04-20-21

    SHEET 1 of 1

    REVISIONS:Changed Obstacle to Object.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    3

    CONCRETE BARRIER AND GUARDRAIL

    WITH

    SIDE OBJECT PROTECTION

    http://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0112-9.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba106.pdfhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-18B.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/epv101.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba220.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/epv101.pdf

  • 1

    1

    INFODESIGNER

    1

    W-BEAM INSTALLATION

    ELEVATION

    PLAN

    Rail

    6'' x 12'' Blockout (typ.)

    Height

    Mounting

    31''

    ''21

    3'-1''21

    3'-1

    Height

    Mounting

    31''

    Rail Elements

    LAPPING PROCEDURE

    Steel Beam Guardrail

    Possible Contract Item:

    Ground Elevation

    10:1 Slope (max.)

    SECTION WITH CURBSECTION

    16d Nail 16d Nail

    Height

    Mounting

    31''

    16d Nail (typ.)

    documents

    in contract

    as shown

    (max.)

    10:1 Slope

    Elevation

    Ground

    TRAFFIC

    NEAREST

    2

    Rail Splice (typ.)

    W-Beam Rail 6'-3''

    Elevation

    Ground

    1

    Rail

    6'' x 12'' Blockout (typ.)6'-0" Steel Post (typ.)

    place post(s) such that Bridge End Drains abut post(s).and Turf Reinforcement Mat) or remove rock as required to At Bridge End Drains, cut Scour Protection (Transition Mat

    2

    3

    3

    allowed.

    Wood or composite only. Steel blockouts will not be

    non-standard curbs.

    6" maximum for 6" Standard or 6" Sloped curbs and for

    '' spacing.21

    at 3'-1

    When specified by the contract documents, install posts

    3

    6'-0" Wood Post (optional)

    BA-200

    REVISION

    04-20-21

    SHEET 1 of 4

    REVISIONS:Added new circle note 4 and renumbered remaining notes.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    6

    STEEL BEAM GUARDRAIL COMPONENTS

    http://www.iowadot.gov/design/dmanual/01e-06.pdf

  • POSTS

    3''

    3"

    6" 6"

    6'-0'' 3''

    3"

    6'-0''

    L = Bolt Length

    6"

    12"

    19"

    HARDWARE

    T = Min. Thread Length

    6'' x 8'' Wood Post

    '' dia. Hole43

    ''85

    7

    ''85

    7

    '' dia.85

    ''41

    1

    NUT

    BOLT

    ''43

    7''

    W-BEAM BLOCKOUT THRIE-BEAM BLOCKOUT

    6"

    6"

    W6x9 or W6x8.5

    ''83

    ''87

    PLAN

    ELEVATION ELEVATION

    PLAN

    ''41

    4

    ''83

    12

    ''85

    7

    12''

    BOLT DETAILS

    Splice Bolt

    22''

    LTAPPLICATION

    ''41

    1''161

    1

    ''21

    2 18''

    ''21

    2 14''

    ''21

    2

    Bolt for Wood Post with 8" Blockout

    Bolt for Wood Post with 12" Blockout

    Bolt for Steel Post with 12" Blockout

    10''''21

    2Bolt for Steel Post with 8" Blockout6"

    12"

    Elevation

    Ground

    STEEL POST AND BLOCKOUT DETAILS

    WOOD POST AND BLOCKOUT DETAILS

    W-BEAM THRIE-BEAM

    Holes

    '' dia.43

    Holes

    '' dia.43

    6'' x 8'' Wood Post

    '' dia. Hole43

    THRIE-BEAM INSTALLATION

    6'-0''

    Threads recessed

    L

    T

    PLAN

    ELEVATION

    PLAN

    ELEVATION

    W-BEAM BLOCKOUT THRIE-BEAM BLOCKOUT

    ShoulderOval

    3

    3 3

    3 3

    allowed.

    Wood or composite only. Steel blockouts will not be

    6'-0" STEEL POST

    6'-0''

    7'' 7''

    7''

    14"

    7''

    ''43

    Holes Typ

    '' dia.43

    7''

    14''

    ''43

    1

    Hole

    '' dia.43

    ''85

    719''

    7''

    Holes

    '' dia.43

    ''43

    1

    HeightMounting

    32"

    BA-200

    REVISION

    04-20-21

    SHEET 2 of 4

    REVISIONS:Added new circle note 4 and renumbered remaining notes.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    6

    STEEL BEAM GUARDRAIL COMPONENTS

    4 Thrie-beam post may be substituted for W-beam post.

    4

  • 20"

    ASYMMETRICAL TRANSITION SECTION

    ''75

    ''41

    12

    ''41

    6

    ''21

    12 ''21

    62

    ''21

    87

    ''21

    37''

    81

    6

    10-gauge Section

    ''81

    4

    Splice Bolt Slots (typ.)Post Bolt Slot (typ.)

    W-BEAM RAIL

    required per slot

    One splice bolt

    SECTIONRAIL SPLICEELEVATION

    '' (typ.)21

    3'-1

    Post Bolt Slot

    12'-6" or 25'-0'' "41

    6

    SECTIONRAIL SPLICEELEVATION

    THRIE-BEAM RAIL

    "41

    6

    Splice Bolt Slots (typ.)Post Bolt Slot (typ.)

    '' 21

    3'-1

    ''21

    12

    ''41

    6

    ''41

    3

    ''163

    6

    ''85

    7

    ''41

    12

    ''81

    6

    ''41

    3 ''

    21

    12

    ''41

    6

    ''21

    '' dia. x 243

    ''81

    '' dia. x 13229

    ''81

    '' dia. x 13229 ''2

    1 '' dia. x 2

    43

    required per slot

    One splice bolt

    20''

    Slots

    Post Bolt

    2''

    2''

    12'-6"

    6'-3"

    BA-200

    REVISION

    04-20-21

    SHEET 3 of 4

    REVISIONS:Added new circle note 4 and renumbered remaining notes.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    6

    STEEL BEAM GUARDRAIL COMPONENTS

  • PLAN - CASE A PLAN - CASE B

    7

    24"

    Post Embedment

    Case

    A

    B

    5

    POST INSTALLED IN BEDROCK

    Elevation

    Ground

    S

    R Special Backfill

    Drilled Hole

    Top of Bedrock

    12"

    Drilled HoleDrilled Hole(s)

    2" min. typ.

    HeightMounting

    Steel or Wood PostBlockout

    Depth to Bedrock

    S = 0" to 16"

    S = 16" to 52"

    R = 24"

    R = Post Length - Mounting Height - S

    Minimum Depth to Drill into Bedrock

    3

    POST INSTALLED IN PAVEMENT

    6

    6

    7

    Either approach is acceptable.

    PLAN - PAVEMENT THICKNESS

  • INFODESIGNER

    2 BA-200

    NEAREST TRAFFIC

    ELEVATION

    PLAN

    LAPPING PROCEDURE

    108-8A

    108-8B

    108-8C

    108-8D

    BA-205

    REVISION

    04-20-21

    SHEET 1 of 1

    REVISIONS:Modified note in PLAN view regarding 22" offset.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    3

    (MASH TL-3)

    TANGENT END TERMINAL

    STEEL BEAM GUARDRAIL

    Possible Tabulations:

    Steel Beam Guardrail Tangent End Terminal, BA-205

    Possible Contract Item:

    108-8D

    108-8C

    108-8B

    108-8A

    1

    Impact Head

    1

    Ground Line

    ET = 47'-8"

    and Blockout

    W-beam Post2

    BA-200.Refer to

    sheeting.

    requirements for Type III or Type IV reflective

    - Yellow stripes meet the retroreflectivity

    traffic is to pass the end terminal.

    down at a 45 degree angle toward the side on which

    - Stripes are approximately 3 inches wide and slope

    following requirements:

    and yellow striped adhesive sheeting meeting the

    Cover entire face of impact head with alternating black

    455.02

    maintenance manual for the alternate design.

    Engineer with three copies of the most current installation and

    shown. When such a substitution is made, provide the

    the end terminal may be substituted for the post design

    the manufacturer and accepted by the FHWA for use within

    Contracting Authority, alternate post designs developed by

    Note: at the Contractor's option, and at no cost to the

    manufacturer's recommendations.

    specifications. Install end terminals according to the

    Use materials meeting the respective manufacturer's

    for a list of approved sources.Refer to Materials I.M.

    4" max

    Post 8Post 7

    Post 6Post 5

    Post 4Post 3

    Post 2Post 1 Post 0

    HeightMounting31"

    "21

    Steel Beam Guardrail Tangent End Terminal 50'-9

    from Post 822" offset

    http://www.iowadot.gov/design/dmanual/01E-06/BA-200.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba200.pdfhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-08A.PDFhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-08B.PDFhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-08C.PDFhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-08D.PDF

  • INFODESIGNER

    2 BA-200

    NEAREST TRAFFIC

    ELEVATION

    PLAN

    LAPPING PROCEDURE

    108-8A

    1

    Impact Head

    1

    Ground Line

    ET = 35'-2"

    and Blockout

    W-beam Post2

    BA-200.Refer to

    for Type III or Type IV reflective sheeting.

    - Yellow stripes meet the retroreflectivity requirements

    traffic is to pass the end terminal.

    down at a 45 degree angle toward the side on which

    - Stripes are approximately 3 inches wide and slope

    following requirements:

    and yellow striped adhesive sheeting meeting the

    Cover entire face of impact head with alternating black

    455.02

    and maintenance manual for the alternate design.

    Engineer with three copies of the most current installation

    shown. When such a substitution is made, provide the

    the end terminal may be substituted for the post design

    the manufacturer and accepted by the FHWA for use within

    Contracting Authority, alternate post designs developed by

    Note: at the Contractor's option, and at no cost to the

    manufacturer's recommendations.

    specifications. Install end terminals according to the

    Use materials meeting the respective manufacturer's

    for a list of approved sources.Refer to Materials I.M.

