07.03.2014BOSTON PROGRAMMING STUDYBOSTON PROGRAMMING STUDY
2
3
TABLE OF CONTENTS...
ABOUT
THE
PROJECT
OVERVIEW
SONOS
NOW
PROGRAMMING
SUMMARY
SUPPORTING
DATA
INTERVIEW
NOTES
12
3 4
56
4
5
ABOUT THE PROJECT...
The goal of this programming study is to provide SONOS with a forecasted view of their employee’s space needs in order to support the effectiveness of their future growth and workspace environment.
This study is based off of data collected from interviews between TROIKA and 12 SONOS employees. Through these interviews each employee acted as a spokesperson for their department, providing TROIKA with valuable information regarding employee counts, space requirements, workspace environment needs, and social/ammenity requests.
The results of this programming study should lead to exciting, engaging spaces for the company, branding opportunities spreading its creative culture, and innovative audio spaces for employees and visitors to be part of the SONOS experience.
1
6
SONOS NOW... Before beginning the interview process, TROIKA conducted an onsite observational walkthrough of the current SONOS space in order to gather an overall understanding of the departmental layout, work flow, and density. During this walkthrough a number of individuals within each department were briefly questioned about their spaces. The highlighted floor plans to the left and the Department Schedule shown below are the graphic representation of this walkthrough. The initial understanding of these spaces was a critical element when conducting the official programming interviews.
The takeaway from this initial walkthrough was that the existing layout is inefficient and crowded, a product of the rapid growth of the company within a building where there is minimal expansion opportunities. The densification resulting from these issues skews the USF per person metric (shown above). This number is based on the usable square footage measured off of the plans shown to the left (46,829 USF) divided by the expected employee count for the 2014 Fiscal Year of 219 people. It was also discovered that departments and locations shown in the graphics on this page are a generalization. The densification has led to a mingling of departments sometimes creating unexpected benefits in workflow while at other times creating distractions and difficult working environments.
DEPARTMENT SCHEDULE
LEVEL SONOS ZONE DEPARTMENT TEAMS INCLUDED OCCUPANCY
02 SECOND FLOOR 2ND FLOOR PRODUCT DEVELOPMENT SW & HW DEVELOPERS APPROX. 40 PPL
03 THIRD FLOOR HARDWARE/PLTE HARDWARE LAB LABS: PRODUCTION LINE TEST, ELECTRONICS, HW, ACOUSTIC
APPROX. 14 PPL
03 THIRD FLOOR THORNDIKE WING PRODUCT DEVELOPMENT SW,HW, UX DEVELOPERS APPROX. 60 PPL
03 THIRD FLOOR HARDWARE/PLTE HARDWARE LAB LABS: ACOUSTIC NA
03 THIRD FLOOR QA WING QUALITY ASSURANCE QUALITY ASSURANCE APPROX. 20 PPL
03 THIRD FLOOR SUPPORT WING CUSTOMER SUPPORT CUSTOMER SUPPORT APPROX. 25 PPL
03 THIRD FLOOR FULD SPACE FUTURE CUST. SUPPORT CUSTOMER SUPPORT MOVING INTO APPROX. 50+ PPL
03 THIRD FLOOR FIRST STREET WING FINANCE, IT, OPS, SALES FINANCE, IT, OPS, SALES APPROX. 32 PPL
03 THIRD FLOOR ATRIUM WING PRODUCT MANAGEMENT, FACILITIES, HR
RECEPTION, PRODUCT MANAGEMENT, FACILITIES, HR
APPROX. 25 PPL
03 THIRD FLOOR ATRIUM WING WEST CUSTOMER SUPPORT CUSTOMER SUPPORT APPROX. 25 PPL
04 FOURTH FLOOR 4TH FLOOR SOUND LAB LABS: ACOUSTIC, 3D PRINTER APPROX. 9 PPL
22014
214USF/PERSON
7
W65/36RW65/36R
W35/ 36R W35/ 36RW35/ 36R W35/ 36RW35/ 36RW35/ 36R
W65/3
6RW6
5/36R
W65/3
6RW6
5/36R
W35/ 36R W35/ 36RW35/ 36RW35/ 36R
W65/3
6RW6
5/36R
W35/ 36R W35/ 36R W35/ 42RW35/ 42R
W50/ 60R
W50/60R
W50/ 60R
W50/60R
W65/3
6RW6
5/36R
W65/36RW65/36R
W65/36RW65/36R
W65/3
6RW6
5/36R
W50/36RW50/36R
W50/24R
W50/36RW50/36R
W50/ 2
4R
W50/36RW50/36R
W50/24R
W50/36RW50/36R
W50/2
4R
W50/24R W50/48R W50/24RW50/48R
W35/3
6RW3
5/36R
W35/4
2RW3
5/36R
W35/3
6R
W65/36RW65/36R
W65/ 36R W65/ 36R
W35/3
6RW3
5/36R
W35/4
2RW3
5/36R
W35/36RW35/36R
W65/3
6R
W65/36RW65/36R
W35/42R W35/36R W35/36RW35/36R
W65/36RW65/36R
W35/42R W35/36R W35/36RW35/36R W35/42R W35/36R
W65/36R
W65/ 36R W65/ 36R W65/ 42R W65/ 36R W65/ 36R
W35/36RW35/36RW35/36R
W65/ 42R
W50/48R
W50/36RW50/36R
W50/24RW50/48R
W50/ 48R W50/ 24R
W50/36RW50/36R
W50/36RW50/36R
W50/24RW50/48R
W50/ 48R W50/ 24R W50/ 24R W50/ 48R W50/ 48R W50/ 24R W50/ 24R W50/ 48R
W35/36R W35/36R
W65/36RW65/36R
W65/36RW65/36R
W35/36RW35/36R W35/36R W35/36R W35/36RW35/36RW35/42R W35/42R
W50/60R
W50/ 60R
W50/60R
W50/ 60R
W65/36RW65/36R
W65/36R
W50/ 48R W50/ 24R
W65/36RW65/36R
W65/3
6RW6
5/36R
W65/3
6RW6
5/36R
W50/ 36R W50/ 36R
W50/2
4R
W50/ 36R W50/ 36R
W50/24R
W50/ 36R W50/ 36R
W50/2
4R
W50/ 36R W50/ 36R
W50/24R
W50/ 48R
W50/ 48R
W35/42R
W35/ 60R W35/ 48R
Z6 DM1 44 8 L
Z6DM1448L
Z6DM1448L Z6DM1448L
Z6DM
1448
L
Z6DM1448L
Z6DM
1448
L
Z6DM
1448
L
Z6DM1448L
Z6DM1448LZ6DM1448L
Z6DM
1448
L
24SCFC 24SCFC24SCFC 24SCFC24SCFC 24SCFC
24SCFC24SCF
C
24SCFC24SCF
C
24SCFC
24SCFC
24SCFC 24SCFC
24SCF
C
24SCFC
24SCF
C
24SCF
C
24SCFC
24SCFC24SCFC
24SCF
C 24SCFC
24SCF
C
24SCFC
24SCF
C 24SCFC
24SCF
C
24SCFC 24SCF
C
24SCFC
24SCF
C
24SCFC 24SCF
C
24SCFC
24SCF
C
24SCFC
24SCF
C
24SCFC
24SCF
C
24SCFC
24SCF
C
BF BFBF BFBF BF
BFBF
BFBF
BF
BF
BF BF
BF
BF
BF BF
BF
BFBF
BF BF
BF
BF
BF BF
BF
BF BF
BF
BF
BF BF
BF
BF
BF
BF
BF
BF
BF
BF
TPH36
TPH36TPH36
TPH36
TPH60
TPH36
TPH36 TPT36 TPT36TPH48TPH42 TPT36TPT36TPT36TPT36 TPH42TPH36 TPH36 TPH36
TPH36TPH36
TPH36TPH36
TPH36
TPH3
6TP
H36
TPH3
6
TPH36TPH36
TPH36 TPH36 TPH36 TPH36TPH42
TPH4
2
TPH36 TPH36 TPH36 TPH36TPH42
TPH3
6TP
H36
TPH4
2TP
H36
TPH36 TPH42 TPH36
TPH36TPH36
TPH36 TPH42 TPH36 TPH36
TPH3
6TP
H36
TPH42 TPH36
TPH3
6
TPH36
TPH3
6TP
H36
TPH3
6TP
H36
TPH36 TPH42 TPH36
TPH3
6
TPH36
TPH42
TPH42
TPH36
TPH36
TPH3
6TP
H36
TPH3
6
TPH3
6TP
H36
TPH3
6
TPT36TPT36TPT36TPT36
TPT36
TPT36TPT36TPT36TPT36
TPT3
6TP
T36
TPT3
6TP
T36
BPT7
2
BPT72
BPT72
BPT72
BPT72
BPT72
TPH36 TPH36 TPH36 TPH36TPH42
TPH36
TPH3
6TP
H36
TPH3
6
TPH36
12
33
21
TPH36
4 1
TPH36JC
1 2
12
33
2
11 2
322
31 1
1 1
2 2
331 23
23
TPH3
6
32
3
TPH3
6JC
TPH3
6
1
12
23
312
21 2
2
31
21
2
2 3
3 1
1
2
2
3
3
