SN ASSOCIATES PROFILE
-
Upload
sachin-chandane -
Category
Documents
-
view
186 -
download
1
Transcript of SN ASSOCIATES PROFILE
![Page 1: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/1.jpg)
ArchitectureLandscape
Master PlanningLiasoning
Our Experience
![Page 2: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/2.jpg)
Building no. - 63Plot area - 798.35 sq.m. No. of floors -P+G+14; multi-level mechanical parking Status -under construction
Nehru Nagar Mhada Colony, Mumbai
![Page 3: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/3.jpg)
Building no. - 34Plot area - 1193.68 sq.m. No. of floors -B+G+15; multi-level mechanical parking Status -under construction
Nehru Nagar Mhada Colony, Mumbai
![Page 4: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/4.jpg)
Building no. - 58Plot area - 810.50 sq.m. No. of floors -B+G+15; multi-level mechanical parking Status -under construction
Nehru Nagar Mhada Colony, Mumbai
![Page 5: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/5.jpg)
Building no. - 60Plot area - 822.50 sq.m. No. of floors -B+G+15; multi-level mechanical parking Status - At Approval Stage
Nehru Nagar Mhada Colony, Mumbai
![Page 6: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/6.jpg)
Building no. - 79 TO 83Plot area - 3573.23 sq.m. No. of floors -B+G+15; multi-level mechanical parking Status - At Design Stage
Nehru Nagar Mhada Colony, Mumbai
![Page 7: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/7.jpg)
Nehru Nagar Mhada Colony, Mumbai
1. Building No. 12 2. Building No. 64
3. Building No. 66
1
2
3
Status - Completed
![Page 8: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/8.jpg)
Mahakaleshwar CHS (SRA) Redevelopment, Bhandup (W), Mumbai
Building Under S.R.A. SchemePlot area - 2556.58 sq.m. No. of floors -G+20; multi-level mechanical parking Status - Under Construction
![Page 9: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/9.jpg)
Shantiniketan CHS Redevelopment, Andher (W), Mumbai
Building Under T.D.R ProposalPlot area - 916.50 sq.m. No. of floors -G+12; multi-level mechanical parking Status - Under Construction
![Page 10: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/10.jpg)
Padmavati Nagari Residential Layout, Igatpuri
Plot area - 10718 sq.mBungalows,row-houses & buildings Status - Under Construction
![Page 11: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/11.jpg)
Padmavati Nagari Residential Layout, Igatpuri
BungalowAvg.Plot area - 115 sq.m.No. of Bungalows – 20 nos. No. of floors -G+2; No of rooms – 4 BHK. Status - Under Construction
Avg.Plot area - 52 sq.m.No. of Row-houses – 38 nos. No. of floors -G+2; No of rooms – 2 BHK. Status - Under Construction
ROW-HOUSE
![Page 12: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/12.jpg)
Padmavati Nagari Residential Layout, Igatpuri
Plot area - 2756 sq.m. No. of Buildings – 2 nos. No. of floors -G+2 & ST+3 Flat Type – 1 BHK. Status - Under Construction
BUILDINGS
REAR VIEW
FRONT VIEW
![Page 13: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/13.jpg)
Padmavati Nagari Residential Layout, Igatpuri
BUILDING’S AND SAMPLE FLAT PHOTOS
![Page 14: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/14.jpg)
Padmavati Nagari Residential Layout, IgatpuriAMENITY AREAS AND ACTUAL PHOTOS
![Page 15: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/15.jpg)
Padmavati Nagari Residential Layout, IgatpuriCLUB HOUSE
PLAN & ELEVATION
![Page 16: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/16.jpg)
Padmavati Nagari Residential Layout, IgatpuriVIEW
![Page 17: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/17.jpg)
Senior college at Gove,Kolad. Raigarh
Plot area - 132720 sq.m.Senior College for Science, Arts And Commerce. for Tatkare Charitable Trust, Kolad
![Page 18: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/18.jpg)
Residential Lay-out At Dahanu
Plot area - 132720 sq.m. Bungalows with 900 sqm. Plot Bungalows with 650 sq.m. Plot Bungalows with 300 sq.m. PlotClub-house and independent cottages with swimming poolGo- karting track
![Page 19: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/19.jpg)
Residential Lay-out At Ghoti
Plot area - 132720 sq.m.Contoured site with1m slope for every 5 mBungalow design as such that every bungalow has the lake viewRow-houses and single building with 1bhk flats Club-house with swimming pool
![Page 20: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/20.jpg)
Residential Lay-out At Wade-Bolai, Nagar Road, Pune
Plot area - 20438.50sq.m.Residential buildings with flat areas up to 365 sft.Row-houses and Club-house with swimming pool
![Page 21: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/21.jpg)
TOWN SHIP LAYOUT AT RAIPUR, CHHATTISGARH
![Page 22: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/22.jpg)
COMPANY TRAINING & RECREATION CENTER , NASHIK
![Page 23: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/23.jpg)
Proposed Projects in Comming Future
1.Kajal Kiran CHS redevelopment at Mulund West2.Alpa CHS redevelopment at Mulund East – planning3.Nirmala Niwas CHS redev at Chembur – 4.14 acre mixed user layout at Pune5.Proposed Redevelopment under cluster scheme at Thane6.Proposed Redevelopment at Kannamwar Nagar Mhada Colony7.Proposed mixed user development at Kurla8. Proposed Residential Towers at Mulund (W) and Mulund (E)
Ongoing project only for liasoning in M.C.G.M.
1.Residential Tower at Byculla For Rubberwala Realtors2.Residential Tower at Worli and Tardeo For Kumar Builders3.Commercial Tower at B.K.C. For Orbit Developers4.Commercial Mall at Kurla(Phoenix Mall) for Market city Developer5.Residential Tower at Byculla for Fortune Builders.6.Residential Complex at Saki Vihar Road for S P Associates
![Page 24: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/24.jpg)
DESIGN STAGE
Taking the clients instructions and preparing the conceptual designModify the conceptual designs incorporating required changes and prepare the preliminary drawings for clients approval.After clients approval prepare all the necessary drawings required for the approval as per the prevailing norms of the authorities .
APPROVAL STAGE
Get the project approved on behalf of client from the concerned authorities as per the specified conditions.After the basic approval from the concerned authorities Prepare the elevation of the building. Preparing all the basic architectural working drawings as per the approved plans and elevation.
CONSTRUCTION STAGE
Prepare and issue working drawings and details for proper execution of works during construction.On site demarcation of proposed building (setting out)Checking of c-line as per the c-line drawings Guide the contractor throughout the process of construction.Checking of each slab at the time of shuttering process.Approve samples of various elements and materialsKeep the client informed regarding the process of construction and if any changes has to be done as per the site condition.Site visit at various stages of the construction.
SCOPE OF WORK
![Page 25: SN ASSOCIATES PROFILE](https://reader038.fdocuments.us/reader038/viewer/2022110218/587c7c2e1a28ab93568b46d9/html5/thumbnails/25.jpg)
Thank You