  • BUILDING MATERIALS PRICES

    February-2012 March-2012and

  • Building Materials Prices for Johor

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorOrdinary Portland Cement, bag

    Ordinary Portland Cement, 50 kg bag 16.67 16.331 Bag 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorOrdinary Portland Cement, bulk

    Ordinary Portland Cement in bulk 310.00 323.332 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorWhite Cement

    White Cement 40 kg per bag , collection in MT 744.00 732.333 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorGranite 3/4"

    Granite Aggregate 3/4" 22.67 23.004 MT 60 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorNormal River Sand

    Normal River Sand- Ex 16.00 15.835 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorFine River Sand

    Fine River Sand for Plastering -Ex 24.00 24.676 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorNormal Mining Sand

    Normal Mining Sand 16.17 16.337 MT 30 Ex-Factory

    Page 2 of9523 April 2012

  • Building Materials Prices for Johor

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorFine Mining Sand

    Fine Mining Sand for Plastering 24.00 24.008 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorMild Steel Round Bar

    Mild Steel Round Bar R10, MS146 2516.67 2550.009 MT 60 Delivered

    Mild Steel Round Bar R12, MS146 2516.67 2550.0010 MT 60 Delivered

    Mild Steel Round Bar R16, MS146 2416.67 2450.0011 MT 60 Delivered

    Mild Steel Round Bar R20, MS146 2466.67 2500.0012 MT 60 Delivered

    Mild Steel Round Bar R22, MS146 2466.67 2500.0013 MT 60 Delivered

    Mild Steel Round Bar R25, MS146 2466.67 2500.0014 MT 60 Delivered

    Mild Steel Round Bar R32, MS146 2410.00 2500.0015 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorHigh Tensile Deformed Bar

    High Tensile Deformed Bar-Y10, MS146 2516.67 2550.0016 MT 60 Delivered

    High Tensile Deformed Bar - Y12, MS146 2516.67 2550.0017 MT 60 Delivered

    High Tensile Deformed Bar- Y16, MS146 2383.33 2416.6718 MT 60 Delivered

    High Tensile Deformed Bar - Y20, MS146 2383.33 2416.6719 MT 60 Delivered

    High Tensile Deformed Bar- Y25, MS146 2383.33 2416.6720 MT 60 Delivered

    Page 3 of9523 April 2012

  • Building Materials Prices for Johor

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorHigh Tensile Deformed Bar

    High Tensile Deformed Bar- Y32, MS146 2383.33 2416.6721 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorBRC Fabric

    BRC A6, MS145 6.12 6.1222 m2 30 Delivered

    BRC A7, MS145 8.22 8.2223 m2 30 Delivered

    BRC A8, MS145 10.86 10.8624 m2 30 Delivered

    BRC A9, MS145 13.79 13.7925 m2 30 Delivered

    BRC A10, MS145 16.51 16.5126 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorReady Mix Concrete-Granite

    Ready Mix Concrete - Normal Mix - Grade 10,Granite

    171.30 171.9727 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 15,Granite

    177.47 183.8028 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 20,Granite

    184.60 188.2729 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 25,Granite

    191.53 196.5330 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 30,Granite

    198.87 203.2031 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 35,Granite

    213.80 217.4732 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 40,Granite

    228.33 232.0033 m3 30 Delivered

    Page 4 of9523 April 2012

  • Building Materials Prices for Johor

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorCommon Clay Bricks

    Common Clay Bricks - Pallet 0.40 0.4034 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorCement Sand Bricks

    Cement Sand Brick - Pallet 0.24 0.2435 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorSmooth Face Facing Bricks

    Smooth Face Facing Brick, Red 1.05 1.1536 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorConcrete Roof Tiles

    Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)

    1.55 1.5537 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorMetal Sheet Decking

    MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT

    51.10 52.4038 m2 30 Delivered

    MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT

    56.57 56.5739 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorCorrugated Roofing Sheet

    Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)

    24.83 27.7340 Sheet 60 Delivered

    Page 5 of9523 April 2012

  • Building Materials Prices for Johor

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorCeramic Floor Tiles

    Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1

    0.98 0.9341 Piece 60 Delivered

    Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1

    1.84 1.8442 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorHomogeneous Ceramic Tiles

    Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1

    1.34 1.3443 Piece 60 Delivered

    Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1

    2.50 2.3744 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorPaver

    Uni-Espave - 200mm x 190mm 0.89 0.8945 Piece 60 Delivered

    Uni-Pave/ Sunpave, 225mm x 112.5mm 0.84 0.8446 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorPlain Cellulose Fibre

    Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)

    3.92 3.9247 Sheet 60 Delivered

    Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)

    6.78 6.7848 Sheet 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorGypsum Ceiling Board

    Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)

    4.97 4.9749 Sheet 60 Delivered

    Page 6 of9523 April 2012

  • Building Materials Prices for Johor

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorTimber door

    Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM

    212.00 212.0050 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorGI Pipes

    Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863

    35.50 35.5051 6mrun

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorPVC Pipes

    PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628

    26.10 26.1052 4mrun

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorHDPE Pipes

    HDPE Pipe PN 10 - 50mm Diameter, MS1058 427.67 427.6753 100mroll

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorABS Pipes

    ABS Pipe PN 15 Class E - 20mm, MS1419 23.23 23.2354 5.8mrun

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorPolytank

    Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant

    118.57 118.5755 No. 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorWash Hand Basin

    Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan

    71.47 71.4756 Set 60 Delivered

    Page 7 of9523 April 2012

  • Building Materials Prices for Johor

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorWater Closets

    Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan

    139.10 139.1057 Item 60 Delivered

    Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse

    53.50 53.5058 Item 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorStainless Steel Sink

    Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''

    82.57 82.5759 Item 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorNippon

    Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish

    95.67 95.6760 5Litres

    60 Delivered

    Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo

    88.73 88.7361 5Litres

    60 Delivered

    Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex

    31.67 31.6762 7Litres

    60 Delivered

    Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond

    95.47 95.4763 5Litres

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorSquare Hollow Sections

    Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)

    3182.67 3182.6764 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorRectangular Hollow Sections

    Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)

    3347.67 3347.6765 MT 60 Delivered

    Page 8 of9523 April 2012

  • Building Materials Prices for Johor

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorUniversal Beams

    Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)

    3500.00 3500.0066 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorEqual Angles

    Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2581.33 2581.3367 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    JohorPlywood

    Plywood - Shuttering Board, 4' x 8' x 12mm 53.27 53.2768 Piece 60 Delivered

    Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade

    134.00 134.0069 Piece 60 Delivered

    Page 9 of9523 April 2012

  • Building Materials Prices for Kelantan

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanOrdinary Portland Cement, bag

    Ordinary Portland Cement, 50 kg bag 16.70 16.701 Bag 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanOrdinary Portland Cement, bulk

    Ordinary Portland Cement in bulk 330.00 330.002 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanWhite Cement

    White Cement 40 kg per bag , collection in MT 744.00 732.333 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanGranite 3/4"

    Granite Aggregate 3/4" 25.67 25.674 MT 60 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanNormal River Sand

    Normal River Sand- Ex 10.67 10.675 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanFine River Sand

    Fine River Sand for Plastering -Ex 18.33 18.336 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanNormal Mining Sand

    Normal Mining Sand 15.67 15.677 MT 30 Ex-Factory

    Page 10 of9523 April 2012

  • Building Materials Prices for Kelantan

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanFine Mining Sand

    Fine Mining Sand for Plastering 21.00 21.008 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanMild Steel Round Bar

    Mild Steel Round Bar R10, MS146 2583.33 2616.679 MT 60 Delivered

    Mild Steel Round Bar R12, MS146 2583.33 2616.6710 MT 60 Delivered

    Mild Steel Round Bar R16, MS146 2483.33 2516.6711 MT 60 Delivered

    Mild Steel Round Bar R20, MS146 2533.33 2566.6712 MT 60 Delivered

    Mild Steel Round Bar R22, MS146 2533.33 2566.6713 MT 60 Delivered

    Mild Steel Round Bar R25, MS146 2533.33 2566.6714 MT 60 Delivered

    Mild Steel Round Bar R32, MS146 2533.33 2566.6715 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanHigh Tensile Deformed Bar

    High Tensile Deformed Bar-Y10, MS146 2583.33 2616.6716 MT 60 Delivered

    High Tensile Deformed Bar - Y12, MS146 2583.33 2616.6717 MT 60 Delivered

    High Tensile Deformed Bar- Y16, MS146 2450.00 2483.3318 MT 60 Delivered

    High Tensile Deformed Bar - Y20, MS146 2450.00 2483.3319 MT 60 Delivered

    High Tensile Deformed Bar- Y25, MS146 2450.00 2483.3320 MT 60 Delivered

    Page 11 of9523 April 2012

  • Building Materials Prices for Kelantan

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanHigh Tensile Deformed Bar

    High Tensile Deformed Bar- Y32, MS146 2450.00 2483.3321 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanBRC Fabric

    BRC A6, MS145 6.65 6.7222 m2 30 Delivered

    BRC A7, MS145 8.79 8.7923 m2 30 Delivered

    BRC A8, MS145 12.07 12.0724 m2 30 Delivered

    BRC A9, MS145 15.29 15.2925 m2 30 Delivered

    BRC A10, MS145 17.83 17.8326 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanReady Mix Concrete-Granite

    Ready Mix Concrete - Normal Mix - Grade 10,Granite

    186.63 186.6327 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 15,Granite

    192.13 192.1328 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 20,Granite

    195.93 195.9329 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 25,Granite

    204.20 204.2030 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 30,Granite

    212.83 212.8331 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 35,Granite

    223.13 223.1332 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 40,Granite

    238.00 238.0033 m3 30 Delivered

    Page 12 of9523 April 2012

  • Building Materials Prices for Kelantan

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanCommon Clay Bricks

    Common Clay Bricks - Pallet 0.46 0.4634 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanCement Sand Bricks

    Cement Sand Brick - Pallet 0.28 0.2835 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanSmooth Face Facing Bricks

    Smooth Face Facing Brick, Red 1.17 1.2036 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanConcrete Roof Tiles

    Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)

    1.73 1.7337 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanMetal Sheet Decking

    MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT

    54.00 54.0038 m2 30 Delivered

    MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT

    57.63 57.6339 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanCorrugated Roofing Sheet

    Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)

    28.67 28.6740 Sheet 60 Delivered

    Page 13 of9523 April 2012

  • Building Materials Prices for Kelantan

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanCeramic Floor Tiles

    Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1

    0.97 0.9741 Piece 60 Delivered

    Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1

    1.90 1.9042 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanHomogeneous Ceramic Tiles

    Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1

    1.38 1.3843 Piece 60 Delivered

    Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1

    2.42 2.4044 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanPaver

    Uni-Espave - 200mm x 190mm 1.01 1.0145 Piece 60 Delivered

    Uni-Pave/ Sunpave, 225mm x 112.5mm 0.97 0.9746 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanPlain Cellulose Fibre

    Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)

    3.92 3.9247 Sheet 60 Delivered

    Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)

    7.18 7.1848 Sheet 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanGypsum Ceiling Board

    Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)

    4.97 4.9749 Sheet 60 Delivered

    Page 14 of9523 April 2012

  • Building Materials Prices for Kelantan

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanTimber door

    Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM

    257.00 257.0050 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanGI Pipes

    Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863

    35.40 35.4051 6mrun

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanPVC Pipes

    PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628

    28.87 29.2052 4mrun

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanHDPE Pipes

    HDPE Pipe PN 10 - 50mm Diameter, MS1058 437.90 437.9053 100mroll

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanABS Pipes

    ABS Pipe PN 15 Class E - 20mm, MS1419 24.17 24.1754 5.8mrun

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanPolytank

    Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant

    121.90 121.9055 No. 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanWash Hand Basin

    Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan

    71.47 71.4756 Set 60 Delivered

    Page 15 of9523 April 2012

  • Building Materials Prices for Kelantan

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanWater Closets

    Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan

    142.77 142.7757 Item 60 Delivered

    Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse

    54.17 54.1758 Item 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanStainless Steel Sink

    Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''

    82.57 82.5759 Item 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanNippon

    Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish

    98.27 98.2760 5Litres

    60 Delivered

    Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo

    91.07 91.0761 5Litres

    60 Delivered

    Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex

    31.67 31.6762 7Litres

    60 Delivered

    Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond

    97.47 97.4763 5Litres

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanSquare Hollow Sections

    Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)

    3213.67 3213.6764 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanRectangular Hollow Sections

    Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)

    3258.33 3258.3365 MT 60 Delivered

    Page 16 of9523 April 2012

  • Building Materials Prices for Kelantan

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanUniversal Beams

    Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)

    3350.67 3350.6766 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanEqual Angles

    Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2583.33 2583.3367 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KelantanPlywood

    Plywood - Shuttering Board, 4' x 8' x 12mm 53.93 53.9368 Piece 60 Delivered

    Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade

    130.67 134.0069 Piece 60 Delivered

    Page 17 of9523 April 2012

  • Building Materials Prices for Kota Kinabalu

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluOrdinary Portland Cement, bag

    Ordinary Portland Cement, 50 kg bag - (30) 17.20 17.201 Bag 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluWhite Cement

    White Cement 25kg per bag , collection in MT - (30) 880.00 880.002 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluGranite 3/4"

    Granite Aggregate 3/4" - (30) 54.33 54.673 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluSandstone

    Sandstone Aggregates 3/4" 48.67 49.334 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluNormal River Sand

    Normal River Sand - Delivery 39.33 40.005 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluFine River Sand

    Fine River Sand for Plastering- Delivery 43.33 43.676 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluMild Steel Round Bar

    Mild Steel Round Bar R10, MS146 - (30) 2750.00 2750.007 MT 30 Delivered

    Mild Steel Round Bar R12, MS146 - (30) 2700.00 2750.008 MT 30 Delivered

    Page 18 of9523 April 2012

  • Building Materials Prices for Kota Kinabalu

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluMild Steel Round Bar

    Mild Steel Round Bar R16, MS146 - (30) 2650.00 2630.009 MT 30 Delivered

    Mild Steel Round Bar R20, MS146 - (30) 2650.00 2900.0010 MT 30 Delivered

    Mild Steel Round Bars - R25, MS146 - (30) 2650.00 2900.0011 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluHigh Tensile Deformed Bar

    High Tensile Deformed Bar Y10, MS146 - (30) 2800.00 2750.0012 MT 60 Delivered

    High Tensile Deformed Bar Y12, MS146 - (30) 2750.00 2750.0013 MT 60 Delivered

    High Tensile Deformed Bar Y16, MS146 - (30) 2700.00 2630.0014 MT 60 Delivered

    High Tensile Deformed Bar Y20, MS146 - (30) 2700.00 2630.0015 MT 60 Delivered

    High Tensile Deformed Bar Y25, MS146 - (30) 2700.00 2630.0016 MT 60 Delivered

    High Tensile Deformed Bar Y32, MS146 - (30) 2700.00 2630.0017 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluBRC Fabric

    BRC A6, MS145 8.50 8.5018 m2 30 Delivered

    BRC A7, MS145 9.50 9.5019 m2 30 Delivered

    BRC A8, MS145 12.50 12.4720 m2 30 Delivered

    BRC A9, MS145 16.00 16.0021 m2 30 Delivered

    Page 19 of9523 April 2012

  • Building Materials Prices for Kota Kinabalu

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluBRC Fabric

    BRC A10, MS145 19.33 19.3322 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluReady Mix Concrete-Granite

    Ready Mix Concrete - Normal Mix - Grade 30,Granite

    290.00 290.0023 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 35,Granite

    308.33 310.0024 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 40,Granite

    320.00 320.0025 m3 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluReady Mix Concrete-Sandstone

    Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)

    215.00 216.6726 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)

    223.33 225.0027 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)

    233.33 233.3328 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)

    243.33 245.0029 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)

    288.33 291.6730 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)

    320.00 325.0031 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)

    306.67 311.6732 m3 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluCommon Clay Bricks

    Common Clay Bricks - Pallet 0.32 0.3233 Piece 30 Delivered

    Page 20 of9523 April 2012

  • Building Materials Prices for Kota Kinabalu

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluCement Sand Bricks

    Cement Sand Bricks - Pallet -(30) 0.30 0.3034 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluSmooth Face Facing Bricks

    Smooth Face Facing Brick, Red 0.85 0.8535 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluConcrete Roof Tiles

    Interlocking Concrete Tiles - Standard DuotoneColour, Local Product - (30)

    1.77 1.7736 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluMetal Sheet Decking

    MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)

    53.67 54.6737 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluCorrugated Roofing Sheet

    Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm (Hume/Malex/UAC) - (30)

    31.33 31.6738 Sheet 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluCeramic Floor Tiles

    Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)

    1.68 1.7039 Piece 30 Delivered

    Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)

    3.48 3.5040 Piece 30 Delivered

    Page 21 of9523 April 2012

  • Building Materials Prices for Kota Kinabalu

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluHomogeneous Ceramic Tiles

    Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)

    3.00 3.0041 Piece 30 Delivered

    Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)

    4.50 4.5042 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluPaver

    Uni-Espave- 200mm x 190mm - (30) 1.42 1.4343 Piece 30 Delivered

    Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.33 1.3344 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluPlain Cellulose Fibre

    Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)

    9.00 9.0045 Sheet 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluGypsum Ceiling Board

    Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)

    7.50 7.5046 Sheet 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluTimber door

    Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)

    261.00 263.3347 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluGI Pipes

    Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)

    63.33 64.0048 6mrun

    30 Delivered

    Page 22 of9523 April 2012

  • Building Materials Prices for Kota Kinabalu

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluPVC Pipes

    PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)

    38.33 38.6749 6mrun

    30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluHDPE Pipes

    HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)

    710.00 718.3350 100mroll

    30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluABS Pipes

    ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 18.33 18.6751 5.8mrun

    30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluPolytank

    Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)

    163.33 165.0052 No. 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluWash Hand Basin

    Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)