2
2
1
1
11
23
2
TPH3
6
JC
JC
1 13 3 3
22
11
12 1 12 233
TPT36
1 2 1 23
1 2
JC TPH36
1
23
32
1
12 3 2 2
1 1
1 1
2 2
1 1
1 2 3 21
12
1 12
33
21
TPH36
TPH3
6TP
H36
TPH3
6
CBLCBRCBLCBRCBLCBRCBLCBRCBLCBR CBLCBR CBLCBR CBLCBR
CBL CBRCBL CBRCBL CBRCBL CBR
CBLCBR CBLCBR CBLCBR CBLCBR
WBKWBK
CBL CBR
CBLCBRCB
LCB
RCBLCBRCB
LCB
R
WBKWBKWBKWBK
CBL
CBR
CBLCBR CBLCBR
CBLCBR
CBL
CBR
CBL
CBR
CBL CBRCBL CBR
CBLCBR
CBLCBR
CBL CBLCBRCBL
CBR
CBR
CBL
CBR
CBL
CBR
CBL
CBR
CBL CBRCBL CBR CBLCBR CB
LCB
R
CBL CBRCBL CBR CBLCBR CB
LCB
R
CBL CBRCBL CBR CBLCBR
CBLCBR
CBL
WBK
CBR WBK
WBK
WBK
WBK
WBK
WBK
WBK
WBK
CBL
CBR
CBL CBRCBL CBR
CBLCBR
CBL CBRCBL CBR
CBLCBR CBLCBR
CBL
CBR
CBL CBRCBL CBR
CBLCBR
CBL CBRCBL CBR
CBLCBR
WBK
WBK
WBK
CBR
29FL29FR 29F
L29F
R
60
29FL
29FR29FL
29FR
60
29FL
29FR29FL
29FR
60
29FL
29FR29FL
29FR
60
29F L29F R
29FL 29FR
60
29FL 29FR
60
29F L29F R
29FL 29FR
60
29F L29F R
29FL 29FR
60
29FL 29FR
29F L29F R
60
29FL 29FR
60
29FL 29FR
29F L29F R
60
29F L29F R
29FL 29FR
60
UCON2
35TT
30PVH
UCON4
65LL
UCON4
65LL
UCON3
UCON
2
UCON2
35TT
30PVH
UCON
3UC
ON2
UCON4
65LL
UCON3
UCON2
50PE
50PE
50PE
50PE
UCON4
65LL
65PE
UCON4
65LL
65PE
UCON4
65TT
UCON4
65LL
65 PE
UCON4
65LL
65PE
65PE
65PE
UCON4
65LL
UCON
2
35LL
30PVH
UCON2
35TT
30PVH
UCON2
35LL
30PVH
UCON2
35TT
30PVH
UCON2
35TT
30PVH
35TT
65PE
UCON4
65TT 65PE
UCON4
65TT
UCON4
65LL
UCON
2
35LL
30PVH
UCON4
65LL
UCON
4
65LL
65PE
65PE65PE65PE
UCON2
35LL
30PVH
UCON
2
35TT
30PVH
65PE
UCON4
65LL
UCON4
65TT
UCON4
65LL
65PE
50PE
UCON
2
35TT
15PVH
UCON4
65LL65PE
UCON3
50PE
UCON3
UCON
2
50PE
50PE
UCON4
65LL
65PE
UCON4
65TT
UCON
4
65LL
65PE
UCON4
65LL
65PE
UCON2
35TT
30PVH
UCON4
65LL
UCON
4
65LL
UCON
3
UCON2
UCON2
35LL
30PVH
50PE
UCON2
35LL30PVH
UCON3
UCON
250PE
UCON
2
35TT
15PVH
50PE
35PE
95040-WA
95040-WA
95040-WA
95040-WA
95040-WA
95040-WA
95040-WA
95040-WA
95040-WA95040-WA
95040-WA95040-WA
95040-WA 95040-
WA95040-
WA95040-WA95040-WA 950
40-WA 95040-WA 950
40-WA 95040-WA 950
40-WA 95040-W
A
95040-WA
95040-WA
95040-WA
95040-WA
95040-WA
95040-WA
95040-WA
95040-MF95040-MF
95040-MF
95040-MF
95040-MF
9504
0-MF
95040-MF
95040-MF
9504
0-MF
9504
0-MF
9504
0-MF
78054_WA78054_WA
78054_WA78054_WA
78054_WA
78054_WA
95040-MF
95040-MF 95040-MF
95040-MF 95040-MF
P72
P72
P72
P72 P72
P72
P72P72
35PF
65PL
65PL
50TS
65PF
15PF
50TS
15PF
65PL
50XS
15PF
15PF
65PL 65PL
65PF 65PL 65PL
65PL
35PL
P72 P72
P24P24
P72 P72
P24P24
P72 P72
35PF
35PF
65PF
65PF
65PL
35PL
65PL
65PL
65PL
65PF
65PL
65PL
50TS
65PF
15PF
P72P72
P72
P72
P72
P72
P72
P72P72
P72 P72 P72
P72P72
P72P72
50XS
15PF
15PF
65PL
65PF65
PL65PL
P72
P72
P72
P72
65PL
65PL P72P72
P24 P24
P72P72
P24 P24
50TS
65PF
15PF
35PL
35PL
50TS
65PF
15PF
35PF
35PF
35PF
35PF
ZDOC
36U ZDOC36U
ZDOC36UZDOC36UZD
OC36
UZD
OC36
UZDOC36UZDOC36UZD
OC36
UZD
OC36
U
ZD OC 36 U ZD OC 36 U
ZDOC36U ZDOC36U
ZD OC 36 U ZD OC 36 U
ZDOC
36U
ZDOC36U
ZDOC36UZDOC
36U ZDOC36UZD
OC36
U ZDOC
36U
ZDOC
36U ZDOC36U
ZDOC36U ZDOC
36U
ZDOC
36U ZDOC36U
ZDOC36U
36 x72- 24L /24R72 x36- 24L /24R 24x36 24x48 24x3636 x72- 24L /24R
24x36
72x36-24L/24R24x3636x72-24L/24R
24x36
72 x36- 24L /24R 24x36 24x6036 x72- 24L /24R
24x36
72x36-24L/24R24x3636x72-24L/24R
24x36
72 x36- 24L /24R 24x36 24x42 24x42
36 x7 2-24L/24R
24x36
72 x3 6-24L/24R
24x36
24x42
72x36-24L/24R 36x72-24L/24R
24x36
36 x7 2-24L/24R 72 x3 6-24L/24R
24x36
72x36-24L/24R24x
36
36x72-24L/24R
24x36
24x42 72x36-24L/24R24x
36
36x72-24L/24R
24x36
24x42 72x36-24L/24R24x
36
36x72-24L/24R
24x36
24x42
24x36
24x42
24x42T
36x72-24L/24R
24x36
72 x36- 24L /24R 24x36 36 x72- 24L /24R
24x36
72x36-24L/24R24x36 36x72-24L/24R
24x36
72 x36- 24L /24R 24x36 36 x72- 24L /24R
72x36-24L/24R24x3624x4224x42
24x42
30x60
30x60
30x60 30x60
30x60
30x60
24x78
24x78
30x60
30x60
30x60
30x6030x60
30x60
Strd 65 Mono 36Strd 65 Mono 36
35 mono 36 35 mono 3635 mono 36 35 mono 3635 mono 3635 mono 36
Strd 65
Mono
36Strd
65 Mo
no 36
Strd 65
Mono
36Strd
65 Mo
no 36
35 mono 36 35 mono 3635 mono 3635 mono 36
Strd 65
Mono
36Strd
65 Mo
no 36
35 mono 36 35 mono 36 35 mono 4235 mono 42
60 mkr bd 60
60 mkr bd 60
60 mkr bd 60
60 mkr bd 60
65 Aisle
Mono
3665 A
isle Mo
no 36
65 Aisle Mono 3665 Aisle Mono 36
65 Aisle Mono 3665 Aisle Mono 36
65 Aisle
Mono
3665 A
isle Mo
no 36
50 Aisle ntpcp 3650 Aisle ntpcp 36
50 Aisle ntpcp 24
50 Aisle ntpcp 3650 Aisle ntpcp 36
50Ais
lentpcp
24
50 Aisle ntpcp 3650 Aisle ntpcp 36
50 Aisle ntpcp 24
50 Aisle ntpcp 3650 Aisle ntpcp 36
50Ais
lentpcp
24
50 Aisle ntpcp 24 50 Aisle Mkrbd 48 50 Aisle ntpcp 2450 Aisle Mkrbd 48
35 mon
o 36
35 mon
o 36
35 mon
o 42
35 mon
o 36
35 mon
o 36
Strd 65 Mono 36Strd 65 Mono 36
Strd 65 Mono 36 Strd 65 Mono 36
35 mon
o 36
35 mon
o 36
35 mon
o 42
35 mon
o 36
35 mono 3635 mono 36
Strd 65
Mono
36
Strd 65 Mono 36Strd 65 Mono 36
35 mono 42 35 mono 36 35 mono 3635 mono 36
Strd 65 Mono 36Strd 65 Mono 36
35 mono 42 35 mono 36 35 mono 3635 mono 36 35 mono 42 35 mono 36
65 Aisle Mono 36
65 Aisle Mono 36 65 Aisle Mono 36 65 Aisle Mono 42 65 Aisle Mono 36 65 Aisle Mono 36
35 mono 3635 mono 3635 mono 36
Strd 65 Mono 42
50 mono mkrbd 48
50 Aisle ntpcp 3650 Aisle ntpcp 36
50 Aisle ntpcp 2450 Aisle Mkrbd 48
50 Aisle Mkrbd 48 50 Aisle ntpcp 24
50 Aisle ntpcp 3650 Aisle ntpcp 36
50 Aisle ntpcp 3650 Aisle ntpcp 36
50 Aisle ntpcp 2450 Aisle Mkrbd 48
50 Aisle Mkrbd 48 50 Aisle ntpcp 24 50 Aisle ntpcp 24 50 Aisle Mkrbd 48 50 Aisle Mkrbd 48 50 Aisle ntpcp 24 50 Aisle ntpcp 24 50 Aisle Mkrbd 48
35 mono 36 35 mono 36
Strd 65 Mono 36Strd 65 Mono 36
Strd 65 Mono 36Strd 65 Mono 36
35 mono 3635 mono 36 35 mono 36 35 mono 36 35 mono 3635 mono 3635 mono 42 35 mono 42
60 mkr bd 60
60 mkr bd 60
60 mkr bd 60
60 mkr bd 60
65 Aisle Mono 3665 Aisle Mono 36
65 Aisle Mono 36
50 Aisle Mkrbd 48 50 Aisle ntpcp 24
65 Aisle Mono 3665 Aisle Mono 36
65 Aisle
Mono
3665 A
isle Mo
no 36
65 Aisle
Mono
3665 A
isle Mo
no 36
50 Aisle ntpcp 36 50 Aisle ntpcp 36
50 Aisle
ntpcp 2
4
50 Aisle ntpcp 36 50 Aisle ntpcp 36
50 Aisle ntpcp 24
50 Aisle ntpcp 36 50 Aisle ntpcp 36
50 Aisle
ntpcp 2
4
50 Aisle ntpcp 36 50 Aisle ntpcp 36
50 Aisle ntpcp 24
50 mono mkrbd 48
60 mkr bd 48
Strd35prtd42
Strd 35 pr td 60 Strd 35 pr td 48
MECH.
