SIRDAR - modern knitting · 7th Row.1ch, 1dc into each st to end, turn. Last 2 row sets treble...

6
SIRDAR One size 7221 COUNTRY STYLE DK

Transcript of SIRDAR - modern knitting · 7th Row.1ch, 1dc into each st to end, turn. Last 2 row sets treble...

Page 1: SIRDAR - modern knitting · 7th Row.1ch, 1dc into each st to end, turn. Last 2 row sets treble relief patt. Cont in treble relief patt for 2 more rows. 10th Row. 1ch, 1tr/rf around

SIRDAR

One size7221COUNTRY STYLE DK

Page 2: SIRDAR - modern knitting · 7th Row.1ch, 1dc into each st to end, turn. Last 2 row sets treble relief patt. Cont in treble relief patt for 2 more rows. 10th Row. 1ch, 1tr/rf around

CROCHET TEACOSY CUPCAKE

CASE (Make 2 pieces)Using 3.50 hook and A, make 32 ch. Foundation Row. (rs) 1dc into 3rd chfrom hook, 1dc into each ch to end,turn. 31dc.1st and Every Alt Row. 1ch (1chcounts as 1dc), 1dc into each st toend, turn.

2nd Row. 1ch, * 1tr/rf around next dcon foundation row, 1dc into next dc,rep from * to end, turn.4th Row. 1ch, 1tr/rf around stem ofnext 1tr/rf on previous row, 2dc intonext dc, * 1tr/rf around stem of next1tr/rf on previous row, 1dc into nextdc, ** rep from * to last 4 sts, 1tr/rfaround stem of next 1tr/rf onprevious row, 2dc into next dc, rep

from * to ** once more, turn. 33sts.

6th Row. 1ch, 1tr/rf around stem ofnext 1tr/rf on previous row, 1dc intoeach of next 2dc, * 1tr/rf around stemof next 1tr/rf on previous row, 1dcinto next dc, ** rep from * to last 5 sts,1tr/rf around stem of next 1tr/rf onprevious row, 1dc into each of next2dc, rep from * to ** once more, turn.

TEACOSIES in SIRDAR COUNTRY STYLE DK

MEASUREMENTSCrochet Teacosy Cupcake To fit an average size Teapot

Crochet Teacosy with Butterflies To fit an average size TeapotKnitted Teacosy Campervan To fit an average size Teapot

Knitted Teacosy Cottage To fit an average size Teapot

TENSION16 sts x 19 rows to 10cm, (4in) over dc pattern on 4.00 crochet hook. 17 sts x 20 rows to 10cm, (4in) over Tr/rf pattern on 3.50 crochet hook or thesize required to give correct tension. 22 sts x 28 rows to 10cm, (4in) over stocking stitch on 4mm needles or the size required to give correct tension. Check your tension - if less stitches use a thinner hook or needles, if more use a thicker hook or needles.

IT IS ESSENTIAL TO WORK TO THE STATED TENSION TO ENSURE SUCCESS.

ABBREVIATIONSch chain, cm centimetres, cont continue, dc double crochet, DK double knitting, dtr double treble, g grammes, htr half treble, in inch(es), k knit,mm millimetres, p purl, patt pattern, rep repeat, rem remain(ing), rnd round, rs right side, sp(s) space(s), ss slip stitch, st(s) stitch(es), tog together, tr treble, ws wrong side, yoh yarn over hook.dc2tog (insert hook into next st, yoh and draw yarn through) twice, yoh and draw through 3 loops.Tr/rf - yoh, insert hook around stem right to left at front of stitch on previous row, yoh and draw through, yoh and draw through first 2 loops, yohand draw through all loops, (ensuring loops are pulled through until level to top of work, work tr/rf around stem of dc on 1st row and around stemof previous row tr/rf on following rows).K1below – knit into st 1 row below.