    43.67 43.6753 Set 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluWater Closets

    Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without

    65.00 65.3354 Item 30 Delivered

    Water Closet Western Type - Baltimore, C-56Syphonic W.C. With S or P trap, With Cistern,

    183.33 185.0055 Set 30 Delivered

    Page 23 of9523 April 2012

  • Building Materials Prices for Kota Kinabalu

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluStainless Steel Sink

    Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)

    85.00 87.0056 Item 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluNippon

    Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)

    100.00 100.0057 5Litres

    30 Delivered

    Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)

    85.00 85.3358 5Litres

    30 Delivered

    Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)

    44.33 44.6759 7Litres

    30 Delivered

    Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)

    96.00 96.3360 5Litres

    30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluSquare Hollow Sections

    Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)

    2883.33 2900.0061 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluRectangular Hollow Sections

    Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)

    3900.00 3900.0062 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluUniversal Beams

    Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)

    3366.67 3400.0063 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluEqual Angles

    Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)

    2383.33 2400.0064 MT 30 Delivered

    Page 24 of9523 April 2012

  • Building Materials Prices for Kota Kinabalu

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Kota KinabaluPlywood

    Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 77.00 76.3365 Piece 30 Delivered

    Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)

    157.00 157.0066 Piece 30 Delivered

    Page 25 of9523 April 2012

  • Building Materials Prices for Kuching

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingOrdinary Portland Cement, bag

    Ordinary Portland Cement, 50 kg bag - (30) 15.80 15.801 Bag 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingWhite Cement

    White Cement 25kg per bag , collection in MT - (30) 840.00 831.672 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingGranite 3/4"

    Granite Aggregate 3/4" - (30) 36.00 36.003 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingLimestone

    Limestone Aggregates 3/4" 28.00 28.004 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingNormal River Sand

    Normal River Sand - Delivery 31.67 32.005 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingFine River Sand

    Fine River Sand for Plastering- Delivery 35.00 35.006 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingMild Steel Round Bar

    Mild Steel Round Bar R10, MS146 - (30) 2700.00 2650.007 MT 30 Delivered

    Mild Steel Round Bar R12, MS146 - (30) 2650.00 2650.008 MT 30 Delivered

    Page 26 of9523 April 2012

  • Building Materials Prices for Kuching

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingMild Steel Round Bar

    Mild Steel Round Bar R16, MS146 - (30) 2600.00 2530.009 MT 30 Delivered

    Mild Steel Round Bar R20, MS146 - (30) 2600.00 2800.0010 MT 30 Delivered

    Mild Steel Round Bars - R25, MS146 - (30) 2600.00 2800.0011 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingHigh Tensile Deformed Bar

    High Tensile Deformed Bar Y10, MS146 - (30) 2750.00 2650.0012 MT 60 Delivered

    High Tensile Deformed Bar Y12, MS146 - (30) 2700.00 2650.0013 MT 60 Delivered

    High Tensile Deformed Bar Y16, MS146 - (30) 2600.00 2550.0014 MT 60 Delivered

    High Tensile Deformed Bar Y20, MS146 - (30) 2600.00 2550.0015 MT 60 Delivered

    High Tensile Deformed Bar Y25, MS146 - (30) 2600.00 2550.0016 MT 60 Delivered

    High Tensile Deformed Bar Y32, MS146 - (30) 2600.00 2550.0017 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingBRC Fabric

    BRC A6, MS145 7.00 7.0018 m2 30 Delivered

    BRC A7, MS145 9.00 8.5019 m2 30 Delivered

    BRC A8, MS145 12.00 11.6320 m2 30 Delivered

    BRC A9, MS145 15.00 14.4321 m2 30 Delivered

    Page 27 of9523 April 2012

  • Building Materials Prices for Kuching

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingBRC Fabric

    BRC A10, MS145 18.50 17.8022 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingReady Mix Concrete-Granite

    Ready Mix Concrete - Normal Mix - Grade 30,Granite

    288.00 288.3323 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 35,Granite

    303.33 303.3324 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 40,Granite

    301.67 301.6725 m3 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingReady Mix Concrete-Sandstone

    Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)

    220.00 217.6726 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)

    220.00 220.0027 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)

    233.33 230.0028 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)

    255.00 253.3329 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)

    263.33 261.0030 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)

    280.00 280.0031 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)

    300.00 300.0032 m3 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingCommon Clay Bricks

    Common Clay Bricks - Pallet 0.30 0.3033 Piece 30 Delivered

    Page 28 of9523 April 2012

  • Building Materials Prices for Kuching

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingCement Sand Bricks

    Cement Sand Bricks - Pallet -(30) 0.32 0.3234 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingConcrete Roof Tiles

    Interlocking Concrete Tiles - Standard DuotoneColour, Shanta- (30)

    1.28 1.2835 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingMetal Sheet Decking

    MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)

    55.00 54.6736 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingCorrugated Roofing Sheet

    Corrugated Roofing Sheet- 76mm (3'') DoubleWidth, Grey 1065mm x 2440mm - (30)

    32.00 32.3337 Sheet 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingCeramic Floor Tiles

    Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)

    1.00 1.0038 Piece 30 Delivered

    Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)

    3.00 3.0039 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingHomogeneous Ceramic Tiles

    Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)

    3.00 3.0040 Piece 30 Delivered

    Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)

    4.13 4.1741 Piece 30 Delivered

    Page 29 of9523 April 2012

  • Building Materials Prices for Kuching

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingPaver

    Uni-Espave- 200mm x 190mm - (30) 1.00 1.0042 Piece 30 Delivered

    Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.00 1.0043 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingPlain Cellulose Fibre

    Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)

    9.00 8.8344 Sheet 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingGypsum Ceiling Board

    Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)

    7.60 7.5345 Sheet 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingTimber door

    Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)

    313.33 311.6746 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingGI Pipes

    Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)

    57.33 56.6747 6mrun

    30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingPVC Pipes

    PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)

    38.67 38.6748 6mrun

    30 Delivered

    Page 30 of9523 April 2012

  • Building Materials Prices for Kuching

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingHDPE Pipes

    HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)

