NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS).
SKETCH NO.
REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459
WESLEYAN U N I V E R S I T Y SKS-1
SKS-2
MAJOR MAINTENANCE FY 14BID PACKAGE #21
200 HIGH ST – MASONRY PIER REPLACEMENT / CARPENTRY REPAIRS
SECTION 00020 – STRUCTURAL REPAIR SKETCHES
DATE: 06/11/13
REVISIONSConstruction Services
170 Long LaneMiddletown, CT 06459
WESLEYAN U N I V E R S I T Y SKS-3
DATE: 06/11/13
SKETCH NO.
NOTE: REMOVE EXISTING FLOOR AND FASCIA BOARDS AS REQUIRED TO COMPLETE THE WORK, REPLACE THE TONGUE & GROOVE DECKING AND FASCIA BOARDS TO THE LIMITS SHOWN ON THE PHOTO SHEETS.
BID PACKAGE #21200 HIGH ST – MASONRY PIER REPLACEMENT /
CARPENTRY REPAIRSSECTION 00020 – STRUCTURAL REPAIR SKETCHES
REVISIONSConstruction Services
170 Long LaneMiddletown, CT 06459
WESLEYAN U N I V E R S I T Y SKS-4
DATE: 06/11/13
SKETCH NO.BID PACKAGE #21200 HIGH ST – MASONRY PIER REPLACEMENT /
CARPENTRY REPAIRSSECTION 00020 – STRUCTURAL REPAIR SKETCHES
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS).
PHOTO. NO.
REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459
WESLEYAN U N I V E R S I T Y P-103-1
DATE: 06/11/13
INSTALL NEW PIER.
PLUMB & LEVEL COLUMN ABOVE PIER. REMOVE /
REINSTALL EXISTING RAILINGS AS REQUIRED
EAST ELEVATIONSOUTH ELEVATION
BID PACKAGE #21200 HIGH ST – MASONRY PIER REPLACEMENT /
CARPENTRY REPAIRSSECTION 00020 – STRUCTURAL REPAIR SKETCHES
PHOTO. NO.
REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459
WESLEYAN U N I V E R S I T Y P-103-2
DATE: 06/11/13
REMOVE EXISTING FRAMING AND REFRAME
AS REQUIRED TO COMPLETE THE WORK.
REPLACE EXISTING FASCIA BOARD.
BID PACKAGE #21200 HIGH ST – MASONRY PIER REPLACEMENT /
CARPENTRY REPAIRSSECTION 00020 – STRUCTURAL REPAIR SKETCHES
PHOTO. NO.
REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459
WESLEYAN U N I V E R S I T Y P-103-3
DATE: 06/11/13
BID PACKAGE #21200 HIGH ST – MASONRY PIER REPLACEMENT /
CARPENTRY REPAIRSSECTION 00020 – STRUCTURAL REPAIR SKETCHES
PHOTO. NO.
REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459
WESLEYAN U N I V E R S I T Y P-103-4
DATE: 06/11/13
BID PACKAGE #21200 HIGH ST – MASONRY PIER REPLACEMENT /
CARPENTRY REPAIRSSECTION 00020 – STRUCTURAL REPAIR SKETCHES
PHOTO. NO.
REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459
WESLEYAN U N I V E R S I T Y P-103-5
DATE: 06/11/13
INSTALL NEW TONGUE & GROOVE DECKING TO THE LIMITS SHOWN. INSTALLATION SHALL RUN UNDER THE RAILINGS TO THE EXTERIOR FASCIA BOARDS FOR A COMPLETE REPLACEMENT IN THIS AREA. ALL NEW DECKING SHALL RUN
PERPENDICULAR TO THE JOISTS. THIS AREA ALSO IDENTIFIES THE LIMITS OF THE NEW FASCIA BOARDS TO BE INSTALLED.
BID PACKAGE #21200 HIGH ST – MASONRY PIER REPLACEMENT /
CARPENTRY REPAIRSSECTION 00020 – STRUCTURAL REPAIR SKETCHES
PHOTO. NO.
REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459
WESLEYAN U N I V E R S I T Y P-103-6
DATE: 06/11/13
BID PACKAGE #21200 HIGH ST – MASONRY PIER REPLACEMENT /
CARPENTRY REPAIRSSECTION 00020 – STRUCTURAL REPAIR SKETCHES