Minutes of 30th SOAP Meeting held on 28.06.2017 Page 1
SSLLDDCC
MMIINNUUTTEESS OOFF 3300tthh
MMEEEETTIINNGG OOFF SSOOAAPP
HHEELLDD OONN 2288..0066..22001177
Minutes of 30th SOAP Meeting held on 28.06.2017 Page 2
Minutes of 30th
meeting of Sub Committee for Operation and Protection (SOAP)
held at SLDC, Raipur on 28.06.2017
The 30th
meeting of Chhattisgarh State Operation and Protection Sub
Committee of SGCC was held on 28th June 2017 at SLDC Conference Hall. The
list of participants is enclosed in Annexure-I.
Sri A.K.Shrivastava, Addl.Chief Engineer welcomed all the participants
of 30th
SOAP meeting.
Item no. 1 Confirmation of minutes:-
No comments have been received from any office. Therefore
minutes of 29th
SOAP meeting is hereby confirmed.
Sub Committee agreed and noted.
Item no. 2 Review of system operation during the month of May 2017:
Presentation and the performance of Thermal Stations and
Transmission System by SLDC, is enclosed in Annexure-II.
Sub Committee noted.
Item no. 3 Outage planning for the month of August 2017 & September 2017:
Outage planning of Transmission feeders, Power transformers for
the month August 2017 & September 2017, submitted by O/o CE
(S/s: O&M) is enclosed in Annexure III.
Once again the representatives were requested to submit
the planned outages by 26th of every month so that the intra-state
outages are discussed & finalize in the SOAP meeting on 28th of
every month.
Despite discussion in SOAP meetings and intimation
to all station heads in Minutes of Meetings, it has been observed
that the proposals for shut down of switchyard and transmission
lines are being still directly received from EE(Opn) of Generating
Power stations which is not in line with the procedure already laid
in the OPERATING PROCEDURE approved by CSERC. All
proposals must be forwarded either through the head of the station
concerned or ED (O&M: Gen) CSPGCL Raipur. Further the
Minutes of 30th SOAP Meeting held on 28.06.2017 Page 3
proposals requiring backing down of generation must also be got
approved by ED (O&M: Gen) CSPGCL Raipur & CE (RA&PM)
CSPDCL, Raipur before submission to SLDC.
ACTION: ED (O&M: Gen), Raipur, ED/CE(Gen),Korba East, Korba
West, & DSPMTPS , CSPGCL, Korba & CE (S/s:O&M) CSPTCL,
Raipur
Sub Committee agreed and noted.
Item no.4 Real Time Telemetry:
Following status is intimated by O/o CE (S/s: O&M).
1. Bilaspur Region :
S.N. Name of the
Substation
Remark
1 220 KV S/S
Bishrampur
This substation pertains to M/s Alstom Ltd. At the site RTU
is available but not commissioned. It has also been noticed
that Splitter and MODEMs are not available in the RTU
which is also intimated to M/s Alstom.
2 220 KV S/S
Gerwani
This substation is charged on dtd. 31.03.16. 220 KV wave
trap is installed. RTU is erected and requisition for final
commissioning of the RTU is sent to SE(S/s:O&M) circle vide
office letter No.45 dtd 19.04.2017.
3 132 KV S/s
Ambikapur
132 KV S/s
Pratappur
132 KV S/s
Balrampur
132 KV S/s
Bishrampur
Real Time Data of 132 KV sub stations Ambikapur and
Bishrampur are available at SLDC Raipur from 220 KV
Bishrampur to Korba west PH via 220 KV S/s Chhuri. Data
matching work is under progress. Also, it is to be noted that
RTU is not available at 132 KV S/s Balrampur. Requirement
of the same is intimated vide this office letter No.919 dtd
02.01.2017. Also at 132 KV S/s Pratappur real time data work
is under progress. The material is available at the site and will
be executed at the earliest.
Minutes of 30th SOAP Meeting held on 28.06.2017 Page 4
4 132 KV S/s
Lafarge.
At the site the RTU is available and is pre commissioned by
M/s Lafarge intimated vide letter No.918 dtd.31.12.2016 and
57 dated.26.04.2017.
5 132 KV S/s
Baikanthpur. Real Time Data is available at SLDC Raipur.
The status of the RTU at CSPTCL stations is once again given
below:
Telemetry of KTPS, Korba East and Korba 100, 132 kV has not
improved at all since the meeting held on 25/04/2016.
1) DSPM TPS U#1 and U#2, Generator telemetry is still not
available.