    Possible Tabulation:

    Steel Beam Guardrail Tangent End Terminal, BA-225

    Possible Contract Item:

    108-8A

    BA-225

    REVISION

    04-20-21

    SHEET 1 of 1

    REVISIONS:Modified note in PLAN view regarding max offset.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    2

    (MASH TL-2)

    TANGENT END TERMINAL

    STEEL BEAM GUARDRAIL

    Post 6Post 5

    Post 4Post 3

    Post 2Post 1 Post 0

    HeightMounting31"

    "21

    Steel Beam Guardrail Tangent End Terminal 38'-3

    from Post 610" max offset

    4" max

    http://www.iowadot.gov/design/dmanual/01E-06/BA-200.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba200.pdfhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-08A.PDF

  • NEAREST TRAFFIC 2

    1

    3

    LAPPING PROCEDURE

    12'-6''

    1'-3''

    VARIABLE FLARE

    4

    EW-301

    BA-200

    EW-301

    SI-211

    .For general guardrail details, see

    .For grading requirements, see

    .Install delineators and object markers according to

    BA-200

    SI-211

    BA-201

    BA-202

    BA-205

    BA-206Rail Elements

    or Bridge Rail

    Concrete Barrier

    Rail Elements

    INFODESIGNER

    LOCATION STATION Connection

    Bolted

    VT1

    Rail Splice(37'-6'')

    Transition Section

    Steel Beam Guardrail Barrier

    1

    2

    Rail Splice

    Face of Guardrail

    ETVT2

    VF

    Installation Line

    4

    3

    Rail Splice

    (Multiple of 6'-3")

    Variable Tangent

    (Multiple of 6'-3")

    Variable Flare

    Variable Tangent

    108-8A

    ")21

    (40'-7

    for Cable ConnectionSteel Beam Guardrail F

    lared End Terminalor

    ")21

    (50'-9Steel Beam Guardrail T

    angent End Terminal

    (47'-8" for Tangent, 37'-6" for Flared)

    End Terminal

    Possible Tabulation:

    Steel Beam Guardrail Flared End Terminal, BA-206

    Steel Beam Guardrail Tangent End Terminal, BA-205

    Steel Beam Guardrail End Anchor, Bolted

    Steel Beam Guardrail Barrier Transition Section, BA-201

    Steel Beam Guardrail

    Possible Contract Items:

    108-8A

    BA-250

    REVISION

    04-20-21

    SHEET 1 of 1

    REVISIONS:Removed circle note 5.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    7

    (MASH TL-3)

    OR BRIDGE RAIL END SECTION

    INSTALLATION AT CONCRETE BARRIER

    STEEL BEAM GUARDRAIL

    (varies)Steel Be

    am Guardrail

    Pay Length for:

    BA-206

    BA-205

    BA-202

    BA-201

    .See

    .See

    bridge rail end sections.

    for connections to concrete barriers and See

    .See

    http://www.iowadot.gov/design/SRP/IndividualStandards/eew301.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba200.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/esi211.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba201.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba202.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba205.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba206.pdfhttp://www.iowadot.gov/design/dmanual/01E-06/BA-200.pdfhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-08A.PDF

  • INFODESIGNER

    APPROACH TRAFFIC

    1

    LAPPING PROCEDURE

    12'-6''

    1'-3''

    VARIABLE FLARE

    OBSTACLE

    L

    TVT1

    O

    Rail SpliceRail Splice

    2

    1

    1

    APPROACH TRAFFIC

    TRAILING TRAFFIC

    A

    A

    AT

    T

    ET

    VT1 VF

    VF ETVT2

    VT2

    AT POST LOCATION STATION

    2

    2

    (Multiple of 6.25')

    Variable Tangent(Multiple

    of 6.25')Variable

    FlareMin. 12.5')

    (Multiple of 6.25'

    Variable Tangent

    (Multiple of 6.25')

    Variable Flare

    (Multiple of 6.25')

    Variable Tangent

    EW-301.

    BA-205

    BA-206

    BA-200BA-200

    EW-301

    SI-211

    .For general guardrail details, see

    .For grading requirements, see

    .Install delineators and object markers according to

    BA-206

    BA-205

    .See

    .See

    (varies)Steel Bea

    m Guardrail

    Pay length for:

    OD

    Installation LineFace of Guardrail

    Rail Elements Rail Elements

    Edge of Traveled Way

    ")21(40'-7

    for Cable Connection

    Steel Beam Guardrail Flared End Terminal

    or

    ")21(50'-9

    Steel Beam Guardrail Tangent End Terminal

    ")21

    (40'-7

    for Cable ConnectionSteel Beam Guardrail F

    lared End Terminalor

    ")21

    (50'-9Steel Beam Guardrail T

    angent End Terminal

    SI-211

    108-8B

    Possible Tabulation:

    Steel Beam Guardrail Flared End Terminal, BA-206

    Steel Beam Guardrail Tangent End Terminal, BA-205

    Steel Beam Guardrail

    Possible Contract Items:

    108-8B

    (47'-8" for Tangent, 37'-6" for Flared)

    End Terminal

    (47'-8" for Tangent, 37'-6" for Flared)

    End TerminalMin. 12.5')

    (Multiple of 6.25'

    Variable Tangent

    BA-251

    REVISION

    04-20-21

    SHEET 1 of 1

    REVISIONS:Modified graphics to new cells in cell library.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    4

    (TWO-WAY PROTECTION)

    INSTALLATION AT SIDE OBSTACLE

    STEEL BEAM GUARDRAIL

    http://www.iowadot.gov/design/dmanual/01e-06.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eew301.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba205.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba206.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba200.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/esi211.pdfhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-8B.PDF

  • INFODESIGNER

    LAPPING PROCEDURE

    12'-6''

    1'-3''

    VARIABLE FLARE

    APPROACH TRAFFIC

    2

    1 BA-203

    1

    A

    A TVT1 VT1

    VT2 ET

    AVF

    Rail Splice

    AT POST LOCATION STATION

    3

    3

    Min. 12.5')

    (Multiple of 6.25'

    Variable Tangent

    (Multiple of 6.25')

    Variable Flare

    (Multiple of 6.25')

    Variable Tangent

    BA-200

    EW-301

    SI-211

    .For general guardrail details, see

    .For grading requirements, see

    .Install delineators and object markers according to

    EW-301

    BA-200

    SI-211

    BA-205

    BA-206BA-206

    BA-205

    BA-203

    .See

    .See

    .See

    2

    108-8C

    EA

    APPROACH TRAFFIC

    OBSTACLERail Splice

    (12'-6'')

    End Anchor, W-Beam

    Steel Beam Guardrail

    (varies)Steel Be

    am Guardrail

    Pay length for:

    ")21

    (40'-7

    for Cable ConnectionSteel Beam Guardrail F

    lared End Terminalor

    ")21

    (50'-9

    Steel Beam Guardrail Tangent End Terminal

    Min. 37.5')

    (Multiple of 6.25'

    Variable Tangent

    Possible Tabulation:

    Steel Beam Guardrail Tangent End Terminal, BA-205

    Steel Beam Guardrail Flared End Terminal, BA-206

    Steel Beam Guardrail End Anchor, W-Beam

    Steel Beam Guardrail

    Possible Contract Items:

    108-8C

    Edge of Traveled Way

    OD

    Face of GuardrailInstallation Line

    Rail Elements

    (47'-8" for Tangent, 37'-6" for Flared)

    End Terminal

    ")21

    (9'-4

    End Anchor

    LO Min. 25.0'

    BA-252

    REVISION

    04-20-21

    SHEET 1 of 1

    REVISIONS:Removed Interim from standard.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    7

    (ONE-WAY PROTECTION)

    INSTALLATION AT SIDE OBSTACLE

    STEEL BEAM GUARDRAIL

    http://www.iowadot.gov/design/dmanual/01e-06.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba203.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eew301.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba200.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/esi211.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba205.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba206.pdfhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-8C.PDF

  • 2

    Installation LineEdge of Traveled Way

    Automatic Signal Footing

    C of RoadwayL

    TrackofLC

    LAPPING PROCEDURE

    PLAN

    TRAFFIC

    EW-301

    BA-200

    EW-301

    .For additional guardrail requirements, refer to

    .For grading requirements, refer to

    BA-200

    BA-205

    NEAREST TRAFFIC

    ")21

    (50'-9Steel Beam Guar

    drail End Terminal

    (18'-9")

    Thrie-Beam End Anchor

    BA-204

    21

    LOCATION STATION

    Possible Tabulation:

    Object Marker, Type 3

    Object Marker, Type 2

    Delineator, Rigid - Type I

    Incidental to Steel Beam Guardrail End Anchor, Thrie-Beam:

    Steel Beam Guardrail Tangent End Terminal, BA-205

    Steel Beam Guardrail End Anchor, Thrie-Beam

    Possible Contract Items:

    108-8D 108-8D

    OD

    ")21

    (Min. 34'-4

    Variable Tangent

    BA-204

    BA-205

    .Refer to

    .Refer to 1

    INFODESIGNER

    BA-253

    REVISION

    04-20-21

    SHEET 1 of 1

    REVISIONS:Modify PLAN view for new cells in cell library.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    4

    INSTALLATION AT RAILROAD SIGNAL

    STEEL BEAM GUARDRAIL

    (47'-8" for Tangent)End Terminal

    ETVT

    (varies)Steel Beam Guardrail

    Pay Length for:

    http://www.iowadot.gov/design/SRP/IndividualStandards/eew301.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba200.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba205.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba204.pdfhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-08D.PDFhttp://www.iowadot.gov/design/dmanual/01e-06/BA-253.pdf

  • NEAREST TRAFFIC

    2

    1

    3

    LAPPING PROCEDURE

    12'-6''

    1'-3''

    VARIABLE FLARE

    EW-301

    BA-200

    EW-301

    SI-211

    .For general guardrail details, see

    .For grading requirements, see

    .Install delineators and object markers according to

    BA-200

    SI-211

    BA-221

    BA-202

    BA-225

    Rail Elements

    or Bridge Rail

    Concrete Barrier

    Rail Elements

    LOCATION STATION Connection

    Bolted

    VT1

    Rail Splice

    1

    2

    Rail Splice

    Face of Guardrail

    ETVT2

    VF

    Installation Line

    3

    Rail Splice

    (Multiple of 6'-3")

    Variable Tangent

    (Multiple of 6'-3")

    Variable Flare

    Variable Tangent

    108-8A

    EW-301

    SI-211

    ")21

    (21'-10

    Transition Section

    Steel Beam Guardrail Barrier

    ")21

    (38'-3Steel Beam Guardrail T

    angent End Terminal

    (35'-2" for Tangent)End Terminal

    Possible Tabulation:

    Steel Beam Guardrail Tangent End Terminal, BA-225

    Steel Beam Guardrail End Anchor, Bolted

    Steel Beam Guardrail Barrier Transition Section, BA-221

    Steel Beam Guardrail

    Possible Contract Items:

    108-8A

    INFODESIGNER

    (varies)

    Steel Beam Guardrail

    Pay length for:

    BA-225

    BA-202

    BA-221

    .See

    bridge rail end sections.

    for connections to concrete barriers and See

    .See

    BA-260

    REVISION

    04-20-21

    SHEET 1 of 1

    REVISIONS:Removed circle note 4.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    1

    (MASH TL-2)

    OR BRIDGE RAIL END SECTION

    INSTALLATION AT CONCRETE BARRIER

    STEEL BEAM GUARDRAIL

    http://www.iowadot.gov/design/SRP/IndividualStandards/eew301.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba200.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/esi211.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba221.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba202.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba225.pdfhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-08A.PDFhttp://www.iowadot.gov/design/SRP/IndividualStandards/eew301.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/esi211.pdfhttp://www.iowadot.gov/design/dmanual/01e-06/BA-200.pdf

  • 108-9A

    (length varies)

    Protection Length

    (length varies)

    End Anchor

    DO

    TRAILING TRAFFIC

    High Tension Cable Guardrail

    APPROACH TRAFFIC

    High Tension Cable Guardrail

    End Anchor

    DO

    End Anchor End Anchor

    Protection Length

    (length varies) (length varies)

    LOCATION STATION

    LOCATION STATION

    C OA

    C

    AC O

    C C T

    INFODESIGNER

    Possible Tabulation:

    Guardrail, Special Anchor Section

    High Tension Cable Guardrail, End Anchor

    High Tension Cable Guardrail

    Possible Contract Items:

    108-9A

    BA-351

    REVISION

    04-20-21

    SHEET 1 of 2

    REVISIONS:Changed Obstacle to Object.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    2

    HIGH TENSION CABLE GUARDRAIL

    TRAFFIC

    TRAFFIC

    Edge of Traveled Way

    Edge of Traveled Way

    OBJECT

    ROADSIDE OBJECT, TWO-WAY PROTECTION

    OBJECT

    ROADSIDE OBJECT, ONE-WAY PROTECTION

    http://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-9A.PDFhttp://www.iowadot.gov/design/dmanual/08C-03.pdf

  • TRAFFIC

    TRAFFIC

    End Anchor

    Protection Length

    Protection Length

    (length varies)

    End Anchor

    (length varies)

    High Tension Cable Guardrail

    High Tension Cable Guardrail

    End Anchor

    (length varies)

    End Anchor

    (length varies)

    LOCATION STATION

    LOCATION STATION

    C OC A

    DO

    DO

    C O

    C A

    BA-351

    REVISION

    04-20-21

    SHEET 2 of 2

    REVISIONS:Changed Obstacle to Object.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    2

    HIGH TENSION CABLE GUARDRAIL

    Edge of Traveled Way

    Edge of Traveled Way

    MEDIAN OBJECT PROTECTION

  • INFODESIGNER

    " Chamfer43

    12"

    24"

    1

    1

    17"

    12" 12" 12"

    C

    Void area

    See Connection Pin

    Spacing

    Blockout

    See Chamfer Detail

    Assembly Details

    A

    "Marked End"

    1

    8"

    B

    A

    24"

    2-4c1

    2-5b1

    4a1

    3

    1-5b1

    8"

    1-5b1

    2-4c1

    3

    17"

    22"

    32"

    4'-3"

    6"

    4'-3" 4'-3"

    12'-6"

    6"

    4a1 Spa.

    6a2 (in pairs)

    4'-3"

    8"

    3"

    3"

    6a21"

    3"

    2"

    6a2

    2"8"

    3"

    7"

    "Marked End"

    "Marked End"

    4a1

    4a1

    5b1

    12'-6"

    5b1

    4c1

    5b1

    6d3

    4c1

    6a26a2

    5b1

    4c1 5b1

    6d3

    4a1

    5b1

    4c1

    5b1

    4a16d3

    4c1

    5b1

    1"

    2-5b1

    3

    6d1

    6d1

    6d2

    5b1

    6d2

    4a1

    5"

    3

    B

    2

    7"

    1"1"1"

    Lifting Slot6a26d1

    6d2

    6d1

    6d2

    6d3

    2Blockout (both sides)

    C

    9"

    4"

    CHAMFER DETAIL

    PLAN

    ELEVATION

    SECTION C-CStirrup Placement

    SECTION A-ALifting Slot

    "41

    2

    "21

    22

    ''43

    "87

    2

    "85

    14

    "21

    6

    2" clear

    1" clear to 6a2 bar

    " min. clear

    43

    1

    SECTION B-BStirrup Placement

    " min. clear

    43

    1

    "87

    2

    "85

    14

    8"

    "21

    6

    2" clear

    1" clear to 6a2 bar

    2" min. clear

    4a1

    2" dia. Hole 4" typ.

    "21

    22

    " Wooden Block85

    Set with 3

    "21

    7

    "21

    4

    to outside edge of loop bar

    " measured from face of rail81

    " ± 83

    3

    "21

    25

    9" "21

    21 "21

    21 "21

    21 "21

    21 8" 9" 9"

    4" typ.

    24" 24"4'-3"

    (Elevation)

    BARRIER CONNECTION

    bid for "Temporary Barrier Rail, Concrete".

    Include the cost of anchorage, when required in the price

    cubic yards.

    Estimated quantity of concrete for one taper section is 0.6

    to 50 mph.

    within 10 feet of traffic on facilities with speed limits 40 mph

    of traffic on facilities with speed limits 55 mph or greater, nor

    Tapered end section is not designed for use within 30 feet

    approved non-shrink grout.

    Following removal of anchorage, fill all holes with an

    site upon completion of work.

    shall be the property of the Contractor. Remove from the

    Unless stated otherwise in the plans, the barrier rail sections

    within one hour of notification of need.

    to realign barrier which has been struck. Initiate service

    on call and available 24 hours a day, each day of the week,

    Provide for an approved monitoring schedule with a person

    not lift or move using loop bars 6d1, 6d2 or 6d3.

    Use Grade 60, ASTM A615 for all other reinforcements. Do

    " of the plan dimensions.81

    Install loops within

    " pin bend diameter. 21

    a 180 degree bend test using a 3

    80 ksi, a minimum 14% elongation in 8 inches, and passing

    not less than 1.25 times the yield strength but a minimum of

    with a minimum yield strength of 60 ksi, a tensile strength of

    " smooth steel bars 43

    For loop bars 6d1, 6d2, and 6d3, use

    1

    2

    3

    BA-401

    1 inch radius allowed.

    Lifting hole. 4 inch diameter PVC Pipe.

    Type A ● ● Date Manufactured (Month and Year) ● Manufacturer Identification

    information in the marking:

    two loop bars at the bottom. Include the following

    end of the barrier having one loop bar at the top and

    manufacturing information. The “marked end” is that Permanently mark one end of each rail section with

    Possible Tabulation:

    Temporary Barrier Rail, Concrete

    Possible Contract Item:

    108-33108-33

    BA-401

    BA-401

    REVISION

    04-20-21

    SHEET 1 of 4

    REVISIONS:Changed Obstacle to Object.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    3

    (PRECAST CONCRETE)

    TEMPORARY BARRIER RAIL

    https://iowadot.gov/design/dmanual/09b-09.pdfhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-33.PDFhttp://www.iowadot.gov/design/SRP/IndividualStandards/eba401.pdf

  • 16"

    Barrier Marker

    16"

    12"16"

    28"

    Connection Pin

    28"

    Retainer Bolt

    4

    Marker Centered on Unit

    2"

    E60

    4"

    4

    8"

    D=3"

    33"

    7"

    2" 2"

    6d3

    6d2

    6d1

    Top Plate

    BARRIER MARKER PLACEMENT

    CONNECTION PIN ASSEMBLY

    " Top Plate 21

    6a2

    4a1

    (Marked end shown, invert for other end.)

    Elevation

    bars unless otherwise noted.)

    (Dimensions are out to out of

    BENT BAR DETAILS

    (A36 Steel - 10.9 lbs. each)

    CONNECTION PIN

    6d1, 6d2, 6d3

    Plan

    Traffic Side

    Centered on Plate

    " dia. hole83

    1

    "21

    2

    "21

    1for retainer bolt

    " dia. hole85

    " dia.41

    1

    "21

    "21

    2

    "21

    2

    ''41

    (ASTM A490, Grade 8)

    " dia. bolt & nut21

    RETAINER BOLT & NUT

    L

    L

    C Bar

    3" to

    C Bar17"

    "21

    34

    "43

    33

    "43

    "43

    17"

    43

    20

    "41

    5

    "85

    18

    "81

    3

    "21

    4

    "21

    15

    "83

    4

    "815

    "41

    D=4

    "21

    D=6

    "41

    4

    "43

    D=2

    Barrier Rail, Concrete."

    maintaining markers in the price bid for "Temporary

    units. Include costs for furnishing, installing and

    promptly repair or replace any damaged or missing

    adjacent edge line in color. Maintain the markers and

    Markers to face oncoming traffic and match the

    barrier in a manner approved by the manufacturer.

    Furnish and install Barrier Markers. Attach to the

    with Strap Anchorage.

    2-loop barriers (previous designs) or in conjunction

    Retainer bolt & nut are required for connections with

    5

    4

    Per 12'-6" Barrier Section

    Size

    Bar

    Bar Bars

    of

    No.

    Shape

    4a1

    6 25.5

    LOOP ASSEMBLY

    26d3

    6

    6

    2

    2

    REINFORCING A615 Gr. 60

    Ft.

    Length

    8'-6"

    35"

    Lbs.

    Weight

    7'-7"

    12'-2"

    6'-0"

    8'-5"

    12'-2"

    5

    4 12

    4 16.34c1

    5b1 38.1

    48.1

    3

    6d2

    6d1

    22.8

    25.3

    66a2

    2

    6 26.3

    5

    BA-401

    REVISION

    04-20-21

    SHEET 2 of 4

    REVISIONS:Changed Obstacle to Object..

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    3

    (PRECAST CONCRETE)

    TEMPORARY BARRIER RAIL

  • " core bit.85

    Pre-drill holes for stakes with 1

    3 stakes required per rail section.

