BUILDING MATERIALS PRICES

April-2012 May-2012and

Page 2: Standard Bm Monthly Report - 201205

Building Materials Prices for Johor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorOrdinary Portland Cement, bag

Ordinary Portland Cement, 50 kg bag 16.33 16.831 Bag 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorOrdinary Portland Cement, bulk

Ordinary Portland Cement in bulk 328.33 328.332 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorWhite Cement

White Cement 40 kg per bag , collection in MT 744.00 744.003 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorGranite 3/4"

Granite Aggregate 3/4" 23.00 23.004 MT 60 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorNormal River Sand

Normal River Sand- Ex 16.00 14.505 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorFine River Sand

Fine River Sand for Plastering -Ex 24.67 24.676 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorNormal Mining Sand

Normal Mining Sand 16.33 16.337 MT 30 Ex-Factory

Page 2 of9514 July 2012

Page 3: Standard Bm Monthly Report - 201205

Building Materials Prices for Johor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorFine Mining Sand

Fine Mining Sand for Plastering 24.00 24.008 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorMild Steel Round Bar

Mild Steel Round Bar R10, MS146 2573.33 2623.339 MT 60 Delivered

Mild Steel Round Bar R12, MS146 2573.33 2623.3310 MT 60 Delivered

Mild Steel Round Bar R16, MS146 2473.33 2490.0011 MT 60 Delivered

Mild Steel Round Bar R20, MS146 2523.33 2573.3312 MT 60 Delivered

Mild Steel Round Bar R22, MS146 2523.33 2573.3313 MT 60 Delivered

Mild Steel Round Bar R25, MS146 2523.33 2573.3314 MT 60 Delivered

Mild Steel Round Bar R32, MS146 2523.33 2573.3315 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorHigh Tensile Deformed Bar

High Tensile Deformed Bar-Y10, MS146 2573.33 2623.3316 MT 60 Delivered

High Tensile Deformed Bar - Y12, MS146 2573.33 2623.3317 MT 60 Delivered

High Tensile Deformed Bar- Y16, MS146 2440.00 2490.0018 MT 60 Delivered

High Tensile Deformed Bar - Y20, MS146 2440.00 2490.0019 MT 60 Delivered

High Tensile Deformed Bar- Y25, MS146 2440.00 2490.0020 MT 60 Delivered

Page 3 of9514 July 2012

Page 4: Standard Bm Monthly Report - 201205

Building Materials Prices for Johor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorHigh Tensile Deformed Bar

High Tensile Deformed Bar- Y32, MS146 2440.00 2490.0021 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorBRC Fabric

BRC A6, MS145 6.12 6.5522 m2 30 Delivered

BRC A7, MS145 8.22 8.7723 m2 30 Delivered

BRC A8, MS145 10.86 11.4224 m2 30 Delivered

BRC A9, MS145 13.79 14.9625 m2 30 Delivered

BRC A10, MS145 16.73 18.0526 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorReady Mix Concrete-Granite

Ready Mix Concrete - Normal Mix - Grade 10,Granite

178.63 179.3027 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 15,Granite

183.80 194.4728 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 20,Granite

188.27 199.2729 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 25,Granite

196.53 206.5330 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 30,Granite

203.20 212.8731 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Granite

217.47 226.4732 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Granite

232.00 243.3333 m3 30 Delivered

Page 4 of9514 July 2012

Page 5: Standard Bm Monthly Report - 201205

Building Materials Prices for Johor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorCommon Clay Bricks

Common Clay Bricks - Pallet 0.40 0.4534 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorCement Sand Bricks

Cement Sand Brick - Pallet 0.24 0.2735 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorSmooth Face Facing Bricks

Smooth Face Facing Brick, Red 1.15 1.1836 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorConcrete Roof Tiles

Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)

1.55 1.6737 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorMetal Sheet Decking

MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT

52.40 52.4038 m2 30 Delivered

MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT

56.57 56.5739 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorCorrugated Roofing Sheet

Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)

27.73 28.6740 Sheet 60 Delivered

Page 5 of9514 July 2012

Page 6: Standard Bm Monthly Report - 201205

Building Materials Prices for Johor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorCeramic Floor Tiles

Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1

0.97 0.9741 Piece 60 Delivered

Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1

1.84 1.9042 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorHomogeneous Ceramic Tiles

Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1

1.34 1.3843 Piece 60 Delivered

Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1

2.31 2.3744 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorPaver

Uni-Espave - 200mm x 190mm 0.89 0.9545 Piece 60 Delivered

Uni-Pave/ Sunpave, 225mm x 112.5mm 0.84 0.9746 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorPlain Cellulose Fibre

Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)

3.92 3.9247 Sheet 60 Delivered

Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)

6.78 7.2748 Sheet 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorGypsum Ceiling Board

Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)

4.97 4.9749 Sheet 60 Delivered

Page 6 of9514 July 2012

Page 7: Standard Bm Monthly Report - 201205

Building Materials Prices for Johor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorTimber door

Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM

212.00 212.0050 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorGI Pipes

Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863

35.50 35.1651 6mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorPVC Pipes

PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628

26.10 28.7752 4mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorHDPE Pipes

HDPE Pipe PN 10 - 50mm Diameter, MS1058 427.67 439.6753 100mroll

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorABS Pipes

ABS Pipe PN 15 Class E - 20mm, MS1419 23.23 23.7354 5.8mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorPolytank

Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant

118.57 121.9055 No. 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorWash Hand Basin

Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan

71.47 71.4756 Set 60 Delivered

Page 7 of9514 July 2012

Page 8: Standard Bm Monthly Report - 201205

Building Materials Prices for Johor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorWater Closets

Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan

139.10 142.7757 Item 60 Delivered

Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse

53.50 54.1758 Item 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorStainless Steel Sink

Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''

82.57 82.5759 Item 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorNippon

Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish

95.67 98.2760 5Litres

60 Delivered

Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo

88.73 91.0761 5Litres

60 Delivered

Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex

31.67 31.6762 7Litres

60 Delivered

Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond

95.47 97.4763 5Litres

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorSquare Hollow Sections

Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)

3182.67 3242.6764 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorRectangular Hollow Sections

Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)

3347.67 3407.6765 MT 60 Delivered

Page 8 of9514 July 2012

Page 9: Standard Bm Monthly Report - 201205

Building Materials Prices for Johor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorUniversal Beams

Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)

3500.00 3500.0066 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorEqual Angles

Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2581.33 2598.0067 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

JohorPlywood

Plywood - Shuttering Board, 4' x 8' x 12mm 53.27 53.9368 Piece 60 Delivered

Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade

134.00 122.3369 Piece 60 Delivered

Page 9 of9514 July 2012

Page 10: Standard Bm Monthly Report - 201205

Building Materials Prices for Kelantan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanOrdinary Portland Cement, bag

Ordinary Portland Cement, 50 kg bag 17.37 17.371 Bag 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanOrdinary Portland Cement, bulk

Ordinary Portland Cement in bulk 330.00 330.002 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanWhite Cement

White Cement 40 kg per bag , collection in MT 744.00 744.003 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanGranite 3/4"

Granite Aggregate 3/4" 25.67 25.674 MT 60 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanNormal River Sand

Normal River Sand- Ex 10.67 9.675 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanFine River Sand

Fine River Sand for Plastering -Ex 18.33 18.006 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanNormal Mining Sand

Normal Mining Sand 15.67 16.007 MT 30 Ex-Factory

Page 10 of9514 July 2012

Page 11: Standard Bm Monthly Report - 201205

Building Materials Prices for Kelantan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanFine Mining Sand

Fine Mining Sand for Plastering 21.00 21.008 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanMild Steel Round Bar

Mild Steel Round Bar R10, MS146 2640.00 2640.009 MT 60 Delivered

Mild Steel Round Bar R12, MS146 2640.00 2640.0010 MT 60 Delivered

Mild Steel Round Bar R16, MS146 2540.00 2506.6711 MT 60 Delivered

Mild Steel Round Bar R20, MS146 2590.00 2590.0012 MT 60 Delivered

Mild Steel Round Bar R22, MS146 2590.00 2590.0013 MT 60 Delivered

Mild Steel Round Bar R25, MS146 2590.00 2590.0014 MT 60 Delivered

Mild Steel Round Bar R32, MS146 2590.00 2590.0015 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanHigh Tensile Deformed Bar

High Tensile Deformed Bar-Y10, MS146 2640.00 2640.0016 MT 60 Delivered

High Tensile Deformed Bar - Y12, MS146 2640.00 2640.0017 MT 60 Delivered

High Tensile Deformed Bar- Y16, MS146 2506.67 2506.6718 MT 60 Delivered

High Tensile Deformed Bar - Y20, MS146 2506.67 2506.6719 MT 60 Delivered

High Tensile Deformed Bar- Y25, MS146 2506.67 2506.6720 MT 60 Delivered

Page 11 of9514 July 2012

Page 12: Standard Bm Monthly Report - 201205

Building Materials Prices for Kelantan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanHigh Tensile Deformed Bar

High Tensile Deformed Bar- Y32, MS146 2506.67 2506.6721 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanBRC Fabric

BRC A6, MS145 6.72 6.7822 m2 30 Delivered

BRC A7, MS145 8.79 8.8923 m2 30 Delivered

BRC A8, MS145 12.07 12.2024 m2 30 Delivered

BRC A9, MS145 15.29 15.3925 m2 30 Delivered

BRC A10, MS145 17.53 17.6826 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanReady Mix Concrete-Granite

