SOUTHWARK STREETSCAPE DESIGN MANUAL (SSDM) AND ALL...

2
N DEEPDENE ROAD PORTCHESTER CLOSE SUNRAY AVENUE EXISTING SIGN 958 TO BE RELOCATED ON EXISTING LAMP COLUMN. SIGN TO BE OFFSET AWAY FROM CARRIAGEWAY. EXISTING SIGN POST TO BE REMOVED. 3.2 3.0 1.8 4.2 5.8 DENMARK HILL REINSTATE AND ENLARGE TREE PIT. RAISE BACK OF FOOTWAY LEVELS AND RECONSTRUCT FOOTWAY TO IMPROVE FOOTWAY DRAINAGE 3.0 3.2 6.4 3.2 4.0 EXISTING SIGN 959 TO BE RELOCATED ON EXISTING LAMP COLUMN. SIGN TO BE OFFSET AWAY FROM CARRIAGEWAY. EXISTING SIGN POST TO BE REMOVED. EXISTING SIGN 959 TO BE REPLACED ON EXISTING LAMP COLUMN. SIGN TO BE OFFSET AWAY FROM CARRIAGEWAY. 3.2 3.0 3.0 3.2 3.0 3.2 RECONSTRUCTED PEDESTRIAN ISLAND. CONTINUATION - REFER TO LAYOUT B CONTINUATION - REFER TO INSET A 2.5 4.0 3.7 WIDTH OF RIGHT TURN POCKET TO BE REDUCED TO IMPROVE SOUTHBOUND MERGE. AG AG AG AG AG AG AG AG BUS SHELTER BUS SHELTER AG LC LC LC LC LC LC LC BB BO BO P BO BO RS RS PS PS PS ACLAND CRESCENT BLANCHEDOWNE EXISTING HATCHING REMOVED AND BUS LANES WIDENED TO 4.0M. EXISTING RAISED CONTROLLED CROSSING RETAINED 3.0 4.0 3.0 4.0 CONTINUATION - REFER TO LAYOUT C CONTINUATION - REFER TO LAYOUT A DENMARK HILL 3.2 3.0 6.0 6.1 4.0 6.1 4.0 INFORMAL CROSSING REMOVED AND FOOTWAY RECONSTRUCTED TO SUIT. EXISTING CENTRAL ISLAND TO BE REMOVED AND CARRIAGEWAY REINSTATED N REMOVE SIGN 959 FROM LAMP COLUMN. REMOVE SIGN 543, ASSOCIATED SUPPLEMENTARY PLATE AND POST. MOUNT NEW SIGN 959 ON EXISTING LAMP COLUMN. SIGN TO BE OFFSET AWAY FROM CARRIAGEWAY. AG AG AG AG AG AG EG EG AG BUS SHELTER BO BO BB LC LC LC LC LC LC LC RS RS PS N A B 5.1 N CONTINUATION - REFER TO LAYOUT A SCHEME EXTENT A AG LC PS LEGEND 160 TOOLEY STREET LONDON SE1P 5LX REV DATE REVISION DESCRIPTION / DETAILS DRN BY CHKD BY APRVD BY PROJECT: TITLE: CONTRACT NO: SCALE: DRAWING NO: DATE DRAWN: PURPOSE: DRAWN DESIGNED CHECKED APPROVED DATE ISSUED: REV: BASED UPON THE ORDNANCE SURVEY 1:1250 MAPPING WITH THE PERMISSION OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE © CROWN COPYRIGHT 2018. UNAUTHORISED REPRODUCTION AND ANY CROWN COPYRIGHT INFRINGES MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. ON BEHALF OF LONDON BOROUGH OF SOUTHWARK. LICENCE NO. 0100019252. ISO FULL BLEED A3 420 X 297 MM Y:\C0488 RMP441 DENMARK HILL\50 CAD\20 SHEETS\C0488-SHE-20-0.DWG RMP440/441: Denmark Hill between Sunray Avenue and Champion Hill OUTLINE DESIGN SHEET 1 OF 2 DC DG HMC AGB 12/07/19 APRIL 2019 60493382-C0488-OD-01 FOR APPROVAL 1 : 500 @ A3 C 60493382-C0488 LAYOUT A LAYOUT B AGB AA DC FIRST ISSUE 14/01/19 0 LC UP TO 40MM ASPHALT CARRIAGEWAY RESURFACING UP TO 100MM ASPHALT CARRIAGEWAY RESURFACING ASPHALT CARRIAGEWAY REINSTATEMENT FOOTWAY RECONSTRUCTION (CONCRETE SLABS) EXISTING COVER (UNAFFECTED) EXISTING UTILITY COVERS TO BE ADJUSTED TO NEW FOOTWAY / CARRIAGEWAY LEVEL EXISTING LAMP COLUMN TO REMAIN PROPOSED SIGN ON EXISTING LAMP COLUMN REMOVE SIGN FROM EXISTING LAMP COLUMN REMOVE POST REMOVE POST AND SIGN EXISTING GULLY TO REMAIN EXISTING GULLY COVER TO BE REPLACED WITH CYCLE-FRIENDLY COVER EXISTING BUS SHELTER TO REMAIN EXISTING TREE TO REMAIN PROPOSED TREE PIT CONSTRUCTION PROPOSED ROAD MARKINGS EXISTING ROAD MARKINGS TO REMAIN EXISTING ROAD MARKINGS TO BE REMOVED PROPOSED GRANITE FULL HEIGHT KERB (150MM WIDE) PROPOSED GRANITE FULL HEIGHT KERB (300MM WIDE) EG BUS SHELTER AG KEY NOTES 1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED. 2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH LB SOUTHWARK STREETSCAPE DESIGN MANUAL (SSDM) AND ALL RELEVANT CONTRACT CLAUSES. 3. TOPOGRAPHICAL SURVEY COMPLETED IN JANUARY 2018 AND FEBRUARY 2019 BY PREMIER SURVEYS. 4. LOCATIONS OF PROPOSED GULLIES ARE INDICATIVE ONLY AND ARE NOT THE RESULT OF ANY IN-DEPTH INVESTIGATIONS. AGB AA DC REVISIONS FOLLOWING ECI & DQW 08/02/19 A PROPOSED GRANITE TRANSITION KERB (150MM WIDE) PROPOSED GRANITE FLUSH KERB (150MM WIDE) EXISTING KERB TO BE REMOVED EXISTING BOLLARD TO BE REMOVED EXISTING CENTRAL ISLAND BEACON TO BE DISCONNECTED AND REMOVED PROPOSED BENCH LEGEND (CONTINUATION): RS PS LC P BB BO RS LC AGB HMC DC REVISIONS FOLLOWING RSA COMMENTS 18/04/19 B DENMARK HILL SUNRAY AVENUE INSET A KEY AGB AA CM NO CHANGES 12/07/19 C

