Minutes of 29th SOAP Meeting held on 29.05.2017 Page 1
SSLLDDCC
MMIINNUUTTEESS OOFF 2299tthh
MMEEEETTIINNGG OOFF SSOOAAPP
HHEELLDD OONN 2299..0055..22001177
Minutes of 29th SOAP Meeting held on 29.05.2017 Page 2
Minutes of 29th
meeting of Sub Committee for Operation and Protection
(SOAP) held at SLDC, Raipur on 29.05.2017
The 29th
meeting of Chhattisgarh State Operation and Protection Sub
Committee of SGCC was held on 29th May 2017 at SLDC Conference Hall.
The list of participants is enclosed in Annexure-I.
Shri. B.R.Soni, Chief Engineer welcomed all the participants of 29th
SOAP meeting. Item no. 1 Confirmation of minutes:-
No comments have been received from any office. Therefore
minutes of 28th
SOAP meeting is hereby confirmed.
Sub Committee agreed and noted.
Item no. 2 Review of system operation during the month of April 2017:
Presentation and the performance of Thermal Stations and
Transmission System by SLDC, is enclosed in Annexure-II.
Sub Committee noted.
Item no. 3 Outage planning for the month of July 2017 & August 2017:
Outage planning of Transmission feeders, Power transformers
for the month July 2017 & August 2017, submitted by O/o CE
(S/s: O&M) is enclosed in Annexure III.
Once again the representatives were requested to
submit the planned outages by 26th of every month so that the
intra-state outages are discussed & finalize in the SOAP meeting
on 28th of every month.
Despite discussion in SOAP meetings and
intimation to all station heads in Minutes of Meetings, it has
been observed that the proposals for shut down of switchyard
and transmission lines are being still directly received from
EE(Opn) of power stations which is not in line with the
procedure already laid in the OPERATING PROCEDURE
approved by CSERC. All proposals must be forwarded either
through the head of the station concerned or ED(O&M:Gen)
CSPGCL Raipur. Further the proposals requiring backing down
Minutes of 29th SOAP Meeting held on 29.05.2017 Page 3
of generation must also be got approved by ED(O&M:Gen)
CSPGCL Raipur & CE(Commercial) CSPDCL, Raipur before
submission to SLDC.
ACTION: CE (O&M: Gen),Raipur, ED/CE(Gen),Korba East, Korba West, &
DSPMTPS , CSPGCL, Korba & CE (T&C) CSPTCL, Raipur
Sub Committee agreed and noted.
Item no.4 Real Time Telemetry:
Following status is intimated by O/o CE (S/s: O&M).
1. Bilaspur Region :
S.N. Name of the
Substation
Remark
1 220 KV S/S
Bishrampur
After the commissioning at Chhuri S/s , the work of 220 KV
Substation Bishrampur will be taken up by the same agency.
2 220 KV S/S
Gerwani
This substation is charged on dtd. 31.03.16. RTU is
commissioned, the real time data will be transmitted to
SLDC Raipur within a month.
3 132 KV S/s
Ambikapur
132 KV S/s
Pratappur 132
KV S/s
Balrampur
132 KV S/s
Bishrampur
Real Time Data of these sub stations will be transmitted to
SLDC Raipur from 220 KV Bishrampur to Korba west PH
via 220 KV S/s Chhuri. Therefore, the Real Time Data of
these sub stations will be transmitted to SLDC Raipur as and
when Data of 220 KV Bishrampur and 220 KV Chhuri is
available at SLDC Raipur. Also, it is to be noted that RTU is
not available at 132 KV S/S Balrampur. Requirement of the
same is intimated vide this office letter No.
4 132 KV S/s
Baramkela
At the site the RTU is available and is pre commissioned.
Only real time data matching with SLDC Raipur is pending
which is under progress.
Minutes of 29th SOAP Meeting held on 29.05.2017 Page 4
The status of the RTU at CSPTCL stations is once again given below:
Telemetry of KTPS, Korba East and Korba 100, 132 kV has not
improved at all since the meeting held on 25/04/2016.
1) DSPM TPS U#1 and U#2, Generator telemetry is still not
available.
2) Marwa U#1 and U#2 Generator telemetry is still not available.
3) Korba West 220 Side Korba East Line-1 – CB & Station X-mer
1,2 & 3 – CB indications are not available.