    " dia. x 5" min.).43

    Titen HD Wedge Bolt (

    " min.) OR Simpson 21

    " dia. x 443

    Large Diameter Tapcon (

    " long ASTM A325 structural bolt OR Red Head 43

    x 1

    '' dia. 43

    inch Red Head Multi-Set II drop-in anchor with 43

    6

    7

    8

    2"

    See Table A

    3"

    3"

    3"

    Stop Plate

    Traffic Side

    3"

    See Table A

    8

    8

    36"

    16" 16"

    10"

    2"

    6

    Bend Line (typ.)

    20"

    Edge of Dropoff

    Tie-Down Strap

    7

    3"

    Stake

    Traffic Side

    END VIEW

    STAKE

    " STOP PLATE21

    TYPICAL SECTION

    TABLE A

    ANCHORAGE REQUIREMENTS

    (after bending)

    TIE-DOWN STRAP

    (before bending)

    TIE-DOWN STRAP

    PCC Pavement

    Bridge Decks

    For use on:

    PCC Pavement

    Composite Pavement

    HMA Pavement (2'' min. thickness)

    For use on:

    68°

    68°

    " dia.21

    1

    "21

    38"21

    1

    "21

    1

    ''41

    Anchor (typ.)

    Pin Assembly

    Connection

    " dia.87

    "163

    " dia.83

    1"

    163 "

    163

    " dia.87

    "21

    10

    "21

    2

    "21

    2

    "21

    103"2"

    A36 Steel Plate

    "41

    " x 341

    3" x

    " inside rad.41

    "83

    " rad. to Inside41

    A36 Steel Strap

    '' x 36''41

    3'' x

    A36 Steel Plate

    "41

    " x 341

    3" x

    "21

    1

    Edge of Dropoff

    or Fixed Vertical Object

    or Fixed Vertical Object

    Min. offset

    where T

    BR

    is U

    nanchore

    d

    Min. offset

    where T

    BR

    is A

    nchore

    d

    N/A

    3"

    3"

    24"

    24"

    1''

    6''

    6''

    N/A

    6''

    6''

    Depth

    Dro

    poff

    A dropoff is a slope of 2H:1V or steeper*

    *Dropoffpavement

    from

    bridgefrom

    Fixed vertical object

    24''

    45''

    45''

    24''

    STRAP ANCHORAGE

    STAKE ANCHORAGE

    BA-401

    REVISION

    04-20-21

    SHEET 3 of 4

    REVISIONS:Changed Obstacle to Object.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    3

    (PRECAST CONCRETE)

    TEMPORARY BARRIER RAIL

    Object

  • 12"

    16"

    33"

    16"6d2

    6d3

    for stirrup assembly

    2 at each size required

    A

    6d1

    8"

    5"

    B

    Plan

    4v_ bars

    Elevation

    (Dimensions are out to out of bars unless otherwise noted.)

    BENT BAR DETAILS

    LC Bar

    3" to

    LC Bar

    17" to

    "43

    "43

    33

    "21

    34

    "43

    20

    "43

    17

    "41

    4

    "43

    D=2

    invert for other end)(Connection to "Marked End" shown,

    6d1, 6d2, 6d3

    1 inch radius allowed.3

    Per 12'-6" Barrier Taper Section

    23"

    26"

    33"

    30"

    4

    4

    2

    2

    4

    4v1

    4v2

    4

    4

    2

    4.2

    3.7

    16.0

    4.5

    3.3

    2

    2 2.9

    2.6

    5f3

    4f2 4

    44v6

    Size

    BarBar Bars

    of

    No.

    Shape

    5

    4v5

    2

    4v3

    4v4

    4

    2

    2

    4f1

    1

    10.0

    8'-6"

    7'-7"

    16

    8'-5"

    LOOP ASSEMBLY

    7'-6"

    3'-4"

    12'-0"

    11'-9"

    3'-2"

    ft.

    Length

    12.3

    REINFORCING A615 Gr. 60

    lbs.

    Weight

    6d1

    1

    1

    12.86d3

    6

    12.6

    6d2

    6

    11.4

    20"

    27"

    17"

    4v5

    4v4

    13"

    4v6

    Bar

    1"10"4v1

    B

    4v3

    4v2

    A

    "41

    1

    "85

    1

    "87

    1

    "83

    2

    "43

    2

    "21

    24

    17"32"

    12"12"

    18"18"18"18"

    6d3

    4d2

    4v15f3

    6d1

    6d24v2

    4v3

    12"

    PLAN

    4v4

    4v64v5

    See Detail 'A'

    5'-4"

    6"

    8"

    6"

    6"

    12'-6"

    Center of Gravity

    2" V bar Spa.

    4f13"

    3"

    LC

    "43

    4'-2

    "21

    22

    " measured from face of rail to outside edge of loop bar.81

    " ± 83

    3

    " chamfer43

    Section A-A

    the Contractor.

    for details. Location to be determined by

    Provide two lifting slots. See

    Invert loop bars for other end.)

    (For connection to "marked end" of barrier.

    SIDE ELEVATION

    TAPERED END SECTION

    14"

    32"

    22"

    TRAF

    FIC

    4f1

    7"12'-6''

    5f3

    4f2

    4f1

    3

    3

    Spaces

    2 Equal

    3"

    8"

    5"

    See chamfer detail

    Possible Curb

    8''

    PERSPECTIVE VIEW

    DETAIL 'A'

    FRONT ELEVATION END SECTION

    169°

    " clear21

    1

    2" clear

    "21

    22

    "41

    2

    2" min. clear

    2" min. clear

    BA-401

    REVISION

    04-20-21

    SHEET 4 of 4

    REVISIONS:Changed Obstacle to Object.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    3

    (PRECAST CONCRETE)

    TEMPORARY BARRIER RAIL

  • 108-30

    Possible Tabulation:

    Temporary Crash Cushion

    Embankment In Place

    Possible Contract Items:

    108-30

    6'-0''

    35'-0''

    EMBANKMENT DIMENSIONSBarrel Installation Line

    35'-0''

    3'-0''

    1

    5°Barrel Installation Line

    1

    10°

    V

    Width

    Shoulder

    EMBANKMENT PLAN

    2:1 maximum

    3:1 preferred,

    Approach Traffic

    X

    Approach Traffic

    10°

    20:1

    Edge of Pavement

    Edge of Shoulder

    Z

    Y

    of Embankment

    Possible Toe

    15°

    4:1

    W

    max

    X

    Approach Traffic

    Y

    4

    3

    Required

    Layouts

    Barrel

    Sand

    2

    1

    3'-7" - 10'-7"

    3'-6" or less

    W Z

    negative)

    (must not be

    26'-6"

    25'-9"

    17'-10" - 32'-3"

    10'-8" - 17'-9"

    25'-0"

    24'-3"

    Edge of Special Shaping

    Angle of Barrel Installation Line is measured from a line parallel to roadway centerline.

    BARREL INSTALLATION LINE LAYOUT

    INFODESIGNER

    2:1 max.

    3:1 pref,

    EMBANKMENT TYPICAL SECTION

    Embankment

    Toe of

    120

    Edge of Special Shaping

    Edge of Shoulder

    V + 3'-3"

    V + 10'-0"

    V + 17'-0"

    V + 24'-0"

    V + 5'-3"

    V + 12'-3"

    V + 19'-3"

    V + 26'-3"

    3.73 V + 12'-0"

    3.73 V + 38'-0"

    3.73 V + 64'-0"

    3.73 V + 89'-0"

    LOCATION STATION

    BA-500

    REVISION

    04-20-21

    SHEET 1 of 2

    REVISIONS:Changed Obstacle to Object.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    2

    SAND BARREL

    TEMPORARY CRASH CUSHIONS

    OBJECT

    Widths:

    For Object

    X

    Y

    dimension.

    dimension equals to roadway centerline. In this case,

    space is limited, Barrel Installation Line may be parallel

    For object located within the traveled way where

    Where distance to object is less than 15 feet from edge of traveled way:

    Where distance to object is 15 feet or greater from edge of traveled way:

    http://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0108-30.PDFhttp://www.iowadot.gov/design/dmanual/01e-06.pdf

  • SAND BARREL DELINEATION

    MARKER PLATE

    200200

    200400

    700

    400

    400

    700

    700

    1400

    1400

    1400

    1400

    2100

    2100

    30" min.

    30" min.

    Leading Barrel

    Leading Barrel

    Approach Traffic

    Approach Traffic

    Opposing Traffic

    18"

    2"

    2"

    18"

    SAND BARREL LAYOUT

    centered on the barrel installation line.

    Mount marker plate on the leading barrel,

    2"

    retroreflective sheeting

    Type III or Type IV

    plate sheeted with yellow

    0.032 inch aluminum

    6"

    6"

    6"

    6"

    (lbs)

    Sand Weight

    (36" nominal dia.)

    Sand Barrel

    30" min.

    12"

    Barrel Installation Line

    Leading Barrel

    " dia.167

    4186.09

    be substituted for the marker plate.

    Self-adhesive sheeting meeting the above requirements may

    for Type A signs.the requirements of Article

    " bolts, nuts, and washers meeting 83

    Mount plate using four

    4186.09

    BA-500

    REVISION

    04-20-21

    SHEET 2 of 2

    REVISIONS:Changed Obstacle to Object.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    2

    SAND BARREL

    TEMPORARY CRASH CUSHIONS

    Edge of Object

    OBJECT

    PROTECTING OBJECT BETWEEN OPPOSING TRAFFIC PROTECTING WIDE OBJECT

    All barrels separated by 6 inches.

    to the one shown, will be measured as a single crash cushion.

