Sprint 114 Review / Sprint 115 PlanningAugust 26th, 2013
Sprint Resource Pages
• For this sprint, visit: https://developer.connectopensource.org/display/NHINProgress/Sprint+114+Progress+Summary
• For next sprint, visit:https://developer.connectopensource.org/display/NHINProgress/Sprint+115+Progress+Summary
• For information on the CONNECT 4.3 release visit: https://developer.connectopensource.org/x/NIADCQ
2
Sprint 114 Summary - Cumulative Flow
3
To Do
In Progress
QA
Done
Sprint 114 Summary - Burndown Chart
4
Sprint 114 Summary –Sprint Statistics
• Points committed = 14.0– Initial points committed – 14.0
– 0 ticket was moved to sprint 115 for 0.0
– 0 tickets pulled into sprint for 0.0
• Points remaining (unclosed) at end of sprint = 1.0
• Points completed in sprint (velocity) = 13.0
5
Sprint 114 - What We are Showing TodayRelease 4.2 Available
Release 4.2 Available
–The Release 4.2 Wiki page: https://developer.connectopensource.org/x/AoBWC
6
Sprint 114 - Proposed ThemesSupport and Improved Testing
• Next steps in CI and testing automation improvements
– Add JBoss to the automated CI process
– Build Regression suite Framework for automation
– Configuration management via JMX (i.e. Standard/ Entity)
– Interoperability/integration test cases updates and enhancements
• Continue working with Healtheway/ CCHIT on certification program
• Support community that have begun Healtheway/ CCHIT participant certification testing
– Beginning to field support questions for community members actively engaged in certification testing
• Support community with Release 4.2 deployments 7
Sprint 114 - What We are Showing TodayCI and Test Automation Improvements
• Add JBoss to the automated CI process
– CONN-490
– Validation suite automatically runs at code check in
• Build Regression suite Framework for automation
– CONN-491
– CONN-492
– CONN-535
• Configuration management via JMX (i.e. Standard/ Entity)
– CONN-490
• Interoperability/integration test cases updates and enhancements
8
Sprint 114 - What We are Showing TodayCI and Test Automation Improvements
• Interoperability/integration test cases updates and enhancements
– CONN-563
– CONN-567
– CONN-568
– CONN-569
– CONN-570
9
Sprint 114 - What We are Showing TodayInteroperability Testing
• Release 4.3 Interoperability Testing Improvements
– Interoperability Migration and Stability Setup
10
Sprint 114 - What We are Showing TodayCertification Support
• Determination of Auditing Requirements for ATNA Compliance
– Bring CONNECT into compliance with ATNA guidance; requirements specific to each of the exchange Services
– Focus this sprint on the determination of required auditing data elements and preliminary design approach CONN-573
– Requirements for enhancements to Audit Logging https://developer.connectopensource.org/x/BIADCQ
– Preliminary Audit Design Approach: https://developer.connectopensource.org/x/kICrBw
11
IHE Audit Section DICOM Audit Section Field NameOpt/checklist Value Constraints
DSR COMMENTS (Dev team to validate the current audit content) Field Mapping
EventAuditMessage/EventIdentification
EventID M EV(110112, DCM, “Import”)EventActionCode M “C” (Create)EventDateTime M not specialized
Sprint 114 - What We are Showing TodayHealtheway Certification Support
• Healtheway Participation Certification Support
– Working with CCHIT on any clarifications
– Continuing to work with several community members on testing
– Haven’t been contacted on any members testing with 4.2
– No new updates or details on vendor certification
– Links below provide valuable insight and help on CONNECT and the certification test cases
Test case results
Table 1 – https://developer.connectopensource.org/x/JwA4C
Table 2 – https://developer.connectopensource.org/x/IoA7C
Certification - https://developer.connectopensource.org/x/ZIC6C
12
Sprint 114 - What We are Showing TodayAdditional Work this Sprint
• Meaningful Use Testing (NIST)
– Working with NIST team on testing CONNECT with Meaningful Use test cases
• Bug Fixes
– CONN-531 Document Retrieve in pass-thru mode failing in validation suite
• Community Support Tools (JIRA & Wiki)
– Made changes to increase stability and uptime for both JIRA and CONNECT Wiki
• More stable server setup
• Increased storage capacity
• Clean up of Network
13
Sprint 114 - What We are Showing TodayCustodial Agent and Community Support
• Working on updates to the CONNECT Roadmap to reflect current needs and industry requirements
• Other tasks
– Partner and Community Support
– Ongoing Custodial Agent Duties
• Product Backlog
https://issues.connectopensource.org/secure/VersionBoard.jspa?selectedProjectId=10140
14
Sprint 115 - Proposed ThemesSupport and Improved Testing
• Wrap up next step in testing automation improvements
– Finish Regression suite Framework for automation (Large Payload)
– Next components of Testing Configuration management via JMX (i.e. Standard/ Entity)
– Interoperability/integration test cases updates and enhancements
• Continue supporting Healtheway/ CCHIT and community members on certification program
– Beginning to field support questions for community members actively engaged in certification testing
• Support community with Release 4.2 deployments• Design Approach for Auditing enhancements
15
CONNECT 4Community Announcements
• CONNECT Awareness
– Open sprint review and planning meetings Next sprint meeting will be September 9th
– CONNECT 4 Blogs and Forum posts
– http://www.connectopensource.org/developer-resources/forums
16
Questions and Discussion
17