4) Bango Hydel Power Station Station X-mer 1- CB indication is
not available
The real time telemetry of following 14 charged substations is
still not available to the SLDC. The same needs to be integrated
to SLDC SCADA at the earliest.
i. 220 KV Chhuri.
ii. 220 KV Bishrampur.
iii. 220KV Gerwani
iv. 132 KV Ambikapur
v. 132 KV Pratappur
vi. 132 KV Balrampur
vii. 132 KV Bishrampur
viii. 132 KV Gariaband
ix. 132 KV Magarload ( None of the Analog Data are
available )
x. 132 KV Kondagaon
xi. 132 KV Sankara
xii. 132 KV Gopalpurlafarge
xiii. 132 KV Mana
xiv. 132 KV Rawanbhatha
A speedy action on this matter is requested by all Generating
stations heads and CE (S/s:O&M),CSPTCL to arrange
Minutes of 29th SOAP Meeting held on 29.05.2017 Page 5
telemetry on priority for successful & realistic commissioning of
EMS module in the upgraded SCADA system.
Sub Committee agreed and noted.
ACTION: CE (O&M: Gen),Raipur, ED/CE(Gen), Korba East, Korba West, &
DSPMTPS , CSPGCL, Korba & CE (T&C) CSPTCL, Raipur.
Item no.5. Status of FGMO { Free Governor Mode Operation } in thermal
units as on 28.05.2017:
The status of FGMO/RGMO in thermal units of Korba west,
DSPM & Marwa is not clear at all. This issue has been discussed
in every OCC Meetings and SLDC has not been able to give
proper reply due to non submission of data at the time of grid
disturbance.
The FGMO of unit no.3 of KWB is out from a long time. The
necessary action being taken by the authorities of KWB shall be
appraised in next meeting.
As desired in last OCCM, for providing signal for Monitoring of
Restricted Governor Mode Operation (RGMO) at NLDC,
RLDC & SLDC for ensuring grid security and proper
operational guide lines by concerned grid operators. In last
meeting, SE (GCC) CSPGCL has intimated that arrangements
are being made for proving the same at power stations but till
the end of May17 no intimation has been received.
ACTION: CE (O&M: Gen), CSPGCL Raipur, ED (Gen) DSPMTPS
CSPGCL Korba & CE (Gen) HTPS CSPGCL Korba.
Item no. 6. Status of AUFLS {Automatic Under Frequency Load Shedding}
and df/dt relays as on 28.05.2017:
The status of AUFLS & df/dt relays submitted by the
representatives of CE (S/s: O&M) is same as given in Annexure
IV and Annexure V respectively of minutes of 26th SOAP
Minutes of 29th SOAP Meeting held on 29.05.2017 Page 6
Meeting held on 28.02.2016 forwarded vide letter No. 03-
02/SLDC/OPN/SOAP/2412 Raipur dated 10.03.2017.
As decided in 4th, 5th & 6th National Power Committee (NPC)
meetings, the feeders/lines mapping of the Feeders / Lines
covered under AUFLS, on SCADA systems of SLDC's/RLDC's
was discussed, wherein NPC have desired that monitoring of the
feeders / loads under the AUFLS shall be done at SLDC's /
RLDC's, so as to ascertain that the desired results are ensured
during the events, frequency falling below the AUFLS frequency
settings. O/o CE (S/s: O&M) has intimated that the data will
be provided from the system being procured at their office for
integration of all S/s data. Mean while they have been requested
to explore the possibility of providing data from S/s where
RTUs are already installed. No reply has been received in this
regard.
It was requested to the representatives of O/o CE (S/s: O&M), CSPTCL to submit the updated status of AUFLS & df/dt relays. As per instruction of Member Secretary (I/c), WRPC , in the 31st WRPC meeting held on 30.03.2016, at item no 11, He requested that SLDCs shall collect the data of self certification by Discoms/STUs and inspection carried out by intra-circles of Discoms/STUs and submit to WRPC immediately (within 15 days). Also as decided in 478th OCC meeting, the STUs were requested to self certify the healthiness of the UFRs under their jurisdiction and submit the same to this office for onward submission to WRPC. Office of CE(S/s:O&M) CSPTCL is requested to submit the self certification of present AUFLS relays on designated feeders and also assign each circle head to certify the AUFLS status of other circle and submit the report to SLDC within 15 days time.
Sub Committee noted.