    726.67 725.0049 100mroll

    30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingABS Pipes

    ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 18.33 18.6750 5.8mrun

    30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingPolytank

    Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)

    161.67 163.3351 No. 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingWash Hand Basin

    Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)

    60.67 61.6752 Set 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingWater Closets

    Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without

    66.33 64.3353 Item 30 Delivered

    Water Closet Western Type - Camelot C - 74Washdown W.C With S-trap, With Cistern.White

    205.00 201.6754 Set 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingStainless Steel Sink

    Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)

    78.00 78.6755 Item 30 Delivered

    Page 31 of9523 April 2012

  • Building Materials Prices for Kuching

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingNippon

    Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)

    101.67 100.0056 5Litres

    30 Delivered

    Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)

    83.67 84.3357 5Litres

    30 Delivered

    Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)

    33.00 33.0058 7Litres

    30 Delivered

    Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)

    80.00 80.0059 5Litres

    30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingSquare Hollow Sections

    Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)

    2810.00 2816.6760 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingRectangular Hollow Sections

    Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)

    3016.67 3000.0061 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingUniversal Beams

    Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)

    3366.67 3350.0062 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingEqual Angles

    Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)

    2816.67 2816.6763 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingPlywood

    Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 70.00 70.0064 Piece 30 Delivered

    Page 32 of9523 April 2012

  • Building Materials Prices for Kuching

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    KuchingPlywood

    Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)

    163.33 163.3365 Piece 30 Delivered

    Page 33 of9523 April 2012

  • Building Materials Prices for Miri

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriOrdinary Portland Cement, bag

    Ordinary Portland Cement, 50 kg bag - (30) 17.00 17.001 Bag 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriWhite Cement

    White Cement 25kg per bag , collection in MT - (30) 860.00 860.002 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriLimestone

    Limestone Aggregates 3/4" 32.00 32.003 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriNormal River Sand

    Normal River Sand - Delivery 31.00 31.004 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriFine River Sand

    Fine River Sand for Plastering- Delivery 34.00 34.005 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriMild Steel Round Bar

    Mild Steel Round Bar R10, MS146 - (30) 2750.00 2680.006 MT 30 Delivered

    Mild Steel Round Bar R12, MS146 - (30) 2700.00 2680.007 MT 30 Delivered

    Mild Steel Round Bar R16, MS146 - (30) 2600.00 2560.008 MT 30 Delivered

    Mild Steel Round Bar R20, MS146 - (30) 2650.00 2850.009 MT 30 Delivered

    Page 34 of9523 April 2012

  • Building Materials Prices for Miri

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriMild Steel Round Bar

    Mild Steel Round Bars - R25, MS146 - (30) 2650.00 2850.0010 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriHigh Tensile Deformed Bar

    High Tensile Deformed Bar Y10, MS146 - (30) 2800.00 2700.0011 MT 60 Delivered

    High Tensile Deformed Bar Y12, MS146 - (30) 2750.00 2700.0012 MT 60 Delivered

    High Tensile Deformed Bar Y16, MS146 - (30) 2700.00 2600.0013 MT 60 Delivered

    High Tensile Deformed Bar Y20, MS146 - (30) 2700.00 2600.0014 MT 60 Delivered

    High Tensile Deformed Bar Y25, MS146 - (30) 2700.00 2600.0015 MT 60 Delivered

    High Tensile Deformed Bar Y32, MS146 - (30) 2700.00 2600.0016 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriBRC Fabric

    BRC A6, MS145 8.43 8.5017 m2 30 Delivered

    BRC A7, MS145 10.50 10.4318 m2 30 Delivered

    BRC A8, MS145 13.53 13.1719 m2 30 Delivered

    BRC A9, MS145 16.57 16.1720 m2 30 Delivered

    BRC A10, MS145 20.83 20.6721 m2 30 Delivered

    Page 35 of9523 April 2012

  • Building Materials Prices for Miri

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriReady Mix Concrete-Granite

    Ready Mix Concrete - Normal Mix - Grade 30,Granite

    296.67 293.3322 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 35,Granite

    316.67 318.3323 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 40,Granite

    323.33 320.0024 m3 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriReady Mix Concrete-Sandstone

    Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)

    223.33 223.3325 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)

    235.33 233.3326 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)

    246.67 246.6727 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)

    258.33 253.3328 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)

    270.67 270.0029 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)

    283.33 283.3330 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)

    290.00 288.3331 m3 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriCommon Clay Bricks

    Common Clay Bricks - Pallet 0.34 0.3432 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriCement Sand Bricks

    Cement Sand Bricks - Pallet -(30) 0.33 0.3333 Piece 30 Delivered

    Page 36 of9523 April 2012

  • Building Materials Prices for Miri

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriConcrete Roof Tiles

    Interlocking Concrete Tiles - Standard DuotoneColour, Shanta- (30)

    1.30 1.2834 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriMetal Sheet Decking

    MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)

    52.67 51.6735 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriCorrugated Roofing Sheet

    Corrugated Roofing Sheet- 76mm (3'') DoubleWidth, Grey 1065mm x 2440mm - (30)

    33.00 32.6736 Sheet 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriCeramic Floor Tiles

    Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)

    1.00 1.0037 Piece 30 Delivered

    Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)

    3.00 3.0038 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriHomogeneous Ceramic Tiles

    Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)

    3.20 3.0739 Piece 30 Delivered

    Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)

    4.50 4.4340 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriPaver

    Uni-Espave- 200mm x 190mm - (30) 1.20 1.2041 Piece 30 Delivered

    Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.03 1.0342 Piece 30 Delivered

    Page 37 of9523 April 2012

  • Building Materials Prices for Miri

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriPaver

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriPlain Cellulose Fibre

    Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)

    9.50 9.4343 Sheet 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriGypsum Ceiling Board

    Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)

    8.00 8.0044 Sheet 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriTimber door

    Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)

    285.00 285.0045 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriGI Pipes

    Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)

    65.33 65.0046 6mrun

    30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriPVC Pipes

    PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)

    42.00 42.3347 6mrun

    30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriHDPE Pipes

    HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)