2) Marwa U#1 and U#2 Generator telemetry is still not available.
3) Korba West 220 Side Korba East Line-1 – CB & Station X-mer
1,2 & 3 – CB indications are not available.
4) Bango Hydel Power Station Station X-mer 1- CB indication is not
available
The real time telemetry of following 17 charged substations is still
not available to the SLDC. The same needs to be integrated to
SLDC SCADA at the earliest.
i. 220 KV Bishrampur.
ii. 220KV Gerwani
iii. 132 KV Ambikapur
iv. 132 KV Pratappur
v. 132 KV Balrampur
vi. 132 KV Bishrampur
vii. 132 KV Gariaband
viii. 132 KV Magarload ( None of the Analog Data are available )
ix. 132 KV Kondagaon
x. 132 KV Sankara
xi. 132 KV Gopalpurlafarge
xii. 132 KV Mana
Minutes of 30th SOAP Meeting held on 28.06.2017 Page 5
xiii. 132 KV Rawanbhatha
xiv. 132 KV Sector A Heera pool
xv. 132 KV Lodhama
xvi. 132 KV Renki
xvii. 132 KV Gewra
A speedy action on this matter is requested by all Generating
stations heads and CE (S/s:O&M),CSPTCL to arrange telemetry on
priority for successful & realistic commissioning of EMS module in
the upgraded SCADA system.
During discussion of Telemetry status with MD (CSPTCL), she has
desired that the EEs of the communication circle must attend the
SOAP meeting along with plan to restore the telemetry.
Sub Committee agreed and noted.
ACTION: ED (O&M: Gen),Raipur, ED/CE(Gen), Korba East, Korba
West, & DSPMTPS , CSPGCL, Korba & CE (S/s:O&M) CSPTCL,
Raipur.
Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal units
as on 28.06.2017:
The status of FGMO/RGMO in thermal units of Korba west,
DSPM & Marwa is not clear at all. This issue has been discussed in
every OCC Meetings and SLDC has not been able to give proper
reply due to non submission of FRC data at the time of grid
disturbance.
The FGMO of unit no.3 of KWB is out from a long time. The
necessary action being taken by the authorities of KWB shall be
appraised in next meeting.
As desired in last OCCM, for providing signal for Monitoring of
Restricted Governor Mode Operation (RGMO) at NLDC, RLDC &
SLDC for ensuring grid security and proper operational guide lines
by concerned grid operators. In last meeting, SE (GCC) CSPGCL
has intimated that arrangements are being made for proving the
same at power stations but till the end of June17 no intimation has
been received.
Minutes of 30th SOAP Meeting held on 28.06.2017 Page 6
Also as per provision made under regulation 5 (h) to IEGC dated
12.04.2017, RLDCs /SLDCs shall not schedule the generating
station or unit(s) beyond ex-bus generation corresponding to 100 %
of the installed capacity of the generating stations or unit(s).
Through this office letter no.669 dated 29.06.2017 and 684 dated
01.07.2017 all ED/CE(Gen) have been requested schedule ex-bus
generation corresponding to 100% of installed capacity of the
station,at normative Auxiliary Consumption. Presently DSPM
station & Korba West Extn 500 MW station are scheduling in excess
of ex-bus generation which needs to be scheduled as per the above
provisions failing which SLDC will have to take action of curtailing
the scheduling .
ACTION: ED (O&M: Gen), CSPGCL Raipur, ED (Gen) DSPMTPS
CSPGCL Korba & CE (Gen) HTPS CSPGCL Korba.
Item no. 6. Status of AUFLS {Automatic Under Frequency Load Shedding} and
df/dt relays as on 28.06.2017:
The status of AUFLS & df/dt relays submitted by the
representatives of CE (S/s: O&M) is same as given in Annexure IV
and Annexure V respectively of minutes of 26th SOAP Meeting held
on 28.02.2016 forwarded vide letter No. 03-
02/SLDC/OPN/SOAP/2412 Raipur dated 10.03.2017.
As decided in 4th, 5th & 6th National Power Committee (NPC)
meetings, the feeders/lines mapping of the Feeders / Lines covered
under AUFLS, on SCADA systems of SLDC's/RLDC's was
discussed, wherein NPC have desired that monitoring of the feeders
/ loads under the AUFLS shall be done at SLDC's / RLDC's, so as
to ascertain that the desired results are ensured during the events,
frequency falling below the AUFLS frequency settings. O/o CE
(S/s: O&M) has intimated that the data will be provided from the
system being procured at their office for integration of all S/s data.