Ready Mix Concrete - Normal Mix - Grade 10,Granite

186.63 186.6327 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 15,Granite

192.13 192.1328 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 20,Granite

195.93 195.9329 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 25,Granite

204.20 204.2030 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 30,Granite

212.83 212.8331 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Granite

223.13 223.1332 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Granite

238.00 238.0033 m3 30 Delivered

Page 12 of9514 July 2012

Page 13: Standard Bm Monthly Report - 201205

Building Materials Prices for Kelantan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanCommon Clay Bricks

Common Clay Bricks - Pallet 0.46 0.4634 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanCement Sand Bricks

Cement Sand Brick - Pallet 0.28 0.2835 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanSmooth Face Facing Bricks

Smooth Face Facing Brick, Red 1.20 1.2036 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanConcrete Roof Tiles

Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)

1.73 1.7337 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanMetal Sheet Decking

MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT

54.00 54.0038 m2 30 Delivered

MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT

57.63 57.6339 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanCorrugated Roofing Sheet

Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)

28.67 28.6740 Sheet 60 Delivered

Page 13 of9514 July 2012

Page 14: Standard Bm Monthly Report - 201205

Building Materials Prices for Kelantan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanCeramic Floor Tiles

Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1

0.97 0.9741 Piece 60 Delivered

Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1

1.90 1.9042 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanHomogeneous Ceramic Tiles

Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1

1.38 1.3843 Piece 60 Delivered

Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1

2.37 2.3744 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanPaver

Uni-Espave - 200mm x 190mm 1.01 1.0145 Piece 60 Delivered

Uni-Pave/ Sunpave, 225mm x 112.5mm 0.97 0.9746 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanPlain Cellulose Fibre

Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)

3.92 3.9247 Sheet 60 Delivered

Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)

7.18 7.1848 Sheet 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanGypsum Ceiling Board

Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)

4.97 4.9749 Sheet 60 Delivered

Page 14 of9514 July 2012

Page 15: Standard Bm Monthly Report - 201205

Building Materials Prices for Kelantan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanTimber door

Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM

257.00 257.0050 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanGI Pipes

Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863

35.40 35.4051 6mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanPVC Pipes

PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628

29.20 29.2052 4mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanHDPE Pipes

HDPE Pipe PN 10 - 50mm Diameter, MS1058 438.00 438.0053 100mroll

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanABS Pipes

ABS Pipe PN 15 Class E - 20mm, MS1419 24.17 24.1754 5.8mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanPolytank

Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant

121.90 121.9055 No. 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanWash Hand Basin

Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan

71.47 71.4756 Set 60 Delivered

Page 15 of9514 July 2012

Page 16: Standard Bm Monthly Report - 201205

Building Materials Prices for Kelantan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanWater Closets

Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan

142.77 142.7757 Item 60 Delivered

Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse

54.17 54.1758 Item 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanStainless Steel Sink

Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''

82.57 82.5759 Item 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanNippon

Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish

98.27 98.2760 5Litres

60 Delivered

Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo

91.07 91.0761 5Litres

60 Delivered

Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex

31.67 31.6762 7Litres

60 Delivered

Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond

97.47 97.4763 5Litres

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanSquare Hollow Sections

Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)

3213.67 3213.6764 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanRectangular Hollow Sections

Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)

3258.33 3258.3365 MT 60 Delivered

Page 16 of9514 July 2012

Page 17: Standard Bm Monthly Report - 201205

Building Materials Prices for Kelantan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanUniversal Beams

Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)

3350.67 3350.6766 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanEqual Angles

Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2583.33 2583.3367 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KelantanPlywood

Plywood - Shuttering Board, 4' x 8' x 12mm 53.93 53.9368 Piece 60 Delivered

Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade

122.33 122.3369 Piece 60 Delivered

Page 17 of9514 July 2012

Page 18: Standard Bm Monthly Report - 201205

Building Materials Prices for Kota Kinabalu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluOrdinary Portland Cement, bag

Ordinary Portland Cement, 50 kg bag - (30) 17.00 17.001 Bag 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluWhite Cement

White Cement 25kg per bag , collection in MT - (30) 860.00 860.002 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluGranite 3/4"

Granite Aggregate 3/4" - (30) 53.33 53.003 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluSandstone

Sandstone Aggregates 3/4" 48.00 48.004 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluNormal River Sand

Normal River Sand - Delivery 38.00 37.675 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluFine River Sand

Fine River Sand for Plastering- Delivery 42.33 42.006 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluMild Steel Round Bar

Mild Steel Round Bar R10, MS146 - (30) 2700.00 2700.007 MT 30 Delivered

Mild Steel Round Bar R12, MS146 - (30) 2650.00 2650.008 MT 30 Delivered

Page 18 of9514 July 2012

Page 19: Standard Bm Monthly Report - 201205

Building Materials Prices for Kota Kinabalu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluMild Steel Round Bar

Mild Steel Round Bar R16, MS146 - (30) 2600.00 2600.009 MT 30 Delivered

Mild Steel Round Bar R20, MS146 - (30) 2600.00 2600.0010 MT 30 Delivered

Mild Steel Round Bars - R25, MS146 - (30) 2600.00 2600.0011 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluHigh Tensile Deformed Bar

High Tensile Deformed Bar Y10, MS146 - (30) 2750.00 2750.0012 MT 60 Delivered

High Tensile Deformed Bar Y12, MS146 - (30) 2700.00 2700.0013 MT 60 Delivered

High Tensile Deformed Bar Y16, MS146 - (30) 2650.00 2650.0014 MT 60 Delivered

High Tensile Deformed Bar Y20, MS146 - (30) 2650.00 2650.0015 MT 60 Delivered

High Tensile Deformed Bar Y25, MS146 - (30) 2650.00 2650.0016 MT 60 Delivered

High Tensile Deformed Bar Y32, MS146 - (30) 2650.00 2650.0017 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluBRC Fabric

BRC A6, MS145 8.37 8.5018 m2 30 Delivered

BRC A7, MS145 9.37 9.5019 m2 30 Delivered

BRC A8, MS145 12.43 12.5020 m2 30 Delivered

BRC A9, MS145 16.00 16.0021 m2 30 Delivered

Page 19 of9514 July 2012

Page 20: Standard Bm Monthly Report - 201205

Building Materials Prices for Kota Kinabalu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluBRC Fabric

BRC A10, MS145 19.00 19.3322 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluReady Mix Concrete-Granite

Ready Mix Concrete - Normal Mix - Grade 30,Granite

288.33 287.6723 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Granite

311.67 313.3324 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Granite

320.00 320.0025 m3 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluReady Mix Concrete-Sandstone

Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)

213.33 215.0026 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)

221.67 221.6727 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)

228.33 228.3328 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)

241.67 240.0029 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)

285.00 285.0030 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)

320.00 320.0031 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)

300.00 300.0032 m3 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluCommon Clay Bricks

Common Clay Bricks - Pallet 0.31 0.3233 Piece 30 Delivered

Page 20 of9514 July 2012

Page 21: Standard Bm Monthly Report - 201205

Building Materials Prices for Kota Kinabalu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluCement Sand Bricks

Cement Sand Bricks - Pallet -(30) 0.30 0.3034 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluSmooth Face Facing Bricks

Smooth Face Facing Brick, Red 0.85 0.8535 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluConcrete Roof Tiles

Interlocking Concrete Tiles - Standard DuotoneColour, Local Product - (30)

1.75 1.7836 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluMetal Sheet Decking

MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)

54.33 54.6737 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluCorrugated Roofing Sheet

Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm (Hume/Malex/UAC) - (30)

30.33 30.3338 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluCeramic Floor Tiles

Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)

1.78 1.8239 Piece 30 Delivered

Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)

3.50 3.5040 Piece 30 Delivered

Page 21 of9514 July 2012

Page 22: Standard Bm Monthly Report - 201205

Building Materials Prices for Kota Kinabalu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluHomogeneous Ceramic Tiles

Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)

3.00 3.0041 Piece 30 Delivered

Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)

4.40 4.3342 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluPaver

Uni-Espave- 200mm x 190mm - (30) 1.35 1.3543 Piece 30 Delivered

Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.30 1.3044 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluPlain Cellulose Fibre

Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)

8.77 9.0045 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluGypsum Ceiling Board

Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)

7.67 7.6346 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluTimber door

Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)

256.00 256.6747 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluGI Pipes

Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)

60.67 61.3348 6mrun

30 Delivered

Page 22 of9514 July 2012

Page 23: Standard Bm Monthly Report - 201205

Building Materials Prices for Kota Kinabalu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluPVC Pipes

PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)

36.33 36.0049 6mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluHDPE Pipes

HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)

691.67 696.6750 100mroll

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluABS Pipes

ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 17.67 17.3351 5.8mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluPolytank

Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)

151.67 155.0052 No. 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluWash Hand Basin

Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)

42.33 42.0053 Set 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluWater Closets

Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without

65.33 65.3354 Item 30 Delivered

Water Closet Western Type - Baltimore, C-56Syphonic W.C. With S or P trap, With Cistern,

183.33 183.3355 Set 30 Delivered

Page 23 of9514 July 2012

Page 24: Standard Bm Monthly Report - 201205

Building Materials Prices for Kota Kinabalu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluStainless Steel Sink

Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)

83.33 85.0056 Item 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluNippon

Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)

96.67 100.0057 5Litres

30 Delivered

Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)

83.33 85.3358 5Litres

30 Delivered

Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)

42.67 42.6759 7Litres

30 Delivered

Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)

90.67 91.3360 5Litres

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluSquare Hollow Sections

Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)

2745.00 2800.0061 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluRectangular Hollow Sections

Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)

3660.00 3645.0062 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluUniversal Beams

Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)

3100.00 3100.0063 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluEqual Angles

Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)

2271.67 2278.3364 MT 30 Delivered

Page 24 of9514 July 2012

Page 25: Standard Bm Monthly Report - 201205

Building Materials Prices for Kota Kinabalu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Kota KinabaluPlywood

Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 75.00 75.0065 Piece 30 Delivered

Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)

151.67 153.3366 Piece 30 Delivered

Page 25 of9514 July 2012

Page 26: Standard Bm Monthly Report - 201205

Building Materials Prices for Kuching

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingOrdinary Portland Cement, bag

Ordinary Portland Cement, 50 kg bag - (30) 16.50 16.501 Bag 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingWhite Cement

White Cement 25kg per bag , collection in MT - (30) 840.00 840.002 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingGranite 3/4"

Granite Aggregate 3/4" - (30) 36.00 35.673 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingLimestone

Limestone Aggregates 3/4" 28.00 28.334 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingNormal River Sand

Normal River Sand - Delivery 33.33 34.005 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingFine River Sand

Fine River Sand for Plastering- Delivery 38.00 39.006 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingMild Steel Round Bar

Mild Steel Round Bar R10, MS146 - (30) 2650.00 2650.007 MT 30 Delivered

Mild Steel Round Bar R12, MS146 - (30) 2600.00 2600.008 MT 30 Delivered

Page 26 of9514 July 2012

Page 27: Standard Bm Monthly Report - 201205

Building Materials Prices for Kuching

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingMild Steel Round Bar

Mild Steel Round Bar R16, MS146 - (30) 2550.00 2550.009 MT 30 Delivered

Mild Steel Round Bar R20, MS146 - (30) 2550.00 2550.0010 MT 30 Delivered

Mild Steel Round Bars - R25, MS146 - (30) 2550.00 2550.0011 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingHigh Tensile Deformed Bar

High Tensile Deformed Bar Y10, MS146 - (30) 2700.00 2700.0012 MT 60 Delivered

High Tensile Deformed Bar Y12, MS146 - (30) 2650.00 2650.0013 MT 60 Delivered

High Tensile Deformed Bar Y16, MS146 - (30) 2550.00 2550.0014 MT 60 Delivered

High Tensile Deformed Bar Y20, MS146 - (30) 2550.00 2550.0015 MT 60 Delivered

High Tensile Deformed Bar Y25, MS146 - (30) 2550.00 2550.0016 MT 60 Delivered

High Tensile Deformed Bar Y32, MS146 - (30) 2550.00 2550.0017 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingBRC Fabric

BRC A6, MS145 7.00 7.0018 m2 30 Delivered

BRC A7, MS145 9.00 9.0019 m2 30 Delivered

BRC A8, MS145 12.00 12.0020 m2 30 Delivered

BRC A9, MS145 15.00 15.0021 m2 30 Delivered

Page 27 of9514 July 2012

Page 28: Standard Bm Monthly Report - 201205

Building Materials Prices for Kuching

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingBRC Fabric

BRC A10, MS145 19.00 19.0022 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingReady Mix Concrete-Granite

Ready Mix Concrete - Normal Mix - Grade 30,Granite

286.67 286.6723 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Granite

300.00 300.0024 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Granite

306.67 306.6725 m3 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingReady Mix Concrete-Sandstone

Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)

216.67 216.6726 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)

225.00 225.0027 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)

235.00 238.3328 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)

260.00 256.6729 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)

265.00 260.0030 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)

290.00 286.6731 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)

301.67 303.3332 m3 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingCommon Clay Bricks

Common Clay Bricks - Pallet 0.33 0.3333 Piece 30 Delivered

Page 28 of9514 July 2012

Page 29: Standard Bm Monthly Report - 201205

Building Materials Prices for Kuching

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingCement Sand Bricks

Cement Sand Bricks - Pallet -(30) 0.30 0.3034 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingConcrete Roof Tiles

Interlocking Concrete Tiles - Standard DuotoneColour, Shanta- (30)

1.29 1.2735 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingMetal Sheet Decking

MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)

56.33 57.0036 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingCorrugated Roofing Sheet

Corrugated Roofing Sheet- 76mm (3'') DoubleWidth, Grey 1065mm x 2440mm - (30)

31.33 32.3337 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingCeramic Floor Tiles

Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)

1.00 1.0038 Piece 30 Delivered

Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)

3.00 3.0039 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingHomogeneous Ceramic Tiles

Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)

3.00 3.0040 Piece 30 Delivered

Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)

4.30 4.3741 Piece 30 Delivered

Page 29 of9514 July 2012

Page 30: Standard Bm Monthly Report - 201205

Building Materials Prices for Kuching

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingPaver

Uni-Espave- 200mm x 190mm - (30) 1.00 1.0242 Piece 30 Delivered

Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.00 1.0043 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingPlain Cellulose Fibre

Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)

9.00 9.0044 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingGypsum Ceiling Board

Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)

7.77 8.0045 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingTimber door

Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)

316.67 319.3346 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingGI Pipes

Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)

57.67 57.3347 6mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingPVC Pipes

PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)

38.67 38.6748 6mrun

30 Delivered

Page 30 of9514 July 2012

Page 31: Standard Bm Monthly Report - 201205

Building Materials Prices for Kuching

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingHDPE Pipes

HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)

735.00 739.3349 100mroll

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingABS Pipes

ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 18.00 18.0050 5.8mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingPolytank

Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)

166.67 167.6751 No. 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingWash Hand Basin

Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)

65.00 66.0052 Set 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingWater Closets

Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without

68.00 68.6753 Item 30 Delivered

Water Closet Western Type - Camelot C - 74Washdown W.C With S-trap, With Cistern.White

206.67 207.6754 Set 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingStainless Steel Sink

Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)

78.67 79.3355 Item 30 Delivered

Page 31 of9514 July 2012

Page 32: Standard Bm Monthly Report - 201205

Building Materials Prices for Kuching

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingNippon

Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)

105.67 106.6756 5Litres

30 Delivered

Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)

85.00 85.0057 5Litres

30 Delivered

Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)

33.33 33.3358 7Litres

30 Delivered

Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)

80.00 80.0059 5Litres

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingSquare Hollow Sections

Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)

2816.67 2883.3360 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingRectangular Hollow Sections

Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)

3116.67 3150.0061 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingUniversal Beams

Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)

3466.67 3550.0062 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingEqual Angles

Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)

2916.67 2976.6763 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingPlywood

Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 70.00 71.6764 Piece 30 Delivered

Page 32 of9514 July 2012

Page 33: Standard Bm Monthly Report - 201205

Building Materials Prices for Kuching

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

KuchingPlywood

Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)

166.00 169.3365 Piece 30 Delivered

Page 33 of9514 July 2012

Page 34: Standard Bm Monthly Report - 201205

Building Materials Prices for Miri

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriOrdinary Portland Cement, bag

Ordinary Portland Cement, 50 kg bag - (30) 17.00 17.001 Bag 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriWhite Cement

White Cement 25kg per bag , collection in MT - (30) 860.00 850.002 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriLimestone

Limestone Aggregates 3/4" 32.33 32.333 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriNormal River Sand

Normal River Sand - Delivery 32.00 31.674 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriFine River Sand

Fine River Sand for Plastering- Delivery 35.00 35.335 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriMild Steel Round Bar

Mild Steel Round Bar R10, MS146 - (30) 2650.00 2650.006 MT 30 Delivered

Mild Steel Round Bar R12, MS146 - (30) 2650.00 2650.007 MT 30 Delivered

Mild Steel Round Bar R16, MS146 - (30) 2600.00 2600.008 MT 30 Delivered

Mild Steel Round Bar R20, MS146 - (30) 2600.00 2600.009 MT 30 Delivered

Page 34 of9514 July 2012

Page 35: Standard Bm Monthly Report - 201205

Building Materials Prices for Miri

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriMild Steel Round Bar

Mild Steel Round Bars - R25, MS146 - (30) 2600.00 2600.0010 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriHigh Tensile Deformed Bar

High Tensile Deformed Bar Y10, MS146 - (30) 2750.00 2750.0011 MT 60 Delivered

High Tensile Deformed Bar Y12, MS146 - (30) 2700.00 2700.0012 MT 60 Delivered

High Tensile Deformed Bar Y16, MS146 - (30) 2650.00 2650.0013 MT 60 Delivered

High Tensile Deformed Bar Y20, MS146 - (30) 2650.00 2650.0014 MT 60 Delivered

High Tensile Deformed Bar Y25, MS146 - (30) 2650.00 2650.0015 MT 60 Delivered

High Tensile Deformed Bar Y32, MS146 - (30) 2650.00 2650.0016 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriBRC Fabric

BRC A6, MS145 8.50 8.5017 m2 30 Delivered

BRC A7, MS145 10.50 10.8318 m2 30 Delivered

BRC A8, MS145 13.50 13.5019 m2 30 Delivered

BRC A9, MS145 16.50 16.5020 m2 30 Delivered

BRC A10, MS145 20.50 21.0021 m2 30 Delivered

Page 35 of9514 July 2012

Page 36: Standard Bm Monthly Report - 201205

Building Materials Prices for Miri

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriReady Mix Concrete-Granite

Ready Mix Concrete - Normal Mix - Grade 30,Granite

305.00 311.6722 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Granite

323.33 325.0023 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Granite

335.00 335.0024 m3 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriReady Mix Concrete-Sandstone

Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)

236.67 240.0025 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)

245.00 250.0026 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)

251.67 260.0027 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)

262.67 273.3328 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)

275.33 285.0029 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)

