Speaker: Klaus Siegemund (Ferrero) Co-Speaker: José ...€¦ · • Budgeting process integration...
Transcript of Speaker: Klaus Siegemund (Ferrero) Co-Speaker: José ...€¦ · • Budgeting process integration...
01.12.2015 Page 1
Speaker: Klaus Siegemund (Ferrero)
Co-Speaker: José Iglesias (Ciber)
Oktober 2015
at
01.12.2015 Page 2
Need for a 360° view on manufacturing
Source: SAP AG
01.12.2015 Page 3
Users don´t care about systems and applications
Source: SAP AG
01.12.2015 Page 4
Ferrero Group Facts
Start as a pastry shop in Alba (Italy, Piemont)
1946 Company founded in Italy by Michele Ferrero
Today global, non-listed company
Since its foundation in family ownership: CEO Giovanni Ferrero
The Ferrero Group in figures:
• ~ 30,000 employees
• 22 plants and 46 business units
• Turnover 2013: 8 Billion €
Worldwide Plants
01.12.2015 Page 5
Irland
Belgien
Frankreich
Italy
(4 Plants)
Deutschland
Polen
Kanada
Kamerun
Südafrika
Ecuador
Argentinien Brasilien
Türkei
Indien
Sri Lanka
Australien
Russland
Mexiko
China
German Plant Stadtallendorf
01.12.2015 Page 8
• First and largest production site of Ferrero outside Italy
• Workforce average of 4,000 employees
• Areal has size of 634,000 square meter in total
• High-Bay warehouse capacity for 70,000 pallets, expansion to 90,000 in 2016
• Worldwide Export
Gate
FG Warehouses
R/P Wh.
Power Plant
Chocolate
Factory
Ferrero Brands
01.12.2015 Page 9
01.12.2015 Page 12
MII in Production and Quality Management
01.12.2015 Seite 13
Production Lines
QM IPC QualityControl
RealtimeMES
QMDashboard
Time Mgmt.
Integrating Automatic Palletizer with MII
01.12.2015 Seite 14
Packing
Machine
Packing
Machine
Palletizer Applicator
PLC
Scanner
SAP
(ERP)MIIDB
MII Web Page
(display
on panel-PC)
Select
Order
Order +
Schema
WINCC
PCo
Show
Orders
Order
Details
01.12.2015 Page 15
Demand to implement EM
As is situation
New Horizons
How shall we begin ?
Simply define your requirements
01.12.2015 Page 16
Simple!
SAP ERP Preventive Maintenance
Continuous Improvement
Hu
ma
n C
ap
ita
l
Org
an
iza
tio
n
Predictive Maintenance
Budget / Investments
Productive MaintenanceMES / SF*
OEE
Dashboard
Production Efficiency
Idea
Managem
ent
MobilitySAP BI
Operations
Energy Management
Energy Management is embedded
01.12.2015 Page 17
* Shop-Floor
01.12.2015 Page 18
Main Intentions
• Increase energy efficiency in our group
• Comparison between production lines
• Tool for identifying potentials for savings
• Benchmarking our own energy improvements
• Overall Corporate Energy Balance
• Profitcenter responsability
• Compare historical periods
• Budgeting process integration
• Cost controlling - Energy cost per product / cost center
• Evidence of Green Production
01.12.2015 Page 19
Expectations
• One central solution covering all functions
• Substitute EXCEL and other island solutions
• International standards and KPI
• Flexible business reports
• Dynamic report creation by user
• Minimum effort for configuration
• Good performance based on high data volume
• Stable and complete data transfer all over the chain
• Less data layers / interfaces
• High integration potential
• Open to OEE, Maintenance, Financial, Controlling
01.12.2015 Page 20
Different Types of Measurements
• Primary– Electric Power (by Source)
– Gas
– Oil
– ……….
• Secondary– Compressed Air
– Steam
– Fresh Water (different temperatures)
– Waste Water
– ………..
01.12.2015 Page 21
Demand to implement EM
As is situation
New Horizons
Current Solution
01.12.2015 Page 22
Landscape Shop-Floor (Germany)
01.12.2015 Page 23
SiemensWINCC
FrakoServer
non electricalPowerratefor WinCC
TransformerCounter
~ 800
FrakoServerFrako
Server
electrical
non counted kWhConcentrator (security level)
CompressedAir
Steam
Counter ~ 150
High Power Bus
operationalDatabase
SQL-Server
MII
Landscape Shop-Floor
01.12.2015 Page 24
Acquisition
Systems
Sub system
Priv. Fieldbus
Acquisition
Devices
Ethernet/Field
-bus
PLC
Power Rate
Acquisition
Devices
ProfiNet / Ethernet
Ethernet/Field
-bus
EDMS Interface
Systems
Concentrator
Sub system
Transfer rate
15 min
PLC Power Rate
Up to 6 FIFO buffers for
one S7-300. Each buffer is able
to buffer 20 measuring points
for one day when the EDMS is
not available.