Mean while they have been requested to explore the possibility of
providing data from S/s where RTUs are already installed. No
reply has been received in this regard.
Minutes of 30th SOAP Meeting held on 28.06.2017 Page 7
It was requested to the representatives of O/o CE (S/s: O&M),
CSPTCL to submit the updated status of AUFLS & df/dt relays.
The data from Bilaspur circle is also incomplete. Kindly arrange to
submit the timeline for installing Under frequency relays for the
balance feeders as approved by honourable CSERC in the month of
August 2015. As per instruction of Member Secretary (I/c), WRPC , in the 31st
WRPC meeting held on 30.03.2016, at item no 11, He requested
that SLDCs shall collect the data of self certification by
Discoms/STUs and inspection carried out by intra-circles of
Discoms/STUs and submit to WRPC immediately (within 15 days).
Also as decided in 478th OCC meeting, the STUs were requested to
self certify the healthiness of the UFRs under their jurisdiction and
submit the same to this office for onward submission to WRPC.
Office of CE(S/s:O&M) CSPTCL is requested to submit the self
certification of present AUFLS relays on designated feeders and also
assign each circle head to certify the AUFLS status of other circle
and submit the report to SLDC within 15 days time.
Sub Committee noted.
ACTION: CE (S/s: O&M), CSPTCL
Item no.7. Details of new transmission lines transformer or any other
transmission elements to be charged in August 2017 & September
2017 :
The representative of O/o CE (S/s: O&M) has intimated that no new
element is going to be charged in August 2017 & September 2017.
Sub Committee noted.
The issue of TTC/ATC calculation in CSPTCL is long
pending and needs immediate attention.
Date & Venue of next meeting :
The 31th
SOAP meeting is proposed to be held on 28th July 2017
(Friday) at SLDC Raipur. The time of meeting will be from 12:00
hrs sharp.
*******
Annexure-I
S.No. Participants Designation Office Name Mobile No E-mail ID
1 Shri.A.K.Shrivastava Addl. CE O/o CE(SLDC), CSPTCL 9827177466 [email protected]
2 Shri.D.K.Khicharya SE O/o CE(SLDC), CSPTCL 9827117925 [email protected]
3 Shri. H.K Deota SE O/o CE(SLDC), CSPTCL 9893150920 [email protected]
4 Shri. Narottam Lal Sahu SE O/o ED(O&M:), CSPDCL 9425562906 [email protected]
5 Shri.G.K.Mandavi SE O/o CE(S/s:O&M), CSPTCL [email protected] ,
6 Ms. Manju Singh SE O/o CE(RA&PM), CSPDCL 9893325095 [email protected]
7 Shri.Y.K.Rao EE O/o CE(SLDC), CSPTCL 9826518820 [email protected]
8 Shri Girish Gupta EE O/o CE(SLDC), CSPTCL [email protected] ,
9 Shri.Sunil Gore EE O/o ED(O&M:), GCC,CSPGCL 9406028971 [email protected]
10 Shri.Shashank Dhabre EE O/o ED(O&M:),CSPGCL 9329296556 [email protected]
11 Shri.G.P.Singh AE O/o CE(SLDC), CSPTCL 9826137760 [email protected] ,
[email protected] Shri.Sourabh Pandey AE O/o CE(S/s:O&M), CSPTCL 9406052313 [email protected]
13 Ms.Pratibha Khunte AE O/o CE(SLDC), CSPTCL 8305447363 [email protected]
14 Ms. Juvena Gomes AE O/o SE(Back-up SLDC), CSPTCL 9827495849 [email protected]
15 Ms. Namita Vibha Lakra AE O/o CE(SLDC), CSPTCL 9406122692 [email protected]
List of participants attended the 30th SOAP (Sub-committee of Operation & Protection) Meeting.
7/12/2017
1
2.1 Performance of CSPGCL THERMAL & HYDEL Power Plant :
Generation (in MU)PLANT AVAILABILITY FACTOR
PAF (in %)
PLANT LOAD
FACTOR PLF
(in %)
Gener
atorCapacity MAY-17
Prog.
from
Apr-17
Gross
Gen.
