Photography in Flux (Photographers Opinions) from SNAG PDS 2011
Snag List
-
Upload
vishal-tiwari -
Category
Documents
-
view
217 -
download
5
description
Transcript of Snag List
Snag List ( Civil Work )
Nos. ParticularA SHOP FLOOR1 Cracks in plaster at the junction of RCC column & Brick wall2 Un even surface of column3 Gaps between sub frame & main frame in str.glazing (Window)work4 Scratches in some frames of str. Glazing (window) work5 Sealant filling of str. Glazing (window) work is not proper6 colour of Screws of str.glazing(window) work are not matched with main frame 7 Screws of str.glazing(window) work are not fixed properly 8 Colour of Puff doors is not matched with frame9 Locking arrangement of Puff doors
10 Other fittings of Puff doors11 Puff doors are not sealed proper with floor12 One strip is welded in all Puff doors shutter poorly13 Legs of frames of Puff doors are not corrected14 Rolling shutter near Toilet 1 is not touching with floor properly 15 Painting of Rolling shutter16 Aluminium doors are not OK17 Glass thickness is not OK in Aluminium doors/ plane windows18 Aluminium strips are not fixed properly at expansion joints19 Bituman is still falling from expansion joints20 Trimix floor is not in level at some locations21 Final paint work pending22 One slab beam is not in lineB Toilet 21 Some Tiles are not in level in floor 2 Joints of dado tiles are not correct at corners3 cutting of dado tiles is not correct at fittings location4 Granite work is not correct in dado5 Locking arrangement of doors6 Other fittings of doors7 Painting of doors8 Ventilator work pending9 Fixtures & fitting work pendingC AHU1 M.S.doors not fixed properly2 Gaps between M.S door shutter & floor3 Jali over Traps4 Painting on doorsD Compressure Room
1 Cracks in plaster at the junction of RCC column & Brick wall2 Colour & finishing not proper3 Rolling shutter are not touching with floor properly 4 Painting of Rolling shutterE LT Panel Room1 Cracks in plaster at the junction of RCC column & Brick wall2 Rolling shutter are not touching with floor properly 3 Painting of Rolling shutter4 Painting of Rolling shutter5 Gaps between sub frame & main frame in str.glazing (Window)work6 Scratches in some frames of str. Glazing (window) work7 Sealant filling of str. Glazing (window) work is not proper8 colour of Screws of str.glazing(window) work are not matched with main frame 9 Screws of str.glazing(window) work are not fixed properly
10 Colour of Puff doors is not matched with frame11 Locking arrangement of Puff doors12 Other fittings of Puff doors13 Puff doors are not sealed proper with floor14 One strip is welded in all Puff doors shutter poorlyF Meter Room1 Ventilator glass not fixed2 Painting of Door shutter3 Trench covering with chequered plate4 Exuast FanG VCB Room1 Painting of Door shutter2 Trench covering with chequered plate3 Exuast FanH Winding Area1 Gaps between two Removable Partitions2 Gaps in False Ceiling & also not in proper level at some location3 Undulation in column
Grid 11/A to HGrid 6,6`/A to H
All
AllAllAllAllAll4meter wide door
AllAllAll