ACTION: CE (S/s: O&M), CSPTCL
Minutes of 29th SOAP Meeting held on 29.05.2017 Page 7
Item no.7. Details of new transmission lines transformer or any other
transmission elements to be charged in July 2017 & August 2017:
The representative of O/o CE (S/s: O&M) has intimated that
no new element is going to be charged in July 2017 & August
2017.
Sub Committee noted.
Date & Venue of next meeting :
The 30th
SOAP meeting is proposed to be held on 28th June 2017
(Wednesday) at SLDC Raipur. The time of meeting will be
from 12:00 hrs sharp.
*******
Annexure-I
S.No. Participants Designation Office Name Mobile No E-mail ID
1 Shri.B.R.Soni CE O/o CE(SLDC), CSPTCL 9425188807 [email protected] Shri. Vivekanand Pandey Addl. CE O/o CE(O&M), CSPDCL 9425204352 [email protected]
3 Shri.A.K.Shrivastava Addl. CE O/o CE(SLDC), CSPTCL 9827177466 [email protected]
4 Shri.D.K.Khicharya SE O/o CE(SLDC), CSPTCL 9827117925 [email protected]
5Shri.Sandeep Kumar Verma
SE O/o CE(RA&PM), CSPDCL 9425211356---
6 Shri.J.K.Vaidya SE O/o ED(O&M), CSPGCL 9425382836 [email protected]
7 Shri.Y.K.Rao EE O/o CE(SLDC), CSPTCL 9826518820 [email protected]
8 Shri.Shashank Dhabre EE O/o ED(O&M:), GCC,CSPGCL 9329296556 [email protected]
9 Smt. Veena Narang EE O/o CE(S/s:O&M), CSPTCL 9713990560 [email protected]
10 Shri.Santosh Soni AE O/o SE (ET&I),DSPTPS 9827461184 [email protected]
11 Shri. Badal Verma AE ET&C-Maintenance,HTPS,CSPGCL 8103512540 [email protected]
12 Shri.Sourabh Pandey AE O/o CE(S/s:O&M), CSPTCL 9406052313 [email protected]
13 Ms. Namita Vibha Lakra AE O/o CE(SLDC), CSPTCL 9406122692 [email protected]
List of participants attended the 29th SOAP (Sub-committee of Operation & Protection) Meeting.
6/16/2017
1
2.1 Performance of CSPGCL THERMAL & HYDEL Power Plant :
Generation (in MU)PLANT AVAILABILITY
FACTOR PAF (in %)
PLANT LOAD
FACTOR PLF
(in %)
Genera
torCapacity APR-17
Prog.
from Apr-
17
Gross
Gen.
Target*
APR-17
Prog.
from
Apr-17
Normative
Target *APR-17
Prog.
from
Apr-17
KTPS440 MW
{4X50 +
2X120}111.80 111.80 2325.00 33.71 33.71
60%- PH2
70%- PH335.29 35.29
DSPM500 MW
{2X250}233.73 233.73 3723.00 69.28 69.28 85.00 64.92 64.92
HTPS 840 MW
{4X210}507.21 507.21 6107.47 89.89 89.89 83.00 83.86 83.86
KWB
Extn500 MW
{1X500}360.09 360.09 3723.00 100.68 100.68 85.00 100.02 100.02
MTPP500 MW
{2X500}355.60 355.60 --- 57.32 57.32 --- 49.39 49.39
Thermal 3280 MW 1568.42 1568.42 --- --- --- --- 66.41 66.41
Bango
HPS120 MW
{3X40}20.36 20.36 274 --- --- --- --- ---
6/16/2017
2
2.2 Performance of CSPGCL
Generating
StationCapacity
Auxiliary Consumption (in %) No. of Forced Outage
APR-17
Progressive
from Apr-
16
Target*APR-17
Progressive
from Apr-16
KTPS440 MW {4X50
+ 2X120}14.61 14.61 11.25 14 14
DSPM500 MW
{2X250}8.51 8.51 9.00 03 03
HTPS840 MW
{4X210}9.68 9.68 9.70 04 04
KWB
Extn.
500 MW
{1X500}4.01 4.01 5.25 0 0
MTPP500 MW
{2X500}7.71 7.71 5.25 03 03
Thermal 3280 MW 8.11 8.11 --- 24 24
Bango 120 MW {3X40} 0.40 0.40 1.00 --- ---
2.4 Frequency ParticularsFrequency status during Mar 17 , Apr-17 and Apr-16 (As per WRLDC)
Other Frequency parameters during the month of April- 2017.