MECH.ELEC.
MEN
WOMEN
MEN
WOMEN
FEC
FEC
24"
wb
ATRIUM
EXTERIORCOURTYARD
D.P.36x60
36x60?
30x60
DEPARTMENT LEGEND
PRODUCT DEVELOPMENT
30x84
30x84
30x84
W50/24R W50/24R
W50/24RW50/24R
P60W50/60R
P60W5
0/60R
W50/
24R
W50/
60R
W50/24RW50/60R
W50/42RW50/42R
W50/24RW50/24R
W50/24R W50/24R
P60W5
0/60R
P60W50/60R
W50/24R
W50/
24R
W50/42
RW50
/42R
W50/
60R
W50/
24R
W50/
60R
W50/
60R
W50/
24R
P24W50/24R W50/ 48R W50/ 48R
P24W50/24R
P24W50/24R W50/ 48R
W50/24RW50/24R
W50/ 48RP24
W50/24R
P60W5
0/60R
P60W50/60R
P60W5
0/60R
P60W50/60R
W50/60RW50/60RW50/60R
W50/
60R
W50/
24R
W50/
24R
P24W50/24R W50/ 48R W50/ 48R
P24W50/24R
P24W50/24R W50/ 48R W50/ 48R
P24W50/24R
P60W5
0/60R
P60W50/60R
P60W5
0/60R
P60W50/60R
W50/60R
W50/
60R
P24
W50/24R W50/ 48R W50/ 48RP24
W50/24R
P60W5
0/60R
P60W50/60R
W50/60R
W50/
60R
W50/24RW50/24R
W50/60RW50/60R
W50/
24R
W50/
24R
P24W50/24R
P24W50/24R
P24W50/24R
P24W50/24R
P60W5
0/60R
P60W50/60R
P60W5
0/60R
P60W50/60R
W50/60R
W50/
60R
W50/
60R
W50/
60R
P24W50/24R
P24W50/24R
P60W5
0/60R
P60W50/60R
W50/60R
W50/
60R
W50/24RW50/24R
W50/
24R
W50/24R
W50/
24R
W50/24R
W50/
24R
W50/24R
W50/
24R
W50/24R
W50/24R
W50/
24R
W50/
24R
W50/
24R
P60W50/60R
W50/24RW50/60R
W50/24RW50/60R
W50/24RW50/24R
P60W50/60R
W50/24R W50/60R
W50/24R W50/60R
W65/
30R
W35/
36R
W35/
36R
W65/36R W65/36R W65/36R W65/36R
W35/
36R
W35/
36R
W35/
36R
W35/
36R
W65/36R
W35/
36R
W35/
36R
W65/36R
W35/
36R
W35/
36R
W65/36RW65/36R
W65/
30R
W65/36R W65/36R W65/36R W65/36R
W35/
36R
W35/
36R
W35/
36R
W35/
36R
W65/30R
W65/
30R
W65/36R W65/36R W65/36R W65/36R
W35/
36R
W35/
36R
W35/
36R
W35/
36R
W65/30R
W35/
36R
W35/
36R
W65/30R
W65/36RW65/36RW65/36RW65/36R
W65/36RW65/36R
W65/36RW65/36R
W50/36RW50/ 48R
W65/30R
W65/36RW65/36R
W50/36RW50/ 48R
W65/36RW65/48R
W65/36R W65/36R
W35/36RW35/36R
W35/36RW35/36R
W65/36RW65/36R
W35/
36R
W35/
36R
W35/
36R
W35/
36R
W65/36R W65/36R
W65/36R
W35/
36R
W35/
36R
W65/36R
W35/
36R
W35/
36R
W35/
36R
W35/
36R
W65/36R W65/36R
W65/30R
W65/
30R
W65/36R
W65/36R
W65/36RW65/36RW65/36RW65/36R
W50/36RW50/36R
W50/36RW50/36R
W50/
30R
W50/
30R
W50/36RW50/36R
W50/36RW50/36R
W50/36RW50/36R
W50/36RW50/36R
W50/36RW50/36R
W50/36RW50/36R
W50/60R
W50/
60R
W50/
60R
W50/60RW50/60R
W50/60RW50/60R
P24
W50/
24R
P24W50/24R
W50/24RW50/24R
W50/24RW50/24R
W50/24RW50/24R
W50/24RW50/24R
W50/60R
W35/30
RW35
/30R
W35/30R
W50/4
8RW5
0/48R W50/48R
W50/48R
W50/ 48R W50/ 48R
W50/48RW50/48R
W50/ 48R W50/ 48R
W50/48RW50/48R
W50/ 48R W50/ 48R W50/ 48R W50/ 48R W50/ 48R W50/ 48R
30x84
W42/30F
W42/30F
W42/30F
W42/36FW50/24F
W50/24F
CH
PMK48 PMK48
PMK48PMK48PMK48 PMK48
PMK48 PMK48
PMK48 PMK48 PMK48 PMK48 PMK48 PMK48 PMK48 PMK48 PMK48 PMK48
PMK48 PMK48 PMK48 PMK48 PMK48 PMK48
PMK48
PMK48 PMK48
PMK48
Z6DM1460L
Z6DM1
460D
Z6DM1460D
Z6DM1
460D
Z6DM1460D
Z6DM1460D
Z6DM1460D
Z6DM1460LZ6DM1460L
Z6DM1460L
Z6DM1460L
Z6DM1
460D
Z6DM1460D
Z6DM1460L
Z6DM1460D
Z6DM1460D
Z6DM1460DZ6DM1460D
Z6DM1460D
TPH3
6
TPH363 3
TPH3
6
TPH36
121
2
8988E
BZ3
JC
TPH36 TPT36TPT36 TPH36
TPH3
6TP
H36
12
TPH3
6TP
H36
12
TPH3
6TP
H36
12
TPH3
6TP
H36
12
TPH36
TPH36
3
3
3
3
TPH3
6
TPH36TPH36
TPH363 3
8988EBZ3
TPH3
6
TPH36
121
2
TPH3
6TP
H36
12
TPH36
12
TPH36
8988E
BZ3
8988E
BZ3
JCTP
H36
TPH36TPH36
TPH363 3
8988EBZ3
TPH3
6
TPH36
121
2
TPH3
6TP
H36
12
TPH36
12
TPH36
8988E
BZ3
8988E
BZ3
JC
TPH36TPH36 TPT36TPT36
8988EBZ3
TPH3
6TP
H36
12
TPH36
12
TPH36
8988E
BZ3
BPT7
2
TPH48 TPH36
TPH3
6TP
H36
1
1 2
2 33
TPT3
6TP
T36
JCTPH48
8988E
BZ3
TPH48 TPH36
TPH3
6
1 2 3
TPT3
6
JCTPH48
TPH36TPH36
1
TPH36TPH36
12
TPH36TPH36
1 2
TPH36TPH36
2
JC
BPT72
TPH3
6TP
H36
12
TPH3
6
2
TPH3
6 1
TPH3
6TP
H36
12
TPH36
TPH36
3
3
3
3
TPH3
6TP
H36
1
TPH36 TPH36
1 2
TPH36TPH36
1 2
TPH36TPH36
2
TPH36TPH36
1
TPH36TPH36
12
TPH36 TPH36
12
TPH3
6TP
H36
2
JCJC
BPT72
BPT72
13
132
TPH60
TPH60
BPT72BPT72
CIFCIF
TPH42
TPH42
BPT72
TPH24
TPH24 BPT72
BPT72BPT72
TPH60
TPH60
TPH24
BPT72
TPH30
TPH30
TPH30
JC JCTP
H60
TPH6
0TP
H60
TPH6
0
TPH6
0TP
H60
TPH60TPH60
TPH24TPH24TPH24TPH24 TPH24TPH24TPT96 TPT96 TPT96
1
1
22
22222 2
1
1
1
1
1
1
1
1
22
2222
1
1
8988EBZ3 8988EBZ3
8988EBZ3 8988EBZ3 8988EBZ3 8988EBZ3 8988EBZ3 8988EBZ3
TPH6
0
TPH6
0TP
H60
TPH6
0
TPH6
0TP
H60
TPH24TPH24 TPH24TPH24TPT96
222 2
1
1
1
1
1
22
2222
1
1
TPH48 TPH48
TPH6
0
TPH6
0TP
H60
TPH6
0
TPH6
0TP
H60
TPH60TPH60
TPH24TPH24TPH24TPH24 TPH24TPH24TPT96 TPT96 TPT96
1
1
2222
2 2
1 1
1
1
1
1
22
2222
1
1
JC JC
JC JCTPH60
TPH60TPH60
TPH60
TPH24
TPH24
TPH24TPH24
TPT96
TPT96
2
2 2
2
111
1
8988E
BZ3
8988EBZ3
8988EBZ3
8988EBZ3
TPH6
0
TPH6
0
TPH60
TPH60
TPH24TPH24
TPH24TPH24TPH24 TPH24
TPH24 TPH24
TPH42
TPH42TPH42
TPH42
1 1
1 1
1 1
1 1
2
22
2
2
22
2
TPT96
TPT96
TPT96
TPT96
BPT72
BPT72
BPT7
2
BPT72
BPT72
BPT7
2
BPT72
BPT72
BPT72
TPH36
TPH36
TPH36 TPH36
TPH36 TPH36
TPH36
TPH36
12
3
3 1
1
2
2
12
RL-MHW
RL-MHW
RL-MHW
RL-MHW
RL-MHW
RL-MHW
RL-MHW
RL-MHWRL-MHW
RL-MHW
RL-MHW
RL-MHWRL-MHW
RL-MHW
RL-MHW
RL-MHW
RL-MHW
RL-MHW
RL-MHW
RL-MHW
RL-MHW
RL-MHWRL-MHW
RL-MHW
RL-MHW
RL-MHW
RL-MHW
RL-MHWRL-
MHW
84
84
84
84
84
84
84
8484
84
84
84
84
84
84
84
8484
84
95040-
MF95040-
MF
95040-
MF95040-
MF95040-MF
95040-MF
95040-MF
95040-
MF95040-MF 95040-
MF95040-MF
95040-
MF
95040-MF
95040-
MF
95040-MF
95040-
MF95040-MF 95040-
MF95040-MF
95040-
MF
95040-MF
95040-
MF
95040-MF
95040-
MF95040-MF
95040-
MF
95040-MF
95040-
MF95040-MF 95040-
MF95040-MF
95040-
MF
95040-MF
95040-
MF
95040-MF
95040-
MF95040-MF
95040-
MF
95040-MF
95040-MF
95040-MF95040-MF
95040-MF
95040-MF
78054_WA
95040-MF
95040-MF78054_WA
78054_WA
95040-MF
95040-MF
78054_WA
95040-MF
78054_WA
95040-MF
78054_WA
95040-MF
78054_WA
95040-MF
95040-MF
78054_WA
95040-
MF
78054_
WA