Local Landscape
01.12.2015 Page 25
MII
MESEDMS
Siemens
WebserviceEC
EEMSOAP
XML
operationalDatabase
SQL-Server
Data accumulated15‘ base
BWU
Manual InputSAP ECCPP-PI
QLI
Pieces
Run- and Idle time
INFOCube
Webservice
PI
External
Local
Global Landscape
01.12.2015 Page 26
From ECC
Central Instance
EC-EEM
Group System
Turkey
MES MII
Mexico
MII
ECC GEA
PI GEA
GER + ITA*
MES
MIIPI OHG
Local Plant Systems
ECC OHG From ECC
Local Instance
Operational
Database
SQL-Server
Operational
Database
SQL-Server
Historian MII
Operational
Database
SQL-Server
Operational
Database
SQL-Server
XI Proxy
MappingProd. Data
async
sync
Tag-listtagnames
tagnames
tagnames
GER Data
MEX Data
TUR Data
Propagate Tagnames
Back to other MIIand ECC
tagnames
Plant Data
Italy
Historian
*temporary
BI
Example – Daily Energy Report
01.12.2015 Page 27
Energy per 100 kg production output
01.12.2015 Page 28
01.12.2015 Page 29
Demand to implement EM
As is situation
Open new horizons!
Main Pillars approaching the future solution
01.12.2015 Seite 30
MII
on
HANA
HANANear
Real Time
Integration
Mobility
HTML 5
Easy
Analytics
Energy Management 2.0 = Energy2Go
Current System Landscape Simplification
01.12.2015 Seite 31
Meter
0,000 Meter Data
Management
System
MES
PCOOPC
MII EM BI
SSCE
HANA
System Landscape Simplification
01.12.2015 Seite 32
Meter
0,000 Meter Data
Management
System
MES
PCOOPC
MII EM BI
Meter
0,000 Meter Data
Management
System
MES
PCOOPC
MII
BI
SSCE*
*SSCE = Self Service Composition Environment
HANA
HANA EM 2.0 – Reporting View
01.12.2015 Seite 33
HANA DB
Big
Data
High Performance availabiliity with MII 15.x
Custom
ApplicationsStandard - SW
Reporting on MII with SSCE
Services
Interfaces
Inte
gra
tion S
cenario
Office Integration(EXCEL)
BI – Design Studio
Lumira
PIC
MII on HANA EM 2.0 BI – Operational View
01.12.2015 Seite 34
HANA DB
Control
Center
MES System(if in place)
WINCC
MII(Version independent)(if in place)
"traditional" Databases
MII 15.xOn HANA
Historian
Dashboards
PCOOPC Scada
PLC
15'
Buckets
Central MII 15.x on HANA – Integration View
01.12.2015 Page 35
PIC
Strong SAP ERP integration
01.12.2015 Seite 36
Master Data stored in ERP
Master Data
Production
Cost Center
Products
Meter Config
SAP ERP
MII – System
Full
Global
Modules
PM
PP
….
PIC =
Plant information
Catalog
Basic settings
Company data
Plant Integration
01.12.2015 Seite 37
PI
MII – System
Full
Global
Modules
MII – System
LOCAL
Function
Modules
MII – System
LOCAL
Function
Modules
MII – System
LOCAL
Function
Modules
MII – System
LOCAL
Function
Modules
PI
Ferrero Plant MII Systems
POC Progress
• System Design Process– Concept with SAP
– BBP finalized
– HANA design finalized
• Ongoing Tasks – Co-Innovation Tasks with SAP ongoing
– Continous approval with stakeholders
– Continous POC systems improvements
– Build additional HANA DB, Views
– Loading Test Data (~ 30th June, 2015)
• POC Evaluation
01.12.2015 Page 38
Project Schedule
01.12.2015 Page 39
Sept - DezMay - AugJan - Apr
2014
Sept - DezMay - AugJan - Apr
2015
POC
MII Upgrade
HANA Setup
Evaluation
Concept Phase
HANA Tools - Power Designer
01.12.2015 Page 40
SAP Hana Studio
01.12.2015 Seite 41
Reporting Example with LUMIRA
01.12.2015 Seite 42
Reporting Example with LUMIRA
01.12.2015 Seite 43
Reporting Example with LUMIRA
01.12.2015 Seite 44
Benefits
Very simple:
All improvements and constant opimization
is finally saving our Job's because we are
competitive despite high labor costs in Germany
01.12.2015 Seite 45
Thank you!
01.12.2015 Page 46