    An installation consisting of multiple sand barrel layouts, similar

    For wide object, repeat sand barrel layout as needed

    OBJECT

    OBJECT

    opposing traffic

    beyond edge of object for

    Ensure barrels do not extend

    http://www.iowadot.gov/erl/current/GS/content/4186.pdf

  • SECTION

    Bridge Approach BRNO. DATE TITLE

    BR-101 04-21-15 Bridge Approach Section (General Details)BR-102 10-17-17 Bridge Approach Section (Two-Lane, Abutting PCC Pavement)BR-103 10-17-17 Bridge Approach Section (Two-Lane for Bridge Reconstruction, PCC Pavement)BR-104 10-17-17 Bridge Approach Section (at Existing Bridges, PCC Pavement)BR-105 04-21-15 Bridge Approach Section (Two-Lane, HMA Pavement)BR-106 04-21-15 Bridge Approach Section (Two-Lane for Bridge Reconstruction, HMA Pavement)BR-107 04-21-15 Bridge Approach Section (at Existing Bridges, HMA Pavement)BR-111 04-21-15 PCC Overlay of Reinforced Bridge Approach SectionBR-112 10-17-17 Bridge Approach Details (in Conjunction with Bridge Deck Overlay)BR-121 04-21-15 Bridge Approach Details (Secondary Roads)BR-201 10-17-17 Double Reinforced 10" ApproachBR-202 10-17-17 Double Reinforced 10" Approach with Variable Depth Paving NotchBR-203 10-17-17 Double Reinforced 12" ApproachBR-204 10-17-17 Double Reinforced 12" Approach with Variable Depth Paving NotchBR-205 04-20-21 Double Reinforced 12" Approach (Slab Bridge)BR-211 10-17-17 Bridge Approach (Abutting PCC or Composite Pavement)BR-212 04-21-15 Bridge Approach (Abutting HMA Pavement)BR-213 04-21-15 Bridge Approach (Abutting Pavement)BR-231 10-17-17 Bridge Approach (Multi-Lane, Curbed Roadway)BR-241 04-18-17 Double Reinforced 10" Approach On Gravel Roads

    4/20/21

  • CL

    (See Project Typical Drawings)

    Design Shoulder

    Single Reinforced Section

    Non-Reinforced Section

    PLAN VIEW

    (Polyethylene, Corrugated Tubing)

    4" Perforated Subdrain

    (See Project Typical Drawings)

    Design Shoulder

    10' Max.

    5' Min.

    'DW' or 'R

    T'

    'EF'

    X

    'KT-2' or 'L-2'Floor

    Bridge

    'EF'

    'KT-2' or 'L-2'

    'DW' or 'R

    T'

    5' Min.

    10' Max.

    Joint

    Contraction

    Possible

    Pavement

    P.C.C. or Composite

    X

    B

    A

    1

    B

    1

    A

    'CD'

    'CD'

    Approach Roadway

    8

    7

    6

    5

    1

    2

    3

    4

    PV-101

    PV-101

    include the following areas:

    Pay limits for contract item

    Double Reinforced Section

    Sleeper Beam Section

    SECTION A-A

    2

    SECTION B-B

    2

    2

    2

    2

    3

    3

    4

    4

    5

    6

    6

    7

    7

    9

    9

    'CF-3'

    'CF-3'

    8

    8

    9

    PV-101

    See Detail 'C'.

    inch Preformed Joint Filler and seal top.41

    otherwise.

    Place 'RD' Joint where PCC shoulder. Place 'B' joint

    the outside edge of pavement.

    Place an "X" in the plastic concrete near the 'EF' joint at

    Slope subdrain to drain.

    2 feet outside of pavement edge.

    Polymer Grid and excavation limits of Modified Subbase

    Extend 'CD' and 'EF' joints where PCC Shoulder.

    Section).

    Use 'KS-2' joint (Double Reinforced

    Section).

    Two Pours - Use 'KS-1' joint (Single Reinforced

    Single Pour - Saw cut joint per Detail B .

    ):Longitudinal Joint (

    Sections.

    Build 4 inch Sloped Curb to end of Reinforced

    See Detail 'F'

    See Detail 'F'

    APPROACH PAVEMENT LAYOUT AT A SKEW

    112-6

    Possible Tabulation:

    Bridge Approach, BR-205

    Possible Contract Item:

    INFODESIGNER

    See DR-306 for outlet details

    PV-101

    in the double reinforced section quantities.

    6'-3" portion under the approach pavement have been included

    Quantities for both the 1'-9" top part of the sleeper slab and the

    Use epoxy coated bars for all reinforcement.

    All transverse bars are #5.

    For curb details, see Detail 'G'.

    .For joint details, see

    24''

    Detail 'G'

    Curb per Normal Pavement Slope

    LC

    Polymer Grid

    Excavation Limits

    6"

    Earth

    Modified Subbase

    24''

    Polymer Grid

    Excavation Limits

    Design Shoulder

    Modified Subbase

    Approach Roadway

    15'-0" min.

    Deck

    Bridge

    20'-0" min.

    Skew Angle

    Pavement

    Roadway

    Section (typ.)

    Bridge Rail End

    Reinforced Bridge Approach Section

    Design Shoulder Width

    Design Shoulder Width BR-205

    REVISION

    04-20-21

    SHEET 1 of 4

    REVISIONS:Modified #4 Bars at 12" Centers to #5 Bars.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    6

    (SLAB BRIDGE)

    DOUBLE REINFORCED 12'' APPROACH

    http://www.iowadot.gov/design/SRP/IndividualStandards/epv101.pdfhttp://www.iowadot.gov/design/SRP/IndividualStandards/epv101.pdfhttp://www.iowadot.gov/design/dmanual/01e-06.pdf

  • 10

    11

    12

    10

    3"

    16"

    -

    " Max. Lap21

    4

    4" Min. Lap

    DETAIL 'B'

    3"9"

    (Slab Edge Details for CF Joint with Curb)

    END VIEW

    (Slab Bridge)

    DETAIL 'A'

    (Slab Edge Details for CF Joint with Curb)

    PARTIAL PLAN VIEW

    BENT BAR SHAPES

    15

    13

    16

    14

    Full Length of Paving Notch

    Resilent Joint Filler Placed

    " Thick and 16" Wide 43

    15

    Notch through drilled holes

    Full Length of Paving

    Place at 32" + Spacing

    " dia. X 2' Steel Rod.21

    " Preformed Joint Filler and Seal Top41

    DETAIL 'C'

    12

    11

    11 11

    11

    11

    13

    16

    14

    16

    Paper full length.

    Debond Paving Notch with 2 layers of 30# Asphaltic Felt

    length of Sleeper Slab.

    inch thick x 16 inch wide Resilient Joint Filler for full43

    Space at 32" + for full length of Sleeper Slab.

    Space at 24 inches O.C.

    inch bottom end clearance.21

    #8 dowels 1'-6" long with 2

    skewed face.

    If bridge is skewed, place additional #5 bar parallel to

    #8 Bars - 48"

    #6 Bars - 27"

    Minimum lap length: #5 Bars - 18"

    2" min. to 2 1/2" max. clear to bent bar.

    15

    9"

    6"

    Single Reinforced Section (20'-0")

    24''

    #5 Bars At 12" max. Centers

    Double Reinforced Section (20'-0" min.)

    #5 Bars At 12" max. Centers

    #4 Bars at 12" Centers" CL.

    21

    2

    " CL.21

    2

    Steel Rod

    Resilient Joint Filler

    5"

    6"

    #6 Bars At 12" Centers

    Approach Pavement 12" Approach Pavement

    6" 3" 6"

    Modified Subbase

    Polymer Grid

    6"

    3"

    Non-Reinforced Section

    'CD' Joint

    Approach Pavement

    " CL.21

    2

    #5 Bars At 12" Centers

    12"

    'E' Joint

    See Detail 'B'

    Sleeper Slab

    1'-9"

    CF Joint

    " x 6" Studs43

    12"

    "83

    to Allow Plate Travel

    " Recess in Curb 83

    " Joint Filler41

    Preformed CF Joint

    3"

    Single Reinforced SectionDouble Reinforced Section

    6"

    6"

    Single Reinforced SectionDouble Reinforced Section

    " Joint Filler41

    Preformed

    " x 6" Studs43

    " x 2' Galvanized End Plate41

    1'-6" x

    " x 2' Galvanized End Plate41

    1'-6" x

    1'-5"

    4 Mil Polyethylene Sheeting

    1'-9"

    #5 Bars At 12" CentersSleeper Slab

    2 Equal Spaces 2 Equal Spaces

    1'-9"2'-3" 2'-3"

    'CF-3' Joint

    " CL.21

    2

    " CL.21

    2

    " CL.21

    2

    12"

    min.

    " CL21

    2

    or #4 Rebar

    Steel Rod

    " dia. x 24"21

    20"

    D=2"

    33"

    7"

    7"

    5'-10"

    "21

    D=2

    (Sleeper Slab)

    12" Centers

    #5 Bars at

    (Approach Pavement)

    #4 Bars at 12" Centers

    (Sleeper Slab)

    #5 Bars at 12" Centers

    1'-4"

    1'-7"

    "21

    D=2

    6"

    6"

    Steel Rod

    Bond Breaking Coating

    Resilient Joint Filler

    #8 Bars at 9" Centers

    13" 13"

    Do not bend.

    to be Placed with Bridge.

    Stainless Steel Dowel

    Approach Pavement

    " Preformed Joint Filler and Seal Top41

    6"

    min.

    13"

    (Typ)

    #5 Bars

    Paving Notch

    13"

    Paving Notch

    "41

    2'-

    Sleeper Slab

    1'-9"

    "21

    D=2

    BR-205

    REVISION

    04-20-21

    SHEET 2 of 4

    REVISIONS:Modified #4 Bars at 12" Centers to #5 Bars.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    6

    (SLAB BRIDGE)

    DOUBLE REINFORCED 12'' APPROACH

  • SECTION THRU CENTERLINE

    SECTION THRU CENTERLINE

    4" SUBDRAIN LOCATION

    (Abutting PCC or Composite Pavement)

    (Doweled PCC Pavement)

    (Abutting HMA Pavement)

    17

    17

    17

    BR-213BR-213.to

    If abutting pavement (PCC or HMA) is not in place, refer

    DETAIL 'D'

    DETAIL 'E'

    24"

    24"

    10'-0"

    10'-0"

    12" min.

    20'-0" 20'-0"As required by skew angle (20'-0" min.)

