S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.
Sr1 Status & TDAQ School - gantep.edu.trhep/presentations/Faruk-25-02-2010.pdf · ISOTDAQ Friday,...
Transcript of Sr1 Status & TDAQ School - gantep.edu.trhep/presentations/Faruk-25-02-2010.pdf · ISOTDAQ Friday,...
Previous News
• Endcap triplet boards have been tested
• Test of both front and back side of Barrel FE, harnesses, LV cables done.
• TTC PPs, ROD PPs in clean room are tested
• Cabling from Marathon PS to Barrel is done
• Barrel CO2 cooling system is ready
• Active gas system will be completed in January.
• HWI system is being setup, will finish soon
Friday, February 26, 2010
News
• Endcap triplet boards have been tested
• Test of both front and back side of Barrel FE, harnesses, LV cables done.
• TTC PPs, ROD PPs in clean room are tested
• Cabling from Marathon PS to Barrel is done
• Barrel CO2 cooling system is ready
• Active gas system will be completed in January. Finished!
• HWI system is being setup, will finish soon. Finished!
Friday, February 26, 2010
News
• Scintillator trigger is ready to test
• Still having a software problems
• DAQ server problems
• SBC problems
Friday, February 26, 2010
Future Plans
• DAQ needs to be tested
• TRT Fast-OR trigger
• Endcap
• Monitoring Tool & Event viewer
• ATLAS note
Friday, February 26, 2010
• Very good lectures and heavy program
• Very good lab sessions
• 40 students (20 from Turkey, 20 from other countries)
Friday, February 26, 2010
Lectures Given
• NIM
• C and ROOT programing languages
• Threaded programming
• Scratch
• FPGA
• Trigger and DAQ hardware
• Data networksFriday, February 26, 2010
Project Assignment
• 4x4 Keypad designkey | wire | binary | decimal-------------------------------0 | SHORT => 0000 => 0 1 | A => 1000 => 8 2 | AC => 1010 => 103 | C => 0010 => 2 4 | BC => 0110 => 6 5 | BCD => 0111 => 76 | ABD => 1101 => 137 | AD => 1001 => 98 | AB => 1100 => 129 | ACD => 1011 => 1110 | ABC => 1110 => 1411 | CD => 0011 => 312 | B => 0100 => 413 | ABCD => 1111 => 1514 | BD => 0101 => 515 | D => 0001 => 1
Friday, February 26, 2010
Project Assignment
• Bicycle speedometer
• Uses PyQt and reads data from USB
• Gets only one bit data from bike’s tire
Friday, February 26, 2010
Heptin• You don’t need to install SinOS
• SinOS has pythia 8.1, 6.4, ROOT, GEant4 pre installed
• Version 0.1 Alpha will be available soon
• Python modules that calls shell scripts
Friday, February 26, 2010