Target*
MAY-
17
Prog.
from
Apr-17
Normative
Target *
MAY-
17
Prog.
from
Apr-17
KTPS440 MW
{4X50 +
2X120}167.49 279.29 2325.00 50.24 42.11
60%- PH2
70%- PH345.00 43.36
DSPM500 MW
{2X250}361.31 595.03 3723.00 101.92 85.87 85.00 97.12 81.29
HTPS 840 MW
{4X210}515.21 1022.42 6107.47 88.82 89.35 83.00 82.44 83.14
KWB
Extn500 MW
{1X500}368.69 728.78 3723.00 100.67 100.68 85.00 99.11 99.56
MTPP500 MW
{2X500}487.37 842.97 --- 65.36 61.41 --- 65.51 57.58
Thermal 3280 MW 1900.07 3468.49 --- --- --- --- 77.86 72.23
Bango
HPS120 MW
{3X40}6.48 26.84 274 --- --- --- --- ---
2.2 Performance of CSPGCL
Generating
StationCapacity
Auxiliary Consumption (in %) No. of Forced Outage
MAY-17Progressive
from Apr-17
Target*MAY-17
Progressive
from Apr-17
KTPS440 MW
{4X50 +
2X120}12.66 13.44 11.25 4 18
DSPM500 MW
{2X250}7.57 7.94 9.00 0 3
HTPS840 MW
{4X210}9.72 9.70 9.70 4 8
KWB
Extn.500 MW
{1X500}4.22 4.12 5.25 0 0
MTPP500 MW
{2X500}6.62 7.08 5.25 3 6
Thermal 3280 MW 7.71 7.89 --- 11 35
Bango120 MW
{3X40}1.45 0.65 1.00 --- ---
ANNEXURE II
7/12/2017
2
2.4 Frequency ParticularsFrequency status during Apr-17, May-17 and May-16 (As per WRLDC)
Other Frequency parameters during the month of May- 2017.
Frequency Status APR-17 MAY-17 MAY-16
% of time % of time % of time
Between
49.90 & 50.05 Hz74.49 71.45 69.78
< 49.90 Hz 9.05 9.09 7.10
> 50.05 Hz 16.45 19.46 23.12
Frequency Status Frequency {Hz} Time
{ h:mm}
Date
Average Freq. 49.99 -- --
Max Instantaneous Freq.50.26 18:07 21-05-2017
Min Instantaneous Freq.49.64 15:11 11-05-2017
2.5 Demand & ENERGY Pattern
APR-17 MAY-17 MAY-16% Change
compared to
previous year
Max. Demand Met4074 MW
22-04-17
24:00
3889 MW
03-05-2017
24:00
3457 MW
19-05-16
20:00
12%
Max. Unrestricted
Demand at the
time of Max.
Demand Met
4068 MW 3903 MW 3461 MW 13%
Min. Demand Met3221 MW
02-04-17
17:00
1771 MW
27-05-2017
18:00
1653 MW
21-05-16
17:00
7%
Max. Unrestricted
Demand
4068 MW
22-04-17
24:00
3910 MW
02-05-2017
23:00
3510 MW
19.05-16
23:00
11%
ANNEXURE II
7/12/2017
3
2800
2900
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
MW
Date
Daily Max Demand met in the month of MAY-16, MAY-17 & APR-17. MAX 3889 MW on 03.05.2017 at 24:00 hrs.
Average increase of 12 % compared
MAY-2016
MAY-2017
APR-2017
1700
1900
2100
2300
2500
2700
2900
3100
3300
3500
3700
3900
MW
Date
Daywise Min and Max Demand met in the month of May-17,
[ Difference : Max 1508 MW on 27 May 17 & Min 414 MW on 7 May17 ]
1508MW
414 MW
ANNEXURE II
7/12/2017
4
Break-Up of Generation / Injection at the time of monthly Peak Demand :
(3889 MW on 03-05-2017 at 24:00 hrs)
MW %
CSPGCL Thermal
(Ex Bus)2421 62%
CSPGCL Hydel 7 0.18%
CPP/IPP's (STOA+PPA)
Injection + Inter state STOA105 3%
Other Injection 84 2%
CS Share including BSP share in
NSPCL1216 31%
Net Import / Export 79 2%
OD(+) / UD(-) -23 -1%
Demand Met (MW) 3889
CSPGCL Thermal 242161%
CSPGCL Hydel7
0%
CPP/IPP's (STOA+PPA) Injection
+ Inter state STOA1053%
Other Injection842%
CS Share including BSP share in NSPCL
121631%
Net Import / Export 792%
OD(+) / UD(-) -23-1%
Break-up of Generation/Injection at the time of peak demand.
ANNEXURE II
7/12/2017
5
2.7 LOAD SHEDDING
Load Shedding during MAY-17:
Load Shedding Duration
(in HH:MM)
Equivalent
Load Relief
(in MU/Day)
Max Load
Shedding Done.