Crochet Teacosy CupcakeF021 Country Style DKColour A shade 389 1 50g ballColour B shade 412 1 50g ballColour C shade 418 OddmentCrochet Teacosy with ButterfliesF021 Country Style DKColour A shade 629 1 50g ballColour B shade 471 OddmentColour C shade 619 Oddment Knitted Teacosy CampervanF021 Country Style DKColour A shade 613 1 50g ballColour B shade 395 1 50g ballColour C shade 411 1 50g ballKnitted Teacosy CottageF021 Country Style DKColour A shade 630 1 50g ballColour B shade 470 1 50g ballColour C shade 411 OddmentColour D shade 418 OddmentColour E shade 614 OddmentColour F shade 629 OddmentThe yarn amounts are based on average requirements when specified tension and yarn is used.Also suitable for Click DK, Wash ‘n’ Wear Double Crepe DK and Cotton DK. Amounts may vary. You will also need 1 4.00 (UK8 - USAF/5) Crochet Hook and 1 3.50 (UK9 - USAE/4) Crochet Hook and 1 3.00 (UK10 – USAD/3) Crochet Hook. 1 Pair of 4mm (UK8 -USA6) Knitting Needles and 1 Pair of 3¼mm (UK10 - USA3) Knitting Needles. 1 Button for each Crochet Teacosy, 1 Button and 2 stitch holders for Knitted TeacosyCottage and 4 Buttons for Knitted Teacosy Campervan.

MATERIALS

7221

Page 3: SIRDAR - modern knitting · 7th Row.1ch, 1dc into each st to end, turn. Last 2 row sets treble relief patt. Cont in treble relief patt for 2 more rows. 10th Row. 1ch, 1tr/rf around

7th Row. 1ch, 1dc into each st toend, turn.Last 2 row sets treble relief patt.Cont in treble relief patt for 2 morerows.10th Row. 1ch, 1tr/rf around stem ofnext 1tr/rf on previous row, 1dc intoeach of next 2dc, 1tr/rf around stemof next 1tr/rf on previous row, 2dcinto next dc, * 1tr/rf around stem ofnext 1tr/rf on previous row, 1dc intonext dc, ** rep from * to last 7sts,1tr/rf around stem of next 1tr/rf onprevious row, 2dc into next dc, 1tr/rfaround stem of next 1tr/rf onprevious row, 1dc into each of next2dc, rep from * to ** once more, turn.35sts.Cont working without shaping intreble relief patt for 3 more rows.14th Row. 1ch, (1tr/rf around stemof next 1tr/rf on previous row, 1dcinto each of next 2dc) twice, 1tr/rfaround stem of next 1tr/rf onprevious row, 2dc into next dc, * 1tr/rfaround stem of next 1tr/rf onprevious row, 1dc into next dc, repfrom * to last 10 sts, 1tr/rf aroundstem of next 1tr/rf on previous row,2dc into next dc, (1tr/rf around stemof next 1tr/rf on previous row, 1dcinto each of next 2dc) twice, 1tr/rfaround stem of next 1tr/rf onprevious row, 1dc into next dc, turn.37sts.Cont working without shaping intreble relief patt for 1 more row.16th Row. 1ch, (1tr/rf around stemof next 1tr/rf on previous row, 1dcinto each of next 2dc) 3 times, 1tr/rfaround stem of next 1tr/rf onprevious row, 2dc into next dc, * 1tr/rfaround stem of next 1tr/rf onprevious row, 1dc into next dc, repfrom * to last 13 sts, 1tr/rf aroundstem of next 1tr/rf on previous row,2dc into next dc, (1tr/rf around stemof next 1tr/rf on previous row, 1dcinto each of next 2dc) 3 times, 1tr/rfaround stem of next 1tr/rf onprevious row, 1dc into next dc, turn.39sts.Cont working without shaping in

treble relief patt until work measuresapproximately 11cm, (4¼in) or lengthrequired for teapot, ending with a wsrow. Fasten off.