287.67 295.0030 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)

308.33 310.0031 m3 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriCommon Clay Bricks

Common Clay Bricks - Pallet 0.35 0.3532 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriCement Sand Bricks

Cement Sand Bricks - Pallet -(30) 0.31 0.3133 Piece 30 Delivered

Page 36 of9514 July 2012

Page 37: Standard Bm Monthly Report - 201205

Building Materials Prices for Miri

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriConcrete Roof Tiles

Interlocking Concrete Tiles - Standard DuotoneColour, Shanta- (30)

1.40 1.4334 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriMetal Sheet Decking

MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)

53.33 53.6735 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriCorrugated Roofing Sheet

Corrugated Roofing Sheet- 76mm (3'') DoubleWidth, Grey 1065mm x 2440mm - (30)

33.33 33.6736 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriCeramic Floor Tiles

Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)

1.00 1.0037 Piece 30 Delivered

Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)

3.00 3.0038 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriHomogeneous Ceramic Tiles

Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)

3.23 3.2339 Piece 30 Delivered

Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)

4.73 4.7340 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriPaver

Uni-Espave- 200mm x 190mm - (30) 1.20 1.2041 Piece 30 Delivered

Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.03 1.0342 Piece 30 Delivered

Page 37 of9514 July 2012

Page 38: Standard Bm Monthly Report - 201205

Building Materials Prices for Miri

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriPaver

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriPlain Cellulose Fibre

Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)

9.60 9.6043 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriGypsum Ceiling Board

Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)

8.37 8.3744 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriTimber door

Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)

295.00 308.3345 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriGI Pipes

Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)

68.67 71.6746 6mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriPVC Pipes

PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)

45.00 45.3347 6mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriHDPE Pipes

HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)

758.33 755.0048 100mroll

30 Delivered

Page 38 of9514 July 2012

Page 39: Standard Bm Monthly Report - 201205

Building Materials Prices for Miri

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriABS Pipes

ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 18.00 18.0049 5.8mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriPolytank

Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)

169.33 169.3350 No. 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriWash Hand Basin

Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)

57.00 58.3351 Set 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriWater Closets

Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without

71.00 71.3352 Item 30 Delivered

Water Closet Western Type - Camelot C - 74Washdown W.C With S-trap, With Cistern.White

205.00 211.6753 Set 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriStainless Steel Sink

Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)

76.67 76.6754 Item 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriNippon

Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)

103.33 103.3355 5Litres

30 Delivered

Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)

85.33 85.3356 5Litres

30 Delivered

Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)

33.67 34.3357 7Litres

30 Delivered

Page 39 of9514 July 2012

Page 40: Standard Bm Monthly Report - 201205

Building Materials Prices for Miri

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriNippon

Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)

76.67 77.6758 5Litres

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriSquare Hollow Sections

Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)

2981.67 3100.0059 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriRectangular Hollow Sections

Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)

3083.33 3083.3360 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriUniversal Beams

Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)

3350.00 3383.3361 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriEqual Angles

Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)

2956.67 3050.0062 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

MiriPlywood

Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 75.00 75.0063 Piece 30 Delivered

Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)

167.67 170.0064 Piece 30 Delivered

Page 40 of9514 July 2012

Page 41: Standard Bm Monthly Report - 201205

Building Materials Prices for Pahang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangOrdinary Portland Cement, bag

Ordinary Portland Cement, 50 kg bag 17.37 17.371 Bag 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangOrdinary Portland Cement, bulk

Ordinary Portland Cement in bulk 330.00 330.002 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangWhite Cement

White Cement 40 kg per bag , collection in MT 744.00 744.003 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangGranite 3/4"

Granite Aggregate 3/4" 24.00 24.004 MT 60 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangNormal River Sand

Normal River Sand- Ex 9.00 9.005 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangFine River Sand

Fine River Sand for Plastering -Ex 11.00 11.006 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangNormal Mining Sand

Normal Mining Sand 16.33 16.337 MT 30 Ex-Factory

Page 41 of9514 July 2012

Page 42: Standard Bm Monthly Report - 201205

Building Materials Prices for Pahang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangFine Mining Sand

Fine Mining Sand for Plastering 21.33 21.338 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangMild Steel Round Bar

Mild Steel Round Bar R10, MS146 2656.67 2606.679 MT 60 Delivered

Mild Steel Round Bar R12, MS146 2606.67 2606.6710 MT 60 Delivered

Mild Steel Round Bar R16, MS146 2473.33 2456.6711 MT 60 Delivered

Mild Steel Round Bar R20, MS146 2556.67 2540.0012 MT 60 Delivered

Mild Steel Round Bar R22, MS146 2556.67 2540.0013 MT 60 Delivered

Mild Steel Round Bar R25, MS146 2556.67 2540.0014 MT 60 Delivered

Mild Steel Round Bar R32, MS146 2556.67 2540.0015 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangHigh Tensile Deformed Bar

High Tensile Deformed Bar-Y10, MS146 2573.33 2606.6716 MT 60 Delivered

High Tensile Deformed Bar - Y12, MS146 2606.67 2606.6717 MT 60 Delivered

High Tensile Deformed Bar- Y16, MS146 2473.33 2456.6718 MT 60 Delivered

High Tensile Deformed Bar - Y20, MS146 2473.33 2490.0019 MT 60 Delivered

High Tensile Deformed Bar- Y25, MS146 2473.33 2490.0020 MT 60 Delivered

Page 42 of9514 July 2012

Page 43: Standard Bm Monthly Report - 201205

Building Materials Prices for Pahang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangHigh Tensile Deformed Bar

High Tensile Deformed Bar- Y32, MS146 2473.33 2490.0021 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangBRC Fabric

BRC A6, MS145 6.47 6.4722 m2 30 Delivered

BRC A7, MS145 9.03 9.0323 m2 30 Delivered

BRC A8, MS145 11.48 11.4824 m2 30 Delivered

BRC A9, MS145 14.38 14.3825 m2 30 Delivered

BRC A10, MS145 18.03 18.0326 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangReady Mix Concrete-Granite

Ready Mix Concrete - Normal Mix - Grade 10,Granite

175.97 175.9727 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 15,Granite

181.47 181.4728 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 20,Granite

188.27 188.2729 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 25,Granite

194.20 194.2030 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 30,Granite

206.53 206.5331 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Granite

213.80 213.8032 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Granite

230.17 230.1733 m3 30 Delivered

Page 43 of9514 July 2012

Page 44: Standard Bm Monthly Report - 201205

Building Materials Prices for Pahang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangCommon Clay Bricks

Common Clay Bricks - Pallet 0.42 0.4534 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangCement Sand Bricks

Cement Sand Brick - Pallet 0.24 0.2435 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangSmooth Face Facing Bricks

Smooth Face Facing Brick, Red 1.20 1.2036 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangConcrete Roof Tiles

Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)

1.56 1.5637 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangMetal Sheet Decking

MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT

54.00 54.0038 m2 30 Delivered

MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT

57.63 57.6339 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangCorrugated Roofing Sheet

Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)

29.07 29.0740 Sheet 60 Delivered

Page 44 of9514 July 2012

Page 45: Standard Bm Monthly Report - 201205

Building Materials Prices for Pahang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangCeramic Floor Tiles

Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1

0.93 0.9341 Piece 60 Delivered

Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1

1.84 1.8442 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangHomogeneous Ceramic Tiles

Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1

1.34 1.3443 Piece 60 Delivered

Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1

2.31 2.3144 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangPaver

Uni-Espave - 200mm x 190mm 0.87 0.8745 Piece 60 Delivered

Uni-Pave/ Sunpave, 225mm x 112.5mm 0.84 0.8446 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangPlain Cellulose Fibre

Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)

3.85 3.8547 Sheet 60 Delivered

Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)

6.70 6.7048 Sheet 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangGypsum Ceiling Board

Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)

4.97 4.9749 Sheet 60 Delivered

Page 45 of9514 July 2012

Page 46: Standard Bm Monthly Report - 201205

Building Materials Prices for Pahang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangTimber door

Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM

195.33 195.3350 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangGI Pipes

Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863

35.93 35.9351 6mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangPVC Pipes

PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628

27.37 27.3752 4mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangHDPE Pipes

HDPE Pipe PN 10 - 50mm Diameter, MS1058 407.13 407.1353 100mroll

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangABS Pipes

ABS Pipe PN 15 Class E - 20mm, MS1419 23.00 23.0054 5.8mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangPolytank

Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant

120.67 120.6755 No. 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangWash Hand Basin

Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan

70.60 70.6056 Set 60 Delivered

Page 46 of9514 July 2012

Page 47: Standard Bm Monthly Report - 201205

Building Materials Prices for Pahang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangWater Closets

Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan

135.80 135.8057 Item 60 Delivered

Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse

55.53 55.5358 Item 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangStainless Steel Sink

Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''

84.47 84.4759 Item 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangNippon

Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish

100.27 100.2760 5Litres

60 Delivered

Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo

91.13 91.1361 5Litres

60 Delivered

Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex

31.77 31.7762 7Litres

60 Delivered

Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond

99.67 99.6763 5Litres

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangSquare Hollow Sections

Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)

3159.33 3159.3364 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangRectangular Hollow Sections

Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)

3277.33 3277.3365 MT 60 Delivered

Page 47 of9514 July 2012

Page 48: Standard Bm Monthly Report - 201205

Building Materials Prices for Pahang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangUniversal Beams

Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)

3234.67 3234.6766 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangEqual Angles

Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2533.33 2533.3367 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PahangPlywood