95040-
MF780
54_WA
95040-MF78054_WA
95040-
MF780
54_WA
95040-MF78054_WA
95040-MF
78054_WA
95040-MF95040-MF
78054_
WA780
54_WA
95040-MF95040-MF
78054_
WA780
54_WA
95040-MF95040-MF
78054_
WA780
54_WA
95040-MF
78054_WA
95040-
MF950
40-MF
78054_WA78054_WA
95040-MF
78054_WA
95040-
MF
78054_
WA
95040-MF
78054_WA
95040-
MF
78054_
WA
95040-MF
78054_WA
95040-MF
78054_WA
95040-
MF
78054_WA
95040-MF
78054_WA
95040-MF
78054_WA
78054_WA
78054_WA
95040-MF
95040-MF
78054_WA78054_WA
95040-MF
78054_WA
95040-MF78054_WA
95040-MF78054_WA
78054_WA
95040-
MF950
40-MF
95040-MF
78054_WA
95040-MF
78054_WA
95040-MF
78054_
WA
95040-
MF
95040-MF
95040-
MF
78054_
WA
78054_WA
95040-MF
78054_WA
95040-MF
78054_WA
95040-MF
78054_WA
95040-MF
78054_WA
95040-MF
78054_WA
95040-MF
78054_
WA
95040-
MF
78054_WA
95040-MF
78054_WA
95040-MF
78054_WA
95040-MF
78054_WA 78054_WA
95040-MF
78054_WA
95040-MF
78054_WA
95040-MF
78054_WA
95040-
MF
36 LM
ABD26FABD26F
36 LM
24x84
24x84T
36x72-24L/24R72x36-
24L/24R
24x36 24x36
36x72-
24L/24R
24x36
72x36-24L/
24R24
x36
36x72-
24L/24R
24x36
72x36-24L/
24R24
x36
36x72-24L/24R72x36-
24L/24R
24x36 24x36
36x72-24L/
24R
72x36-24L/24R
24x3624x36
36x72-24L/24R72x36-
24L/24R
24x36 24x36
36x72-24L/
24R
72x36-24L/24R
24x3624x36
36x72-24L/
24R
72x36-24L/24R
24x3624x36
36x72-24L/24R
72x36-24L/24R
24x48
24x48
72x36-24L/24R
24x48
72x36-24L/24R
24x36
36x72-24L/24R
24x36
36x72-
24L/24R
72x36-24L/24R
24x36
72x36-24L/
24R24
x36
24x36
36x72-
24L/24R
72x36-24L/
24R
36x72-
24L/24R
24x36
72x36-24L/
24R24
x36
36x72-24L/24R
24x36
30x84
24x30
24x30
24x30
24x60
24x60 24x60
24x60
24x46
24x46 24x46
24x4660
60
6060
60 60
606024x4624x46
24x46 24x46
24x6024x60
60 6024x46 24x46
24x6024x60
606024x4624x46
24x60 24x60
60 6024x46 24x46
24x6024x60
60 6024x46 24x46
24x6024x60
60 6024x46 24x46
24x6024x60
606024x4624x46
24x60 24x60
606024x4624x46
24x60 24x60
606024x4624x46
24x60 24x60
606024x4624x46
24x60 24x60
606024x4624x46
24x60 24x60
606024x4624x46
24x60 24x60
606024x4624x46
24x60 24x60
606024x4624x46
24x60 24x60
60 6024x46 24x46
24x6024x60
60 6024x46 24x46
24x6024x60
60 6024x46 24x46
24x6024x60
60 6024x46 24x46
24x6024x60
60 6024x46 24x46
24x6024x60
24x6024x60
30x84
30x84
30x84
30x84
30x84
30x84
30x8430x84
30x84
30x84
30x84
30x84
30x84
30x84
30x84
30x8430x84
30x84
30x30
24/30x84
15x60
P30
P72P72
P72 P72
50TL50PL
65PF
P72
P72
P72
P72
35PF
35PF
35PF
P72
P72
35PF
P72P72
P30
P72P72
P72 P72
P30
35PF
50PF
65XX
50PF
P72P72
P30
P72P72
P72 P72
P30
35PF
50PF
65XX
50PF
P72P72
P72 P72
P30
35TL 35PL
50TL50PL
65PF
P72
P72
50TL
50PLP84
P3065PF
P72
P84
65PL65TS
P72
P30
P72
P30
35TL35PL
35TL35PL
65PL
65PL
P72P72
P72P72
P72 P72
P72
P72
P72
P72
P30
P30
P72
P72
P72
P72
35TL
35TL 50TL
50TL50PL
50PL
35PL
35PL
65PF
65PF
35PF
35PF
P84P84
P84
P84
P84
P84
P84
P84
P84
P84
P24
P24 P24
P24
P84
P84
P84 P84
P84 P84 P84
P84
P24
P24P24
P24P24
P24
P84
P84
P84
P84 P84
P84 P84
P84
P84
P84
P84
P84
P84P84
P51P51
P51P51
P24
P24
PP42
PP42
P60
P66P66
P30
50XX 50XX 50XX 50XX 50XX
50PF
50PF
50PL 50PL
50PL
50PL
50PL 50PL
50PL
50PL
50PF
50PF
50PF
50PF
50PL
50PL
50PL
50PL
50PF
50PF
50X50X50X50X50X50X50X50X
50PF
50PF
50PF
50PF
50PF
50PF
50PF
50PF
42PL
P24P60
50PE
65PE
35PE
UCON3
15PVH
UCON4
65TT
UCON2
UCON2
35TT
35TT
35TT
50PE
30PVH
30PVH
UCON2
35TT
30PVH
35PE
15PVH
50PE
65PE
65PE
UCON2
35TT
30PVH
UCON3
15PVH
50TT
UCON4
50PE
35PE
35PE
50PE
65PE
65PE
UCON2
35TT
30PVH
UCON3
15PVH
50TT
UCON4
50PE
35PE
35PE
65PE
50PE35P
E
UCON2
30PVH
UCON3 15PVH
UCON4
65TT
UCON
3UC
ON4
65TT
15PV
H
50PE
65PE
65PE
UCON4
65LL
UCON4
15PVH50PE
65PE
65PE
UCON230PVH
UCON2
30PVH
UCON
4
UCON4
65LL
65LL
50PE
65PE
50PE
UCON2
UCON2
UCON
2
UCON2
UCON3
UCON3UCON4
UCON4
65TT
65TT
35TT
35TT
15PVH
15PVH
65PE
30PVH
30PVH
30PVH
30PVH
UCON3UCON3UCON3UCON3UCON3UCON3UCON3
50TT50TT
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
UCON
3 UCON3 UCON3
UCON3
UCON3
UCON
3 UCON3 UCON3
UCON3 UCON3
UCON3
50LL50LL
50LL
50LL
50LL50LL
50LL
UCON3
50TT
50TT
50TT
50TT
50LL
UCON3
UCON
3
UCON3
UCON3
UCON3UCON4
50TT 50TT
50LL
50LL
50LL
50LL
50PE
50PE
50PE
50PE
50PE
50PE
UCON
3 UCON3 UCON3 UCON3
UCON3 UCON3
UCON3 UCON3 UCON3 UCON3 UCON3
UCON3
50TT 50TT 50TT 50TT
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
UCON3UCON3
UCON3UCON3
50T50T
50T50T
15PVH
15PVH
15PVH
15PVH
50PE
50PE
50PE
50PE
50PE
50PE
50PE
50PE
UCON2
42LL
7PVH
7PVH
50PE
50PE
B/B/F B/B/F
B/B/FB/B/F B/B/FB/B/F
B/B/F B/B/F
B/B/F B/B/F B/B/F B/B/F
B/B/FB/B/F B/B/FB/B/F
B/B/F B/B/F B/B/F B/B/F
B/B/FB/B/F B/B/FB/B/F
B/B/F B/B/F
B/B/FB/B/F
B/B/F B/B/F B/B/F B/B/F
B/B/FB/B/F B/B/FB/B/F
B/B/F B/B/F
B/B/FB/B/F
B/B/F
B/B/F B/B/F
B/B/F
24x24 24x24
24x24
24x24
24x24
24x24
24x24 24x24
24x2424x24
24x24 24x24
24x2424x24
24x2424x24
24x24
24x24
24x24
24x24
24x24
24x2424x24
24x24
24x24
24x24
24x24
24x24 24x24
B/B/F
B/B/F
B/B/
F
B/B/F B/B/F
B/B/F B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/FB/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/FB/B/F
B/B/F
B/B/F
B/B/F
B/B/FB/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/F B/B/F
B/B/F
B/B/F
B/B/F
B/B/F
B/B/FB/B/F B/B/F
B/B/F
B/B/F
24x42
24x42
29PENR
29PENL
CBRCBL
CBRCBL
29PENR 29PENL
CBL
CBR
CBRCBL
CBR
CBL
CBR
CBL
CBR
CBL
CBR
CBL
29PENL
29PENR 29PENL
CBL
CBR
CBRCBL
29PENR29PENL
CBLCBR
CBR
CBL
29PENR 29PENL
CBL
CBR
CBRCBL
29PENR29PENL
CBLCBR
CBR
CBL
29PENR29PENL
CBLCBR
CBR
CBL
29PENR29PENL
CBL CBR
CBR CBL
29PENR
CBL CBR
CBRCBL
CBRCBL
CBLCBR
CBRCBL
29PENR
29PENL
CBLCBR
CBR
CBL
CBR
CBL
CBR
CBL
CBR
CBL
CBR
CBL
CBR
CBL CBR
CBL
29HL29HR
29HR
29HL
CBR
CBL
CBL
CBR
WBK
WBK
WBK
WBK
CBL
CBLCBR
CBR
WBK
WBK
WBK
WBK
CBL
CBR
WBK
WBK
CBLCBR
WBK
WBK
