Shipbuilding and Repair Now more than ever ship building re-fits and repair efforts are feeling the pressure to meet shorter delivery times at even more competitive prices. There is a real need to synchronize the Engineering, Fabrication, Assembly and Erection workflow. Regrettably many shipyards appear to be operating as independent silos despite a desire to plan, schedule and execute in unison. Informational Dashboards to manage a Portfolio of Projects EzExecution provides powerful informational dashboards for managing your portfolio of projects. Intuitive Point and Click technology has replaced cumbersome and complex drop down menus. The EzExecution systems architecture allows communication with your legacy or third party solutions. Intelligent Wizards guide the user through the process of constructing a project network, converting the plan into a firm schedule and then maximizing the company’s profit across all of the projects in a portfolio. Synchronize Team Resources with Sub-contractors with the Master Schedule Therefore it is necessary to coordinate both the work to be performed and resource utilization within your company and in many cases with other companies. Typically many resources from sub contractors are brought in and become part of your team. The challenge of course is to integrate their availability with your needs while at the same time synchronizing with your master schedule. Embedded Intelligence displays when and where to Focus EzExecution provides the collaboration tools allowing both internal and external teams to synchronize workflow activities in real-time. Embedded intelligence and informational Dashboards display Tasks requiring immediate attention to keep the entire shipbuilding, re-fit or repair efforts on time, to specification and within budget.

Transcript of Shipbuilding and Repair updated

Page 1: Shipbuilding and Repair updated

Shipbuilding and Repair Now more than ever ship building re-fits and repair efforts are feeling the pressure to meet shorter delivery times at even more competitive prices. There is a real need to synchronize the Engineering, Fabrication, Assembly and Erection workflow. Regrettably many shipyards appear to be operating as independent silos despite a desire to plan, schedule and execute in unison.

Informational Dashboards to manage a Portfolio of Projects

EzExecution provides powerful informational dashboards for managing your portfolio of projects. Intuitive Point and Click technology has replaced cumbersome and complex drop down menus. The EzExecution systems architecture allows communication with your legacy or third party solutions. Intelligent Wizards guide the user through the process of constructing a project network, converting the plan into a firm schedule and then maximizing the company’s profit across all of the projects in a portfolio.

Synchronize Team Resources with Sub-contractors with the Master Schedule

Therefore it is necessary to coordinate both the work to be performed and resource utilization within your company and in many cases with other companies. Typically many resources from sub contractors are brought in and become part of your team. The challenge of course is to integrate their availability with your needs while at the same time synchronizing with your master schedule.

Embedded Intelligence displays when and where to Focus

EzExecution provides the collaboration tools allowing both internal and external teams to synchronize workflow activities in real-time. Embedded intelligence and informational Dashboards display Tasks requiring immediate attention to keep the entire shipbuilding, re-fit or repair efforts on time, to specification and within budget.

Page 2: Shipbuilding and Repair updated

Critical Question Intuitive Dashboards

What is the Value and

Risk of this Project?

When should we start

the next project?

Which Projects requires

attention?

Will our Project finish on

Time?

To recover lost time - which

Tasks require immediate

attention?

What Task should resources be

working on now and which

task is next?

Which Resources are currently

overloaded

now and in the future?