Frequency Status MAR-17 APR-17 APR-16
% of time % of time % of time
Between
49.90 & 50.05 Hz73.56 74.49 69.94
< 49.90 Hz 8.95 9.05 13.07
> 50.05 Hz 17.50 16.45 16.98
Frequency Status Frequency
{Hz}
Time
{ h:mm}
Date
Average Freq. 49.99 -- --
Max Instantaneous
Freq.50.26 18:02:10 30.04.2017
Min Instantaneous Freq. 49.66 19:15:40 18.04.2017
6/16/2017
3
2.5 Demand & ENERGY Pattern
MAR-17 APR-17 APR-16
% Change
compared to
previous year
Max. Demand
Met
3768 MW
29-03-17
19:00
4074 MW
22-04-17
24:00
3891 MW
16-04-16
22:00
5%
Max.
Unrestricted
Demand at the
time of Max.
Demand Met
3775 MW 4068 MW 3879 MW 5%
Min. Demand
Met2341 MW
13-03-17
16:00
3221 MW
02-04-17
17:00
2523 MW
28-04-16
04:00
28%
Max.
Unrestricted
Demand
3917 MW
31-03-17
22:00
4068 MW
22-04-17
24:00
3935 MW
11-04-16
22:00
3%
2900
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
MW
Date
Daily Max Demand met in the month of MAR-17, APR-17 & APR-16. MAX 4074 MW on 22.04.2017 at 24:00 hrs.
Average increase of 4.70 % compared
APR-2016
MAR-2017
APR-2017
6/16/2017
4
3100
3300
3500
3700
3900
4100
MW
Date
Daywise Min and Max Demand met in the month of April-17,
[ Difference : Max 687 MW on 22 Apr 17 & Min 339 MW on 12 Apr 17 ]
339 MW
687MW
Break-Up of Generation / Injection at the time of monthly Peak Demand :
(4074 MW on 22-04-2017 at 24:00 hrs)
MW %
CSPGCL Thermal
(Ex Bus)2117 52%
CSPGCL Hydel 47 1%
CPP/IPP's (STOA+PPA) Injection
+ Inter state STOA52 1%
Other Injection 105 3%
CS Share including BSP share in
NSPCL1195 29%
Net Import / Export 612 15%
OD(+) / UD(-) -54 -1%
Demand Met (MW) 4074
6/16/2017
5
CSPGCL Thermal 51%
CSPGCL Hydel1%
CPP/IPP's (STOA+PPA)
Injection + Inter state STOA
1%
Other Injection2%
CS Share including BSP share in
NSPCL 29%
Net Import / Export
15%
OD(+) / UD(-) -1%
Break up of Generation / Injection at the time of peak demand.
ACBIL0.981
0%
ACBIL11.772
2%
JITPL49.05
8%
BALCO42.183
6%
JPL-II19.62
3%
JPNIGRIE_JNSTPP49.05
7%
KWPCL29.43
5%
LAMKPL12.753
2%
MCCPL13.2435
2%
MPPMCL MPSEB245.25
37%
SPECTRUM_ACBIL1.7658
0%
SPECTRUM_ACBIL1.7658
0%
APL Stage-139.24
6%
DVC58.86
9%
DVC88.2913%
Import during max demand.
6/16/2017
6
-51
Export during max demand (Through Power Exchange).
2.6- Percentage of BDI Compliance Percentage Status of Compliances of Backing Down Instruction issued by
SLDC to Generating Stations of CSPGCL for APR 2017:
MonthTotal no of
BDI issued by
SLDC
Compliance % by Generators/Generating Stations
Total Non
Compliance < 25% 25 to 50% 50 to 90% > 90%
APR-17 143 5 6 7 74 51
MonthTotal no of
BDI issued by
SLDC
Backing Down by Generators/Generating Stations.
(In Mus)
((
KTPS HTPS KWB Extn MTPP DSPM
APR-17 92.176 0.0004 29.68 0.093 49.796 12.606
6/16/2017
7
2.7 LOAD SHEDDING
Load Shedding during APRIL-17:
Load Shedding Duration
(in HH:MM)
Equivalent
Load Relief
(in MU/Day)
Max Load
Shedding Done.
