Solar photovoltaic systems
Engineering, wiring & grid connection
![Page 2: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/2.jpg)
1. PV array options2. Siting & design considerations3. Component selection4. Grid connection5. MCS & installer selection
![Page 3: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/3.jpg)
Installing systems since 1995
Installed hundreds of systems across the UK
Installations on houses, schools, offices, community centres, churches, village halls, libraries, museums, farms, railway stations and more.
Sundogs (or parhelia) are brilliant spots of light sometimes seen around a solar halo
Sundog Energy
![Page 4: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/4.jpg)
Sundog Energy current live projects
Kings Cross Station
Client – Kier / Network Rail
Project size – 240kWp / £1.3M
Technology – Bespoke PV glazing
Ferrier Point
Client – Rydon / Newham Council
Project size – 50kWp / £200K
Technology – PV facade
![Page 5: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/5.jpg)
PV module
Semiconductor devices that convert sunlight directly into electricity
No moving parts PV modules typically offer a 25 years performance warranty (life expectancy ~50 years)
![Page 6: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/6.jpg)
Grid connected PV systems Solar array – generates DC electricity
Inverter – converts DC to AC
Connected to Fuse Box / Distribution Board
Electricity used in property and/or exported
![Page 7: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/7.jpg)
Above roof systems
Cost effective solution
Comprise standard framed modules, fixed to a mounting assembly just above the existing roof.
Robust and weather-tight fixings are available for almost all roof types (slates, tiles, metal sheet etc).
Array options
![Page 8: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/8.jpg)
Pitched roof - Integrated systems
Directly replaces conventional roofing materials
Various products available Selection depends on tile type and the visual effect desired. Small format PV tiles are typically more costly than larger format solutions
Typically installed on new roofs or as part of re-roofing schemes.
![Page 9: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/9.jpg)
Flat roof systems
Can be installed to a fixed frame or to a ballasted mount
Ballasted systems are the simplest (rely on the weight of the ballast to resist wind loads); require no roof penetrations; simple to move for any subsequent roofing works.
Fixed frames are typically new build / re-roofing solution
![Page 10: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/10.jpg)
PV glazing systems
Can replace glass in roofs, skylights and facades
Cell layout, cell spacing, single / double glazing and desired light transmission all variable
As a bespoke product is a more expensive option - typically of interest for commercial or high value projects
![Page 11: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/11.jpg)
PV facades
PV modules and PV glazing can be used within building façades
Often use bespoke modules or laminates, but standard modules can be used in some circumstances
Wind loading issues to be considered on large facades
![Page 12: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/12.jpg)
Ground mounted
Huge variety of locations and structures will accept PV array
Ground mounting often very cost effective & practical option
Structures such as pergolas, shelters and canopies can be created or adapted to take PV
Tracking devices can boost performance by 20% or more
![Page 13: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/13.jpg)
Effect of orientation and pitch on array performance (% of ideal)
Vert. 80 70 60 50 40 30 20 10 Horiz.
EAST 58 65 70 76 80 84 86 88 90 90
SE 69 77 84 89 93 96 96 96 94 90
SOUTH 71 80 87 93 97 100 100 98 96 90
SW 67 75 82 87 92 95 96 96 94 90
WEST 56 63 69 74 78 82 86 87 89 90
Ideal site is one that faces south with a slope of around 30-40 °.
Other orientations and pitches may also be viable with relatively little drop in performance
Siting considerations
Orientation and pitch
![Page 14: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/14.jpg)
Other factors
Shade - Any shade, such as from trees or neighbouring buildings, can make a large impact on performance
To work effectively, the whole PV array needs to be free from shade for the majority of the day
Size - a 1kWp PV array will occupy at least 8m² of roof. Positioning an array too close to the edges of a roof may compromise the aesthetics of the installation and has implications on wind loading.
Rule of thumb: 1kWp array per year … Generate approx 800kWh (units) of electricity Save approx 0.4 tonnes of CO2
Not a sundog site!