Transcript of SOUTHWARK STREETSCAPE DESIGN MANUAL (SSDM) AND ALL...

Page 1: SOUTHWARK STREETSCAPE DESIGN MANUAL (SSDM) AND ALL …moderngov.southwark.gov.uk/documents/s86531/Appendix 1.pdf · 2020. 1. 8. · southwark streetscape design manual (ssdm) and

N

DE

EP

DE

NE

R

OA

D

P

O

R

T

C

H

E

S

T

E

R

C

L

O

S

E

S

U

N

R

A

Y

A

V

E

N

U

E

EXISTING SIGN 958 TO BE RELOCATED

ON EXISTING LAMP COLUMN. SIGN TO BE

OFFSET AWAY FROM CARRIAGEWAY.

EXISTING SIGN POST TO BE REMOVED.

3.2

3.0

1.8

4.2

5.8

DENMARK HILL

REINSTATE AND ENLARGE TREE PIT.

RAISE BACK OF FOOTWAY LEVELS

AND RECONSTRUCT FOOTWAY TO

IMPROVE FOOTWAY DRAINAGE

3.0

3.2

6.4

3.2

4.0

EXISTING SIGN 959 TO BE

RELOCATED ON EXISTING

LAMP COLUMN. SIGN TO

BE OFFSET AWAY FROM

CARRIAGEWAY.

EXISTING SIGN POST TO

BE REMOVED.

EXISTING SIGN

959 TO BE

REPLACED ON

EXISTING LAMP

COLUMN. SIGN

TO BE OFFSET

AWAY FROM

CARRIAGEWAY.

3.2

3.0

3.0

3.2

3.0

3.2

RECONSTRUCTED PEDESTRIAN

ISLAND.