    As required by skew angle (20'-0" min.) 20'-0" 20'-0"

    Grid

    Polymer

    Subbase

    Modified

    Subdrain

    4" Perforated

    Backfill

    Porous

    Bridge Floor

    Detail 'A'

    See

    'EF' Joint'CD' Joint

    Non-Reinforced SectionsSingle Reinforced SectionDouble Reinforced Section

    Pay Limits for Contract Item

    'DW' or 'RT' Joint

    Composite Pavement

    Abutting PCC or

    Subbase (if applicable)See Detail 'D'Polymer Grid

    Modified Subbase

    Granular Backfill line

    Excavate to existing

    placed with bridge

    and Subdrain

    Backfill

    'EF' Joint

    12"

    Modified Subbase

    Polymer Grid

    4" Perforated Subdrain

    10"

    (if applicable)

    Subbase

    'DW' or 'RT' Joint

    Composite Pavement

    Abutting PCC or

    3"

    3"3"

    'CD' Joint

    Pay Limits for Contract Item

    Double Reinforced Section Single Reinforced Section Non-Reinforced Section

    Modified SubbaseSee Detail 'E'

    Polymer Grid

    Granular Backfill line

    Excavate to existing

    Bridge Floor

    Detail 'A'

    See

    placed with bridge

    and Subdrain

    Backfill

    'B' Joint

    HMA Pavement

    Abutting

    Subbase (if applicable)

    'B' JointBridge Approach

    Section

    Subbase

    (if applicable)Modified Subbase

    12"

    Polymer Grid

    'CF-3' Joint

    'CF-3' Joint

    1'-9"

    1'-9"

    4 Mil Polyethylene Sheeting

    4 Mil Polyethylene Sheeting

    Sleeper Slab

    Sleeper Slab

    Abutting HMA Pavement

    BR-205

    REVISION

    04-20-21

    SHEET 3 of 4

    REVISIONS:Modified #4 Bars at 12" Centers to #5 Bars.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    6

    (SLAB BRIDGE)

    DOUBLE REINFORCED 12'' APPROACH

    http://www.iowadot.gov/design/SRP/IndividualStandards/ebr213.pdf

  • DETAIL 'G'

    (Joint Placement)

    (Back of Curb Placement)

    DETAIL 'F'

    DETAIL 'H'

    8"

    4"

    1"

    2"7"

    Detail 'G'

    Curb per

    Detail 'G'

    Curb per

    9"

    Gutter Line

    See Detail 'H'

    Floor

    Bridge

    End Section

    Bridge Rail

    End Section

    Bridge Rail

    Joint Filler and seal top

    " Preformed41

    Provide

    Joint Filler and seal top

    " Preformed41

    Provide

    BR-205

    REVISION

    04-20-21

    SHEET 4 of 4

    REVISIONS:Modified #4 Bars at 12" Centers to #5 Bars.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    6

    (SLAB BRIDGE)

    DOUBLE REINFORCED 12'' APPROACH

  • SECTION

    Erosion Control ECNO. DATE TITLE

    EC-101 04-19-16 Wood Excelsior Mat for Ditch ProtectionEC-102 04-21-15 Sod for Ditch ProtectionEC-103 04-21-15 Wood Excelsior Mat for Slope ProtectionEC-104 04-17-18 Turf Reinforced Mat (TRM)EC-105 04-17-18 Transition Mat

    EC-201 04-20-21 Silt FenceEC-202 10-21-14 Floating Silt CurtainEC-204 04-20-21 Perimeter, Slope and Ditch Check Sediment Control Devices

    EC-301 10-18-16 Rock Erosion Control (REC)EC-302 10-16-18 Rock Check DamEC-303 10-20-20 Stabilized Construction Entrance

    EC-501 04-21-15 Trees and ShrubsEC-502 04-21-15 Seeding in Rural Areas

    EC-601 10-16-18 Temporary Sediment Control BasinEC-602 04-21-20 Open-Throat Curb Intake Sediment Filter

    4/20/21

  • 100-18

    100-17

    2

    A

    Silt Fence

    Flow

    A

    2

    1

    Flow

    Contour Lines

    3

    Flow

    2

    Silt Fence

    Fabric

    Engineering

    Fabric

    Engineering

    Post 4'-0" min.

    'T' Steel Fence

    Fabric

    Engineering

    required on slope.

    to the ground contour when

    Install Silt Fence parallel

    Post 4'-0" min.

    'T' Steel Fence

    ROW

    Existing or Proposed Right of Way

    2

    Flow

    Flow

    B

    Typical Installation

    Toe of Foreslope

    Flow

    Flow B

    SECTION B-B

    FRONT VIEW

    SECTION A-A

    SILT FENCE - MACHINE AND MANUAL INSTALLATION

    1 1

    Ground Line

    3

    PLAN FOR SILT FENCE

    10' min.

    8' max. Post Spacing

    Possible Tabulations:

    Silt Fence for Ditch Checks

    Silt Fence

    Possible Contract Items:

    100-18

    100-17

    (Manual Installation)

    Bottom of Trench

    19'' min.

    1111

    INFODESIGNER

    Belt

    Steel Post

    Fabric

    ATTACHMENT TO POST

    BACK VIEW

    From Ground

    Approx 4"

    or Cable Tie

    Tie Bottom Wire

    (evenly spaced)

    Cable Ties

    Wire or

    Steel Post

    Belt

    Fabric

    ATTACHMENT TO POST

    PROFILE VIEW

    13

    14

    13

    14

    (manual installation)

    4'' x 10'' trench

    (manual installation)

    4'' x 10'' trench

    EC-201

    REVISION

    6 04-20-21

    SHEET 1 of 6

    REVISIONS:Modified trench to 10". Added circle notes 13 & 14.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    SILT FENCE

    pneumatic tamper.

    For manual installation, compact with a mechanical or

    of silt fence at least two times with a rubber-tired vehicle.

    For machine installation, compact by driving over each side

    installation.

    (trench) installation if phyical conditions prohibit machine

    Install all silt fence using a silt fence machine. Use manual

    10" min.

    13

    4" Offset

    to contain runoff as shown.

    flare up the slope on both ends 20 feet of the segment

    200 feet. For every segment of silt fence that is placed,

    Place silt fence continuously up to a maximum length of

    as shown.

    hump that extends 20 feet up the slope to contain runoff

    - Place silt fence continuously. Every 200 feet, place a

    contain runoff as shown, or

    up the slope on both ends 20 feet of the segment to

    feet. For every 200 foot segment of fence placed, flare

    - Place silt fence continuously up to a maximum of 200

    The contractor has two installation options:

    Refer to Tab. 100-17

    Embed all posts 28 inches below the ground line.

    along bottom of trench.

    For manual installation only, fold engineering fabric

    encompassing the belt. See attachment to post.

    cable ties (50 lb.) or wire passing through or

    Secure top of engineering fabric to steel posts using

    4" Offset

    (evenly spaced)

    Cable Ties

    Wire or

    http://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0100-18.PDFhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0100-17.PDFhttp://www.iowadot.gov/design/dmanual/01e-06.pdf

  • Flow FlowDitch

    Silt Fence Ditch Check

    Foreslope

    Flow Flow

    Backslope

    Fabric

    Engineering

    3

    1

    2

    3

    SECTION C-C

    C C

    SECTION C-C

    Trench

    4" x 12"

    DITCH CHECK - MACHINE INSTALLATION DITCH CHECK - MANUAL INSTALLATION

    FRONT VIEW

    Flow

    Fabric

    Engineering

    2

    Flow

    4

    4' max. Post Spacing

    Post 4' min.

    'T' Steel Fence Post 4' min.

    'T' Steel Fence

    5

    5

    Backslo

    pe

    6

    1

    4

    (Manual Installation)

    Bottom of Trench

    19" min.

    6

    12

    PLAN FOR DITCH CHECK (TYPE 1)12

    LOCATION STATION

    Foreslope

    19" min.

    Refer to Tab. 100-18

    Minimum end span (in feet) = 2 X Backslope (H:V).

    Minimum end span (in feet) = 2 X Foreslope (H:V).

    and space remaining posts equally.

    Locate posts at toe of foreslope and toe of backslope

    Embed all posts 28 inches below the ground line.

    along bottom of trench.

    For manual installation only, fold engineering fabric

    encompassing the belt. See attachment to post.

    cable ties (50 lb.) or wire passing through or

    Secure top of engineering fabric to steel posts using

    EC-201

    REVISION

    6 04-20-21

    SHEET 2 of 6

    REVISIONS:Modified trench to 10". Added circle notes 13 & 14.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    SILT FENCE

    10" min.

    4" Offset 4" Offset

  • Ditch

    Foreslope

    Flow

    Backslope

    C C

    Silt Fence

    Inlet

    Silt FenceA

    A

    Flow

    FlowFlow

    Flow

    Intake

    Contour Lines

    LOCATION STATION

    PLAN FOR SILT FENCE AT INTAKE (TYPE 2)

    Refer to Tab. 100-1812

    LOCATION STATION

    PLAN FOR SILT FENCE DITCH CHECK AT INLET (TYPE 3)

    12

    12

    EC-201

    REVISION

    6 04-20-21

    SHEET 3 of 6

    REVISIONS:Modified trench to 10". Added circle notes 13 & 14.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    SILT FENCE

  • FRONT VIEW

    4' max. Post Spacing

    5 8

    1

    4

    19" min.

    19" min.

    3Bottom of Trench

    PLAN FOR SILT DITCH (SHALLOW DITCH SECTION-TYPE 4)12

    Backslop

    e

    Ditch FlowA A

    Foreslope

    Backslope

    Silt Fence Ditch Check

    FlowFlow

    6'

    6'

    6'

    6'

    See Detail 'A'

    Detail 'A'

    Foreslope

    ROW Line

    LOCATION STATION

    1

    4

    5

    8

    12

    3

    Refer to Tab. 100-18

    back slope intercept and the other beyone the intercept.

    transverse to parallel installation. Place one post at the

    Place posts shown in Detail 'A' to transition from

    Minimum end span (in feet) = 2 X Foreslope (H:V).

    and space remaining posts equally.

    Locate posts at toe of foreslope and toe of backslope

    Embed all posts 28 inches below the ground line.

    encompassing the belt. See attachment to post..

    cable ties (50 lb.) or wire passing through or

    Secure top of engineering fabric to steel posts using

    EC-201

    REVISION

    6 04-20-21

    SHEET 4 of 6

    REVISIONS:Modified trench to 10". Added circle notes 13 & 14.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    SILT FENCE

    Perimeter Silt Fence (see EC-201 page 1)

    10" min.

  • 3

    4' max. Post Spacing

    5 97

    Bottom of Trench

    FRONT VIEW

    19" min.

    1

    PLAN FOR SILT FENCE (NO DITCH SECTION-TYPE 5)12

    19" min.

