Spectrometer Solenoid Procurement Update Steve Virostek Wing Lau Mike Green Stephanie Yang Lawrence Berkeley National Lab Oxford Physics MICE Collaboration Meeting June 9, 2006
  • date post

    20-Dec-2015
  • Category

    Documents

  • view

    213
  • download

    0

Transcript of Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence...

Page 1: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer

Solenoid Procurement

Update

Steve Virostek Wing LauMike Green Stephanie

YangLawrence Berkeley National Lab Oxford Physics

MICE Collaboration Meeting June 9, 2006

Page 2: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 2

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

•Magnet specification completed and reviewed

•Change request for magnet design submitted

•Superconductor material accepted by LBNL

•Bid request package went out on April 10th

•Quotes requested from 7 vendors (3 US, 4 Europe)

•5 spectrometer solenoid bid packages received

•Bid review process is nearly complete

•Contract award expected before the end of June

Spectrometer Solenoid Update

Page 3: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 3

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

Page 4: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 4

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

Page 5: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 5

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

•Spec completed, reviewed by collaboration and provided to LBNL procurement mid-March

•LBNL Purchasing reviewed and evaluated the specification and wrote the Request for Proposal

•Build-to-spec bid request package including the solenoid specification went out on April 10th

•Quotes requested from 7 qualified vendors

•Bid response requested 5 weeks from RFQ release

•5 bid packages received on May 15th (2 no bids)

Recent Progress (March – June)

Page 6: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 6

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

•Several week evaluation period included analysis by LBNL (Eng. & Purch.) and questions for vendors

•Bid review process at LBNL is nearly complete

•Selected vendor’s bid package has been reviewed by an invited group at this collaboration meeting

•Contract award expected before the end of June

Other:

•Superconductor material arrived at LBNL May 5th

•Magnet design change request submitted May 9th

Recent Progress (continued)

Page 7: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 7

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

•General system description•Applicable codes and standards•Detailed fabrication requirements•Inspection and acceptance requirements•Packing, shipping and handling requirements

•Notification Requirements•List of government furnished materials•Quality assurance requirements•Conceptual design drawings•Attachments (conductor spec, procedures, TRD)

Procurement Specification Content

Page 8: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 8

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

•Material supplied by Outokumpu arrived on May 5th

•Length of the delivered conductor: 121.49 km

•Nominal dims of insulated conductor: 1.00 x 1.65 mm

•Nominal copper to superconductor ratio: 3.9 ± 0.4

•Number of filaments in the conductor matrix: ~222

•Nominal filament diameter: ~41 microns

•Nominal conductor twist pitch: 19 ± 3 mm

•Material cost for both solenoids: $168k

•Material to be shipped to vendor after contract award

Superconductor Details

Page 9: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 9

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

Conductor Cross-section

1.00 mm

1.65 mm

41 mm Nb-Ti FilamentRRR = 70 Copper

Page 10: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 10

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

Conductor Mechanical CharacteristicsBoth tests look for filament breakup

and defects in the filament bundle

The dimensions are acceptable

Page 11: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 11

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

Conductor Electrical Characteristics

Specified conductor critical current: >760 @ 4.2 K and 5 T

Specified conductor n value: >35

Specified conductor copper to S/C ratio: 3.9 ± 0.4

RRR values for the conductor copper are acceptable

Page 12: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 12

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

Typical OKAS Short Sample Test Plot

Page 13: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 13

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

Critical Current vs. Magnetic Induction

Page 14: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 14

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

Spooling of the Conductor

Page 15: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 15

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

LBNL Inspection of the Superconductor•3 crates received containing six

conductor spools •All spools of conductor were visually inspected and found to be in good condition w/no shifting

•A sample was cut from one of the smaller rolls (a small roll is more likely to have defects)

•The surface of the insulation from a 1 meter long section was visually inspected. The twist pitch was observed to be ~19 mm

•The conductor copper was removed using nitric acid to allow the Nb-Ti filaments to be inspected

Page 16: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 16

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

Exposed Conductor Filaments

The conductor twist pitch is within the specified range of values

~2.5 mm

Page 17: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 17

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

A Closer Look at the Filaments

No filament sausaging observed, suggesting a high n valueFilament surfaces appear to be acceptablejc likely to be uniform across the conductor section

Page 18: Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.

Spectrometer Solenoid Procurement Update

Page 18

S. Virostek, M. Green (LBNL) --- W. Lau, S. Yang (Oxford)

•Superconductor material accepted by LBNL

•RFQ’s sent to 7 magnet vendors

•5 bid packages received by LBNL May 15th

•Final vendor selection nearly complete

•Procurement contract expected to be placed before the end of June

Summary