CBL
CBR
WBK
WBK
CBL
CBR
WBK
WBK
CBL
CBR
WBK
WBK
CBLCBR
WBK
WBK
CBLCBR
WBK
WBK
CBLCBR
WBK
WBK
CBLCBR
WBK
WBK
CBLCBR
WBK
WBK
CBLCBR
WBK
WBK
CBLCBR
WBK
WBK
CBLCBR
WBK
WBK
CBL
CBR
WBK
WBK
CBL
CBR
WBK
WBK
CBL
CBR
WBK
WBK
CBL
CBR
WBK
WBK
CBL
CBR
WBK
WBK
29HL 29HR
29HR 29HL
29HL29HR
29HR29HL
29HL 29HR
29HR 29HL
29HL29HR
29HR29HL
29HL
29HR
29HR29HL
29HL
29HR
29HR29HL
29HL2 9HR
29HR
29HL
29HR
29HR
29HL
29HL
29HR
29HR
29HL
29HL
29HR
29HR
29HL
29HL
29HL 29HR
29HR 29HL 29HL29HR
29HR29HL
29HR
29HR
29HL
29HL
29HL
29HR
29HR29HL
29HL29HR
29HR
29HL
29HL
29HR
29HR29HL
29HL
29HR
29HR29HL
29HL29HR
29HR
29HL
ZD H S4 8 R SZD HS4 8L S
ZDHS48RS ZDHS48LS
ZD HS4 8L SZD H S4 8 R S
ZD H S4 8 R SZD HS4 8L S
ZD H S4 8 R SZD HS4 8L S ZD H S4 8 R SZD HS4 8L S ZD H S4 8 R SZD HS4 8L S ZD H S4 8 R SZD HS4 8L S ZD H S4 8 R SZD HS4 8L S
ZD H S4 8 R SZD HS4 8L S ZD H S4 8 R SZD HS4 8L S ZD H S4 8 R SZD HS4 8L S
ZDHS
48RS
ZDHS
48LS
ZDHS48RSZDHS48LS
ZDOC36UZDOC36U
ZDOC36U
ZDOC36U
ZDOC36U
ZDOC36U
ZDOC36UZDOC36U
ZDOC36U ZDOC36U
ZDOC36UZDOC36U
ZDOC36U ZDOC36U
ZDOC36U ZDOC36U
ZDOC
36U
ZDOC
36U
ZDOC
36U
ZDOC36U
ZDOC36U
ZDOC36U ZDOC36U
ZDOC36U
ZDOC36U
ZDOC36U
ZDOC36U
ZDOC36U ZDOC36U
aisle 50 prt inside 24 aisle 50 prt inside 24
aisle 50 prt inside 24aisle 50 prt inside 24
60 mkr bd 60
60 mkr b
d 60
50 end 2
450 e
nd 60
50 end 2450 end 60
50 prt prt mono 4250 prt prt mono 42
aisle 50 prt inside 24aisle 50 prt inside 24
aisle 50 prt inside 24 aisle 50 prt inside 24
60 mkr b
d 60
60 mkr bd 60
50 end 24
50 end 2
4 50 prt
prt mo
no 42
50 prt
prt mo
no 42
50 mkrb
d 60
50 end 2
450 m
krbd 60
50 mkrb
d 6050 e
nd 24
6x7 prtd spine 24 6x7 prtd spine 48 6x7 prtd spine 48 6x7 prtd spine 24 6x7 prtd spine 24 6x7 prtd spine 48
50 end 2450 end 24
6x7 prtd spine 48 6x7 prtd spine 24
60 mkr b
d 60
60 mkr bd 60
60 mkr b
d 60
60 mkr bd 60
50 prt prt mono 60
50 prt
prt mo
no 60
50 end 2
450 e
nd 24
6x7 prtd spine 24 6x7 prtd spine 48 6x7 prtd spine 48 6x7 prtd spine 24 6x7 prtd spine 24 6x7 prtd spine 48 6x7 prtd spine 48 6x7 prtd spine 24
60 mkr b
d 60
60 mkr bd 60
60 mkr b
d 60
60 mkr bd 60
50 prt prt mono 60
50 prt
prt mo
no 60
6x7 prtd spine 24 6x7 prtd spine 48 6x7 prtd spine 48 6x7 prtd spine 24
60 mkr b
d 60
60 mkr bd 60
50 prt prt mono 60
50 prt
prt mo
no 60
50 end 2450 end 24
50 end 6050 end 60
50 end 2
450 e
nd 24
6x7 prtd spine 24 6x7 prtd spine 24 6x7 prtd spine 24 6x7 prtd spine 24
60 mkr b
d 60
60 mkr bd 60
60 mkr b
d 60
60 mkr bd 60
50 prt prt mono 60
50 prt
prt mo
no 60
50 end 6
050 e
nd 60
6x7 prtd spine 24 6x7 prtd spine 24
60 mkr b
d 60
60 mkr bd 60
50 prt prt mono 60
50 prt
prt mo
no 60
50 end 2450 end 24
50 mono
24
50 mono 24
50 mono
24
50 mono 24
50 mono
24
50 mono 24
50 mono
24
50 mono 24
50 mono 24
50 mono
24
aisle 50
prt ins
ide 24
aisle 50
prt ins
ide 24
60 mkr bd 60
50 end 2450 end 60
50 end 2450 end 60
aisle 50 prt inside 24aisle 50 prt inside 24
60 mkr bd 60
50 end 24 50 end 60
50 end 24 50 end 60
Strd 65
Mono 30
35 prtd
3635 p
rtd 36
65 prtd 36 65 prtd 36 65 prtd 36 65 prtd 36
35 prtd
3635 p
rtd 36
35 prtd
3635 p
rtd 36
65 prtd 36
35 prtd
3635 p
rtd 36
65 prtd 36
35 prtd
3635 p
rtd 36
65 prtd 3665 prtd 36
Strd 65
Mono 30
65 prt prt 36 65 prt prt 36 65 prt prt 36 65 prt prt 36
35 prtd
3635 p
rtd 36
35 prtd
3635 p
rtd 36
Strd 65
Mono 30
Strd 65
Mono 30
65 prt prt 36 65 prt prt 36 65 prt prt 36 65 prt prt 36
35 prtd
3635 p
rtd 36
35 prtd
3635 p
rtd 36
Strd 65
Mono 30
35 prtd
3635 p
rtd 36
Strd 65
Mono 30
65 prtd 3665 prtd 3665 prtd 3665 prtd 36
65 prtd
3665 p
rtd 36
65 prtd
3665 p
rtd 36
50 prtd 3650 prtd 48
Strd 65 Mono 30
65 prtd
3665 p
rtd 36
50 prtd 3650 prtd 48
Strd 65 Mono 36Strd 65 Mono 48
65 prtd 36 65 prtd 36
35 prtd 3635 prtd 36
35 prtd 3635 prtd 36
65 prtd 3665 prtd 36
35 prtd
3635 p
rtd 36
35 prtd
3635 p
rtd 36
65 prtd 36 65 prtd 36
65 prtd 36
35 prtd
3635 p
rtd 36
65 prtd 36
35 prtd
3635 p
rtd 36
35 prtd
3635 p
rtd 36
65 prtd 36 65 prtd 36
Strd 65 Mono 30
Strd 65
Mono 30
65 prtd 36
65 prtd 36
65 prtd 3665 prtd 3665 prtd 3665 prtd 36
50 end prt ins. 3650 end prt ins. 36
50 end prt ins. 3650 end prt ins. 36
50 end
prt ins
. 3050
end prt
ins. 30
50 end prt ins. 3650 end prt ins. 36
50 end prt ins. 3650 end prt ins. 36
50 end prt ins. 3650 end prt ins. 36
50 end prt ins. 3650 end prt ins. 36
50 end prt ins. 3650 end prt ins. 36
50 end prt ins. 3650 end prt ins. 36
50 mkrbd 60
50 mkrb
d 6050 m
krbd 60
50 end 6050 end 60
phase 1 worktable ext 60phase 1 worktable ext 60
60 mkr b
d 24
60 mkr bd 24
50 mono 2450 mono 24
50 mono 2450 mono 24
50 mono 2450 mono 24
50 mono 2450 mono 24
50 mono 60
35 prtd
3035 p
rtd 30
35 prtd 30
50 fab a
isle mo
no 48
50 fab a
isle mo
no 48 50 fab aisle mono 48
50 fab aisle mono 48
50 fab aisle mono 48 50 fab aisle mono 48
50 fab aisle mono 4850 fab aisle mono 48
50 fab aisle mono 48 50 fab aisle mono 48
50 fab aisle mono 4850 fab aisle mono 48
50 seg spine 48 50 seg spine 48 50 seg spine 48 50 seg spine 48 50 seg spine 48 50 seg spine 48
rcptn. 30
rcptn.30
rcptn.lam 30
rcptn.lam 36rcptn.lam 50 24
rcptn.lam 50 24
36x84
48x96
48x96
36x84
60x60
36x60
60x96
TESTSTATION
11'-10 1/2"
12'-2"
7'-5"
11'-3"
24'-0"
30'-0"
53 /4"
8'-53 /
8"
17'-21/2"
8'-53 /
8"
23'-03/8"
8'-0"
5'-0"
5'-0"
1'-6"
7'-47 /
8"
24"D x 72"W
24"D x 72"W
24"D x 72"W
24"D x 72"W
24"D x 72"W
DEPARTMENT LEGEND
CUSTOMER SUPPORT
FINANCE, IT, OPS, SALES
FUTURE CUSTOMER SUPPORT
HARDWARE LAB
PRODUCT DEVELOPMENT
PRODUCT MANAGEMENT,FACILITIES, HR
QUALITY ASSURANCE
CLOSET482
DEPARTMENT LEGEND
SOUND LAB
2 N
D
F
L O
O R
3 R
D F
L O
O R
4 T
H
F
L O
O R
8
OVERVIEW...