    Flow

    Flow

    A AFlow Flow

    Silt Fence Ditch Check

    Flow Flow

    6'

    6'

    6'6'

    Detail 'B'

    See Detail 'B'

    Flow

    Foreslope

    ROW Line

    LOCATION STATION

    1

    5

    7

    9

    12

    3

    Silt Fence

    Refer to Tab. 100-18

    intercept of the foreslope.

    the installation should approximately parallel the

    transverse to parallel installation. The parallel portion of

    Place posts as shown in Detail 'B' to transition from

    spacing

    Locate posts at toe of foreslope. Locate posts at 4 foot

    Minimum end span (in feet) = 2 X Foreslope (H:V).

    Embed all posts 28 inches below the ground line.

    encompassing the belt. See attachment to post..

    cable ties (50 lb.) or wire passing through or

    Secure top of engineering fabric to steel posts using

    EC-201

    REVISION

    6 04-20-21

    SHEET 5 of 6

    REVISIONS:Modified trench to 10". Added circle notes 13 & 14.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    SILT FENCE

    Perimeter Silt Fence (see EC-201 page 1)

    10" min.

  • LAUNCHING PIT

    RECEIVING PIT

    Excavated Material

    Silt Fence

    15' min

    15' min

    Boring, Jacking, or Tunneling

    11 Refer to Tab. 100-17

    11

    11

    Silt Fence

    PLAN FOR SILT FENCE FOR TRENCHLESS CONSTRUCTION

    Excavated Material

    EC-201

    REVISION

    6 04-20-21

    SHEET 6 of 6

    REVISIONS:Modified trench to 10". Added circle notes 13 & 14.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    SILT FENCE

  • PERIMETER CONTROL

    Contour Lines

    2

    1

    LEGEND

    Flow

    3

    INLET PERIMETER PROTECTION

    PERIMETER CONTROL ALONG CURB

    Wood Stake

    (Overlap Joint)

    DETAIL 'A'

    3

    Perimeter and Slope Sediment Control Device

    INLET

    3

    45 typ.

    Right of Way or Protected Area

    3

    3

    Perimeter and Slope Sediment Control Device

    1

    See Detail 'A' (Typ.)

    See Detail 'A' (Typ.)

    See Detail 'A' (Typ.)

    12" min.

    2' min.

    (measured along device)

    Installation Length

    DETAIL 'B'

    See Detail 'A' (Typ.)

    Control Device

    Slope Sediment

    Perimeter and

    incidental to Perimeter and Slope Sediment Control Device.

    and compacting rills and gullies, and minor ground shaping, is

    Control Device. Minor ground shaping may be required. Filling

    continuous contact with Perimeter and Slope Sediment

    Ensure ground surface is smooth in order to provide

    placing Perimeter and Slope Sediment Control Device.

    Fill and compact rills and gullies (see Detail 'B') prior to

    Not intended for use in perennial or intermittent streams.

    Sediment Control Device

    Perimeter and Slope

    Perimeter and Slope Sediment Control Device.

    Fill and compact rills and gullies prior to placing

    2

    3

    INFODESIGNER

    12" min.

    7

    8 Install staples every 2 feet on upslope side.

    ground.

    All stakes to be placed at approximatly 45 degree angle to

    minimum actual stake size 3/4" x 3/4" wood stakes.

    Upslope stakes spaced at ends and middle of device. Use

    Install downslope stakes at 4 foot maximum spacing.

    included in the installation length.

    Extra material required to install overlaps will not be

    installation length.

    along the device. Run-ups will be included in the

    run-ups and/or means may be required to reduce erosion

    such that runoff is conveyed along the device, additional

    each run up the slope to help contain runoff. When placed

    Overlap joints per Detail 'A'. Turn the lower 10 feet of

    EC-204

    REVISION

    04-20-21

    SHEET 1 of 3

    REVISIONS:Modified circle note 3 and 5, title and stake placement.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    5

    SEDIMENT CONTROL DEVICES

    PERIMETER, SLOPE AND DITCH CHECK

    7

    8

    100-19

    Possible Tabulation:

    Ditch Check Sediment Control Device

    Perimeter and Slope Sediment Control Device

    Possible Contract Item:

    http://www.iowadot.gov/design/dmanual/01e-06.pdf

  • SLOPE PROTECTION

    3

    4

    4

    30 typ.

    A

    A

    3

    3

    3

    (measured along device)

    Installation Length

    Top of Slope or Undisturbed Area

    Sediment Control Device

    Perimeter and Slope

    Sediment Control Device

    Perimeter and Slope Filler Material

    SECTION A-A

    Installation

    (Typ.)See Detail 'A'

    (Typ.)See Detail 'A'

    (Typ.)See Detail 'A'

    12" min.

    Contour Lines

    LEGEND

    Flow

    3

    Wood Stake

    4

    12" min.

    EC-204

    REVISION

    04-20-21

    SHEET 2 of 3

    REVISIONS:Modified circle note 3 and 5, title and stake placement.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    5

    SEDIMENT CONTROL DEVICES

    PERIMETER, SLOPE AND DITCH CHECK

    Install staples every 2 feet on upslope side.

    length.

    runaround. Run-ups will be included in the installation

    feet of each device up the slope to prevent flow

    contours). Overlap joints per Detail 'A'. Run the last 10

    Install Slope Protection perpendicular to slope (parallel to

    staples every 2 feet on upslope side.

    minimum actual stake size 3/4" x 3/4" wood stakes. Install

    Upslope stakes spaced at ends and middle of device. Use

    Install downslope stakes at 4 foot maximum spacing.

    8

    3

    8

  • DITCH PROTECTION

    Foreslope

    Ditch

    Backslope

    5

    5

    Sediment Control Device

    Perimeter and Slope

    Sediment Control Device

    Perimeter and Slope5

    12" min.

    INSTALLATION IN DITCH

    (measured along device)

    Installation Length

    Contour Lines

    LEGEND

    Flow

    5

    Wood Stake

    6

    6

    12" min.

    EC-204

    REVISION

    04-20-21

    SHEET 3 of 3

    REVISIONS:Modified circle note 3 and 5, title and stake placement.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    5

    SEDIMENT CONTROL DEVICES

    PERIMETER, SLOPE AND DITCH CHECK

    Install staples every 1 foot on upslope side.

    joints per Detail 'A'.

    Install Ditch Protection perpendicular to ditch. Overlap

    minimum actual stake size 3/4" x 3/4" wood stakes.

    Upslope stakes spaced at ends and middle of device. Use

    Install downslope stakes at 2 foot maximum spacing.

    9

    9

  • SECTION

    Earthwork EWNO. DATE TITLE

    Embankments

    EW-101 10-17-17 Embankment and Rebuilding EmbankmentsEW-102 10-20-15 Allowable Placement of Unsuitable Soil in EmbankmentsEW-103 10-20-15 Embankment Subgrade Treatment, Moisture Density Control and Special CompactionEW-105 04-21-15 Reshaping Slopes and DitchesEW-110 10-20-15 Ditch Blocks and Dikes

    Grading at Bridges

    EW-201 04-19-16 Bridge Berm Grading without Recoverable Slope (Barnroof Section)EW-202 04-19-16 Bridge Berm Grading without Recoverable Slope (Non-Barnroof Section)EW-203 10-20-20 Bridge Berm Grading with Recoverable Slope (Non-Barnroof Section)EW-204 10-20-20 Bridge Berm Grading with Recoverable Slope (Barnroof Section)EW-210 10-20-15 Standard Wing DikesEW-211 10-17-17 Special Grading at Side PiersEW-212 10-20-15 Settlement Plate

    Grading for Guardrail

    EW-301 04-20-21 Guardrail GradingEW-302 10-20-15 Special Shaping for High Tension Cable Guardrail at Median Obstacles

    Erosion Control

    EW-401 10-20-15 Temporary Stream Crossing, Causeway, or Equipment PadEW-402 04-18-17 Temporary Stream DiversionEW-403 04-18-17 Temporary Erosion Control Measures

    Entrances, Sideroads, and Safety Ramps

    EW-501 10-20-15 Rural EntranceEW-502 04-18-17 Safety RampEW-503 10-20-15 Side Road Grading

    4-20-21

  • 20'

    TRAFFIC

    X

    Y

    Possible Tabulation:

    107-23107-23

    Earth Fill

    PLAN

    Installation Line

    Y4 Z

    19

    20

    17

    18

    50

    61

    65

    54

    5710

    11

    8

    9

    12

    15

    16

    13

    14

    47

    6

    feet

    7

    43

    5 39

    76

    80

    69

    72

    83

    95

    feet

    87

    91

    Normal Shoulder

    Edge of

    7156

    Guardrail may or may not be attached to face of obstacle.

    .Typical

    Construct paved shoulder in front of guardrail as shown on

    construction of embankments.

    Construct earth fill in conformance with requirements for

    7156

    SECTION A-A SECTION B-B

    GUARDRAIL INSTALLATION LINE AT OR WITHIN 10 FEET OF SHOULDER

    Edge of Shoulder

    Distance from edge of normal shoulder to toe of 10:1 slope

    Measured from Location Station.

    LEGEND

    Slope - 10:1

    Foreslope at Guardrail

    Foreslope

    Y1

    10

    5' min.

    Guardrail

    Foreslope at

    1

    Foreslope

    B

    X2

    X1

    Obstacle

    A

    X4

    X3

    B

    Z

    LOCATION STATION

    Slope Transition

    25' Constant

    A

    15°Y4

    5' min.

    Normal Shoulder

    Edge of

    10

    Y4

    Earth Fill

    Guardrail

    Foreslope at

    1

    1

    1 Match slope of adjacent shoulder.

    Match adjacent shoulder.

    EW-301

    REVISION

    10-20-15

    SHEET 1 of 5

    REVISIONS:adjacent shoulder. Added note 3 on Sheet 4.Changed slope in front of guardrail from a 10 to 1 to match the slope of the

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    1

    GUARDRAIL GRADING

    Y1Y3Y2

    http://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0107-23.PDFhttp://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e7156.PDF

  • 5' min. 5' min.

    PLAN

    Y4 Z

    19

    20

    17

    18

    50

    61

    65

    54

    5710

    11

    8

    9

    12

    15

    16

    13

    14

    47

    6

    feet

    7

    43

    5 39

    76

    80

    69

    72

    83

    95

    feet

    87

    91

    X

    YNormal Shoulder

    Edge of

    Normal Shoulder

    Edge of

    SECTION C-C SECTION D-D

    10

    Y4

    GUARDRAIL INSTALLATION LINE WITHIN SHOULDER

    Earth Fill Earth Fill

    slope

    Distance from edge of normal shoulder to toe of 10:1

    Measured from Location Station.