In Groups Feeders18:43:00 0.06
MW on at HrsIn Industrial
feeders0:00:00 0.00
TOTAL 18:43:00 0.06
Power Cuts / Load shedding : CHHATTISGARH ( APRIL : 2017 )
Date
Hour 1st
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th
19th
20th
21st
22n
d
23rd
24th
25th
26th
27th
28th
29th
30th
01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
05:00 0 228 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
06:00 0 228 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
07:00 0 212 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
08:00 0 83 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
09:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10:00 0 205 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:00 0 250 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12:00 0 289 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
13:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
14:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
15:00 0 118 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6/16/2017
8
Power Cuts / Load shedding : CHHATTISGARH ( APRIL : 2017 )
Date
Hour 1st
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th
19th
20th
21st
22n
d
23rd
24th
25th
26th
27th
28th
29th
30th
16:00 0 373 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
18:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
19:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
20:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
21:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
22:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
23:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
24:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
AVG
(MW)0 83 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MAX
(MW)0 373 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MIN
(MW)0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.8 - SOLAR POWER INJECTION (At 132 KV)
M/s ACME Raipur Solar
Private LimitedM/s Azure power Dhamdha
APR-17 MU 4.6248 4.6507
ANNEXURE III
Sr. No. Name of S/S Name of feeder Date & Duration Remark
02.07.17
(08:00 hrs. to 17:00 hrs.)
04.07.17
(08:00 hrs. to 17:00 hrs.)
06.07.17
(08:00 hrs. to 17:00 hrs.)
10.07.17
(08:00 hrs. to 17:00 hrs.)
12.07.17
(08:00 hrs. to 17:00 hrs.)
15.07.17
(08:00 hrs. to 17:00 hrs.)
21.07.17
(08:00 hrs. to 17:00 hrs.)
23.07.17
(08:00 hrs. to 17:00 hrs.)
27.07.17
(08:00 hrs. to 17:00 hrs.)
30.07.17
(08:00 hrs. to 17:00 hrs.)
Sr. No. Name of S/S Name of feeder Date & Duration Remark
03.08.17
(08:00 hrs. to 17:00 hrs.)
09.08.17
(08:00 hrs. to 17:00 hrs.)
16.08.17
(08:00 hrs. to 17:00 hrs.)
18.08.17
(08:00 hrs. to 17:00 hrs.)
22.08.17
(08:00 hrs. to 17:00 hrs.)
25.08.17
(08:00 hrs. to 17:00 hrs.)
28.08.17
(08:00 hrs. to 17:00 hrs.)
30.08.17
(08:00 hrs. to 17:00 hrs.)8
132 KV S/S
Chaple132 KV Chaple-Champa
For premansoon
maintenance
6132 KV S/S
Sarangarh132 KV Saraipali -I
For preventive
maintenance
7132 KV S/S
Adbhar
132/33 KV, 40 MVA
X-mer No.-I(ABB)
For preventive
maintenance
4132 KV S/S
Pathalgaon
132 KVPathalgaon-
Lodhma feeder
For preventive
maintenance
5132 KV S/S
Baramkela
132/33 KV, 40 MVA
X-mer No.-II(Vijai Elec.)
For premansoon
maintenance
2132 KV S/S
Jaijaipur
132 KV Jaijaipur-Champa
feeder
For preventive
maintenance
3220 KV S/S
Ragiarh
220/132 KV, 160 MVA
X-mer No.-I(TELK)
For preventive
maintenance
OUTAGE PLANNING MONTH OF AUGUST-2017
1132 KV S/S
Sarangarh
132/33 KV, 40 MVA
X-mer No.-I(EMCO)
For premansoon
maintenance
OUTAGE PLANNING MONTH OF JULY-2017
1132 KV S/S
Raigarh132 KV Traction-I&II
For preventive
maintenance
2132 KV S/S
Adbhar132 KV Jaijaipur
For preventive
maintenance
3220 KV S/S
Raigarh132 KV Gerwani
For preventive
maintenance
4132 KV S/S
Gharghoda132 KV Pathalgaon
For preventive
maintenance
5132 KV S/S
Pathalgaon
132/33 KV, 40 MVA
X-mer No.-I
For preventive
maintenance
8220 KV S/S
Raigarh
132/33 KV,40 MVA X-
mer No.2
For preventive
maintenance
6132 KV S/S
Gharghoda132 KV Gerwani
For preventive
maintenance
7132 KV S/S
Raigarh132 KV Sarngarh-II
For preventive
maintenance
10132 KV S/S
Baramkela132 KV Raigarh
For preventive
maintenance
9132 KV S/S
Baramkela132 Kv Sarangarh
For preventive
maintenance