Plywood - Shuttering Board, 4' x 8' x 12mm 50.57 50.5768 Piece 60 Delivered

Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade

113.57 113.5769 Piece 60 Delivered

Page 48 of9514 July 2012

Page 49: Standard Bm Monthly Report - 201205

Building Materials Prices for Perak

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakOrdinary Portland Cement, bag

Ordinary Portland Cement, 50 kg bag 16.20 16.201 Bag 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakOrdinary Portland Cement, bulk

Ordinary Portland Cement in bulk 316.67 316.672 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakWhite Cement

White Cement 40 kg per bag , collection in MT 744.00 744.003 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakGranite 3/4"

Granite Aggregate 3/4" 22.67 22.674 MT 60 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakNormal River Sand

Normal River Sand- Ex 10.00 10.005 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakFine River Sand

Fine River Sand for Plastering -Ex 11.67 11.676 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakNormal Mining Sand

Normal Mining Sand 10.67 10.677 MT 30 Ex-Factory

Page 49 of9514 July 2012

Page 50: Standard Bm Monthly Report - 201205

Building Materials Prices for Perak

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakFine Mining Sand

Fine Mining Sand for Plastering 11.67 11.678 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakMild Steel Round Bar

Mild Steel Round Bar R10, MS146 2590.00 2590.009 MT 60 Delivered

Mild Steel Round Bar R12, MS146 2590.00 2590.0010 MT 60 Delivered

Mild Steel Round Bar R16, MS146 2456.67 2406.6711 MT 60 Delivered

Mild Steel Round Bar R20, MS146 2540.00 2540.0012 MT 60 Delivered

Mild Steel Round Bar R22, MS146 2540.00 2540.0013 MT 60 Delivered

Mild Steel Round Bar R25, MS146 2540.00 2540.0014 MT 60 Delivered

Mild Steel Round Bar R32, MS146 2540.00 2540.0015 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakHigh Tensile Deformed Bar

High Tensile Deformed Bar-Y10, MS146 2590.00 2590.0016 MT 60 Delivered

High Tensile Deformed Bar - Y12, MS146 2590.00 2590.0017 MT 60 Delivered

High Tensile Deformed Bar- Y16, MS146 2456.67 2406.6718 MT 60 Delivered

High Tensile Deformed Bar - Y20, MS146 2506.67 2506.6719 MT 60 Delivered

High Tensile Deformed Bar- Y25, MS146 2456.67 2456.6720 MT 60 Delivered

Page 50 of9514 July 2012

Page 51: Standard Bm Monthly Report - 201205

Building Materials Prices for Perak

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakHigh Tensile Deformed Bar

High Tensile Deformed Bar- Y32, MS146 2456.67 2456.6721 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakBRC Fabric

BRC A6, MS145 6.03 6.1322 m2 30 Delivered

BRC A7, MS145 8.21 8.3523 m2 30 Delivered

BRC A8, MS145 10.75 10.9324 m2 30 Delivered

BRC A9, MS145 13.56 13.7825 m2 30 Delivered

BRC A10, MS145 16.70 16.9826 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakReady Mix Concrete-Granite

Ready Mix Concrete - Normal Mix - Grade 10,Granite

164.60 164.6027 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 15,Granite

172.40 172.4028 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 20,Granite

175.87 175.8729 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 25,Granite

182.80 182.8030 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 30,Granite

194.77 194.7731 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Granite

206.73 206.7332 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Granite

214.43 214.4333 m3 30 Delivered

Page 51 of9514 July 2012

Page 52: Standard Bm Monthly Report - 201205

Building Materials Prices for Perak

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakCommon Clay Bricks

Common Clay Bricks - Pallet 0.40 0.4034 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakCement Sand Bricks

Cement Sand Brick - Pallet 0.24 0.2435 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakSmooth Face Facing Bricks

Smooth Face Facing Brick, Red 1.20 1.2036 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakConcrete Roof Tiles

Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)

1.67 1.6737 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakMetal Sheet Decking

MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT

52.90 52.9038 m2 30 Delivered

MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT

56.23 56.2339 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakCorrugated Roofing Sheet

Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)

27.73 27.7340 Sheet 60 Delivered

Page 52 of9514 July 2012

Page 53: Standard Bm Monthly Report - 201205

Building Materials Prices for Perak

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakCeramic Floor Tiles

Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1

0.93 0.9341 Piece 60 Delivered

Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1

1.84 1.8442 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakHomogeneous Ceramic Tiles

Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1

1.34 1.3143 Piece 60 Delivered

Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1

2.51 2.3144 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakPaver

Uni-Espave - 200mm x 190mm 0.90 0.8745 Piece 60 Delivered

Uni-Pave/ Sunpave, 225mm x 112.5mm 0.84 0.8446 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakPlain Cellulose Fibre

Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)

3.85 3.8547 Sheet 60 Delivered

Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)

6.48 6.4848 Sheet 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakGypsum Ceiling Board

Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)

4.97 4.9749 Sheet 60 Delivered

Page 53 of9514 July 2012

Page 54: Standard Bm Monthly Report - 201205

Building Materials Prices for Perak

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakTimber door

Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM

195.33 195.3350 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakGI Pipes

Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863

37.23 37.2351 6mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakPVC Pipes

PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628

26.00 26.8352 4mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakHDPE Pipes

HDPE Pipe PN 10 - 50mm Diameter, MS1058 406.23 406.2353 100mroll

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakABS Pipes

ABS Pipe PN 15 Class E - 20mm, MS1419 23.13 23.1354 5.8mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakPolytank

Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant

120.90 120.9055 No. 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakWash Hand Basin

Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan

76.47 76.4756 Set 60 Delivered

Page 54 of9514 July 2012

Page 55: Standard Bm Monthly Report - 201205

Building Materials Prices for Perak

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakWater Closets

Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan

141.80 141.8057 Item 60 Delivered

Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse

54.17 54.1758 Item 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakStainless Steel Sink

Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''

82.57 82.5759 Item 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakNippon

Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish

98.27 98.2760 5Litres

60 Delivered

Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo

91.07 91.0761 5Litres

60 Delivered

Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex

31.43 31.4362 7Litres

60 Delivered

Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond

96.67 96.6763 5Litres

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakSquare Hollow Sections

Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)

3154.33 3154.3364 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakRectangular Hollow Sections

Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)

3245.33 3245.3365 MT 60 Delivered

Page 55 of9514 July 2012

Page 56: Standard Bm Monthly Report - 201205

Building Materials Prices for Perak

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakUniversal Beams

Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)

3234.67 3234.6766 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakEqual Angles

Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2533.33 2533.3367 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

PerakPlywood

Plywood - Shuttering Board, 4' x 8' x 12mm 52.27 52.2768 Piece 60 Delivered

Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade

118.33 118.3369 Piece 60 Delivered

Page 56 of9514 July 2012

Page 57: Standard Bm Monthly Report - 201205

Building Materials Prices for Pulau Pinang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangOrdinary Portland Cement, bag

Ordinary Portland Cement, 50 kg bag 15.87 15.871 Bag 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangOrdinary Portland Cement, bulk

Ordinary Portland Cement in bulk 316.67 316.672 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangWhite Cement

White Cement 40 kg per bag , collection in MT 744.00 744.003 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangGranite 3/4"

Granite Aggregate 3/4" 23.33 23.334 MT 60 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangNormal River Sand

Normal River Sand- Ex 14.00 14.005 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangFine River Sand

Fine River Sand for Plastering -Ex 18.00 18.006 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangNormal Mining Sand

Normal Mining Sand 17.33 17.337 MT 30 Ex-Factory

Page 57 of9514 July 2012

Page 58: Standard Bm Monthly Report - 201205

Building Materials Prices for Pulau Pinang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangFine Mining Sand

Fine Mining Sand for Plastering 15.67 15.678 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangMild Steel Round Bar

Mild Steel Round Bar R10, MS146 2573.33 2590.009 MT 60 Delivered

Mild Steel Round Bar R12, MS146 2573.33 2590.0010 MT 60 Delivered

Mild Steel Round Bar R16, MS146 2473.33 2456.6711 MT 60 Delivered

Mild Steel Round Bar R20, MS146 2523.33 2540.0012 MT 60 Delivered

Mild Steel Round Bar R22, MS146 2523.33 2540.0013 MT 60 Delivered

Mild Steel Round Bar R25, MS146 2523.33 2540.0014 MT 60 Delivered

Mild Steel Round Bar R32, MS146 2573.33 2556.6715 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangHigh Tensile Deformed Bar

High Tensile Deformed Bar-Y10, MS146 2556.67 2506.6716 MT 60 Delivered

High Tensile Deformed Bar - Y12, MS146 2590.00 2590.0017 MT 60 Delivered

High Tensile Deformed Bar- Y16, MS146 2456.67 2506.6718 MT 60 Delivered

High Tensile Deformed Bar - Y20, MS146 2456.67 2456.6719 MT 60 Delivered

High Tensile Deformed Bar- Y25, MS146 2456.67 2456.6720 MT 60 Delivered

Page 58 of9514 July 2012

Page 59: Standard Bm Monthly Report - 201205

Building Materials Prices for Pulau Pinang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangHigh Tensile Deformed Bar

High Tensile Deformed Bar- Y32, MS146 2456.67 2456.6721 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangBRC Fabric

BRC A6, MS145 6.03 6.1322 m2 30 Delivered

BRC A7, MS145 8.21 8.3623 m2 30 Delivered

BRC A8, MS145 10.75 10.9324 m2 30 Delivered

BRC A9, MS145 13.56 13.7825 m2 30 Delivered

BRC A10, MS145 16.70 16.9826 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangReady Mix Concrete-Granite