CO

NT

IN

UA

TIO

N - R

EF

ER

T

O L

AY

OU

T B

C

O

N

T

IN

U

A

T

IO

N

- R

E

F

E

R

T

O

IN

S

E

T

A

2.5

4.0

3.7

WIDTH OF RIGHT TURN POCKET TO

BE REDUCED TO IMPROVE

SOUTHBOUND MERGE.

AG

AG

AG

AG

AG

AG

AG

AG

BU

S S

HE

LTE

R

BUS SHELTER

AG

LC

LC

LC

LC

LC

LC

LC

BB

BO

BO

P

BO

BO

RS

RS

PS

PS

PS

A

C

L

A

N

D

C

R

E

S

C

E

N

T

BLA

NC

HE

DO

WN

E

EXISTING HATCHING REMOVED AND

BUS LANES WIDENED TO 4.0M.

EXISTING RAISED CONTROLLED

CROSSING RETAINED

3.0

4.0

3.0

4.0

C

O

N

TIN

U

A

TIO

N

- R

EF

ER

T

O

L

A

YO

U

T C

CO

NT

IN

UA

TIO

N - R

EF

ER

T

O L

AY

OU

T A

DENMARK H

ILL

3.2

3.0

6.0

6.1

4.0

6.1

4.0

INFORMAL CROSSING

REMOVED AND FOOTWAY

RECONSTRUCTED TO SUIT.

EXISTING CENTRAL ISLAND

TO BE REMOVED AND

CARRIAGEWAY REINSTATED

N

REMOVE SIGN 959 FROM LAMP COLUMN.

REMOVE SIGN 543, ASSOCIATED

SUPPLEMENTARY PLATE AND POST.

MOUNT NEW SIGN 959 ON EXISTING

LAMP COLUMN. SIGN TO BE OFFSET

AWAY FROM CARRIAGEWAY.

AG

AG

AG

AG

AG

AG

EG

EG

AG

BU

S S

HE

LTER

BOBO

BB

LC

LC

LC

LC

LC

LC

LCRS

RS

PS

N

A

B

5.1

N

C

O

N

TIN

U

A

TIO

N

- R

E

FE

R

T

O

L

A

Y

O

U

T A

SC

HE

ME

E

XT

EN

T

A

G

A

G

L

C

P

S

LEGEND

160 TOOLEY STREET LONDON SE1P 5LX

REV DATE REVISION DESCRIPTION / DETAILS

DRN

BY

CHKD

BY

APRVD

BY

PROJECT:

TITLE:

CONTRACT NO:

SCALE:

DRAWING NO:

DATE DRAWN:

PURPOSE:

DRAWN

DESIGNED

CHECKED

APPROVED

DATE ISSUED:

REV:

BASED UPON THE ORDNANCE SURVEY 1:1250 MAPPING WITH THE PERMISSION OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE © CROWN COPYRIGHT 2018. UNAUTHORISED REPRODUCTION AND ANY CROWN COPYRIGHT INFRINGES MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. ON BEHALF OF LONDON BOROUGH OF SOUTHWARK. LICENCE NO. 0100019252.

IS

O F

ULL B

LE

ED

A

3 420 X

297 M

MY

:\C

0488 R

MP

441 D

EN

MA

RK

H

ILL\50 C

AD

\20 S

HE

ET

S\C

0488-S

HE

-20-0.D

WG

RMP440/441: Denmark Hill

between Sunray Avenue and Champion Hill

OUTLINE DESIGN

SHEET 1 OF 2

DC

DG

HMC

AGB

12/07/19APRIL 2019

60493382-C0488-OD-01

FOR APPROVAL1 : 500 @ A3

C

60493382-C0488

LAYOUT A

LAYOUT B

AGBAADCFIRST ISSUE14/01/190

LC

UP TO 40MM ASPHALT CARRIAGEWAY

RESURFACING

UP TO 100MM ASPHALT CARRIAGEWAY

RESURFACING

ASPHALT CARRIAGEWAY REINSTATEMENT

FOOTWAY RECONSTRUCTION

(CONCRETE SLABS)

EXISTING COVER (UNAFFECTED)

