SMART CITY PROPOSAL BILASPUR CITYbilaspurnagarnigam.com/pdf/BilaspurSmartCity.pdf · An AIILSG...

33
SMART CITY PROPOSAL BILASPUR CITY

Transcript of SMART CITY PROPOSAL BILASPUR CITYbilaspurnagarnigam.com/pdf/BilaspurSmartCity.pdf · An AIILSG...

  • SMART CITY PROPOSAL BILASPUR CITY

  • 09-12-2015 An AIILSG Presentation 2

    Draft Smart City Proposal for feedback.

    Shortlisting of Projects for Area Based Development on key 24 parameters and finalization of smart initiative for Pan City in consultation with Nodal Officers and other representatives.

    Consultation workshops with MPs, MLAs, Representatives of Governmentt from State as well city, Experts of various backgrounds.

    Study of DPRs and proposals under various schemes of ULB, State and Center in the city such as AMRUT, SBM, Digital India, Housing for All, IPDS, ECBC, SCP, CMP etc.

    Ward Level Consultation, Target Group Discussions, Awareness Workshops and on other platforms such as website, FB, Twitter. Conducting Essay Competition for Vision of the city.

    Data Collection from different departments of municipal corporation and other para statal bodies

    09-12-2015 An AIILSG Presentation

    Citizen Consultation- 1st Round

    Priorities of Citizens shortlisted. Study of other Documents

    Baseline Study: City Profile

    Citizen Consultation- 2nd Round

    Draft Smart City Proposal

    Citizen Consultation- 3rd Round

    Final Smart City Proposal

  • 09-12-2015 An AIILSG Presentation 3

    Bilaspur is the second-largest city (after Raipur) in the state. This part of the state is known as “Rice Bowl of Chhattisgarh” Bilaspur is the

    center of agro products. There are approx. 500 rice and dal mills in the surrounding area.

    Bilaspur is also known as 'Nyayadhani' (Law Capital) of the state, Chhattisgarh State High Court is situated at bilaspur.

    The city is on of the major centers of electric power generation in India. Bilaspur (South East Central Railway) is the highest revenue generating

    railway zone in India among 17 zones. SECL headquarter one of the Miniratna company in public sector located in

    Bilaspur.

  • Round 1

    Essay & Painting

    Competition

    Ward Consultation

    Facebook

    Brand Ambassador

    100 Top Suggestions

    Schools & Colleges Meeting

    My Gov Survey Form

    Stake Holders Meeting

  • Bel

    ow

    12

    13

    to

    20

    21

    to

    35

    36

    to

    60

    Ab

    ove

    60

    1% 23% 43% 29% 4%

    61% MALE 39% FEMALE

    14% of the Total Population Participated in Survey

    CITIZEN CONSULTATION

    ROUND 1

    ONLINE Survey forms Offline Progress

    8040 37,904 forms received Data entry

    completed

  • 09-12-2015 An AIILSG Presentation 6

  • 09-12-2015 An AIILSG Presentation 8

  • 09-12-2015 An AIILSG Presentation 9

  • 09-12-2015 An AIILSG Presentation 10

  • 09-12-2015 An AIILSG Presentation 11

  • 09-12-2015 An AIILSG Presentation 12

  • 09-12-2015 An AIILSG Presentation 13

    LOCATION OF IDENTIFIED AREAS FOR AREA BASED DEVELOPMENT

  • 09-12-2015 An AIILSG Presentation 14

    OPTIONS WITH MODEL

    Area (In acres)

    EXISTING SALIENT FEATURE

    OPTION 1

    RETROFITTING & GREENFIELD

    1197 Approx.

    ( BILASA PARK TO BILASPUR BARRAGE ) PART OF – KONI, SARKANDA, CHATIDIH, LINGYADIH, MOPKA, MANGALA, KUDUDAND, BILASPUR NAZUL, JUNA BILASPUR, TORWA

    OPTION 2

    RETROFITTING

    500 Approx. GOLE BAZAAR, SANICHARI BAZAAR, TELIPARA, OLD BUS STAND CHOWK, AGRASEN CHOWK, MAGARPARA CHOWK, MANDIR CHOWK,NEHRU CHOWK, TILAK NAGAR & GONDPARA AREA

    OPTION 3

    REDEVELOPMENT

    50 Approx.

    MAHARANA PRATAP CHOWK, GAURAV PATH, SBR COLLEGE, RAIPUR ROAD, HUGE LAKE (JATIYA TALAB)

