Staging Equipment

download Staging Equipment

If you can't read please download the document

description

Staging Equipment. Staging Equipment. Rebar Dead Man Used on Many Stakes. Op, Generator and Rest Tents. Masked Boobies Queued up to Use the Loo. Break Tent. Generator Shed. CrankIR. Dave K3EL. Partial of Antenna Farm. 4 Square & Birds. SSB – Generators - CW. SSB / RTTY Tent. - PowerPoint PPT Presentation

Transcript of Staging Equipment

  • Staging Equipment

  • Staging Equipment

  • Rebar Dead Man Used on Many Stakes

  • Op, Generator and Rest Tents

  • Masked Boobies Queued up to Use the Loo

  • Break Tent

  • Generator Shed

  • CrankIR

  • Dave K3EL

  • Partial of Antenna Farm

  • 4 Square & Birds

  • SSB Generators - CW

  • SSB / RTTY TentLuigi IV3YER Heye DJ9RR Gene K5GS

  • SSB / RTTY Tent

  • Plan- 6 stations running for 10 days 24 hours per dayActual 6 stations running for ~5 days 24 hours per day propagation permitting - 6 x Elecraft K3 - 1 x Icom IC-7000 back-up - 1 x Elecraft K2 back-up - 4 x Elecraft KPA 500 - 2 x Tokyo HyPower- 1 x Tokyo HyPower back-up

    - 4 x generators 4 kw each- 7 x 200 liter drums ~1,200 liters fuel,- 2,000 feet RG-8X Operations Plan

  • Antennas

    160 m - Spiderbeam 18m fiberglass mast Inverted L 1/4 Vertical 80 m - Spiderbeam 18m fiberglass mast w/SGC 40 m 4 Square 10 20M Folding Hex Beam x 2 CrankIR x 3 BigIR x 3 Pennant RX antenna Antenna Plan

  • Actual Schedule

    Sailing Schedule

    Day #Op.Day #LocationETAETDNMSpeedHours

    18-MarAdvance Tream Arrives in Mackay

    25-MarDay 1Depart Mackay for Mellish13:306.536

    26-MarDay 2At Sea

    27-MarDay 3At Sea

    28-MarDay 4Arrive Mellish Reef - Start set-up13:25

    29-MarDay 5Set-up

    30-MarDay 6OP Day 1

    31-MarDay 7Op Day 2

    1-AprDay 8Op Day 3

    2-AprDay 9Op Day 4

    3-AprDay 10Op Day 5

    4-AprDay 11Op Day 6Shutdown / Depart - just a few contacts

    5-AprDay 12At Sea~14:00

    6-AprDay 13At Sea

    7-AprDay 14At Sea

    8-AprDay 15Arrive Mackay - Unload Boat2:30

    9-AprDay 16Sort - Repack

    10-AprDay 17Sort - Repack

    11-AprDay 18Arrange Shipments / Sell Generators / Donations

    12-AprDay 19Leave Mackay

  • Then Reality Arrived

  • Cyclone ItaWhat did we know and when did we know it? We knew it was the end of the cyclone season When we arrived at the island it was windy approx 20 knots As the days went on the winds got stronger On about April 1st the skipper told us of a tropical depression forming to the North He said these events are known to form cyclones Whats the difference between a cyclone, hurricane, or a typhoon? The skipper was closely monitoring the weather At one point he said he isnt panicking yet, but if we saw him running we should be close behind him We received radio reports of death and destruction in Honiara He was receiving NOAA WEFAX images and maritime Wx warnings every 4 hours On the early morning of April 5th we decided it was time to start packing

  • Forming of a Cyclone

  • WEFAXEvohe crew: l-r Hamish, Lindsey and the Skipper Steve Kafka

  • Met / Nav Warning Forecast

  • Low Profile CrankIR

  • Winds Effect on OP Tent

  • **