In Groups
Feeders
NILIn Industrial
feeders
TOTAL
2.8 - SOLAR POWER INJECTION (At 132 KV)
M/s ACME Raipur Solar
Private LimitedM/s Azure power Dhamdha
APR-17 MU 4.6248 4.6507
MAY-17 MU 4.595 4.107
ANNEXURE II
7/12/2017
6
ANNEXURE II
Sr. No. Name of S/S Name of feeder Date & Duration Remark
08.08.17
8:00 hrs to 18:00 hrs
03.08.17
(08:00 hrs. to 17:00 hrs.)
09.08.17
(08:00 hrs. to 17:00 hrs.)
16.08.17
(08:00 hrs. to 17:00 hrs.)
18.08.17
(08:00 hrs. to 17:00 hrs.)
22.08.17
(08:00 hrs. to 17:00 hrs.)
25.08.17
(08:00 hrs. to 17:00 hrs.)
28.08.17
(08:00 hrs. to 17:00 hrs.)
30.08.17
(08:00 hrs. to 17:00 hrs.)
Sr. No. Name of S/S Name of feeder Date & Duration Remark
04.09.17
(08:00 hrs. to 17:00 hrs.)
07.09.17
(08:00 hrs. to 17:00 hrs.)
11.09.17
(08:00 hrs. to 17:00 hrs.)
13.09.17
(08:00 hrs. to 17:00 hrs.)
15.09.17
(08:00 hrs. to 17:00 hrs.)
ANNEXURE III
OUTAGE PLANNING MONTH OF AUGUST-2017
2132 KV S/S
Sarangarh
132/33 KV, 40 MVA
X-mer No.-I(EMCO)For premansoon maintenance
3132 KV S/S
Jaijaipur
132 KV Jaijaipur-
Champa feederFor preventive maintenance
4220 KV S/S
Ragiarh
220/132 KV, 160 MVA
X-mer No.-I(TELK)For preventive maintenance
5132 KV S/S
Pathalgaon
132 KVPathalgaon-
Lodhma feederFor preventive maintenance
6132 KV S/S
Baramkela
132/33 KV, 40 MVA
X-mer No.-II(Vijai Elec.)For premansoon maintenance
1132 KV S/S
Gharghoda
132/33 KV, 40 MVA
X-mer No.-I(areva)
For postmansoon
maintenance
7132 KV S/S
Sarangarh132 KV Saraipali -I For preventive maintenance
8132 KV S/S
Adbhar
132/33 KV, 40 MVA
X-mer No.-I(ABB)For preventive maintenance
9132 KV S/S
Chaple132 KV Chaple-Champa For premansoon maintenance
OUTAGE PLANNING MONTH OF SEPT-2017
2132 KV S/S
Adbhar
132 KV Adbhar-Jaijaipur
feederFor preventive maintenance
3220 KV S/S
Gerwani220 KV Raigarh feeder For preventive maintenance
4132 KV S/S
Jashpur
132 KV Jashpur-
Lodhma feeder
For postmansoon
maintenance
5132 KV S/S
Baramkela
132/33 KV, 40 MVA
X-mer No.-I(ABB)
For postmansoon
maintenance
400 KV
switchyard
HTPS, Korba
West.
400 KV Bay No-7, NTPC
Feeder at 400 KV
switchyard HTPS, Korba
West.
Cleaning and tightness of
clamps of bus and line isolator,
CT's & CVT's and
breaker.Cleaning of insulator of
CT's & CVT's , isolator and
breaker.
1
Sr. No. Name of S/S Name of feeder Date & Duration Remark
ANNEXURE III
OUTAGE PLANNING MONTH OF AUGUST-2017
19.09.17
(08:00 hrs. to 17:00 hrs.)
21.09.17
(08:00 hrs. to 17:00 hrs.)
25.09.17
(08:00 hrs. to 17:00 hrs.)
28.09.17
(08:00 hrs. to 17:00 hrs.)
30.09.17
(08:00 hrs. to 17:00 hrs.)
6132 KV S/S
Sarangarh132 KV Saraipali -II
For postmansoon
maintenance
7132 KV S/S
Adbhar
132/33 KV, 40 MVA
X-mer No.-II(ABB)For preventive maintenance
8132 KV S/S
Gharghoda132 KV pathalgaon feeder
For postmansoon
maintenance
8132 KV S/S
Raigarh132 KV RR Energy For preventive maintenance
7132 KV S/S
Adbhar
132/33 KV, 40 MVA
X-mer No.-II(Andrew
yule)
For postmansoon
maintenance