    Guardrail

    Foreslope at

    110

    Y1

    Guardrail

    Foreslope at

    1

    1

    1 Match slope of adjacent shoulder.

    LEGEND

    Slope - 10:1

    Foreslope at Guardrail

    Match adjacent shoulder.

    EW-301

    REVISION

    10-20-15

    SHEET 2 of 5

    REVISIONS:adjacent shoulder. Added note 3 on Sheet 4.Changed slope in front of guardrail from a 10 to 1 to match the slope of the

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    1

    GUARDRAIL GRADING

    20'

    TRAFFIC

    Edge of Shoulder

    Foreslope Foreslope

    B

    X2

    X1

    Obstacle

    A

    X4

    X3

    B

    Z

    LOCATION STATION

    Slope Transition

    25' Constant

    A

    15°

    Installation Line

    Y3Y2

    Y1

    Y4

  • PLAN

    Y4 Z

    19

    20

    17

    18

    50

    61

    65

    54

    5710

    11

    8

    9

    12

    15

    16

    13

    14

    47

    6

    feet

    7

    43

    5 39

    76

    80

    69

    72

    83

    95

    feet

    87

    91

    10' min.

    X

    Y

    Normal Shoulder

    Edge of

    GUARDRAIL INSTALLATION LINE BEYOND 10 FEET FROM SHOULDER

    Earth Fill

    slope

    Distance from edge of normal shoulder to toe of 10:1

    Measured from Location Station.

    5' min.

    Y4

    Guardrail

    Foreslope at

    10

    Typical Section

    1

    Match slope of adjacent shoulder.1

    1

    LEGEND

    Slope - 10:1

    Foreslope at Guardrail

    Match adjacent shoulder.

    EW-301

    REVISION

    10-20-15

    SHEET 3 of 5

    REVISIONS:adjacent shoulder. Added note 3 on Sheet 4.Changed slope in front of guardrail from a 10 to 1 to match the slope of the

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    1

    GUARDRAIL GRADING

    20'

    TRAFFIC

    Installation LineEdge of Shoulder

    Foreslope Foreslope

    B

    X2

    X1

    Obstacle

    A

    X4

    X3

    B

    Z

    LOCATION STATION

    Slope Transition

    25' Constant

    A

    15°Y4Y3Y2Y1

    http://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0107-23.PDF

  • Earth Fill

    SECTION E-E

    4' min.

    Installation Line

    Proposed Culvert

    20'

    FILL OVER PIPE CULVERT

    PLAN

    2

    2

    LEGEND

    Slope - 10:1

    Slope - 8:1

    E

    E

    15°

    8:1 8:1

    3

    10:1 preferred; no steeper than 6:1.

    See sheets 1, 2, or 3 for unshaded areas.

    3

    EW-301

    REVISION

    04-20-21

    SHEET 4 of 5

    REVISIONS:Changes Obstable to Object. Modified guardrail.

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    2

    GUARDRAIL GRADING

  • http://www.iowadot.gov/design/stdrdpln.htmThis image can be viewed in 3D on the the ERL or at our website http://www.iowadot.gov/design/stdrdpln.htm

    http://www.iowadot.gov/design/stdrdpln.htmThis image can be viewed in 3D on the the ERL or at our website http://www.iowadot.gov/design/stdrdpln.htm

    EW-301

    REVISION

    10-20-15

    SHEET 5 of 5

    REVISIONS:adjacent shoulder. Added note 3 on Sheet 4.Changed slope in front of guardrail from a 10 to 1 to match the slope of the

    APPROVED BY DESIGN METHODS ENGINEER

    STANDARD ROAD PLAN

    1

    GUARDRAIL GRADING

    http://www.iowadot.gov/design/stdrdpln.htmhttp://www.iowadot.gov/design/stdrdpln.htm

  • SECTION

    Lighting LINO. DATE TITLE

    LI-101 10-21-14 Light Pole LocationLI-103 04-20-21 Conduit and Precast HandholesLI-104 10-21-14 Junction box (cast Iron)LI-110 04-19-16 Lighting TowerLI-120 10-21-14 Underdeck LightingLI-130 10-17-17 Temporary Floodlighting LuminairesLI-141 10-21-14 Electrical Installation (Roadway Ducts)LI-142 04-21-15 Electrical Installation (Bases)LI-151 10-21-14 Control Cabinet (Pole-Mounted)LI-152 10-21-14 Control Cabinet (Pad-Mounted)

    LI-201 04-18-17 Light Pole FoundationLI-210 10-21-14 Transformer Base (Cast Aluminum)LI-211 10-20-15 Slip-Base for Light Poles

    4-20-21

  • SH

    EE

    T 1 O

    F 2

    FIG

    UR

    E 8

    010.1

    03

    LI-103

    REVISION

    04-20-21

    SHEET 1 of 2

    REVISIONS:Added the HDPE handhole to the precast concrete and composite ones.

    1

    CONDUIT AND PRECAST HANDHOLES

    STANDARD PLANROADFIGURE 8010.103

    SUDAS DIRECTOR DESIGN METHODS ENGINEER

    LOGO

    2'-0" min.

    2'-0" min.

    Finished Pavement Grade

    1" to 3"

    2'-0" dia.

    walls of handhole.

    base 6" beyond

    Extend 8" granular

    (4) Required

    Cable Hooks

    1"

    1"

    2'-0" min. diameter

    Finished Pavement Grade Composite Lid

    HDPE Frame

    PRECAST CONCRETE HANDHOLE (TYPE I)HDPE HANDHOLE (TYPE V)

  • ..

    .

    .

    .

    .

    .....

    ........

    .....

    ...... .......

    ..........

    LOGO

    ..

    .

    .

    .

    .

    .....

    ........

    .....

    ...... .......

    ..........

    LOGO

    LOGO

    Conduit

    D

    L

    W

    L

    W

    III

    IV

    30" 17" 24"

    (NOMINAL)HANDHOLE DIMENSIONS TABLE

    TYPE

    36"

    48"

    24"

    30"

    30"

    36"

    L W D

    II

    LI-103

    REVISION

    04-20-21

    SHEET 2 of 2

    REVISIONS:Added the HDPE handhole to the precast concrete and composite ones.

    1

    CONDUIT AND PRECAST HANDHOLES

    STANDARD PLANROADFIGURE 8010.103

    SUDAS DIRECTOR DESIGN METHODS ENGINEER

    SH

    EE

    T 2 O

    F 2

    FIG

    UR

    E 8

    010.1

    03

    PRECAST CONCRETE COMPOSITE HANDHOLE

    CONDUIT IN TRENCH

    Steel Bolt

    Stainless

    Surface

    Skid Resistant

    Pull Slot

    (Type II or III)

    One Piece Lid

    Steel Bolt

    Stainless

    (Type IV)

    Two Piece Lid Surface

    Skid Resistant

    Pull Slot

    (4) Required

    Cable Hooks

    Trench

    4" min.

    Conduit D

    epth

    24"

    min. to 4

    8"

    max.

    rubble.

    concrete, or other

    is free of cinders,

    Ensure backfill material

    Compact Backfill Material

    walls of handhole.

    base 8" beyond

    Extend granular

  • SECTION

    Local Systems LSNO. DATE TITLE

    LS-625 04-19-16 Steel Beam Guardrail Tangent End Terminal (NCHRP 350 TL-3)LS-626 04-19-16 Steel Beam Guardrail Flared End Terminal (NCHRP 350 TL-3)LS-630 04-20-21 Steel Beam Guardrail Installation At Concrete Barrier Or Bridge Rail End Section (NCHRP 350 TL-3)LS-631 04-19-16 Steel Beam Guardrail Installation At Side Obstacle (Two-Way Protection)LS-632 04-19-16 Steel Beam Guardrail Installation At Side Obstacle (One-Way Protection)LS-633 04-19-16 Steel Beam Guardrail Installation At Railroad SignalLS-635 04-20-21 Steel Beam Guardrail Installation At Concrete Barrier Or Bridge Rail End Section (MASH TL-2)

    4/20/21

  • NEAREST TRAFFIC 2

    1

    3

    LAPPING PROCEDURE

    12'-6''

    1'-3''

    VARIABLE FLARE

    4

    EW-301

    BA-200

    EW-301

    SI-211

    .For general guardrail details, see

    .For grading requirements, see

    .Install delineators and object markers according to

    BA-200

    SI-211

    BA-201

    BA-202

    LS-625

    LS-626Rail Elements

    or Bridge Rail

    Concrete Barrier

    Rail Elements

    INFODESIGNER

    LOCATION STATION Connection

    Bolted

    VT1

    Rail Splice

    (37'-6'')

    Transition Section

    Steel Beam Guardrail Barrier

    1

    2

    Rail Splice

    Face of Guardrail

    ETVT2

    VF

    Installation Line

    4

    3

    Rail Splice

    (varies)Steel Be

    am Guardrail

    Pay length for:

    (Multiple of 6'-3")

    Variable Tangent

    (Multiple of 6'-3")

    Variable Flare

    Variable Tangent

    5

    5

    ")21

    (40'-7

    for Cable ConnectionSteel Beam Guardrail F

    lared End Terminalor

    ")21

    (53'-1Steel Beam Guardrail T

    angent End Terminal

    (50' for Tangent, 37'-6" for Flared)

    End Terminal

    LS-626

    LS-625

    BA-202

    BA-201

    " if VF is used.21

    of 53'-1

    " if VF is not used. Minimum VT1 21

    Minimum VT1 of 40'-7

    .See

    .See

    bridge rail end sections.

    for connections to concrete barriers and See

    .See

    108-8A

    Possible Tabulation:

    Steel Beam Guardrail Tangent End Terminal, LS-625

    Steel Beam Guardrail Flared End Terminal, LS-626

    Steel Beam Guardrail End Anchor, Bolted

    Steel Beam Guardrail Barrier Transition Section, BA-201

    Steel Beam Guardrail

    Possible Contract Items:

    108-8A

    LS-630

    REVISION

    10-18-16

    SHEET 1 of 1

    REVISIONS:

    Section contract item to specify BA-201.Added N