2015 SPACE RATIO*
2019 SPACE RATIO*
The key to programming is collecting data and analyizing spaces in a way that allows the metrics to inform the way we understand and design spaces. The observations in this section point out key pieces of information that should be considered when designing for the future SONOS experience.
1. The USF and RSF required.
2. Multiple Circulation Factors to determine design efficiency and for use during
the design process as a measuring tool for proposed layouts.
3. Occupancy metrics.
4. Ratios that inform how spaces are defined and used.
A summary of where this information derives from as well as all of the supporting data for these metrics can be found in the sections 4 and 5 of this study.
The space ratios shown below describe the proportional utilization of spaces discovered through the programming study. Approximately only half of the required SF is needed for individual use. This metric is inline with the trend seen from similar global companies whose process requires a large amount video conferencing and collaborative workspace.
*Ratios are measured by usable square footage. Lab space and circulation space were not included in the square footages used. Lab spaces are a specialty item that could be itemized as individual, collaboration, social, or utility space leading to an ambiguity that would skew the ratio. Circulation is also ambigious as it can be incorporated into social and collaboration spaces.
INDIVIDUAL 47%
INDIVIDUAL 52%
COLLABORATION 26%
COLLABORATION 27%
SOCIAL 16%
SOCIAL 11%
UTILITY 11%
UTILITY 10%
3
9
The space requirements derived from the programming interviews are shown below, the USF is circled in blue & the RSF is circled in red. The effects of 3 different Circulation Factors are used in order to create guidelines against which the design efficiency of proposed layouts can be measured. These Factors are highlighted in yellow along with the design effeciency standard they create.
Using the the SF requirements from the 40% Circulation Factor and the employee counts from the Programming Summary in the next section, the occupancy metrics for move in 2015 and look ahead 2019 are shown below. It is important to note that the decrease in USF/PERSON between 2015 and 2019 is primarily due to the initial buildout requirements for the social and utility spaces. These spaces are being designed from the initial 2015 phase to accomodate the growth of the company through 2019 leading to a larger proportion of space per person initially.
2015
307USF/PERSON
2019
266USF/PERSON
Circulation Factor at 30% 0 27,825 23% 0 48,120 23%
Totals 920 120,576 USF 100% 1,663 208,521 USF 100%
Loss Factor 15% 18,086 SF 31,278 SF
Total Rentable Square Feet 138,663 RSF 239,799 RSF
Circulation Factor at 35% 0 32,463 26% 0 56,140 26%
Totals 920 125,214 USF 100% 1,663 216,541 USF 100%
Loss Factor 15% 18,782 SF 32,481 SF
Total Rentable Square Feet 143,996 RSF 249,023 RSF
Circulation Factor at 40% 0 37,100 29% 0 64,160 29%
Totals 920 129,851 USF 100% 1,663 224,561 USF 100%
Loss Factor 15% 19,478 SF 33,684 SF
Total Rentable Square Feet 149,329 RSF 258,246 RSF
10
PROGRAMMING SUMMARY... On the left is the programming summary spreadsheet of all of the data collected over the course of the study. A key item to note is that the USF amounts from the supporting spreadsheets which feed into this summary are preliminary and subject to change. Also important to note is that no interview has been conducted with the QA and User Experience departments. As the project moves ahead, it would be important to setup interviews with these departments to identify their specific needs. Also important is the identification of any smaller departments or subdepartments that may have been missed in the first round of investigations.
Lastly, please note that there is an overlap in spaces indicated in the Product Development, Hardware Labs, and Product Management spreadsheets. Due to this replication, the total USF and RSF shown are inflated and could be corrected through another combined meeting with these 3 departments. The known areas of overlap are indicated on the Hardware Labs spreadsheet shown in section 5 in orange highlight. This area amounts to approximately 10,000 USF in 2015 and 16,000 USF in 2019. Our research has shown that there is the potential that these numbers could be as high as 20,000 USF in 2015 and 45,000 USF in 2019.
The results of our initial investigation indicate that, using a 40% circulation factor and a 15% loss factor, the total rentable square feet that would be ideal for the new SONOS space would need to be approximately 150,000 RSF with the ability to grow to around 260,000 RSF within 4 years of occuping the space. The 40% circulation factor used is a conservative estimate and as discussed in the prevoius section, can vary based on the structure of a site, the density of the program, and the ability to incorporate circulation within other programatic elements.
4
11
2015 Headcount 2019 Headcount
Departments People USF % People USF %
Product Development (HW + SW)
229 30,318 23% 415 53,278 24%
Hardware Labs 0 44,570 34% 0 77,798 35%
Product Management 16 6,107 5% 32 11,318 5%
IT 9 3,559 3% 12 6,126 3%
Human Resources & Recruiting
36 4,838 4% 56 8,016 4%
Office Management & Operations
4 1,000 1% 7 1,562 1%
Customer Care 81 7,865 6% 244 23,663 11%
Sales 17 1,733 1% 26 2,862 1%
Finance 11 2,061 2% 21 3,718 2%
QA 20 3,328 3% 31 5,391 2%
General Office 0 24,472 19% 0 30,828 14%
Totals 423 129,851 USF 100% 844 224,561 USF 100%
Space Type Rooms USF % Rooms USF %
Offices 55 6,600 5% 93 11,160 5%
Workstations 368 20,744 16% 751 41,832 19%
Hot Desks 48 1,056 1% 82 1,824 1%
Labs 297 31,836 25% 474 55,570 25%
Collaborative 83 16,070 12% 147 28,000 12%
Social / Amenities 14 9,600 7% 23 11,100 5%
Utility 55 6,845 5% 93 10,915 5%
Circulation Factor at 40% 0 37,100 29% 0 64,160 29%
Totals 920 129,851 USF 100% 1,663 224,561 USF 100%
Loss Factor 15% 19,478 SF 33,684 SF
Total Rentable Square Feet 149,329 RSF 258,246 RSF
12
SUPPORTING DATA... The spreadsheets provided in this section were used to create the Programming Summary in section 4. All of the information shown here was collected from the interview notes included in section 6 and other data shared with TROIKA by SONOS. Please reference the Notes/Assumptions area at the end of every departments spreadsheet for additional information.
5
13
14
15
16
17
18
19
20
21
22
23
24
INTERVIEW NOTES... At the beginning of this project we setup a series of interviews with at least one member from every department within the SONOS team. Over the course of a 2 day period we gathered all of the information found within the following pages. These notes are a summary of the discussions held and do not include any analysis at this point in the project.
6
25
Hardware PD Labs: (Interview: Maarten van der Heide)
A. Work Stylea. Very collaborative space where engineers work together on a variety of
projectsb. Need quiet space for heads down work when need to sit and think through a
problemc. Constant contact with team members at other sites so need areas for skype
calls, phone calls, and VC meetings without disturbing neighborsd. Lab spaces are typically loud (sometimes very loud) and not good for quiet
worke. Dave Perri is VP of PD (People) | Maarten is Manager of Global Labs (Stuff)f. Need 450 GSF
B. Collaborative WorkC. Dedicated SpacesD. Proximity RequirementsE. AmenitiesF. Furniture RequirementsG. Equipment RequirementsH. Technical ConsiderationsI. Other Planning Considerations
a. See Spreadsheet for remaining information from Maarten’s Interview
26
Product Development: (Interview: Dave Perri)
A. Work Stylea. Groups in PD: Hardware, Software, Software Test, Product Creation, IT Softwareb. Typical project teams are 20-40 people and last approximately 2 yearsc. Very Collaboratived. Don’t like big open office arease. All teams and projects are multi-locationf. Lots of travel; sometimes entire project team; at any given time 5%-10% of a
team may be traveling; definitely need hot desksg. Need flex spaceh. Sonos is very focused on career development which means a lot of difficult
and confidential one on one conversations with employeesi. All managers with direct reports need officesj. Engineers in cubes and sit by discipline; they need heads down quiet space for
working; work well in pods of 4k. Need lots of VCl. Want to look at Project based seatingm. Current local PD is approx. 200 will grow
B. Collaborative Worka. Software
i. Approx. 10 teams doing daily standup meetings for about 10 minutes and in groups of about 10
ii. Weekly meetings about an hour long of about 10 peopleiii. Core team meetings per product approx. 5 to 7 per week of 10 to 30
peopleiv. Functional team meetings, 10 to 12 meetings per week of about 5 to 10
peoplev. Product milestone meetings of 10 to 30 people
b. Hardwarei. 6 directors with 5-20 people in weekly meetingsii. 20 managers with 5-10 people in weekly meetingsiii. Project work has several meetings per week; 4 projects meeting 2-3
times per week with 20-30 people; an additional 5 or so more meetings of 5-10 people which are project related.
c. All Hands Meeting for Product Development @ least once per quarterd. In the future number of projects could grow to 7e. Quarterly Summit requires a room for @ least 30 peoplef. Maarten details more; need a project dedicated room with virtual presence for
each project in a suite with a shared lounge and conference room. See Santa Barbara for example.