EXISTING UTILITY COVERS TO BE ADJUSTED TO

NEW FOOTWAY / CARRIAGEWAY LEVEL

EXISTING LAMP COLUMN TO REMAIN

PROPOSED SIGN ON EXISTING LAMP COLUMN

REMOVE SIGN FROM EXISTING LAMP COLUMN

REMOVE POST

REMOVE POST AND SIGN

EXISTING GULLY TO REMAIN

EXISTING GULLY COVER TO BE REPLACED WITH

CYCLE-FRIENDLY COVER

EXISTING BUS SHELTER TO REMAIN

EXISTING TREE TO REMAIN

PROPOSED TREE PIT CONSTRUCTION

PROPOSED ROAD MARKINGS

EXISTING ROAD MARKINGS TO REMAIN

EXISTING ROAD MARKINGS TO BE REMOVED

PROPOSED GRANITE FULL HEIGHT KERB

(150MM WIDE)

PROPOSED GRANITE FULL HEIGHT KERB

(300MM WIDE)

EG

BUS SHELTER

AG

KEY

NOTES

1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED.

2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH LB

SOUTHWARK STREETSCAPE DESIGN MANUAL (SSDM) AND

ALL RELEVANT CONTRACT CLAUSES.

3. TOPOGRAPHICAL SURVEY COMPLETED IN JANUARY 2018

AND FEBRUARY 2019 BY PREMIER SURVEYS.

4. LOCATIONS OF PROPOSED GULLIES ARE INDICATIVE ONLY

AND ARE NOT THE RESULT OF ANY IN-DEPTH

INVESTIGATIONS.

AGBAADCREVISIONS FOLLOWING ECI & DQW08/02/19A

PROPOSED GRANITE TRANSITION KERB

(150MM WIDE)

PROPOSED GRANITE FLUSH KERB

(150MM WIDE)

EXISTING KERB TO BE REMOVED

EXISTING BOLLARD TO BE REMOVED

EXISTING CENTRAL ISLAND BEACON TO BE

DISCONNECTED AND REMOVED

PROPOSED BENCH

LEGEND (CONTINUATION):

RS

PS

LC

P

BB

BO

RS

LC

AGBHMCDCREVISIONS FOLLOWING RSA COMMENTS18/04/19B

DENMARK H

ILL

S

U

N

R

A

Y

A

V

E

N

U

E

INSET A

KEY

AGBAACMNO CHANGES12/07/19C

AutoCAD SHX Text
RG 42.77
AutoCAD SHX Text
RG 42.49
AutoCAD SHX Text
RG 42.67
AutoCAD SHX Text
RG 42.60
AutoCAD SHX Text
RG 42.48
AutoCAD SHX Text
RG 42.38
AutoCAD SHX Text
RG 42.20
AutoCAD SHX Text
RG 42.47
AutoCAD SHX Text
RG 42.46
AutoCAD SHX Text
RG 42.29
AutoCAD SHX Text
RG 42.12
AutoCAD SHX Text
RG 41.67
AutoCAD SHX Text
RG 42.65
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
20
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
LANE
AutoCAD SHX Text
LANE
AutoCAD SHX Text
BUS
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUS
AutoCAD SHX Text
LANE
AutoCAD SHX Text
BUS
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
BUS
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
Faded
AutoCAD SHX Text
BUS
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
LANE
AutoCAD SHX Text
BUS
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
LANE
AutoCAD SHX Text
BUS
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
20
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
BUS
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
20
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
532720mE
AutoCAD SHX Text
1
AutoCAD SHX Text
E=532633.567
AutoCAD SHX Text
N=175286.059
AutoCAD SHX Text
H=43.121
AutoCAD SHX Text
MH CL 42.87
AutoCAD SHX Text
MH CL 42.68
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
20
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
Faded
AutoCAD SHX Text
532620mE
Page 2: SOUTHWARK STREETSCAPE DESIGN MANUAL (SSDM) AND ALL …moderngov.southwark.gov.uk/documents/s86531/Appendix 1.pdf · 2020. 1. 8. · southwark streetscape design manual (ssdm) and

N

F

E

R

N

D

E

N

E

R

O

A

D

DENMARK HILL

DENMARK HILL

3.1

4.0

3.2

3.2

3.3

3.2

3.2

4.5

3.5

3.2

3.0

3.2

REMOVE SIGN 543, ASSOCIATED

SUPPLEMENTARY PLATE AND POST.

