TAPEROO RESERVE Project Update What we heard from the community In September 2014 the City of Port Adelaide Enfield consulted with the community about a proposal to develop the former Taperoo School site as a soccer and community recreation space. As a result of the engagement a number of additional features have now been included in the revised concept plan. They include: A playground area with shade sails Exeloo (public toilet) Outdoor gym equipment BBQ / picnic shelters and park furniture A loop path around the reserve Additional planting What’s happening now? Stage 1: Junior Soccer Pitch Completed February 2017. What’s happening next? Stage 2: Clubroom, Carpark and Main Soccer Pitch This stage is on track to be completed in the 2017/18 financial year. In March 2017, The City of Port Adelaide Enfield was successful in obtaining a State and Local Government Infrastructure Partnership Grant to undertake the construction of the Major Soccer Pitch in the 2017/18 financial year. Stage 3: Community Park In accordance with feedback received, the Community Park has been designed to include a playground, shade sails, public toilet, outdoor gym equipment, pathways and BBQ/picnic facilities. This component of the Reserve Upgrade shall be undertaken in the 2018/19 financial year. Trees In providing the Taperoo Reserve Upgrade, it is unfortunate that some of the existing trees are required to be removed (please refer to the enclosed attachment). As a part of the upgrade, Council is committed to the replacement of trees and other plantings in and around the Reserve to enhance the new facility. Where can I find further information or provide comment on the Project? For further information or to provide comment: [email protected] www.portenf.sa.gov.au (08) 8405 6600 ‘A City that values its diverse community and embraces change through innovation, resilience and community leadership’

Transcript of Stage 1: Junior Soccer Pitch What’s happening next ... · In providing the Taperoo Reserve...

Page 1: Stage 1: Junior Soccer Pitch What’s happening next ... · In providing the Taperoo Reserve Upgrade, it is unfortunate that some of the existing trees ... 909-051-SK15 C Artist impression

TAPEROO RESERVE

Project Update

What we heard from the communityIn September 2014 the City of Port Adelaide Enfield consulted with the community about a proposal to develop the former Taperoo School site as a soccer and community recreation space. As a result of the engagement a number of additional features have now been included in the revised concept plan. They include:

• A playground area with shade sails• Exeloo (public toilet)• Outdoor gym equipment• BBQ / picnic shelters and park furniture • A loop path around the reserve• Additional planting

What’s happening now?Stage 1: Junior Soccer PitchCompleted February 2017.

What’s happening next?Stage 2: Clubroom, Carpark and Main Soccer PitchThis stage is on track to be completed in the 2017/18 financial year.

In March 2017, The City of Port Adelaide Enfield was successful in obtaining a State and Local Government Infrastructure Partnership Grant to undertake the construction of the Major Soccer Pitch in the 2017/18 financial year.

Stage 3: Community ParkIn accordance with feedback received, the Community Park has been designed to include a playground, shade sails, public toilet, outdoor gym equipment, pathways and BBQ/picnic facilities. This component of the Reserve Upgrade shall be undertaken in the 2018/19 financial year.

TreesIn providing the Taperoo Reserve Upgrade, it is unfortunate that some of the existing trees are required to be removed (please refer to the enclosed attachment). As a part of the upgrade, Council is committed to the replacement of trees and other plantings in and around the Reserve to enhance the new facility.

Where can I find further information or provide comment on the Project?For further information or to provide comment:

[email protected]

www.portenf.sa.gov.au

(08) 8405 6600

‘A City that values its diverse community and embraces

change through innovation, resilience and community

leadership’

Page 2: Stage 1: Junior Soccer Pitch What’s happening next ... · In providing the Taperoo Reserve Upgrade, it is unfortunate that some of the existing trees ... 909-051-SK15 C Artist impression

DIMBOOLA STREET

VICT

ORI

A R

OA

D

KANIM

BLA STREET

SEABOURNE ROAD

Date:Checked:Client:

Rev: Scale:Drawn: Dwg no. :

Stage 1 & 2 Landscape Concept Plan | DRAFT

0 10 20 30 40M

15019 - SK04B

YQ/SC 1:1000 @ A304 May 2016PP

Taperoo Reserve | City of Port AdelaideEnfield Council

Stage 2Main Soccer Pitch

Stage 3Community

Park

Stage 2 Clubroom & Carpark

Concept Plan

PERSPECTIVE LOOKING SOUTH FROM JUNIOR PITCH

STUDIO NINEARCHITECTS

Plo

tted:

01-0

4-20

16Fi

le:

Y:\S

yner

gy\P

roje

cts\

0909

\090

9-05

1 Ta

pero

o R

eser

ve\0

5 S

D\S

K03

9 King William StreetKent Town SA 5067Australia

T +618 8132 3999F +618 8363 7499

[email protected]

© 2016 \ Copyright

PROJECT DRAWING TITLE DRAWING NUMBER REVISION

TAPEROO RESERVE PERSPECTIVEVIEW

C909-051-SK15

Artist impression of the proposed clubrooms

Stage 1 Junior Soccer Pitches

(completed)

Page 3: Stage 1: Junior Soccer Pitch What’s happening next ... · In providing the Taperoo Reserve Upgrade, it is unfortunate that some of the existing trees ... 909-051-SK15 C Artist impression

Proposed Tree Removal

DIMBOOLA STREET

VIC

TOR

IA R

OA

D

SEABOURNE ROAD

KA

NIM

BLA STREET