C. Dedicated Spacesa. Project suites as mentioned above.b. Storage requirements from Maartenc. Maarten has all other space requirements for labs, etc…
D. Proximity Requirements
27
a. Hardware near Lab/Chambersb. Hardware near Industrial Designc. Hardware near User Experience Design Team who needs to be near Softwared. Hardware and Software need to be near Product Management
E. Amenitiesa. Keg & Drinksb. Eating & Snackingc. Social Aread. Rough Furniture e. Showersf. Fitnessg. Napping Pods for people coming in on red eye flights
F. Furniture Requirementsa. Workstations
i. More desktop space than currently haveii. Current storage is adequateiii. Usually have 2 monitors and a laptop at leastiv. Need space for laying out product; shelvingv. Coat hooks
vi. Like 4 person pod organization; possibly moveable white boardsvii. Don’t need soft breakout areas
G. Equipment Requirementsa. Plotterb. 2 printers
H. Technical Considerationsa. Would like more isolation between offices; too much noise transference
currentlyI. Other Planning Considerations
a. Managers get offices; 20-25 hardware and softwarei. Hardware – 10 Officesii. Software – 8 Officesiii. Software Test – 4 Officesiv. Product Creation – 5 Officesv. IT Software – 3 Offices
b. Offices should be 100-120 SF (8x10 or 10x12)
28
Product Development - Software: (Interview: Diane Roberts)
A. Work Stylea. 60-70 % heads down, rest is collaborative within the teamb. Would like to have rooms/workstations organized in a way that keeps teams
together. Maybe have team in one room with a conference table they can move back and forth between that can provide hot desk space for traveling team members
c. Team includes PD, QA, PM, and UXd. Estimate growth of 50% year of yeare. Audio team within software may have special requirements. May need to meet
with themf. Need to meet with User Experienceg. Teams are located at multiple sitesh. Need flexibility – teams work on a 2-3 week cyclei. May need to speak with ERP team for their specific requirements
B. Collaborative Worka. All conference rooms need VCb. Stand up meetings once a day for every team with 10-12 people per meeting.
Last about 15 minutes each. 16-24 teams.c. Managers meet 2 per week with 8-10 people per meeting for about an hour at
a time.d. Functional team meetings once a week with 8-10 people (Functional teams of
apps, player, system sw, core, dot.com, and data)e. Lots of quick spot design and one on one meetings throughout week
sometimes with cross team integrationf. Many one on ones currently happen within office spaceg. Weekly scrum meetings of 12 people at least once a week for 30 minutes at a
timeh. At least 1 planning meeting a weeki. If team had a shared conference/work room, many of the meetings mentioned
above could be in team roomC. Dedicated Spaces
a. Library of mobile devices so people can just check out the device they need to test – wall/storage of about 8’
b. Area for demo and display of units – wall/storage of about 14’c. Scale rack – 32 devices on 1 network needs a 4’x6’ storage spaced. Build & tools team needs server space, currently use space within IT’s racks –
could continue that modelD. Proximity Requirements
a. Need to be located with QA/Test, UX, and PM for each teamb. Close proximity to tier 3 of customer carec. Near PD – hardwared. Near HR-Recruiting
E. Amenitiesa. All eat lunch together so need large café space
29
b. Showersc. Bike storaged. Coffee area close bye. Seltzer Waterf. Lots of Iceg. Kegeratorh. After work functions areai. Wall space for current artwork collectionj. Vending machinesk. Better soda and snacksl. Large social area for Friday lunches and Wednesday breakfastsm. Break spacesn. Game roomso. Stage for bands and sonos employeesp. Fitness room / yoga space
F. Furniture Requirementsa. Workstations need desk space for 2 monitors and laptop, space for sonos stuff
like play bar, coat hook, a drawer for personal stuff, but no real filing needs, lots and lots of power – possibly 20+ outlets per workstation
b. Offices have similar needs but also need visitor chairsc. White boards everywhere – need lots of writing surfacesd. Ad hoc soft meeting areas for 3-4 people
G. Equipment Requirementsa. Router, everyone needs their own router
H. Technical Considerationsa. Audio group – team room / soundb. General sound control throughout spacec. VC everywhere
I. Other Planning Considerations
30
Product Management: (Interview: Craig Wisneski)
A. Work Stylea. Kind of decides/comes up with ideas for what projects Sonos will be makingb. Works with Hardware & Softwarec. Currently 8 people in the Cambridge Office; 16 people by move-in; 32 people
within 3yr look aheadd. Current layout has the 8 people split within 3 officese. Most useful layout would have them in open spaces; doesn’t like officesf. When 32 people though, may need approx. 4 offices not sure on hierarchyg. Groups at multiple sites work on projects togetherh. VERY collaborative group for entire day, almost never sits at desksi. Could use in future a couple of hot desks for people coming inj. Forecasting 4x growth for futurek. 50% time workstation work; 50% time meetingsl. Does a lot of traveling; someone in group travelling at least 1 time every week
B. Collaborative Worka. A ton of impromptu meetings-get in a room and solve a problem; 2-5 people;
currently happens in someone’s office but would prefer to have 2-3 small rooms
b. Ad hoc problem solving spacesc. Need a lot of break out space; quick sit down areas with white boards –
possibly moving whiteboardsd. Project teams meet 3 times per day in groups of about 5; combo meetings
with PM and PDe. Have 1 on 1 meetings between sites; need at least 2 rooms with VC based on
current needsf. A larger conference roomg. All hands meeting area for 1/month; currently held in big open area on 4th Floorh. For really large 1/quarter meetings usually rent space somewherei. Open & closed types of collaborative space
C. Dedicated Spacesa. Place to demo current products; somewhere with like home listening
experience that can be publicb. Place to show & demo stuff in development; somewhere with like home
listening experience that is private; public shouldn’t accessc. A dedicated conference room to reserve for project team meetings; estimate
at least 4hrs/day spent currently on VC w/ offsite team membersD. Proximity Requirements
a. Co-located with Product Development; Engineering managers, Designers, User Experience
E. Amenitiesa. Keg Cultureb. Fitnessc. Lots of Bikers; maybe place for storage and showers/lockersd. Social/Café place
31
e. Space for informal company partiesF. Furniture Requirements
a. Sit/Stand Desksb. Usually have 2 monitors and a laptop at leastc. Somewhere to have products at deskd. Not a lot of paper usage or storage needed
G. Equipment Requirementsa. No real equipment needs; very little printing
H. Technical Considerationsa. Double screens for video conferencingb. STC requirements for conference/office spaces very important because of
sensitive topics/conversationsI. Other Planning Considerations
a. Awesome furniture is VERY important; not “soulless hell”
32
IT: (Interview: Neal Piliavin)
A. Work Stylea. Handles Sonos infrastructure, servers, network, help desk, data center, telco
roomsb. Depending on new space, may place servers in COLO spacec. 9 people currently in Cambridge; could grow to 12d. Help desk in its own roome. IT could be in an open spacef. Need small conference room for 1 on 1 meetings; VC would be goodg. Can be loud; always on callsh. Collaborate a lot with each otheri. Global approach to teams across sitesj. Help desk is mainly on phones or VC; Currently do a lot VC @ desk which seem
to work for themk. Platform is mainly heads downl. There is some travel to support other groupsm. Centralized, but a little secluded
B. Collaborative Worka. VC room doesn’t need to be dedicated; can handle most VC meetings at desksb. VC meetings of 2-4 peoplec. Could do 2 shared VC that IT would use 50% of timed. Team meeting of 12+ people
C. Dedicated Spacesa. Telco/IDF rooms on every floor; 1-2 per floor; room for 1 rackb. MDF with room for server room, ups, backup generator with 12 hour capacity;
maybe a 7x24 roomD. Proximity Requirements
a. Close to customer supportb. Near product development
E. Amenitiesa. No recommendations
F. Furniture Requirementsa. 2-3 monitors and a laptopb. Multiple machinesc. Need more portsd. Sit/stand desks with better cable management solutionse. Storage for manuals/booksf. Storage for gearg. May need a cabinet that can be locked uph. Couple of big screens for group to monitor work orders, etc.i. No filing needs
G. Equipment Requirementsa. MDF/server room with room for 4-5 4 post racks + growth space for up to 6
racks totalb. Storage space for PCs help area, network gear, lab space
33
c. 50-70 PCs shipped twice a year; need storage room w/ camera with space for storing PCs and network gear
d. Need build area where help desk people can worke. Help desk area for 2-3 people + space for 1 more help desk person per 100
Sonos employeesf. Lab space; computer lab; testing for internal PC setups and releases
H. Technical Considerationsa. Need sound deadeningb. Don’t like high partitionsc. White noise could help in help desk area
I. Other Planning Considerations a. Like the visual look of open space, but may not be right 100% of the time
34
Human Resources & Recruiting: (Interview: Jen Marchi & Jim DelRosario)
A. Work Stylea. Overall Boston employment numbers are 260 now; 400+ by September 2015;
800+ by 2018b. Jen head of HR which includes: (about 9 people & up 40% for 2015); highly
confidential, offices for senior employees, may need 3-4 offices for 2015 move-in
i. Analytics; heads downii. US services; collaborate and heads downiii. Global Communication; collaborate and heads down
c. Jim head of Recruiting which includes: (about 13 people & up to 23 for 2015), about 1/3 of conversations are private, managers in offices
i. Recruiters (+3-5 people); collaborate and heads downii. Operators (+2 people); primarily heads down, need undistracted low
noise areaiii. Coordinators (+3 people); primarily collaborate-up and down all the time,
need to be visible, open cubesd. Some recruiters (5 or so) may be moving to sit with other Sonos groups that
they supporte. Only Jen and Jim really travel a lotf. Need 1 hot desk for each roleg. Prefer location in office to be deeper in office so potential employees are led
through Sonos and get culture of companyh. Need access to a sound demo room
B. Collaborative Worka. Recruiting interviews for 4-15 people approx. 4-5 times per weekb. Recruiting calls need room for 1 on 1 calls; maybe 1 room for every 3 recruitorsc. Need dedicated 2-3 person Sonos experience room like the current green room
for prospective employeesC. Dedicated Spaces
a. Storage for Sonos giveaway products close to area (6x8 approx) for new hire players, beer, wine, decorations, training materials, etc.