3.9

3.4

3.2

CO

NT

IN

UA

TIO

N - R

EF

ER

T

O L

AY

OU

T D

CO

NT

IN

UA

TIO

N - R

EF

ER

T

O L

AY

OU

T B

REMOVE SIGN 959

FROM LAMP COLUMN.

EXISTING CHUTE GULLY REPLACED WITH NEW

GULLY POT AND CYCLE-FRIENDLY COVER.

PROPOSED CONNECTION DIRECTLY INTO EXISTING

PIPE RUN AND EXISTING MANHOLE BACKFILLED.

DRAINAGE SURVEY TO DETERMINE DETAILS.

MOUNT NEW SIGN 959

ON EXISTING LAMP

COLUMN. SIGN TO BE

OFFSET AWAY FROM

CARRIAGEWAY.

MOUNT EXISTING SIGN 959 ON NEW

OFFSET BRACKET ON EXISTING

LAMP COLUMN. SIGN TO BE OFFSET

AWAY FROM CARRIAGEWAY.

TREE TO BE ASSESSED AND

REMEDIED AS APPROPRIATE IN

COORDINATE WITH LB LAMBETH.

3.0

AG

AG

EG

EG

AG

BUS SHELTER

BUS SHELTER

LC

LC

LC

LC

LC

LC

LC

EG

RS

RS

PG

PS

PS

DEN

MAR

K HILL

C

H

A

M

P

I

O

N

H

I

L

L

3

.

7

1

.

9

4

.

9

3

.

2

N

3

.2

2

.0

CO

NT

IN

UA

TIO

N - R

EF

ER

T

O L

AY

OU

T C

S

C

H

E

M

E

E

X

T

E

N

T

D

E

N

M

A

R

K

H

I

L

L

6

.

2

2.4

3.4

3.4

4.5

3

.

0

BUS LANE WIDENED TO 4.5m

FOR UPHILL CYCLISTS AND

REDUCE IMPACT OF TREES

REMOVE CENTRAL RESERVATION AND

LIGHTING COLUMN TO PROVIDE

ADDITIONAL WIDTH TO BUS LANE.

RESURFACING REQUIRED TO TIE IN

CARRIAGEWAY LEVELS AT THE CROWN.

OVERGROWN VEGETATION TO BE

CUT BACK TO INCREASE USABLE

WIDTH OF BUS LANE

REPLACE EXISTING STAGGERED CROSSING

WITH PROPOSED RAISED TABLE AND NEW

UNCONTROLLED CROSSING.

IMPROVED PEDESTRIAN ISLAND REALIGNED

TO SUIT ENHANCED CROSSING.

EXTEND LOW

LEVEL PLANTING

RECONSTRUCT FOOTWAY TO

IMPROVE FOOTWAY SURFACE

AND REMOVE PEDESTRIAN

GUARDRAIL.

REMOVE SIGN

959 AND POST

INVESTIGATION IN TO DRAINAGE

REQUIREMENTS TO BE UNDERTAKEN

AS PART OF DETAIL DESIGN PHASE.

DRAINAGE SURVEY COMPLETED.

6

.0

BO

A

G

LC

BO

BOBO

BO

BO

A

G

P

G

AG

AG

A

G

LC

LC

BO

LC

RG

LC

P

B

LC

LC

LC

LC

LC

LC

RS

BO

R

G

3.2

3

.8

3

.2

POTENTIAL LOW

LEVEL PLANTING

A'

A

B

'

B

C

'

C

N

C

D

PROPOSED

LEVEL (m)

EXISTING

LEVEL (m)

A

A'

NO

RT

HB

OU

ND

CA

RR

IA

GE

WA

Y

CH

AN

NE

L

EX

IS

TIN

G IS

LA

ND

CH

AN

NE

L

EX

IS

TIN

G T

OP

O

F

IS

LA

ND

2.94

32

.2

3

32

.3

2

1:14

1:14

1:18

1:19

1:18

3.78

31

.7

5

0.89

31

.9

6

32

.1

6

32

.3

5

32

.2

3

EX

IS

TIN

G IS

LA

ND

CH

AN

NE

L

32

.1

7

31

.9

6

31

.7

5

PROPOSED

LEVEL (m)

EXISTING

LEVEL (m)

B

B'