ICINGUsing 4.00 hook and B.1st Rnd. (rs) 1ch (counts as 1dc), 1dcinto each st across first case piece and1dc into each st across second casepiece, ss to first dc , Do Not Turn.78dc.2nd Rnd. 1ch, 1dc into each of next77dc, ss to first dc. 3rd Rnd. 1ch, 1dc into each of next17dc, dc2tog over next 2dc, 1dc intoeach of next 17dc, dc2tog over next2dc, 1dc into each of next 18dc,dc2tog over next 2dc, 1dc into eachof next 17dc, dc2tog over next 2dc, ssto first dc, Do Not Turn. 74dc.4th Rnd. 1ch, 1dc into each of next10dc, dc2tog over next 2dc, (1dc intoeach of next 10dc, dc2tog over next2dc) twice, 1dc into each of next11dc, dc2tog over next 2dc, (1dc intoeach of next 10dc, dc2tog over next2dc) twice, ss to first dc, Do Not Turn.68dc.5th Rnd. 1ch, 1dc into each of next9dc, dc2tog over next 2dc, (1dc intoeach of next 9dc, dc2tog over next2dc) twice, 1dc into each of next10dc, dc2tog over next 2dc, (1dc intoeach of next 9dc, dc2tog over next2dc) twice, ss to first dc, Do Not Turn.62dc.6th Rnd. 1ch, 1dc into each of next8dc, dc2tog over next 2dc, (1dc intoeach of next 8dc, dc2tog over next2dc) twice, 1dc into each of next 9dc,dc2tog over next 2dc, (1dc into eachof next 8dc, dc2tog over next 2dc)twice, ss to first dc, Do Not Turn.56dc.7th Rnd. 1ch, 1dc into each of next4dc, dc2tog over next 2dc, (1dc intoeach of next 5dc, dc2tog over next2dc) 7 times, ss to first dc, Do NotTurn. 48dc.8th Rnd. 1ch, 1dc into each dc toend, ss to first dc, Do Not Turn.9th Rnd. 1ch, 1dc into each of next

3dc, dc2tog over next 2dc, (1dc intoeach of next 4dc, dc2tog over next2dc) 7 times, ss to first dc, Do NotTurn. 40dc.10th Rnd. 1ch, 1dc into each dc toend, ss to first dc, Do Not Turn.11th Rnd. 1ch, 1dc into each of next2dc, dc2tog over next 2dc, (1dc intoeach of next 3dc, dc2tog over next2dc) 7 times, ss to first dc, Do NotTurn. 32dc.12th Rnd. 1ch, 1dc into each dc toend, ss to first dc, Do Not Turn.13th Rnd. 1ch, 1dc into next dc,dc2tog over next 2dc, (1dc into eachof next 2dc, dc2tog over next 2dc) 7 times, ss to first dc, Do Not Turn.24dc.14th Rnd. 1ch, dc2tog over next 2dc,(1dc into next dc, dc2tog over next2dc) 7 times, ss to first dc, Do NotTurn. 16dc.15th Rnd. 1ch, (dc2tog over next2dc) 7 times, dc2tog over next dc andfirst dc. 8dc. Fasten off.

ICING EDGINGUsing 4.00 hook and B, with rs facingand Teacosy upside down rejoin yarnto first round of Icing at side edge.1st Rnd. (rs) * 3ch, miss 2dc, 1dcinto next dc, rep from * ending 3ch,miss 2dc, ss to first ch sp.2nd Rnd. 3ch (counts as 1dc and 2chsp), 6dc into same ch sp, * 2ch, 7dcinto next ch sp, 2ch, 1dc into next chsp, rep from * to end. Fasten off.

CHERRYUsing 3.50 hook and C, make 6ch(leaving a long length to stuff cherry),ss to first ch to make a ring.1st Rnd. (rs) 1ch (counts as 1dc), 8dcinto ring, ss to first dc. 9 sts.2nd Rnd. 1ch, * 2dc into next dc, 1dcinto next dc, rep from * ending 2dcinto last dc, ss to first dc. 13 sts.3rd Rnd. As 2nd Rnd.19 sts.4th Rnd. 1ch, 1dc into each dc toend, ss to first dc.4th Rnd sets dc patt.Work 3 more rounds in dc patt.Next Rnd. 1ch, * dc2tog over next

Page 4: SIRDAR - modern knitting · 7th Row.1ch, 1dc into each st to end, turn. Last 2 row sets treble relief patt. Cont in treble relief patt for 2 more rows. 10th Row. 1ch, 1tr/rf around

2dc, 1dc into next dc, rep from * toend, ss to first dc. 13 sts.Next Rnd. 1ch, * dc2tog over next2dc, 1dc into next dc, rep from * toend, ss to first dc. 9 sts. Fasten offleaving a length of yarn to gather rem9 sts.

