SIR : Energy for the future
ABIDJAN - COTE D’IVOIRE
NOT AN OFFICIAL UNCTAD RECORD
SIR : Energy for the future
IDENTITY CARD
• Date of creation : 3 october 1962
- By the Government of Côte d’Ivoire
- With the contribution of International Petroleum
Companies
• Date of refinery start : August 1965
• Initial capacity : 700 000 t/year
• Current capacity : 3 800 000 t/year
SIR : Energy for the future
• Personal
- 673 workers SIR
composed by 115 Officers
462 Supervisors
96 Operatives
- 4 people from TOTAL
• Technical assistance contract with TOTAL
IDENTITY CARD
SIR : Energy for the future
SIR SHAREHOLDERS
(%)
STATE OF COTE D’IVOIRE : 1,5
PETROCI : 53,7
STATE OF BURKINA FASO : 5,4
TOTAL : 25,4
SHELL : 10,3
CHEVRONTEXACO : 3,7
………….……....100
SIR : Energy for the future
Capital : 39 billions F CFA (USD 80 millions)
Majors39,4%
Burkina Faso5,4%
Côte d'Ivoire55,2%
SIR SHAREHOLDERS
SIR : Energy for the future
BOARD
COMMITTIES : Technical / Commercial/ Financial
MANAGING DIRECTOR
DIRECTORS :Production, Technical, Commercial,
Financial, Human resources
DEPUTY GM
SIR : Energy for the future
REFINING CAPACITY EVOLUTION
700
2 000
4 000
3000
3 5003 800
0
500
1 000
1 500
2 000
2 500
3 000
3 500
4 000
1965 1974 1982 1985 2004 2005
KT
SIR : Energy for the future
REFINING SCHEME TRC (Topping- Reforming – Cracking)
– 2 Crude distillation units 75 000 bbl/d or– 2 Reformers 3 800 000 T/year– 2 Hydrotreating units
– 2 Desulphurisation units– 1 Vacuum distillation unit– 1 Hydrogen unit– 1 Hydrocracker – 1 Power plant
Reliability rate : 98%Utilisation rate : 89 %
SIR : Energy for the future
SIR REFINING SCHEME
CDU
Kérosène
Light GO
VDU
CRUDE
FUELOIL
NHT
SPL
REF
M OGAS
DPK
SPECIALGASOIL
LPG
GASOIL
DDOVGO
DHT
VDU
DHC
Heavy GO
Residue
Gasoline
1 1%
13 20%
18 23%
25 28%
30 10%
9 9%
0 1%
SIR : Energy for the future
10 Crude storage tanks 2 000
000 bbl
90 Products storage tanks 2
000 000 bbl
1 Crude terminal (SPM) 250
000 MT
1 Fuel terminal (CBM) 80
000 MT
2 Product Jetties 20 000 &
30 000 MT
LOGISTIC FACILITIES
SIR : Energy for the future
PROCESSED CRUDE OIL
HEAVY CRUDES BONGA Nigeria FORCADOS Nigeria ANTAN Nigeria BAOBAB Côte d’Ivoire HAMACA Venezuela
LIGHT CRUDES ERHA Nigeria BONNY LIGHT Nigeria ABO Nigeria OBE Nigeria LION Côte d’Ivoire CONDENSATE Côte d’Ivoire
SIR : Energy for the future
CRUDE OIL PROCESSED
BONGA55%
FORCADOS10%
ANTAN9%
BONNY LIGHT4%
OBE1%CDT FOXTROT
1%
ERHA11%
ABO3%
LION2%
HAMACA2%
BAOBAB2%
SIR : Energy for the future
CRUDE OIL PROCESSED
VENEZUELA2%
NIGERIA94%
COTE D'IVOIRE
4%
SIR : Energy for the future
LPG 1%
YIELDS PATTERN
S.I.R.3.8 Millions
tons
MOGAS 20%
DPK 23%
Spec GO 1%
Fuel oil 10%
Gasoil 28%
Crude oil
100%
DDO&VGO 9%
SIR : Energy for the future
AFRI -1 AFRI -2 AFRI -3 AFRI -4RON, min* 91 91 91 91MON, min 81 81 81 81Lead content** Unleaded Unlleaded Unleaded UnleadedSulphur content, mass %, max 0.1 0.05 0.03 0.015Benzene content, vol %, max to be reported to be reported 5 1
AFRI -1 AFRI -2 AFRI -3 AFRI -4Sulphur content, mass %, max 0.8 0.35 0.05 0.005Density at 20ºC, kg/ litre (min/max) 800/890 800/890 800/890 820/880Cetane index (calculated), min 42 45 45 45Lubricity (HFRR @ 60ºC), micron, min to be reported to be reported 460 460
*A higher grade of gasoline may be marketed if required