    OPTION 4

    REDEVELOPMENT

    50 Approx.

    TALAPARA BASTI, PART OF VAISHALI NAGAR, BEHIND MAGNETO MALL , HUGE LAKE (TALAPARA TALAB)

    OPTION 5

    REDEVELOPMENT

    50 Approx.

    SANJAY TARAN PUSKAR, PART OF 27 KHOLI, MUNGELI MAIN ROAD,

    LOCATION OF IDENTIFIED AREAS FOR AREA BASED DEVELOPMENT

  • 09-12-2015 An AIILSG Presentation 15

    Cultural Capital of Chhattisgarh, Bilaspur (C3)

    छत्तीसगढ़ की स ांस्कृतिक र जध नी, बिल सऩुर Goal’s

    1- To strengthen Tourism & Multi-cultural Activities.

    2- To Adapt Technology for Development

    3- To facilitate Industries and Commerce

  • 09-12-2015 An AIILSG Presentation 16

  • 09-12-2015 An AIILSG Presentation 17

  • 09-12-2015 An AIILSG Presentation 18

  • 09-12-2015 An AIILSG Presentation 19

    S.NO FEATURES STATUS 1 Location ARPA RIVER FRONT

    2 Landmarks BILASA PARK TO BILASPUR BARRAGE

    3 Length 10km (APPROX )

    4 Area 1197 Acre

    5 Population 62,150 persons

    6 Households 13,000 nos.

  • 09-12-2015 An AIILSG Presentation 20

    Retrofitting = 724.56 acres Greenfield = 164.37 +306.97 acres

    S.No. Land Use Area For Greenfield

    Development(Acre)

    Area for Retrofitting (Acre)

    1. Residential 66.90 246.38

    2. Commercial 0.20 30.07

    3. Industry - 4.03

    4. Infrastructure 16.03 50.44

    5. Recreational 21.59 -

    6. Public-Semi-Public

    11.60 37.46

    7. Public Utilities and Facilities

    0.21 0.408

    8. Vacant land 112 125.29

    9. Agriculture 197.17 126.83

    10 Reclaimed Water Body

    45.42 102.56

    Total 471.42 724.56

    Total Area = 1197 acres

  • 09-12-2015 21

    GOVERNMENT & RECLAIM LAND PRIVATE LAND

    613 Acres 584 Acres

    51% 49%

  • 09-12-2015 An AIILSG Presentation 22

    14 NOTIFIED SLUM WITH TOTAL AREA OF 92 ACES

    REQUIRED 3640 UNIT

  • 09-12-2015 An AIILSG Presentation 23

    EXISTING ROAD NETWORK

  • 09-12-2015 An AIILSG Presentation 24

    PROPOSED ROAD NETWORK

  • 09-12-2015 An AIILSG Presentation 25

    Establish of 32 choice centres and up-gradation of 2 choice centres for decentralized municipal facilities.

    Developing linear park over 2.5 km of tunnel, OAT, Exhibition Space, Museums along ARPA River.

    Redevelopment of 14 slums under PPP mode & construction of 3640 units. Replacing hand pulled rickshaws with 300 E-rickshaws at market place. Underground road tunnel of 2.5 km length from old bridge to existing Apollo bridge Ropeway cable car of 0.4km length Smart parking lots and cycle on rent facility at six major intersections Construction of 32 bus stops along river front road. Pedestrian footpath & signals, Cycle tracks, street furniture and Tree plantation on major

    roads. Sanichary market to be developed as pedestrian street (500 m length) WIFI Hubs near Bus stations, Education institutes, Hospitals & public open spaces. E-classroom facility in Municipal schools. Under laying electric wiring on 400 km of road length.

  • 09-12-2015 An AIILSG Presentation 26

    LED lights for Street Lighting, Bus stops, public places and government building. Linear solar plant on 14km of retaining wall along ARPA river font. Smart water meter and pre-paid electric metering in 13000 households. Extending water pipelines and Construction of ESR of 10 MLD. Replacing existing sanitary fittings to water efficient with dual plumbing system in

    public and semi-public spaces. Mechanised Street sweeping with RFID based waste management system, Door to

    Door collection and segregation facility. City library, OAT, Exhibition space, Boat and recreational activity, Old age home Installation of sensor based signals and CCTV Cameras at 6 traffic junctions and

    public places.