NO

RT

HB

OU

ND

CA

RR

IA

GE

WA

Y

CH

AN

NE

L

2.37

30

.3

5

1:60

1:60

1:13

1:12

1:13

3.10

29

.9

7

29

.9

1

30

.0

6

30

.4

7

30

.4

6

EX

IS

TIN

G IS

LA

ND

CH

AN

NE

L

29

.8

0

30

.4

7

30

.6

3

30

.7

0

30

.7

2

30

.9

4

29

.9

7

29

.8

5

30

.0

9

29

.8

5

BA

CK

O

F F

OO

TW

AY

TO

P O

F K

ER

B

EX

IS

TIN

G IS

LA

ND

KE

RB

EX

IS

TIN

G IS

LA

ND

KE

RB

30

.4

1

30

.5

3

30

.7

0

30

.8

0

30

.8

0

30

.9

4

3.62 2.20 3.47 1.96 1.38

EX

IS

TIN

G IS

LA

ND

CH

AN

NE

L

SO

UT

HB

OU

ND

CA

RR

IA

GE

WA

Y

CH

AN

NE

L

TO

P O

F K

ER

B

BA

CK

O

F F

OO

TW

AY

1:13

1:18

1:17

1:20

1:22

1:20

1:28

1:12

1:12

PROPOSED

LEVEL (m)

EXISTING

LEVEL (m)

C

C'

EX

IS

TIN

G IS

LA

ND

CH

AN

NE

L

NO

RT

HB

OU

ND

CA

RR

IA

GE

WA

Y

EX

IS

TIN

G T

OP

O

F

IS

LA

ND

3.61

29

.0

2

1:18

1:28

1:18

1:10

1:18

1.74

28

.4

7

3.85

28

.6

0

28

.7

9

29

.0

2

EX

IS

TIN

G IS

LA

ND

CH

AN

NE

L

28

.8

1

28

.5

1

SO

UT

HB

OU

ND

CA

RR

IA

GE

WA

Y

28

.8

9

28

.7

2

CH

AN

NE

L

32

.4

4

32

.5

5

1:28

1:18

SO

UT

HB

OU

ND

CA

RR

IA

GE

WA

Y

1:30

32

.4

4

32

.5

5

3.70 3.12

1:18

1:28

CH

AN

NE

L2

8.3

4

1.883.05

CH

AN

NE

L

1:24

1:17

1:47

29

.0

62

9.0

6

28

.3

4

1:18

1:47

28

.7

0

29

.9

3

TA

CT

IL

E F

OL

DL

IN

E

1:15

1.20

TA

CT

IL

E F

OL

DL

IN

E

30

.9

0

1:35

1.20

RS

LEGEND

160 TOOLEY STREET LONDON SE1P 5LX

REV DATE REVISION DESCRIPTION / DETAILS

DRN

BY

CHKD

BY

APRVD

BY

PROJECT:

TITLE:

CONTRACT NO:

SCALE:

DRAWING NO:

DATE DRAWN:

PURPOSE:

DRAWN

DESIGNED

CHECKED

APPROVED

DATE ISSUED:

REV:

BASED UPON THE ORDNANCE SURVEY 1:1250 MAPPING WITH THE PERMISSION OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE © CROWN COPYRIGHT 2018. UNAUTHORISED REPRODUCTION AND ANY CROWN COPYRIGHT INFRINGES MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. ON BEHALF OF LONDON BOROUGH OF SOUTHWARK. LICENCE NO. 0100019252.

IS

O F

ULL B

LE

ED

A

3 420 X

297 M

MY

:\C

0488 R

MP

441 D

EN

MA

RK

H

ILL\50 C

AD

\20 S

HE

ET

S\C

0488-S

HE

-20-0.D

WG

RMP440/441: Denmark Hill

between Sunray Avenue and Champion Hill

OUTLINE DESIGN

SHEET 2 OF 2

CM

CM

HMC

AGB

12/07/2019APRIL 2019

60493382-C0488-OD-02

FOR APPROVAL1 : 500 @ A3

C

60493382-C0488

NOTES

1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED.

2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH LB

SOUTHWARK STREETSCAPE DESIGN MANUAL (SSDM) AND

ALL RELEVANT CONTRACT CLAUSES.

3. TOPOGRAPHICAL SURVEY COMPLETED IN JANUARY 2018

AND FEBRUARY 2019 BY PREMIER SURVEYS.