TO MAKE UP TEACOSYSew side seams of teacosy leavinggap required for Handle/Spout andleaving open a gap at the bottom ofone side for fastening tab. Gathertogether remaining 9 sts at top ofCherry and stuff using the remaininglength of yarn at the bottom, sewbottom of Cherry to top of Icing.

Fastening TabUsing 4.00 hook and A make 7ch.1st Row. (rs) 1ch into 3rd ch fromhook, 1dc into each ch to end, turn.6dc.2nd Row. 1ch, 1dc into each dc toend, turn.Rep last row 6 times more. Fasten off.Sew tab into position and make a 6chbutton loop. Sew on button. Coverwith a damp cloth and leave until dry.See ball band for washing and furthercare instructions.

CROCHET TEACOSY WITHBUTTERFLIES

TEACOSY (Make 2 pieces)Using 4.00 hook and A make 38ch.1st Row. (rs) 1dc into 2nd ch fromhook, 1dc into each ch to end, turn.37 dc.2nd Row. 1ch (counts as 1dc), 1dcinto each dc to end, turn.2nd row sets dc patt. Cont in dc patt until work measuresapproximately 12cm, (4¾in), or lengthrequired to top of Handle/Spout forteapot, ending with a ws row.

Shape Top1st Row. 1ch, 1dc into each of next4dc, * dc2tog over next 2dc, 1dc intoeach of next 10dc, rep from * once

more, dc2tog over next 2dc, 1dc intoeach of next 6dc, turn. 34dc.2nd, 4th, 6th and 8th Rows. 1ch,1dc into each dc to end, turn.3rd Row. 1ch, 1dc into each of next4dc, * dc2tog over next 2dc, 1dc intoeach of next 9dc, rep from * oncemore, dc2tog over next 2dc, 1dc intoeach of next 5dc, turn. 31dc.5th Row. 1ch, 1dc into each of next3dc, * dc2tog over next 2dc, 1dc intoeach of next 8dc, rep from * oncemore, dc2tog over next 2dc, 1dc intoeach of next 5dc, turn. 28dc7th Row. 1ch, 1dc into each of next3dc, * dc2tog over next 2dc, 1dc intoeach of next 7dc, rep from * oncemore, dc2tog over next 2dc, 1dc intoeach of next 4dc, turn. 25dc.9th Row. 1ch, 1dc into each of next3dc, * dc2tog over next 2dc, 1dc intoeach of next 5dc, rep from * oncemore, dc2tog over next 2dc, 1dc intoeach of next 5dc, turn. 22dc.10th Row. 1ch, 1dc into each of next3dc, * dc2tog over next 2dc, 1dc intoeach of next 4dc, rep from * oncemore, dc2tog over next 2dc, 1dc intoeach of next 4dc, turn. 19dc. 11th Row. 1ch, 1dc into each of next2dc, * dc2tog over next 2dc, 1dc intoeach of next 3dc, rep from * oncemore, dc2tog over next 2dc, 1dc intoeach of next 4dc, turn. 16dc12th Row. 1ch,* dc2tog over next2dc, 1dc into next dc, rep from * 4 times more, turn. 11dc. 13th Row. 1ch, (dc2tog over next2dc) 5 times. 6dc. Fasten off.

BUTTERFLIES (Make 2 for each Butterflyrequired)WingsUsing 3.00 hook and B make 5ch.1st Row. (rs) Using B 3dc into 4th chfrom hook, 1dc into last ch, turn. 4dc.2nd Row. Using B 3ch (counts as 1tr,1ch), 3tr into next dc, 1ch, miss 1dc,3tr into next dc, 1ch, 1tr into top ofturning ch, turn. 11sts.3rd Row. Using C 1ch, 1dc into ch sp,miss 1tr, (1tr, 1dtr, 1tr) all into next tr,

miss 1tr, (1htr, 1dc, 1htr) all into nextch sp, miss 1tr, (1tr, 1dtr, 1tr) all intonext tr, miss 1tr, 1dc into ch sp, ss totop of turning ch. 14 sts. Fasten off.