    745.00 746.6748 100mroll

    30 Delivered

    Page 38 of9523 April 2012

  • Building Materials Prices for Miri

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriABS Pipes

    ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 17.67 17.3349 5.8mrun

    30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriPolytank

    Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)

    166.00 165.6750 No. 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriWash Hand Basin

    Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)

    57.00 55.3351 Set 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriWater Closets

    Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without

    68.00 67.0052 Item 30 Delivered

    Water Closet Western Type - Camelot C - 74Washdown W.C With S-trap, With Cistern.White

    200.00 200.0053 Set 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriStainless Steel Sink

    Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)

    74.33 74.3354 Item 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriNippon

    Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)

    100.00 99.3355 5Litres

    30 Delivered

    Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)

    85.67 85.6756 5Litres

    30 Delivered

    Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)

    32.33 32.6757 7Litres

    30 Delivered

    Page 39 of9523 April 2012

  • Building Materials Prices for Miri

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriNippon

    Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)

    75.33 74.6758 5Litres

    30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriSquare Hollow Sections

    Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)

    2960.00 2960.0059 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriRectangular Hollow Sections

    Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)

    3100.00 3066.6760 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriUniversal Beams

    Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)

    3366.67 3366.6761 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriEqual Angles

    Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)

    2966.67 2966.6762 MT 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    MiriPlywood

    Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 75.00 75.0063 Piece 30 Delivered

    Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)

    167.67 167.0064 Piece 30 Delivered

    Page 40 of9523 April 2012

  • Building Materials Prices for Pahang

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangOrdinary Portland Cement, bag

    Ordinary Portland Cement, 50 kg bag 16.70 16.701 Bag 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangOrdinary Portland Cement, bulk

    Ordinary Portland Cement in bulk 330.00 330.002 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangWhite Cement

    White Cement 40 kg per bag , collection in MT 732.33 732.333 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangGranite 3/4"

    Granite Aggregate 3/4" 24.00 24.004 MT 60 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangNormal River Sand

    Normal River Sand- Ex 9.00 9.005 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangFine River Sand

    Fine River Sand for Plastering -Ex 11.00 11.006 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangNormal Mining Sand

    Normal Mining Sand 16.33 16.337 MT 30 Ex-Factory

    Page 41 of9523 April 2012

  • Building Materials Prices for Pahang

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangFine Mining Sand

    Fine Mining Sand for Plastering 21.33 21.338 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangMild Steel Round Bar

    Mild Steel Round Bar R10, MS146 2583.33 2616.679 MT 60 Delivered

    Mild Steel Round Bar R12, MS146 2533.33 2566.6710 MT 60 Delivered

    Mild Steel Round Bar R16, MS146 2400.00 2433.3311 MT 60 Delivered

    Mild Steel Round Bar R20, MS146 2483.33 2516.6712 MT 60 Delivered

    Mild Steel Round Bar R22, MS146 2483.33 2500.0013 MT 60 Delivered

    Mild Steel Round Bar R25, MS146 2483.33 2516.6714 MT 60 Delivered

    Mild Steel Round Bar R32, MS146 2483.33 2516.6715 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangHigh Tensile Deformed Bar

    High Tensile Deformed Bar-Y10, MS146 2500.00 2533.3316 MT 60 Delivered

    High Tensile Deformed Bar - Y12, MS146 2533.33 2566.6717 MT 60 Delivered

    High Tensile Deformed Bar- Y16, MS146 2400.00 2433.3318 MT 60 Delivered

    High Tensile Deformed Bar - Y20, MS146 2400.00 2433.3319 MT 60 Delivered

    High Tensile Deformed Bar- Y25, MS146 2400.00 2433.3320 MT 60 Delivered

    Page 42 of9523 April 2012

  • Building Materials Prices for Pahang

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangHigh Tensile Deformed Bar

    High Tensile Deformed Bar- Y32, MS146 2400.00 2433.3321 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangBRC Fabric

    BRC A6, MS145 6.47 6.4722 m2 30 Delivered

    BRC A7, MS145 9.03 9.0323 m2 30 Delivered

    BRC A8, MS145 11.48 11.4824 m2 30 Delivered

    BRC A9, MS145 14.38 14.3825 m2 30 Delivered

    BRC A10, MS145 17.48 17.4826 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangReady Mix Concrete-Granite

    Ready Mix Concrete - Normal Mix - Grade 10,Granite

    175.97 175.9727 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 15,Granite

    181.47 181.4728 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 20,Granite

    188.60 188.0029 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 25,Granite

    194.20 194.2030 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 30,Granite

    206.53 206.5331 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 35,Granite

    213.80 210.4732 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 40,Granite

    230.17 230.1733 m3 30 Delivered

    Page 43 of9523 April 2012

  • Building Materials Prices for Pahang

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangCommon Clay Bricks

    Common Clay Bricks - Pallet 0.42 0.4234 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangCement Sand Bricks

    Cement Sand Brick - Pallet 0.24 0.2435 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangSmooth Face Facing Bricks

    Smooth Face Facing Brick, Red 1.20 1.2036 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangConcrete Roof Tiles

    Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)

    1.56 1.5637 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangMetal Sheet Decking

    MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT

    54.00 54.0038 m2 30 Delivered

    MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT

    57.63 57.6339 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangCorrugated Roofing Sheet

    Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)

    29.07 29.0740 Sheet 60 Delivered

    Page 44 of9523 April 2012

  • Building Materials Prices for Pahang

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangCeramic Floor Tiles

    Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1

    0.93 0.9341 Piece 60 Delivered

    Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1

    1.93 1.8442 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangHomogeneous Ceramic Tiles

    Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1

    1.34 1.3443 Piece 60 Delivered

    Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1

    2.31 2.3144 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangPaver

    Uni-Espave - 200mm x 190mm 0.87 0.8745 Piece 60 Delivered

    Uni-Pave/ Sunpave, 225mm x 112.5mm 0.84 0.8446 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangPlain Cellulose Fibre

    Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)

    3.85 3.8547 Sheet 60 Delivered

    Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)

    6.83 6.7048 Sheet 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangGypsum Ceiling Board

    Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)

    4.97 4.9749 Sheet 60 Delivered

    Page 45 of9523 April 2012

  • Building Materials Prices for Pahang

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangTimber door

    Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM

    245.33 245.3350 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangGI Pipes

    Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863

    35.93 35.9351 6mrun

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangPVC Pipes

    PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628

    27.37 27.3352 4mrun

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangHDPE Pipes

    HDPE Pipe PN 10 - 50mm Diameter, MS1058 407.13 407.1353 100mroll

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangABS Pipes

    ABS Pipe PN 15 Class E - 20mm, MS1419 23.00 23.0054 5.8mrun

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangPolytank

    Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant

    120.67 120.6755 No. 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangWash Hand Basin

    Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan

    70.60 70.6056 Set 60 Delivered

    Page 46 of9523 April 2012

  • Building Materials Prices for Pahang

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangWater Closets

    Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan

    135.80 135.8057 Item 60 Delivered

    Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse

    55.53 55.5358 Item 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangStainless Steel Sink

    Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''

    84.47 84.4759 Item 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangNippon

    Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish

    100.27 100.2760 5Litres

    60 Delivered

    Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo

    91.13 91.1361 5Litres

    60 Delivered

    Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex

    31.67 31.7762 7Litres

    60 Delivered

    Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond

    99.67 97.0063 5Litres

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangSquare Hollow Sections

    Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)

    3159.33 3159.3364 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangRectangular Hollow Sections

    Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)

    3277.33 3277.3365 MT 60 Delivered

    Page 47 of9523 April 2012

  • Building Materials Prices for Pahang

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangUniversal Beams

    Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)

    3191.33 3234.6766 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangEqual Angles

    Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2533.33 2533.3367 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PahangPlywood

    Plywood - Shuttering Board, 4' x 8' x 12mm 50.57 50.5768 Piece 60 Delivered

    Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade

    113.57 113.5769 Piece 60 Delivered

    Page 48 of9523 April 2012

  • Building Materials Prices for Perak

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakOrdinary Portland Cement, bag

    Ordinary Portland Cement, 50 kg bag 14.70 15.871 Bag 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakOrdinary Portland Cement, bulk

    Ordinary Portland Cement in bulk 315.00 316.672 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakWhite Cement

    White Cement 40 kg per bag , collection in MT 744.00 732.333 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakGranite 3/4"

    Granite Aggregate 3/4" 22.67 22.674 MT 60 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakNormal River Sand

    Normal River Sand- Ex 10.00 10.005 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakFine River Sand

    Fine River Sand for Plastering -Ex 11.33 11.676 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakNormal Mining Sand

    Normal Mining Sand 10.33 10.337 MT 30 Ex-Factory

    Page 49 of9523 April 2012

  • Building Materials Prices for Perak

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakFine Mining Sand

    Fine Mining Sand for Plastering 11.33 11.338 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakMild Steel Round Bar

    Mild Steel Round Bar R10, MS146 2583.33 2550.009 MT 60 Delivered

    Mild Steel Round Bar R12, MS146 2583.33 2550.0010 MT 60 Delivered

    Mild Steel Round Bar R16, MS146 2450.00 2416.6711 MT 60 Delivered

    Mild Steel Round Bar R20, MS146 2533.33 2500.0012 MT 60 Delivered

    Mild Steel Round Bar R22, MS146 2533.33 2500.0013 MT 60 Delivered

    Mild Steel Round Bar R25, MS146 2533.33 2500.0014 MT 60 Delivered

    Mild Steel Round Bar R32, MS146 2533.33 2500.0015 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakHigh Tensile Deformed Bar

    High Tensile Deformed Bar-Y10, MS146 2583.33 2550.0016 MT 60 Delivered

    High Tensile Deformed Bar - Y12, MS146 2583.33 2600.0017 MT 60 Delivered

    High Tensile Deformed Bar- Y16, MS146 2450.00 2416.6718 MT 60 Delivered

    High Tensile Deformed Bar - Y20, MS146 2500.00 2466.6719 MT 60 Delivered

    High Tensile Deformed Bar- Y25, MS146 2450.00 2416.6720 MT 60 Delivered

    Page 50 of9523 April 2012

  • Building Materials Prices for Perak

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakHigh Tensile Deformed Bar

    High Tensile Deformed Bar- Y32, MS146 2450.00 2416.6721 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakBRC Fabric

    BRC A6, MS145 6.40 6.0322 m2 30 Delivered

    BRC A7, MS145 9.17 9.2123 m2 30 Delivered

    BRC A8, MS145 11.66 11.7524 m2 30 Delivered

    BRC A9, MS145 13.47 13.5625 m2 30 Delivered

    BRC A10, MS145 17.76 17.6826 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakReady Mix Concrete-Granite

    Ready Mix Concrete - Normal Mix - Grade 10,Granite

    164.60 164.6027 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 15,Granite

    162.73 172.4028 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 20,Granite

    163.20 172.8729 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 25,Granite

    170.80 180.8030 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 30,Granite

    187.77 191.4331 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 35,Granite

    195.07 201.7332 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 40,Granite

    204.43 204.4333 m3 30 Delivered

    Page 51 of9523 April 2012

  • Building Materials Prices for Perak

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakCommon Clay Bricks

    Common Clay Bricks - Pallet 0.40 0.4034 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakCement Sand Bricks

    Cement Sand Brick - Pallet 0.23 0.2435 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakSmooth Face Facing Bricks

    Smooth Face Facing Brick, Red 1.07 1.0836 Piece 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakConcrete Roof Tiles

    Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)

    1.76 1.6737 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakMetal Sheet Decking

    MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT

    52.90 52.9038 m2 30 Delivered

    MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT

    56.23 56.2339 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakCorrugated Roofing Sheet

    Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)

    26.73 27.7340 Sheet 60 Delivered

    Page 52 of9523 April 2012

  • Building Materials Prices for Perak

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakCeramic Floor Tiles

    Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1

    0.96 0.9341 Piece 60 Delivered

    Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1

    1.88 1.8442 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakHomogeneous Ceramic Tiles

    Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1

    1.34 1.2743 Piece 60 Delivered

    Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1

    2.51 2.3744 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakPaver

    Uni-Espave - 200mm x 190mm 0.90 0.8745 Piece 60 Delivered

    Uni-Pave/ Sunpave, 225mm x 112.5mm 0.84 0.8446 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakPlain Cellulose Fibre

    Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)

    3.85 3.8547 Sheet 60 Delivered

    Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)

    6.48 6.4848 Sheet 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakGypsum Ceiling Board

    Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)

    4.97 4.9749 Sheet 60 Delivered

    Page 53 of9523 April 2012

  • Building Materials Prices for Perak

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakTimber door

    Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM

    195.33 195.3350 Piece 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakGI Pipes

    Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863

    37.50 33.0751 6mrun

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakPVC Pipes

    PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628

    26.00 25.3352 4mrun

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakHDPE Pipes

    HDPE Pipe PN 10 - 50mm Diameter, MS1058 405.90 400.9053 100mroll

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakABS Pipes

    ABS Pipe PN 15 Class E - 20mm, MS1419 23.13 23.1354 5.8mrun

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakPolytank

    Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant

    120.90 120.9055 No. 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakWash Hand Basin

    Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan

    76.47 71.4756 Set 60 Delivered

    Page 54 of9523 April 2012

  • Building Materials Prices for Perak

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakWater Closets

    Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan

    141.80 141.8057 Item 60 Delivered

    Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse

    54.17 54.1758 Item 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakStainless Steel Sink

    Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''

    82.57 82.5759 Item 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakNippon

    Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish

    98.00 98.2760 5Litres

    60 Delivered

    Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo

    91.07 91.0761 5Litres

    60 Delivered

    Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex

    31.43 31.4362 7Litres

    60 Delivered

    Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond

    96.67 96.6763 5Litres

    60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakSquare Hollow Sections

    Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)

    3154.33 3154.3364 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakRectangular Hollow Sections

    Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)

    3245.33 3245.3365 MT 60 Delivered

    Page 55 of9523 April 2012

  • Building Materials Prices for Perak

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakUniversal Beams

    Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)

    3191.33 3234.6766 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakEqual Angles

    Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2533.33 2533.3367 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    PerakPlywood

    Plywood - Shuttering Board, 4' x 8' x 12mm 52.27 52.2768 Piece 60 Delivered

    Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade

    118.33 118.3369 Piece 60 Delivered

    Page 56 of9523 April 2012

  • Building Materials Prices for Pulau Pinang

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangOrdinary Portland Cement, bag

    Ordinary Portland Cement, 50 kg bag 15.37 15.871 Bag 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangOrdinary Portland Cement, bulk

    Ordinary Portland Cement in bulk 316.67 316.672 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangWhite Cement

    White Cement 40 kg per bag , collection in MT 744.00 732.333 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangGranite 3/4"

    Granite Aggregate 3/4" 23.00 23.334 MT 60 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangNormal River Sand

    Normal River Sand- Ex 14.00 14.005 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangFine River Sand

    Fine River Sand for Plastering -Ex 18.00 17.676 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangNormal Mining Sand

    Normal Mining Sand 17.33 17.337 MT 30 Ex-Factory

    Page 57 of9523 April 2012

  • Building Materials Prices for Pulau Pinang

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangFine Mining Sand

    Fine Mining Sand for Plastering 16.00 16.008 MT 30 Ex-Factory

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangMild Steel Round Bar

    Mild Steel Round Bar R10, MS146 2500.00 2550.009 MT 60 Delivered

    Mild Steel Round Bar R12, MS146 2500.00 2550.0010 MT 60 Delivered

    Mild Steel Round Bar R16, MS146 2400.00 2433.3311 MT 60 Delivered

    Mild Steel Round Bar R20, MS146 2450.00 2500.0012 MT 60 Delivered

    Mild Steel Round Bar R22, MS146 2533.33 2500.0013 MT 60 Delivered

    Mild Steel Round Bar R25, MS146 2533.33 2500.0014 MT 60 Delivered

    Mild Steel Round Bar R32, MS146 2583.33 2550.0015 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangHigh Tensile Deformed Bar

    High Tensile Deformed Bar-Y10, MS146 2550.00 2516.6716 MT 60 Delivered

    High Tensile Deformed Bar - Y12, MS146 2583.33 2550.0017 MT 60 Delivered

    High Tensile Deformed Bar- Y16, MS146 2450.00 2416.6718 MT 60 Delivered

    High Tensile Deformed Bar - Y20, MS146 2450.00 2416.6719 MT 60 Delivered

    High Tensile Deformed Bar- Y25, MS146 2450.00 2416.6720 MT 60 Delivered

    Page 58 of9523 April 2012

  • Building Materials Prices for Pulau Pinang

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangHigh Tensile Deformed Bar

    High Tensile Deformed Bar- Y32, MS146 2450.00 2416.6721 MT 60 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangBRC Fabric

    BRC A6, MS145 6.73 6.7022 m2 30 Delivered

    BRC A7, MS145 8.38 8.3823 m2 30 Delivered

    BRC A8, MS145 12.00 10.7524 m2 30 Delivered

    BRC A9, MS145 15.13 13.5625 m2 30 Delivered

    BRC A10, MS145 16.37 16.3726 m2 30 Delivered

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangReady Mix Concrete-Granite

    Ready Mix Concrete - Normal Mix - Grade 10,Granite

    174.47 174.7727 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 15,Granite

    188.27 188.2728 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 20,Granite

    190.40 190.4029 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 25,Granite

    198.33 198.3330 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 30,Granite

    206.30 206.3031 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 35,Granite

    215.93 215.9332 m3 30 Delivered

    Ready Mix Concrete - Normal Mix - Grade 40,Granite

    226.97 226.9733 m3 30 Delivered

    Page 59 of9523 April 2012

  • Building Materials Prices for Pulau Pinang

    UnitCredit Term

    (Days) Del or ExDescription

    No.

    Feb-2012(RM)

    Mar-2012(RM)

    Pulau PinangCommon Clay Bricks

    Common Clay Bricks - Pallet 0