4. LOCATIONS OF PROPOSED GULLIES ARE INDICATIVE ONLY

AND ARE NOT THE RESULT OF ANY IN-DEPTH

INVESTIGATIONS.

5. ALL PEDESTRIAN GUARD RAILS TO BE REMOVED (SUBJECT

TO GRAF ASSESSMENT FINDINGS).

LAYOUT C

LAYOUT D

AGBAADCFIRST ISSUE14/01/190

LOCATION PLAN

BUILDABILITY NOTE: LANE CLOSURES WILL BE REQUIRED TO UNDERTAKE

THE RAISED TABLE CONSTRUCTION WORKS AFFECTING ACCESS ROUTE TO

HOSPITAL.

LC

UP TO 40MM ASPHALT CARRIAGEWAY

RESURFACING

UP TO 100MM ASPHALT CARRIAGEWAY

RESURFACING

ASPHALT CARRIAGEWAY REINSTATEMENT

FOOTWAY RECONSTRUCTION

(CONCRETE SLABS)

PROPOSED ANTI-SHIFT TABLE (ASPHALT RAMPS)

EXISTING COVER (UNAFFECTED)

EXISTING UTILITY COVERS TO BE ADJUSTED TO

NEW FOOTWAY / CARRIAGEWAY LEVEL

EXISTING LAMP COLUMN TO REMAIN

EXISTING LAMP COLUMN TO BE DISCONNECTED

AND REMOVED

PROPOSED LAMP COLUMN

PROPOSED SIGN ON EXISTING LAMP COLUMN

REMOVE POST AND SIGN

REMOVE SIGN FROM EXISTING LAMP COLUMN

EXISTING BUS SHELTER TO REMAIN

PROPOSED LOW LEVEL PLANTING

PROPOSED ROAD MARKINGS

EXISTING ROAD MARKINGS TO REMAIN

PROPOSED BENCH

BUS SHELTER

KEY

LC

LC

EXISTING ROAD MARKINGS TO BE REMOVED

EXISTING KERB TO BE REMOVED

PROPOSED GRANITE FULL HEIGHT KERB

(150MM WIDE)

PROPOSED GRANITE FULL HEIGHT KERB

(300MM WIDE)

PROPOSED GRANITE TRANSITION KERB

(150MM WIDE)

PROPOSED GRANITE FLUSH KERB

(150MM WIDE)

LEGEND (CONTINUATION):

RG

AG

PG

BO

BO

SECTION A SECTION B

SECTION C

EXISTING GUARDRAIL TO BE REMOVED

EXISTING GULLY TO BE REMOVED

EXISTING GULLY COVER TO BE REPLACED WITH

CYCLE-FRIENDLY COVER

PROPOSED CYCLE-FRIENDLY GULLY

EXISTING BOLLARD TO BE REMOVED

PROPOSED NEW "KEEP LEFT" BOLLARD

PROPOSED NEW BLISTER TACTILE PAVING

KEY KEY

AGBAADCREVISIONS FOLLOWING ECI & DQW08/02/19A

RS

PS

LC

LC

AGBHMCDCREVISIONS FOLLOWING RSA COMMENTS18/04/19B

AGBAACMREVISIONS TO LANE WIDTHS IN LAYOUT D12/07/19C

AutoCAD SHX Text
STOP
AutoCAD SHX Text
LANE
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUS
AutoCAD SHX Text
BUS
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
BUS
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
20
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
20
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUS
AutoCAD SHX Text
20
AutoCAD SHX Text
LANE
AutoCAD SHX Text
BUS
AutoCAD SHX Text
9
AutoCAD SHX Text
50
AutoCAD SHX Text
E=532759.884
AutoCAD SHX Text
N=175823.520
AutoCAD SHX Text
H=30.608
AutoCAD SHX Text
E=532764.441
AutoCAD SHX Text
N=175867.254
AutoCAD SHX Text
H=28.921
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
SLOW
AutoCAD SHX Text
LANE
AutoCAD SHX Text
BUS
AutoCAD SHX Text
20
AutoCAD SHX Text
BUS
AutoCAD SHX Text
LANE
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
LOOK RIGHT
AutoCAD SHX Text
LOOK LEFT
AutoCAD SHX Text
SLOW
AutoCAD SHX Text
20
AutoCAD SHX Text
LANE
AutoCAD SHX Text
BUS