Antenna and BodySew in ends and sew 2 wingstogether. Using 3.00 hook and C make1ch leaving a long thread. Make 1dtrloosely around centre of sewntogether wings as shown, make 3chfor first Antenna. Fasten off leaving ashort 1cm length of yarn.Using the long thread from 1st ch,make 3ch for second Antenna. Fastenoff as first Antenna.

TO MAKE UP TEACOSYLeaving a gap for lid handle, sewshaped side seams of teacosy down togap required for Handle/Spout,leaving seam open below handle forfastening tab. Sew Butterflies inposition around top of Teacosy asillustrated.

Fastening TabUsing 4.00 hook and A, make 7ch.1st Row. (rs) 1ch into 2nd ch fromhook, 1dc into each ch to end, turn.6dc.2nd Row. 1ch, 1dc into each dc toend, turn.Rep last row 6 times more. Fasten off.Sew tab into position and make a 6chbutton loop. Sew on button. Coverwith a damp cloth and leave until dry.See ball band for washing and furthercare instructions.

KNITTED TEACOSY CAMPERVAN

INTARSIA TECHNIQUEWhen working with different balls ofyarn the colour to be used should betwisted round the colour just used tolink the colours together and avoidholes.

FRONT* Using 3¼mm needles, thumbmethod and A, cast on 55 sts.

Page 5: SIRDAR - modern knitting · 7th Row.1ch, 1dc into each st to end, turn. Last 2 row sets treble relief patt. Cont in treble relief patt for 2 more rows. 10th Row. 1ch, 1tr/rf around

1st Row. (rs) Knit.This row will now be refered to asg-st (garter stitch).Work 1 row more in g-st.Change to 4mm needles.1st Row. K20A, 15B, 20A.2nd Row. P20A, 15B, 20A.Rep 1st and 2nd rows once more.5th Row. Using B knit.6th Row. Using B purl.Rep 5th and 6th rows once more. **9th Row. K26A, 3B, 26A.10th Row. P26A, 3B, 26A.11th Row. K25A, 5B, 25A.12th Row. P25A, 5B, 25A.13th Row. K24A, 7B, 24A. 14th Row. P24A, 7B, 24A.15th Row. K23A, 9B, 23A. 16th Row. P23A, 9B, 23A.17th Row. K22A, 11B, 22A.18th Row. P22A, 11B, 22A.19th Row. K20A, 15B, 20A. 20th Row. P20A, 15B, 20A.21st Row. K18A, 19B, 18A.22nd Row. P18A, 19B, 18A.23rd Row. K15A, 25B, 15A.24th Row. P15A, 25B, 15A.25th Row. K9A, k2togA, k1A, (k9B,k2togB) twice, k9B, k1A, k2togA, k9A.51 sts.26th Row. P11A, 29B, 11A.27th Row. K8A, k1B, (k5B, k2togB)twice, k6B, (k2togB, k5B) twice, k8A.47 sts.28th Row. P8A, 31B, 8A.29th Row. K3A, k2togA, k37B,k2togA, k3A. 45 sts.30th Row. P4A, 37B, 4A.31st Row. Using B k9, k2tog, k23,k2tog, k9. 43 sts.32nd Row. Using B purl.33rd Row. K4B, k2togB, k1B, k12C,k5C, k12C, k1B, k2togB, k4B. 41 sts.34th Row. P6B, 12C, 5B, 12C, 6B.35th Row. K6B, 12C, 5B, 12C, 6B.Rep 34th and 35th rows once moreand then 34th row once more.39th Row. K6B, k5C, k2togC, k5C,k5B, k5C, k2togC, k5C, k6B. 39 sts.40th Row. P6B, 11C, 5B, 11C, 6B.41st Row. K6B, k4C, k2togC, k5C, k5B,k5C, k2togC, k4C, k6B. 37 sts.42nd Row. P6B, 10C, 5B, 10C, 6B.