![Page 15: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/15.jpg)
Field arrayLand usage rules of thumb
Dense layout ~ 4acres / MWp Open layout ~ 5acres / MWp
Site shape, slope and shade factors all influence capacity
![Page 16: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/16.jpg)
System performance modellingSoftware models such as PVSyst can estimate can estimate likely performance
![Page 17: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/17.jpg)
System Monitoring Optimising yield
Ensuring performance
Rapid fault detection
![Page 18: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/18.jpg)
PV array Inverter
FIT meter
Siteconnection
to maindistribution
board
• Bankable?• Reliable?• Warranties
System selection - Key components
![Page 19: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/19.jpg)
Site dependant components
PV array InverterFIT meter
Siteconnection
to maindistribution
board
Mounting frameGrid connection
![Page 20: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/20.jpg)
Commercial and agricultural roofsKey considerations
• Size• Aspect • Pitch• Shading
• Structural strength• Wind loads• Fixing type
• Roof material (asbestos)• Access (fragile roofs)• Caustic environment?
![Page 21: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/21.jpg)
Ground mounted systems
Site• Size• Aspect • Slope• Shading• Ground conditions• Wind loads• Land usage• Access
Array design• Mutual shading (density)• Ground clearance • Maximum height (planning)• Speed of installation• Fixed / adjustable / tracking
![Page 22: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/22.jpg)
Grid connection
![Page 23: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/23.jpg)
Single installations
• Install and commission system• Notify DNO within 30 days and provide commissioning info
• System <16A / phase• Type tested inverter to G83/1• Installed in accordance with G83/1
Multiple installations
• Discuss scheme with DNO• Install & commission as agreed
Small systems
![Page 24: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/24.jpg)
G83/1 compliant
≤ 50kW 3 phase≤ 17kW 1 phase Larger system
DNO consent required prior to connection? No Yes Yes
Protection requirements To meet G83/1-1
To meet G59/2
Type verified protection equipment accepted
To meet G59/2
Witnessed commissioning by DNO? No At discretion of DNO
LV: At discretion of DNO
HV: Yes
Connection variations – larger systems
![Page 25: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/25.jpg)
Project planning phaseInitial system design – ensuring compliance to standards
Information phase ( Information exchange with DNO) System design, protection arrangements, peak and fault current, harmonics, earthing etc. Network issues
Design phase (Formal submission of design to DNO)Where new infrastructure required >>> DNO prepares connection design and issues a connection offer
Construction phase Construction of plant. Installation of grid connection infrastructure (DNO and/or ICP)
Testing and commissioning phase G59/2 commissioning (witnessed?).
DNO connection process
![Page 26: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/26.jpg)
“to evaluate microgeneration products and installers against robust criteria, providing greater protection for consumers”
![Page 27: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/27.jpg)
MCS mark owned by UK GovernmentMark licensed to scheme administrator (Gemserve)Mark sub-licensed to Certification bodiesCertification bodies issue mark to product suppliers & installersInstaller provides customer with MCS certificate for system
MCS certificate enables FIT payments
MCS Mark
Scope: Up to 50kWp (relevant for larger schemes?)
![Page 28: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/28.jpg)
Installer
MCS001 Installer certification scheme requirements
MCS3002 Rrequirements for contractors undertaking the supply, design, installation, set to work, commissioning and handover of solar photovoltaic (PV)
microgeneration systems
Product
MCS005 Product Certification Scheme Requirements: Solar PV
MCS011 Test and acceptance criteria
MCS010 Generic Factory Production Control (FPC) requirements.
MCS – Key PV documents
![Page 29: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/29.jpg)
Photovoltaics in buildings - Guide to the installation of PV systems
BS7671 Requirements for Electrical Installations
MIS3002
![Page 30: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/30.jpg)
What MCS does NOT do …
Important to recognise exactly what MCS covers
MCS accreditation process does not particularly scrutinise H&S
A recent photo from the UK press... spot the scaffolding & PPE?
![Page 31: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/31.jpg)
Relevant experience …
MCS accreditation process does not particularly differentiate in terms of scale, complexity & experience
… PV installations obviously vary!
![Page 32: Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (Sundog Energy)](https://reader036.fdocuments.us/reader036/viewer/2022081519/55618d11d8b42ace7d8b4d12/html5/thumbnails/32.jpg)
MCS scope up to 50kWp …. But client must evaluate if experience relevant