Transcript of Sprint 115 Review / Sprint 116 Planning September 9th, 2013.
Sprint Resource Pages
• For this sprint, visit: https://developer.connectopensource.org/display/NHINProgress/Sprint+115+Progress+Summary
• For next sprint, visit:https://developer.connectopensource.org/display/NHINProgress/Sprint+116+Progress+Summary
• For information on the CONNECT 4.3 release visit: https://developer.connectopensource.org/x/NIADCQ
2
Sprint 115 Summary –Sprint Statistics
• Points committed = 14.0– Initial points committed – 14.0
– 1 ticket was moved to sprint 116 for 1.0
– 2 tickets pulled into sprint for 1.0
• Points remaining (unclosed) at end of sprint = 0.0
• 1 Issue remaining at end of the sprint awaiting validation of requester
• Points completed in sprint (velocity) = 14.0
5
Sprint 115 - What We are Showing TodayRelease 4.2 Available
Release 4.2 Available
–The Release 4.2 Wiki page: https://developer.connectopensource.org/x/AoBWC
6
Sprint 115 - Proposed ThemesSupport and Improved Testing
• Wrap up next step in testing automation improvements
– Finish Regression suite Framework for automation
– Next components of Testing Configuration management via JMX (i.e. Standard/ Entity)
– Interoperability/integration test cases updates and enhancements
• Continue supporting Healtheway/ CCHIT and community members on certification program
– Beginning to field support questions for community members actively engaged in certification testing
• Support community with Release 4.2 deployments• Design Approach for Auditing enhancements
7
Sprint 115 - What We are Showing TodayTest Automation Improvements
• Build Regression suite Framework for automation
– CONN-576 Update passthru regression tests to run automatically
– CONN-578 Ensure standard mode regression tests run automatically
– CONN-579 Ensure Bimodal regression suite is running automatically in standard mode
• Configuration management via JMX
– CONN-575 Provide the ability to set specific service/direction combos to standard/passthru mode via JMX
– CONN-582 Research how to call and update JMX values via groovy scripts in SOAPUI
8
Sprint 115 - What We are Showing TodayInteroperability Testing
• Release 4.3 Interoperability Testing Improvements
– Interoperability Migration and Stability Setup
• CONN-569 Setup Interop test environment on Linux with Glassfish/CONNECT 3.1
9
Sprint 115 - What We are Showing TodayCertification Support
• Determination of Auditing Requirements for ATNA Compliance
– Bring CONNECT into compliance with ATNA guidance; requirements specific to each of the exchange Services
– Still accepting community feedback as we work towards finalizing the design approach
– Requirements for enhancements to Audit Logging https://developer.connectopensource.org/x/BIADCQ
– Preliminary Audit Design Approach: https://developer.connectopensource.org/x/kICrBw
10
Sprint 115 - What We are Showing TodayHealtheway Certification Support
• Healtheway Participation Certification Support
– Working with CCHIT on any clarifications
– Continuing to work with several community members on testing
– Metro based gateways; SAML Assertion issues
• TC: MAQD-R-0003.301-2011 - Handle missing Assertion signature element
• TC: MAQD-R-0003.421-2011 - Handle Missing Subject Name ID in Assertion
• TC: MAQD-R-0003.424-2011 - Handle Missing Subject Confirmation Method in Assertion
– Presented findings to Spec Factory
• Additional meetings will be held to determine vulnerability and Healtheway’s path forward with this situation
11
Sprint 115 - What We are Showing TodayHealtheway Certification Support
• Healtheway Participation Certification Support
– Release 4.2 passes all certification tests
• CXF properly handles all the SAML assertion test cases
– No new updates or details on vendor certification
– Links below provide valuable insight and help on CONNECT and the certification test cases
Test case results
Table 1 – https://developer.connectopensource.org/x/JwA4C
Table 2 – https://developer.connectopensource.org/x/IoA7C
Certification - https://developer.connectopensource.org/x/ZIC6C
12
Sprint 115 - What We are Showing TodayAdditional Work this Sprint
• Meaningful Use Testing (NIST)
– Working with NIST team on testing CONNECT with Meaningful Use test cases
• Release 4.2 Support– SSA 4.2 Install Support
– CMS 4.2 Install Support
– Community Install Support
• Bug Fixes
– CONN-574 EnityDocRetrieve regression suite should be in Standard as opposed to Bimodal
• Community Support Tools (JIRA & Wiki)
– Made changes to increase stability and uptime for both JIRA and CONNECT Wiki
sa
13
Sprint 115 - What We are Showing TodayCustodial Agent and Community Support
• Working on updates to the CONNECT Roadmap to reflect current needs and industry requirements
• Other tasks
– Partner and Community Support
– Ongoing Custodial Agent Duties
• Product Backlog
https://issues.connectopensource.org/secure/VersionBoard.jspa?selectedProjectId=10140
14
Sprint 116 - Proposed ThemesTesting wrap up and Certification
• Complete final automation steps for nightly run of Regression test suite
– Bimodal test runs in Passthru
– Ensure automated Regression suite successfully runs for all environments
• Meaningful Use certification testing support
– Address a couple potential issues found
– Meet with NIST test team • Requirements and design for database-less transaction
logging and Wiki page• Support community with Release 4.2 deployments• Start review of DoD Fortify scan results
15
CONNECT 4Community Announcements
• CONNECT Awareness
– Open sprint review and planning meetings Next sprint meeting will be September 23rd
– CONNECT 4 Blogs and Forum posts
– http://www.connectopensource.org/developer-resources/forums
16