43rd Row. K2B, k2togB, k2B, k3C,k2togC, k5C, k5B, k5C, k2togC, k3C,k2B, k2togB, k2B. 33 sts.44th Row. P5B, 9C, 5B, 9C, 5B.45th Row. Using B k2, k2tog, k10,k2tog, k1, k2tog, k10, k2tog, k2. 29 sts.46th, 48th and 50th Rows. Using BPurl.47th Row. Using B k2, k2tog, k9,k2tog, k10, k2tog, k2. 26 sts.49th Row. Using B k2, k2tog, k18,k2tog, k2. 24 sts. 51st Row. Using B k2, (k2tog) twice,k12, (k2tog) twice, k2. 20 sts. 52nd Row. Using B purl.Cast off.

BACKWork as given for Front from * to **.9th Row. Using A knit.10th Row. Using A purl9th and 10th rows set st-st.Last 2 rows will now be refered to as st-st (stocking stitch).Work 14 rows more in st-st.25th Row. Using A k9, k2tog, k10,(k2tog, k9) twice, k1, k2tog, k9. 51 sts.26th Row. Using A purl.27th Row. Using A k14, (k2tog, k5) 4 times, k9. 47 sts.28th Row. Using A purl.29th Row. Using A k3, k2tog, k37,k2tog, k3. 45 sts.30th Row. Using A purl.31st Row. Using B k9, k2tog, k23,k2tog, k9. 43 sts.32nd Row. Using B purl.33rd Row. K4B, k2togB, k1B, k29C,k1B, k2togB, k4B. 41 sts.34th Row. P6B, 29C, 6B.35th Row. K6B, 29C, 6B.Rep 34th and 35th rows once moreand then 34th row once more.39th Row. K6B, k5C, k2togC, k15C,k2togC, k5C, k6B. 39 sts.40th Row. P6B, 27C, 6B.41st Row. K6B, k4C, k2togC, k15C,k2togC, k4C, k6B. 37 sts.42nd Row. P6B, 25C, 6B.43rd Row. K2B, k2togB, k2B, k3C,k2togC, k15C, k2togC, k3C, k2B,

k2togB, k2B. 33 sts.44th Row. P5B, 23C, 5B.45th Row. Using B k2, k2tog, k10,k2tog, k1, k2tog, k10, k2tog, k2. 29 sts.46th, 48th and 50th Rows. Using Bpurl.47th Row. Using B k2, k2tog, k9,k2tog, k10, k2tog, k2. 26 sts.49th Row. Using B k2, k2tog, k18,k2tog, k2. 24 sts. 51st Row. Using B k2, (k2tog) twice,k12, (k2tog) twice, k2. 20 sts. 52nd Row. Using B purl.Cast off.

TO MAKE UPSew roof seams in B to beginning ofsides in A, leaving a gap forHandle/Spout up to beginning of B,then sew remaining side seams asillustrated. Use diagram and coloursas illustrated as a guide for chainstitch embroidery. Sew buttons forheadlights as required for both frontand back. Cover with a damp clothand leave until dry. See ball band forwashing and further care instructions.

KNITTED TEACOSY COTTAGE(Make 2 pieces)

INTARSIA TECHNIQUEWhen working with different balls ofyarn the colour to be used should betwisted round the colour just used tolink the colours together and avoidholes.

Main CottageUsing 3¼mm needles, thumb methodand A, cast on 55 sts.1st Row. Knit.This row will now be referred to as g-st (garter stitch).Work 1 more row in g-st.Change to 4mm needles.1st Row. (rs) K22A, 11B, 22A.2nd Row. P22A, 11B, 22A.Rep 1st to 2nd rows until workmeasures approximately 6cm, (2½in)ending with a ws row.

Page 6: SIRDAR - modern knitting · 7th Row.1ch, 1dc into each st to end, turn. Last 2 row sets treble relief patt. Cont in treble relief patt for 2 more rows. 10th Row. 1ch, 1tr/rf around

cm1

23

45

67

89

1011

1213

1415

1617

1819

2021

2223

2425

26

in1

23

45

67

89

10

QUERIES. Please contact:- Knitting Helpline. Sirdar Spinning Ltd. Flanshaw Lane, Wakefield. WF2 9ND. West Yorkshire, England. For General Queries:- Tel: 01924 371501. Fax: 01924 290506. For Knitting Helpline Enquiries:- Tel: 01924 231686. (Voice mail service replies within 7 working days) www.sirdar.co.uk • email: [email protected]. Reproduction of this publication is protected by copyright. It is sold on the condition that it is only used for non-commercial purposes.All other rights reserved by Sirdar Spinning Ltd.SIRDAR SPINNING LTD CANNOT ACCEPT RESPONSIBILITY FOR THE RESULT OF USING ANY OTHER YARN.Owing to printing restrictions the colour reproduction is matched as closely as possible to the yarn. Printed in Great Britain.WPAH7221