  • S. N. Essential Feature Project Cost (In Crore)

    Timeline (In Months)

    1 Assured electricity supply with at least 10% of the Smart City’s energy requirement coming from solar

    200 15

    2 Adequate water supply including waste water recycling and storm water reuse 19.9 18 3 Sanitation including solid waste management 28.5 18 4 Rain water harvesting (on Govt. Buildings) 11 12 5 Smart metering 268.4 36 6 Smart metering including operation and Maintenance 22.5 36 7 Robust IT connectivity and digitalization 20 24 8 Cable car ropeway (0.4 km) 9 24 9 Encouragement to non-motorised transport (e.g. walking , cycling ,300 e-rickshaw) 5.5 12

    10 Non-vehicle streets/zones (500 m length ) 2.4 18 11 Procurement & operation of mobile toilets 5 12 12 Safety of citizen 3.5 24 13 Establishing 22 Choice centers 4.4 12 14 Redevelopment of slums under Housing for All ( 3640 Nos. ) 218.4 36 15 Smart city app 4.5 12 16 livelihood centre for women 4.5 24 17 Environmental conservation training centre 11.5 24 18 Public amenities kiosks 5 24

  • S. N. Essential Feature Project Cost (In Crore)

    Timeline (In Months)

    19 80% of buildings should be energy efficient and green building 20 36 20 visible improvement in the Area (Landscaping and Urban Design) 13 12 21 River Channel 467 36 22 Barrage, Anicut, waste water recycle 402 36 23 Road pedestrian infrastructure -

    • 20km River front road ( 109.4 cr ) • Approach road ( 84.3 cr ) • Local access road ( 53.5 cr) • 2.5KM length of Tunnels ( 150 cr ) (Old bridge – Proposed Apollo bridge) • Bridges & pedestrian friendly pathway ( 68.5 cr)

    465.5 36

    24 URBAN INFRASTRUCTURE - • Water supply trunk network ( 29.6 cr ) • Sewerage trunk network ( 52.8 cr) • Power supply ( 127.4 cr) • Park, Promenade & Open space ( 96.7cr) • City library, OAT, Exhibision space (18.5cr) • Boat and recreational activity, (12.4 cr) • Oldage home ( 5.5cr ) • Command center, Administrative building ( 13.5cr )

    366.4 36

    25 DPR/ SUPERVISION/ CONTINGENCY 92 --

    TOTAL 2670

  • 09-12-2015 An AIILSG Presentation 29

    E-governance: City performance dashboard, Integrated command and control centre, online workforce resource management, Online citizen services, Social media helpline.

    Transportation:

    • Smart parking- Parkplace management, Video analytics, real time pricing.

    • Smart Traffic Incident Management: Installation of sensors along road network, Video camera and infrastructure to verify the incident.

    • Intelligent traffic signals, e-challans, red light violation detection.

    • Street light management- Installation of smart devices on light poles, Individual control and monitoring.

    Water Management: GIS based asset mapping and consumer indexing, smart metering, Sensors in sewer line infrastructure, Online billing and payment system.

    Waste management: Tracking devices installed on each vehicle, CCTV cameras at secondary and final dumping site, Bin monitoring with RFID tags.

  • 09-12-2015 An AIILSG Presentation 30

  • 09-12-2015 An AIILSG Presentation 31

    S. N. Essential Feature Project Cost (In Crore)

    Timeline (In Months)

    1 Optical fibre lines 67 36

    2 ICT BASED PAN CITY PROPOSAL • Traffic management • Public safety • City lighting • Pollution/ environment • Waste management • Parking optimization

    26 36

    TOTAL 93

  • 09-12-2015 An AIILSG Presentation 32

    S.No. Particulars Amount (in Crore) TOTAL (In Crore)

    Remarks

    ABD PAN

    1. TOTAL PROJECT COST 2670 93 2763

    2. Grant Central 500 1000 State 500

    ABD Pan City

    3. Convergence AMRUT 27.65 27.65 Water supply, sewerage, park development

    PWD 4.15 4.15 Road construction

    SWATCH BHARAT MISSION

    28.5 28.5 Municipal solid waste management

    HOUSING FOR ALL 218.4 218.4 Slum redevelopment

    DIGITAL INDIA 4.4 67 71.40 Optical fibre cables, e-classrooms, choice centres, interactive GIS mapping

    INTEGRATED LOW COST SANITATION

    1.65 1.65 Construction of private toilets.

    Total Convergence 284.75 67 351.75

    4. Project Cost Excluding Convergence & grants

    1385.25 26 1411.25

    PROJECT COST CONVERGENCE

  • 09-12-2015 An AIILSG Presentation 33