Silver Star Rd. (SR 438) Public Meeting
Public Information Meeting
Intersection Safety Improvements Silver Star Road (SR 438) at Ocoee Hills Road
From 2nd St. to Silver Crest Blvd. Financial Project ID 430569-1-52-01
February 29, 2012
Presented By: Bruno Fiori, AECOM
Silver Star Rd. (SR 438) Public Meeting
Civil Rights StatementThis meeting is being held to afford all citizens the right to understand the project and comment on concerns to the Florida Department of Transportation (FDOT). The meeting is being held to comply with Titles VI and VIII of the Civil Rights Act and American with Disabilities Act (ADA). Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status.
Persons wishing to express their concerns relative to FDOT compliance with Title VI and/or Title VIII may do so by contacting the FDOT, District Five, Title VI and VIII Coordinator at 719 South Woodland Boulevard, Deland, Florida 32720 or the Florida Equal Opportunity Office, 605 Suwannee Street, Room 260, Mail Station 65, Tallahassee, FL 32399-0450. All inquiries or complaints will be handled according to FDOT procedure and in an expeditious manner.
Silver Star Rd. (SR 438) Public Meeting
• Please Sign-In
• Comments/Questions– Verbally to staff present today– Written on comment forms
• Turned in today• Mailed out by March 30, 2012
Introductions
Silver Star Rd. (SR 438) Public Meeting
• Improve vehicular, pedestrian, and bicyclist safety:– Provide dedicated westbound right turn lane
along SR 438
Project Objectives
Silver Star Rd. (SR 438) Public Meeting
• Improve vehicular, pedestrian, and bicyclist safety:– Provide
dedicated left turn lane out of Ocoee Hills Road
Project Objectives (continued)
Silver Star Rd. (SR 438) Public Meeting
• Improve vehicular, pedestrian, and bicyclist safety:– Add signals at intersection
– Provide sidewalk and sidewalk connectivity
Project Objectives (continued)
Silver Star Rd. (SR 438) Public Meeting
• Improve vehicular, pedestrian, and bicyclist safety:– Provide bike lanes
Project Objectives (continued)
Silver Star Rd. (SR 438) Public Meeting
Existing traffic flow uninterrupted
Traffic Control Plan along Silver Star Rd. (SR 438)1
2
3
4
Silver Star Rd. (SR 438) Public Meeting
Traffic Control Plan along Ocoee Hills Rd.
1
2
3
4
One direction at a time with flagger
One direction at a time with flagger
Silver Star Rd. (SR 438) Public Meeting
Project Schedule & Cost
Public Information Meeting FEBRUARY 2012
Plans Complete FALL 2012
Construction Begin SPRING 2013
Right-of-Way Cost None
Estimated Construction Cost $800k
Silver Star Rd. (SR 438) Public Meeting
Comment Cards
Please Turn in the Comment Cards
Tonight
OR
Mail the Completed Card by
March 30th
Silver Star Rd. (SR 438) Public Meeting
Thank You for Attending• Contact Representatives:
Ashraf Elmaghraby, P.E.FDOT – District 5(386) [email protected]
Bruno Fiori, P.E.AECOM Technical Services, Inc.(813) [email protected]
The Website For The Project Can Be Located Under The “Future Projects” Tab
http://www.cflroads.com