Next Row. K7A, 9B, 6A, 11B, 6A, 9B,7A.Next Row. P7A, 9B, 6A, 11B, 6A, 9B,7A.Rep last 2 rows twice more.Next Row. K7A, 9B, 23A, 9B, 7A.Next Row. P7A, 9B, 23A, 9B, 7A.Rep last 2 rows once more.Next Row. K7A, 9B, (k3A, k2togA) 4 times, k3A, k9B, k7A. 51 sts.Next Row. P7A, 9B, 19A, 9B, 7A. Next Row. Using A k4, k2tog, k12,k2tog, k11, k2tog, k12, k2tog, k4. 47 sts.Next Row. Using A purl.Next Row. Using A k15, k2tog, k13,k2tog, k15. 45 sts.Next Row. Using A purl.

Roof Eaves (Make 2 pieces foreach side of Teacosy)Using 3¼mm needles, thumb methodand C, cast on 18 sts.Work 4 rows in g-st. Leave these 18 sts on a stitch holder. Break off yarn.

Joining to main Cottage1st Row. Using C Knit across 18 stson main Cottage and across 18 sts on1st stitch holder on Roof Eaves byknitting together 1 st from mainCottage and 1 st from stitch holder,

using B k9 sts from main Cottage,using C knit across last 18 sts on mainCottage and across 18 sts on 2ndstitch holder on Roof Eaves as before.45 sts.2nd Row. P18C, 9B, 18C.3rd Row. P2togC, (k1C, p1C) 8 times,k9B, (p1C, k1C) 8 times, p2togC. 43 sts.4th Row. (K1belowC, p1C) 8 times,k1belowC, p9B, (k1belowC, p1C) 8times, k1belowC.5th Row. K17C, 9B, 17C.6th Row. P17C, 9B, 17C.7th Row. K2togC, (p1C, k1C) 7 times,p1C, k9B, (p1C, k1C) 7 times, p1C,k2togC. 41 sts.8th Row. (P1C, k1belowC) 8 times,p9B, (k1belowC, p1C) 8 times.9th Row. K16C, 9B, 16C. 10th Row. P16C, 9B, 16C.11th Row. P2togC, (k1C, p1C) 7times, k9B, (p1C, k1C) 7 times, p2togC.39 sts. 12th Row. (K1belowC, p1C) 7 times,k1belowC, p9B, (k1belowC, p1C) 7 times, k1belowC.13th Row. Using C knit. 14th Row. Using C purl. 15th Row. Using C p2tog, * k1, p1,rep from * to last 3 sts, k1, p2tog. 37 sts.

16th Row. Using C * k1below, p1, repfrom * to last st, k1below.Rep 13th to 16th row twice more. 33 sts.Next Row. Using C cast off 11 sts,k10, cast off rem 11 sts. Break off yarn. 11 sts.

ChimneyRejoin C to rem 11 sts and proceed asfollows:-Next Row. Purl.Next Row. Knit.Rep last 2 rows until Chimneymeasures approximately 3cm, (1¼in),ending with a ws row. Change to3¼mm needles and work 2 rows in g-st. Cast off knitways.

TO MAKE UPSew straight top of Roof & side seamsof Chimney leaving a gap at top ofChimney to fit over lid handle ofTeapot. Sew side seams of Roof/mainCottage leaving gap required forHandle/Spout. Use diagram andcolours as illustrated as a guide forchain stitch embroidery. Sew onbutton for door handle. Cover with adamp cloth and leave until dry. Seeball band for washing and furthercare instructions.

Chain Stitch Diagram

Lazy Daisy Stitch Diagram Lazy Daisy Stitch Flower Diagram