** 'Unleaded' means <0.013g of lead per litre
GASOLI NE
DI ESEL
PRODUCT SPECIFICATIONS
SIR : Energy for the future
MARKETS
kt/year
Côte d’Ivoire 830 22 %
Burkina 200 5 %
Mali 115 3 %
Sea Export 2 655 70 %
TOTAL 3 800
SIR : Energy for the future
LOCAL MARKET
Gasoil637 kt55%
Super214 kt19%
Butane71 kt6%
FO 18067 kt6%
Petrole / Jet114 kt10%
DDO42 kt4%
SIR : Energy for the future
SEA EXPORT MARKET
19%21%
31%29%
Mogas
Jet A1Gasoil
VGO / Fuel Oil
SIR : Energy for the future
SENEGAL3%
TOGO10%
USA13%
GUINEE EQUATORIALE
6%
HIGH SEAS1%
NIGERIA24%
LIBERIA6%NWE
4%
DRC4%
SIERRA LEONE5%
BENIN9%
CAMEROUN2%
GABON1%
GAMBIE4%
CAP VERT1%
GUINEE CONAKRY6%
GHANA2%
SEA EXPORT MARKET
SIR : Energy for the future
SEA EXPORT MARKET
Nigeria 24 % USA 13
Togo 10 Benin 9
Guinea 6 Equatorial Guinea 6
Liberia 6 Sierra Leone 5 DRC 4 Gambia 4 Europ 4 Senegal 3 Cameroon 2
Ghana 2 Gabon 1
SIR : Energy for the future
SEA EXPORT MARKET
TOTAL28%
ADDAX17%
VITOL16%
STASCO8%
GLENCORE3%
TRAFIGURA16%
OTHER6%
OANDO2%
TACOMA1% TRADE OIL
2%
ORIGIN OIL AND GAS
1%
SIR : Energy for the future
COMPETITION
SIR : Energy for the future
VOCATION
• To produce petroleum products for domestic market and exportation
• To insure the supply security of Côte d’Ivoire
• To be the filling station of West Africa
• To be an international company, competitive, performent, making money
• To be a company socialy responsible, taking care of environment
SIR : Energy for the future
TECHNICAL ADVANTAGES
• High technology : Quality et Flexibility with the Hydrocracker
• Good level of technical knowledge and
experience
• Good position of the refinery: Covering
the aria from Mauritania and Namibia
• Good logistic performances : Loading of
tankers from 400 MT to 30 000 MT
SIR : Energy for the future
HUMAN ADVANTAGES
• Good basic education
• Experience of 15 to 25 years in refining
• Running of the units by national people
• Promotion of Experts
SIR : Energy for the future
REFERENCES
• First Industrial company of Côte d’Ivoire
• Member of SOLOMON Club (International Club comparing the perfomances of refineries in the world)
• SIR has put in place :
• Security chart since 1983
• Quality chart since 1998
• Security/Quality/Environment since 2001
• Integrity chart « Our commitment » in may 2004
SIR : Energy for the future
CERTIFICATION
SIR Laboratory obtained :
• COFRAC (COmité FRançais d’ACcréditation) certification in June 1997, First in Africa.
• Confirmation of COFRAC certificate in 1998, 1999, 2000, 2002, 2003, 2004, 2005 and 2006
• Ivorian Quality price in 2003
REFERENCES
SIR : Energy for the future
SIR Company obtained :
• ISO 9001 certificate for Jet A1 in January 2000
• ISO 9001 issue 2000 for all petroleum products since June 2003 ; renewed in March 2004
• Tropy of Safety Performance of GESIP (Groupe d’Étude de Sécurité de l’Industrie Pétrolière) in 1999, 2000, 2002.
• Super Trophy of Safety Progress of GESIP in 2004
• On 18 may 07: 2 182 days without serious accident
• SIES certification at level 8 in February 2006 from DNV ( Det Norske Veritas)
REFERENCES
SIR : Energy for the future
- Numeric operating system of the units
- Sea line for white products exports
30 kt 50 kt
- House building project for workers
- Project SIR 2015
PROJECTS