b. Training/onboarding spaceD. Proximity Requirements
a. Centralized, but not near front doorb. HR & Recruiting near each other
E. Amenitiesa. More sound rooms to showcase quality of productsb. Fun room; surround sound with video games; Karaokec. Sound rooms with different environments used as social spacesd. Expression of “fun” place to worke. Connection to outside (court yard, patio, etc.)f. Engineers should feel taxed intellectually; Fun but Hard
F. Furniture Requirementsa. Current desks are about right, don’t have mulitiple screens
35
b. Walk around with ipads, would be good to control tech in spacesc. Coordinators could be in more of a group seating with centralized ad hoc
meeting spaced. Sit/stand deskse. Any file cabinets needed could be located in offices, primarily 1-2 people doing
majority of filing, not a massive needf. 2 comfortable meeting chairs in each office
G. Equipment Requirementsa. Dedicated printers for coordinatorsb. Dedicated printer for HR areac. Centralized scannerd. Shredder
H. Technical Considerationsa. Zoom – VC platformsb. Savant controllerc. If in open space may need VC roomsd. High bandwidthe. Household in your workspace, home like environment
I. Other Planning Considerations a. Sonos sustainability goals should come out in design
36
Office Management & Operations: (Interview: Rose Washak)
A. Work Stylea. Reception, shipping, Sonos serviceb. 4 people currently in 3 offices and 1 room for shipping; may be growth with
company growingc. All work together in a groupd. 3-4 hot desks for visitors
B. Collaborative Worka. Would like a meeting room for 10 people for weekly meetingb. Room for 1 on 1 meetings used daily for about timec. Room for meeting with vendors for 3-4 people
C. Dedicated Spacesa. Storage area for suppliesb. Mail room for shipping/receiving; could have remote mailboxes in each areac. Printers are all dedicatedd. Storage for office supplies and kitchen pantry items; should be at least double
current capacitye. Currently have shipping crates stored in basement for shipping equipment for
PD, approx. 240 SF, may need similar in new spaceD. Proximity Requirements
a. Should be directly adjacent to receptionb. Directly adjacent to lobby & shipping/receiving if possiblec. Close proximity to HR, IT, Finance
E. Amenitiesa. Product display/demo areab. Reception seating for 3 peoplec. Kegs for PD team specificallyd. 1 central kitchen/social area; currently use 4 fridges for 260 people, need
dishwashers, microwaves, and vending machines (2-3 for snacks and drinks)e. Fitness rooms; yoga for 20 people and massage sessionsf. Showers/lockersg. Mother’s Roomh. Gaming area which could be combined with product demo room
F. Furniture Requirementsa. Sit/stand desksb. More storage area at desksc. Filing cabinet per desk
G. Equipment Requirementsa. Scannerb. Printer for shippingc. Faxd. Scales for shipping
H. Technical Considerationsa. Shipping/receiving may require treatment to control soundb. Reception area may need presentation capabilities
37
I. Other Planning Considerations a. Freight elevator near lab if possible for deliveriesb. Shipping/receiving is noisy area
38
Customer Care: (Interview: Mike Carlino)
A. Work Stylea. Call center environment in middle with 40% support ring around itb. Open floor plan with groups of 4-6 like current setupc. On the phone a lot and when not on phone, collaborating with those in groupd. 40% escalation engineers, new product intro team, product return team (not
on phone all day) / 60% Tier 1 Call Centere. 1-2 hot desks now and 4-6 by move inf. Current 50-55, move-in 75, 200 max by 2019
B. Collaborative Worka. Meetings of approx. 3 people which don’t require VCb. Meetings of approx. 3-8 people needs VC 3-6 meetings per dayc. All hands once per quarterd. Stand up rooms with 3 chairs and phonee. Don’t need 1 on 1 roomsf. 1 team meeting per dayg. Current needs 2 dedicated 8 person VC rooms & 3 dedicated 3 person standup
roomsh. Move-in is (3) 8 person and (5) standupi. 200 max is (4) 8 person and (5) standup
C. Dedicated Spacesa. Lab space - 10’x20’ – Benches & AC Powerb. Dedicated Bench Space – 24 Linear Feet – outside of cubiclec. Lockable storage room for new product intro – 10’x10’ – with 2’ deep racks
D. Proximity Requirementsa. Close Proximity to QA teamb. Close Proximity to PD
E. Amenitiesa. Access to kitchen/social areab. Small break out area nearby with gamingc. Coffee station nearbyd. Fitnesse. Showers/lockers, have lots of bikers and runners
F. Furniture Requirementsa. Workstations 6x6 maybe high panels with STC materials maybe 5’ tallb. Storage at workstations like locker element and rolling filec. Typically have 2 monitors (some people have 4) and a laptop
G. Equipment Requirementsa. Lab space with TV and 3rd party networkingb. 2 dedicated printers now and 3-4 in future
H. Technical Considerationsa. Need sound absorption and/or white noiseb. Flat screen monitor to hang in space for running call lists
I. Other Planning Considerations a. 2 offices needed
39
Sales: (Interview: George Meeker)
A. Work Stylea. Mostly on the phone working with customersb. Good for sales to hear each other on the phone in case speaking with same
customerc. Sales does a lot of travellingd. Need a hot desk now and probably 1 or 2 more in futuree. Sales and Sales Opsf. 2 people actually in office for sales, rest in fieldg. Sales operations 6 people in office up to 15 for move-in including global salesh. Because of heavy concentration on phone they want to be acoustically
separated from other groupsB. Collaborative Work
a. Dedicated 3-4 person conference room with VCb. Could use shared larger conference roomc. Room for 3-5 people with VC 1 time per weekd. A single phonebooth doesn’t need VC
C. Dedicated Spacesa. Filing cabinets for storing paper contracts that have to keep for specific
amount of time – (4) 4 drawer cabinetsb. Dedicated printer and fax with same fax number as now
D. Proximity Requirementsa. Directly adjacent to Finance
E. Amenitiesa. An office All Hands Areab. Large central social spacec. Smaller coffee spotd. Bean bag chairs in meeting roomse. Fully stocked bar for happy hourf. More fridge spaceg. More microwavesh. Better stocked snacks/healthier snack and drink optionsi. Fitness room
F. Furniture Requirementsa. Current benching setup is fine for size, but noise is an issueb. Sit/stand desksc. 2 monitors and a laptop
G. Equipment Requirementsa. Conference rooms with smart boards so you can take everything you’ve
written with you when you have to leave a conference roomH. Technical Considerations
a. White noiseI. Other Planning Considerations
a. Currently have 1 office for sales, would need 2 offices in new
40
Finance: (Interview: Jeff Chiumiento)
A. Work Stylea. Very collaborative groupb. Some in Santa Barbara, some in Cambridgec. Comprised of 3 groups: FPA, AMPAC, & Leadershipd. FPA is about 50% heads down, 50% collaborative; work with all budgetse. AMPAC is about 50% heads down, 50% collaborative; work with sales leadersf. Leadership is primarily collaborative, about 90%; work very closely with salesg. Leadership travels a loth. Currently have 3 offices with 2 FPA and 2 AMPAC in Workstationsi. By Move-in will need 3 more offices and an additional workstationj. 2019 forecast of 4 more offices and 3 more workstationsk. Could use 2 hot desks
B. Collaborative Worka. AMPAC meets 2-3 times per week in groups of 8-10 with sales/marketingb. Other small meetings 15 or more times per week of 3-4 people, often currently
happen in offices which is acceptable if office was sized for meeting and had presentation abilities
c. FPA 2-3 times per week in groups of 5-6d. All conference rooms need to be VC
C. Dedicated Spacesa. May need some time of lockable storage for tax storage, Jeff is following up
D. Proximity Requirementsa. Directly adjacent to Sales & Marketingb. Directly adjacent to HR if possible, but at least within close proximityc. Close proximity to product developmentd. FPA team could be co-located with the team units they support
E. Amenitiesa. Fitnessb. Parking c. VC and/or presentation options in officesd. Music areas
F. Furniture Requirementsa. Offices need desk space, no storage, coat hook, small table for meetings in
office with TV for presentationsb. Workstations don’t need to be large, but benching is too small. Need more
desk surface than that. May need a pedestal file.c. Soft seating area within space
G. Equipment Requirementsa. Paper shredder or box for collecting paper to be shreddedb. Local printer
H. Technical Considerationsa. Offices need higher STC ratings
I. Other Planning Considerations a. Lots of natural light
41