Ready Mix Concrete - Normal Mix - Grade 10,Granite

174.47 174.4727 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 15,Granite

188.27 188.2728 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 20,Granite

190.40 190.0729 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 25,Granite

198.33 198.3330 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 30,Granite

208.30 208.3031 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Granite

219.27 219.2732 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Granite

231.97 231.9733 m3 30 Delivered

Page 59 of9514 July 2012

Page 60: Standard Bm Monthly Report - 201205

Building Materials Prices for Pulau Pinang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangCommon Clay Bricks

Common Clay Bricks - Pallet 0.39 0.3934 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangCement Sand Bricks

Cement Sand Brick - Pallet 0.22 0.2235 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangSmooth Face Facing Bricks

Smooth Face Facing Brick, Red 1.18 1.1836 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangConcrete Roof Tiles

Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)

1.61 1.6137 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangMetal Sheet Decking

MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT

50.60 50.6038 m2 30 Delivered

MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT

55.13 55.1339 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangCorrugated Roofing Sheet

Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)

27.73 27.7340 Sheet 60 Delivered

Page 60 of9514 July 2012

Page 61: Standard Bm Monthly Report - 201205

Building Materials Prices for Pulau Pinang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangCeramic Floor Tiles

Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1

0.93 0.9141 Piece 60 Delivered

Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1

1.84 1.8442 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangHomogeneous Ceramic Tiles

Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1

1.34 1.3443 Piece 60 Delivered

Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1

2.31 2.3144 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangPaver

Uni-Espave - 200mm x 190mm 0.87 0.8745 Piece 60 Delivered

Uni-Pave/ Sunpave, 225mm x 112.5mm 0.82 0.8246 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangPlain Cellulose Fibre

Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)

3.85 3.8547 Sheet 60 Delivered

Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)

6.70 6.7048 Sheet 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangGypsum Ceiling Board

Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)

4.97 4.9749 Sheet 60 Delivered

Page 61 of9514 July 2012

Page 62: Standard Bm Monthly Report - 201205

Building Materials Prices for Pulau Pinang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangTimber door

Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM

212.00 212.0050 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangGI Pipes

Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863

36.27 36.2751 6mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangPVC Pipes

PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628

25.83 25.8352 4mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangHDPE Pipes

HDPE Pipe PN 10 - 50mm Diameter, MS1058 401.57 406.9053 100mroll

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangABS Pipes

ABS Pipe PN 15 Class E - 20mm, MS1419 22.27 22.2754 5.8mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangPolytank

Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant

120.90 120.9055 No. 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangWash Hand Basin

Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan

71.47 71.4756 Set 60 Delivered

Page 62 of9514 July 2012

Page 63: Standard Bm Monthly Report - 201205

Building Materials Prices for Pulau Pinang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangWater Closets

Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan

139.10 139.1057 Item 60 Delivered

Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse

54.17 54.1758 Item 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangStainless Steel Sink

Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''

82.57 82.5759 Item 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangNippon

Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish

96.33 96.3360 5Litres

60 Delivered

Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo

88.73 88.7361 5Litres

60 Delivered

Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex

31.43 31.4362 7Litres

60 Delivered

Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond

95.47 95.4763 5Litres

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangSquare Hollow Sections

Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)

3147.67 3147.6764 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangRectangular Hollow Sections

Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)

3189.33 3189.3365 MT 60 Delivered

Page 63 of9514 July 2012

Page 64: Standard Bm Monthly Report - 201205

Building Materials Prices for Pulau Pinang

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangUniversal Beams

Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)

3361.00 3294.3366 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangEqual Angles

Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2562.67 2562.6767 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

Pulau PinangPlywood

Plywood - Shuttering Board, 4' x 8' x 12mm 50.60 51.6068 Piece 60 Delivered

Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade

118.33 118.3369 Piece 60 Delivered

Page 64 of9514 July 2012

Page 65: Standard Bm Monthly Report - 201205

Building Materials Prices for Sandakan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanOrdinary Portland Cement, bag

Ordinary Portland Cement, 50 kg bag - (30) 17.20 17.201 Bag 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanWhite Cement

White Cement 25kg per bag , collection in MT - (30) 880.00 880.002 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanGranite 3/4"

Granite Aggregate 3/4" - (30) 52.00 52.003 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanSandstone

Sandstone Aggregates 3/4" 36.33 36.334 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanNormal River Sand

Normal River Sand - Delivery 35.00 35.005 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanFine River Sand

Fine River Sand for Plastering- Delivery 38.00 38.006 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanMild Steel Round Bar

Mild Steel Round Bar R10, MS146 - (30) 2750.00 2750.007 MT 30 Delivered

Mild Steel Round Bar R12, MS146 - (30) 2700.00 2700.008 MT 30 Delivered

Page 65 of9514 July 2012

Page 66: Standard Bm Monthly Report - 201205

Building Materials Prices for Sandakan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanMild Steel Round Bar

Mild Steel Round Bar R16, MS146 - (30) 2650.00 2650.009 MT 30 Delivered

Mild Steel Round Bar R20, MS146 - (30) 2650.00 2650.0010 MT 30 Delivered

Mild Steel Round Bars - R25, MS146 - (30) 2650.00 2650.0011 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanHigh Tensile Deformed Bar

High Tensile Deformed Bar Y10, MS146 - (30) 2800.00 2800.0012 MT 60 Delivered

High Tensile Deformed Bar Y12, MS146 - (30) 2750.00 2750.0013 MT 60 Delivered

High Tensile Deformed Bar Y16, MS146 - (30) 2700.00 2700.0014 MT 60 Delivered

High Tensile Deformed Bar Y20, MS146 - (30) 2700.00 2700.0015 MT 60 Delivered

High Tensile Deformed Bar Y25, MS146 - (30) 2700.00 2700.0016 MT 60 Delivered

High Tensile Deformed Bar Y32, MS146 - (30) 2700.00 2700.0017 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanBRC Fabric

BRC A6, MS145 8.00 8.0018 m2 30 Delivered

BRC A7, MS145 11.00 11.0019 m2 30 Delivered

BRC A8, MS145 14.00 14.0020 m2 30 Delivered

BRC A9, MS145 18.00 18.0021 m2 30 Delivered

Page 66 of9514 July 2012

Page 67: Standard Bm Monthly Report - 201205

Building Materials Prices for Sandakan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanBRC Fabric

BRC A10, MS145 22.00 22.0022 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanReady Mix Concrete-Granite

Ready Mix Concrete - Normal Mix - Grade 30,Granite

297.00 297.0023 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Granite

311.67 311.6724 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Granite

321.67 321.6725 m3 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanReady Mix Concrete-Sandstone

Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)

236.67 236.6726 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)

258.33 258.3327 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)

275.00 275.0028 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)

288.33 288.3329 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)

300.00 300.0030 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)

301.67 300.0031 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)

310.00 311.6732 m3 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanCommon Clay Bricks

Common Clay Bricks - Pallet 0.35 0.3533 Piece 30 Delivered

Page 67 of9514 July 2012

Page 68: Standard Bm Monthly Report - 201205

Building Materials Prices for Sandakan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanCement Sand Bricks

Cement Sand Bricks - Pallet -(30) 0.32 0.3234 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanConcrete Roof Tiles

Interlocking Concrete Tiles - Standard DuotoneColour, Local Product - (30)

1.68 1.6835 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanMetal Sheet Decking

MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)

58.67 58.6736 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanCorrugated Roofing Sheet

Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm (Hume/Malex/UAC) - (30)

33.67 33.6737 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanCeramic Floor Tiles

Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)

1.70 1.7038 Piece 30 Delivered

Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)

3.57 3.5339 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanHomogeneous Ceramic Tiles

Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)

3.00 3.0040 Piece 30 Delivered

Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)

5.60 5.5341 Piece 30 Delivered

Page 68 of9514 July 2012

Page 69: Standard Bm Monthly Report - 201205

Building Materials Prices for Sandakan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanPaver

Uni-Espave- 200mm x 190mm - (30) 1.20 1.2042 Piece 30 Delivered

Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.00 1.0043 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanPlain Cellulose Fibre

Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)

9.53 9.5344 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanGypsum Ceiling Board

Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)

8.00 8.0045 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanTimber door

Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)

274.33 276.6746 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanGI Pipes

Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)

66.33 66.6747 6mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanPVC Pipes

PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)

42.33 42.3348 6mrun

30 Delivered

Page 69 of9514 July 2012

Page 70: Standard Bm Monthly Report - 201205

Building Materials Prices for Sandakan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanHDPE Pipes

HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)

706.67 711.6749 100mroll

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanABS Pipes

ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 20.33 20.0050 5.8mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanPolytank

Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)

177.00 178.0051 No. 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanWash Hand Basin

Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)

46.67 46.3352 Set 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanWater Closets

Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without

65.33 65.3353 Item 30 Delivered

Water Closet Western Type - Baltimore, C-56Syphonic W.C. With S or P trap, With Cistern,

182.33 182.3354 Set 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanStainless Steel Sink

Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)

87.00 87.6755 Item 30 Delivered

Page 70 of9514 July 2012

Page 71: Standard Bm Monthly Report - 201205

Building Materials Prices for Sandakan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanNippon

Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)

97.67 98.6756 5Litres

30 Delivered

Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)

83.33 83.3357 5Litres

30 Delivered

Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)

45.33 45.3358 7Litres

30 Delivered

Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)

98.33 99.0059 5Litres

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanSquare Hollow Sections

Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)

2851.67 2933.3360 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanRectangular Hollow Sections

Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)

3593.33 3600.0061 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanUniversal Beams

Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)

3216.67 3266.6762 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanEqual Angles

Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)

2066.67 2133.3363 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanPlywood

Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 70.00 73.3364 Piece 30 Delivered

Page 71 of9514 July 2012

Page 72: Standard Bm Monthly Report - 201205

Building Materials Prices for Sandakan

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SandakanPlywood

Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)

169.33 170.0065 Piece 30 Delivered

Page 72 of9514 July 2012

Page 73: Standard Bm Monthly Report - 201205

Building Materials Prices for Selangor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorOrdinary Portland Cement, bag

Ordinary Portland Cement, 50 kg bag 16.53 16.531 Bag 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorOrdinary Portland Cement, bulk

Ordinary Portland Cement in bulk 320.00 320.002 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorWhite Cement

White Cement 40 kg per bag , collection in MT 744.00 744.003 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorGranite 3/4"

Granite Aggregate 3/4" 23.00 23.004 MT 60 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorNormal River Sand

Normal River Sand- Ex 21.00 21.335 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorFine River Sand

Fine River Sand for Plastering -Ex 24.67 24.676 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorNormal Mining Sand

Normal Mining Sand 20.67 20.677 MT 30 Ex-Factory

Page 73 of9514 July 2012

Page 74: Standard Bm Monthly Report - 201205

Building Materials Prices for Selangor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorFine Mining Sand

Fine Mining Sand for Plastering 24.33 23.678 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorMild Steel Round Bar

Mild Steel Round Bar R10, MS146 2590.00 2583.339 MT 60 Delivered

Mild Steel Round Bar R12, MS146 2590.00 2583.3310 MT 60 Delivered

Mild Steel Round Bar R16, MS146 2490.00 2440.0011 MT 60 Delivered

Mild Steel Round Bar R20, MS146 2573.33 2573.3312 MT 60 Delivered

Mild Steel Round Bar R22, MS146 2573.33 2573.3313 MT 60 Delivered

Mild Steel Round Bar R25, MS146 2540.00 2540.0014 MT 60 Delivered

Mild Steel Round Bar R32, MS146 2540.00 2540.0015 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorHigh Tensile Deformed Bar

High Tensile Deformed Bar-Y10, MS146 2590.00 2540.0016 MT 60 Delivered

High Tensile Deformed Bar - Y12, MS146 2590.00 2590.0017 MT 60 Delivered

High Tensile Deformed Bar- Y16, MS146 2456.67 2456.6718 MT 60 Delivered

High Tensile Deformed Bar - Y20, MS146 2456.67 2456.6719 MT 60 Delivered

High Tensile Deformed Bar- Y25, MS146 2456.67 2456.6720 MT 60 Delivered

Page 74 of9514 July 2012

Page 75: Standard Bm Monthly Report - 201205

Building Materials Prices for Selangor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorHigh Tensile Deformed Bar

High Tensile Deformed Bar- Y32, MS146 2456.67 2456.6721 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorBRC Fabric

BRC A6, MS145 6.32 6.3222 m2 30 Delivered

BRC A7, MS145 8.48 8.4923 m2 30 Delivered

BRC A8, MS145 10.89 10.8824 m2 30 Delivered

BRC A9, MS145 14.58 14.5725 m2 30 Delivered

BRC A10, MS145 17.07 17.0626 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorReady Mix Concrete-Granite

Ready Mix Concrete - Normal Mix - Grade 10,Granite

173.97 173.9727 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 15,Granite

179.47 179.4728 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 20,Granite

185.60 185.6029 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 25,Granite

193.60 193.9330 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 30,Granite

204.63 204.6331 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Granite

215.47 214.1332 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Granite

218.80 218.8033 m3 30 Delivered

Page 75 of9514 July 2012

Page 76: Standard Bm Monthly Report - 201205

Building Materials Prices for Selangor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorCommon Clay Bricks

Common Clay Bricks - Pallet 0.39 0.3834 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorCement Sand Bricks

Cement Sand Brick - Pallet 0.21 0.2535 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorSmooth Face Facing Bricks

Smooth Face Facing Brick, Red 1.17 1.2036 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorConcrete Roof Tiles

Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)

1.54 1.3037 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorMetal Sheet Decking

MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT

50.43 51.7338 m2 30 Delivered

MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT

55.17 55.1739 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorCorrugated Roofing Sheet

Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)

24.83 27.7340 Sheet 60 Delivered

Page 76 of9514 July 2012

Page 77: Standard Bm Monthly Report - 201205

Building Materials Prices for Selangor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorCeramic Floor Tiles

Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1

0.98 0.9741 Piece 60 Delivered

Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1

1.96 1.9042 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorHomogeneous Ceramic Tiles

Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1

1.34 1.3443 Piece 60 Delivered

Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1

2.51 2.3744 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorPaver

Uni-Espave - 200mm x 190mm 0.91 0.8945 Piece 60 Delivered

Uni-Pave/ Sunpave, 225mm x 112.5mm 0.84 0.8446 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorPlain Cellulose Fibre

Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)

4.07 3.9247 Sheet 60 Delivered

Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)

6.92 6.5248 Sheet 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorGypsum Ceiling Board

Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)

4.97 4.9749 Sheet 60 Delivered

Page 77 of9514 July 2012

Page 78: Standard Bm Monthly Report - 201205

Building Materials Prices for Selangor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorTimber door

Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM

190.33 195.3350 Piece 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorGI Pipes

Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863

36.40 35.4051 6mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorPVC Pipes

PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628

24.38 28.1352 4mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorHDPE Pipes

HDPE Pipe PN 10 - 50mm Diameter, MS1058 402.57 406.2353 100mroll

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorABS Pipes

ABS Pipe PN 15 Class E - 20mm, MS1419 20.20 20.3754 5.8mrun

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorPolytank

Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant

104.30 107.7355 No. 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorWash Hand Basin

Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan

76.63 76.6356 Set 60 Delivered

Page 78 of9514 July 2012

Page 79: Standard Bm Monthly Report - 201205

Building Materials Prices for Selangor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorWater Closets

Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan

133.90 138.2357 Item 60 Delivered

Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse

54.47 55.3058 Item 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorStainless Steel Sink

Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''

83.23 83.2359 Item 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorNippon

Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish

95.17 96.3360 5Litres

60 Delivered

Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo

88.07 87.0761 5Litres

60 Delivered

Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex

30.42 31.4362 7Litres

60 Delivered

Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond

94.60 97.4763 5Litres

60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorSquare Hollow Sections

Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)

3077.33 3144.0064 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorRectangular Hollow Sections

Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)

3181.67 3248.3365 MT 60 Delivered

Page 79 of9514 July 2012

Page 80: Standard Bm Monthly Report - 201205

Building Materials Prices for Selangor

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorUniversal Beams

Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)

3251.33 3234.6766 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorEqual Angles

Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2528.33 2545.0067 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SelangorPlywood

Plywood - Shuttering Board, 4' x 8' x 12mm 51.27 54.6068 Piece 60 Delivered

Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade

123.67 118.0069 Piece 60 Delivered

Page 80 of9514 July 2012

Page 81: Standard Bm Monthly Report - 201205

Building Materials Prices for Sibu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuOrdinary Portland Cement, bag

Ordinary Portland Cement, 50 kg bag - (30) 16.50 16.501 Bag 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuWhite Cement

White Cement 25kg per bag , collection in MT - (30) 830.00 836.672 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuLimestone

Limestone Aggregates 3/4" 31.33 31.333 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuNormal River Sand

Normal River Sand - Delivery 32.00 32.004 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuFine River Sand

Fine River Sand for Plastering- Delivery 33.00 33.005 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuMild Steel Round Bar

Mild Steel Round Bar R10, MS146 - (30) 2700.00 2700.006 MT 30 Delivered

Mild Steel Round Bar R12, MS146 - (30) 2650.00 2650.007 MT 30 Delivered

Mild Steel Round Bar R16, MS146 - (30) 2600.00 2600.008 MT 30 Delivered

Mild Steel Round Bar R20, MS146 - (30) 2600.00 2600.009 MT 30 Delivered

Page 81 of9514 July 2012

Page 82: Standard Bm Monthly Report - 201205

Building Materials Prices for Sibu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuMild Steel Round Bar

Mild Steel Round Bars - R25, MS146 - (30) 2600.00 2600.0010 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuHigh Tensile Deformed Bar

High Tensile Deformed Bar Y10, MS146 - (30) 2750.00 2750.0011 MT 60 Delivered

High Tensile Deformed Bar Y12, MS146 - (30) 2700.00 2700.0012 MT 60 Delivered

High Tensile Deformed Bar Y16, MS146 - (30) 2650.00 2650.0013 MT 60 Delivered

High Tensile Deformed Bar Y20, MS146 - (30) 2650.00 2650.0014 MT 60 Delivered

High Tensile Deformed Bar Y25, MS146 - (30) 2650.00 2650.0015 MT 60 Delivered

High Tensile Deformed Bar Y32, MS146 - (30) 2650.00 2650.0016 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuBRC Fabric

BRC A6, MS145 7.50 7.5017 m2 30 Delivered

BRC A7, MS145 10.17 10.1718 m2 30 Delivered

BRC A8, MS145 12.50 12.5019 m2 30 Delivered

BRC A9, MS145 15.50 15.5020 m2 30 Delivered

BRC A10, MS145 20.00 20.0021 m2 30 Delivered

Page 82 of9514 July 2012

Page 83: Standard Bm Monthly Report - 201205

Building Materials Prices for Sibu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuReady Mix Concrete-Granite

Ready Mix Concrete - Normal Mix - Grade 30,Granite

298.33 300.0022 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Granite

315.00 320.0023 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Granite

311.67 320.0024 m3 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuReady Mix Concrete-Sandstone

Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)

226.67 228.3325 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)

241.67 246.6726 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)

243.33 243.3327 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)

258.33 258.3328 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)

265.00 266.6729 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)

281.67 281.6730 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)

308.33 308.3331 m3 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuCommon Clay Bricks

Common Clay Bricks - Pallet 0.34 0.3432 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuCement Sand Bricks

Cement Sand Bricks - Pallet -(30) 0.30 0.3033 Piece 30 Delivered

Page 83 of9514 July 2012

Page 84: Standard Bm Monthly Report - 201205

Building Materials Prices for Sibu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuConcrete Roof Tiles

Interlocking Concrete Tiles - Standard DuotoneColour, Shanta- (30)

1.33 1.3234 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuMetal Sheet Decking

MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)

54.67 54.6735 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuCorrugated Roofing Sheet

Corrugated Roofing Sheet- 76mm (3'') DoubleWidth, Grey 1065mm x 2440mm - (30)

31.33 31.3336 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuCeramic Floor Tiles

Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)

1.00 1.0037 Piece 30 Delivered

Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)

3.00 3.0038 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuHomogeneous Ceramic Tiles

Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)

3.00 3.0039 Piece 30 Delivered

Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)

4.60 4.6040 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuPaver

Uni-Espave- 200mm x 190mm - (30) 1.20 1.2041 Piece 30 Delivered

Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.00 1.0042 Piece 30 Delivered

Page 84 of9514 July 2012

Page 85: Standard Bm Monthly Report - 201205

Building Materials Prices for Sibu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuPaver

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuPlain Cellulose Fibre

Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)

9.50 9.5043 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuGypsum Ceiling Board

Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)

8.00 8.0044 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuTimber door

Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)

275.00 278.3345 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuGI Pipes

Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)

64.67 65.0046 6mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuPVC Pipes

PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)

41.67 42.0047 6mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuHDPE Pipes

HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)

726.67 728.3348 100mroll

30 Delivered

Page 85 of9514 July 2012

Page 86: Standard Bm Monthly Report - 201205

Building Materials Prices for Sibu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuABS Pipes

ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 17.00 17.0049 5.8mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuPolytank

Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)

168.00 168.0050 No. 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuWash Hand Basin

Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)

53.67 54.3351 Set 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuWater Closets

Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without

64.67 65.0052 Item 30 Delivered

Water Closet Western Type - Camelot C - 74Washdown W.C With S-trap, With Cistern.White

199.67 200.0053 Set 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuStainless Steel Sink

Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)

73.00 72.3354 Item 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuNippon

Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)

98.67 100.0055 5Litres

30 Delivered

Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)

83.67 85.0056 5Litres

30 Delivered

Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)

32.67 32.3357 7Litres

30 Delivered

Page 86 of9514 July 2012

Page 87: Standard Bm Monthly Report - 201205

Building Materials Prices for Sibu

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuNippon

Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)

75.00 75.0058 5Litres

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuSquare Hollow Sections

Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)

3050.00 3050.0059 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuRectangular Hollow Sections

Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)

3033.33 3033.3360 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuUniversal Beams

Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)

3183.33 3200.0061 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuEqual Angles

Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)

2833.33 2883.3362 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

SibuPlywood

Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 68.33 70.6763 Piece 30 Delivered

Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)

157.67 160.0064 Piece 30 Delivered

Page 87 of9514 July 2012

Page 88: Standard Bm Monthly Report - 201205

Building Materials Prices for Tawau

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauOrdinary Portland Cement, bag

Ordinary Portland Cement, 50 kg bag - (30) 17.00 17.001 Bag 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauWhite Cement

White Cement 25kg per bag , collection in MT - (30) 880.00 880.002 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauGranite 3/4"

Granite Aggregate 3/4" - (30) 55.67 56.003 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauSandstone

Sandstone Aggregates 3/4" 36.33 37.004 MT 30 Ex-Factory

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauNormal River Sand

Normal River Sand - Delivery 32.67 32.675 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauFine River Sand

Fine River Sand for Plastering- Delivery 37.00 37.006 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauMild Steel Round Bar

Mild Steel Round Bar R10, MS146 - (30) 2750.00 2750.007 MT 30 Delivered

Mild Steel Round Bar R12, MS146 - (30) 2700.00 2700.008 MT 30 Delivered

Page 88 of9514 July 2012

Page 89: Standard Bm Monthly Report - 201205

Building Materials Prices for Tawau

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauMild Steel Round Bar

Mild Steel Round Bar R16, MS146 - (30) 2650.00 2650.009 MT 30 Delivered

Mild Steel Round Bar R20, MS146 - (30) 2650.00 2650.0010 MT 30 Delivered

Mild Steel Round Bars - R25, MS146 - (30) 2650.00 2650.0011 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauHigh Tensile Deformed Bar

High Tensile Deformed Bar Y10, MS146 - (30) 2800.00 2800.0012 MT 60 Delivered

High Tensile Deformed Bar Y12, MS146 - (30) 2750.00 2750.0013 MT 60 Delivered

High Tensile Deformed Bar Y16, MS146 - (30) 2700.00 2700.0014 MT 60 Delivered

High Tensile Deformed Bar Y20, MS146 - (30) 2700.00 2700.0015 MT 60 Delivered

High Tensile Deformed Bar Y25, MS146 - (30) 2700.00 2700.0016 MT 60 Delivered

High Tensile Deformed Bar Y32, MS146 - (30) 2700.00 2700.0017 MT 60 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauBRC Fabric

BRC A6, MS145 8.00 8.0018 m2 30 Delivered

BRC A7, MS145 11.00 11.0019 m2 30 Delivered

BRC A8, MS145 14.00 14.0020 m2 30 Delivered

BRC A9, MS145 16.50 16.5021 m2 30 Delivered

Page 89 of9514 July 2012

Page 90: Standard Bm Monthly Report - 201205

Building Materials Prices for Tawau

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauBRC Fabric

BRC A10, MS145 23.00 23.0022 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauReady Mix Concrete-Granite

Ready Mix Concrete - Normal Mix - Grade 30,Granite

293.33 293.3323 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Granite

308.33 308.3324 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Granite

316.67 318.3325 m3 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauReady Mix Concrete-Sandstone

Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)

266.67 270.0026 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)

273.33 273.3327 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)

278.33 278.3328 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)

290.00 290.0029 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)

308.33 306.6730 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)

320.00 320.0031 m3 30 Delivered

Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)

325.00 330.0032 m3 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauCommon Clay Bricks

Common Clay Bricks - Pallet 0.35 0.3533 Piece 30 Delivered

Page 90 of9514 July 2012

Page 91: Standard Bm Monthly Report - 201205

Building Materials Prices for Tawau

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauCement Sand Bricks

Cement Sand Bricks - Pallet -(30) 0.32 0.3234 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauConcrete Roof Tiles

Interlocking Concrete Tiles - Standard DuotoneColour, Local Product - (30)

1.70 1.7035 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauMetal Sheet Decking

MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)

58.00 58.6736 m2 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauCorrugated Roofing Sheet

Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm (Hume/Malex/UAC) - (30)

33.33 33.6737 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauCeramic Floor Tiles

Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)

1.68 1.6838 Piece 30 Delivered

Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)

3.53 3.5339 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauHomogeneous Ceramic Tiles

Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)

3.00 3.0040 Piece 30 Delivered

Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)

5.53 5.5741 Piece 30 Delivered

Page 91 of9514 July 2012

Page 92: Standard Bm Monthly Report - 201205

Building Materials Prices for Tawau

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauPaver

Uni-Espave- 200mm x 190mm - (30) 1.30 1.3042 Piece 30 Delivered

Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.10 1.1043 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauPlain Cellulose Fibre

Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)

10.00 10.0044 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauGypsum Ceiling Board

Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)

8.50 8.4545 Sheet 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauTimber door

Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)

286.67 288.3346 Piece 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauGI Pipes

Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)

64.33 65.0047 6mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauPVC Pipes

PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)

40.00 40.0048 6mrun

30 Delivered

Page 92 of9514 July 2012

Page 93: Standard Bm Monthly Report - 201205

Building Materials Prices for Tawau

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauHDPE Pipes

HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)

718.33 720.0049 100mroll

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauABS Pipes

ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 21.33 21.3350 5.8mrun

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauPolytank

Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)

185.00 185.0051 No. 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauWash Hand Basin

Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)

46.33 45.6752 Set 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauWater Closets

Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without

76.00 76.0053 Item 30 Delivered

Water Closet Western Type - Baltimore, C-56Syphonic W.C. With S or P trap, With Cistern,

185.00 185.0054 Set 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauStainless Steel Sink

Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)

87.33 89.3355 Item 30 Delivered

Page 93 of9514 July 2012

Page 94: Standard Bm Monthly Report - 201205

Building Materials Prices for Tawau

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauNippon

Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)

95.00 95.0056 5Litres

30 Delivered

Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)

85.00 85.3357 5Litres

30 Delivered

Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)

46.00 46.0058 7Litres

30 Delivered

Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)

96.00 96.3359 5Litres

30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauSquare Hollow Sections

Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)

2800.00 2816.6760 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauRectangular Hollow Sections

Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)

3833.33 3850.0061 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauUniversal Beams

Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)

3433.33 3500.0062 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauEqual Angles

Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)

2316.67 2350.0063 MT 30 Delivered

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauPlywood

Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 72.33 74.0064 Piece 30 Delivered

Page 94 of9514 July 2012

Page 95: Standard Bm Monthly Report - 201205

Building Materials Prices for Tawau

UnitCredit Term

(Days) Del or ExDescription

No.

Apr-2012(RM)

May-2012(RM)

TawauPlywood

Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)