Ship Work Breakdown Structure Title
Transcript of Ship Work Breakdown Structure Title
![Page 1: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/1.jpg)
SHIP WORK BREAKDOWN STRUCTURE TITLE
000010011012013014015016017018020021022023024025030031032033034035040041042043044050051052053054060061062063064065066067068
Group 0-99 General Guidance and Administration
General Guidance and AdministrationCombat Capabilities (Offensive and Defensive)Air Weapons Vs. Air TargetsAir Weapons Vs. Surface TargetsAir Weapons Vs. Underwater TargetsSurface Weapons Vs. Air TargetsSurface Weapons Vs. Surface TargetsSurface Weapons Vs. Underwater TargetsUnderwater Weapons Vs. Surface TargetsUnderwater Weapons Vs. Underwater TargetsStrategic and Special CapabilitiesSurface Based DeterrentsUnderwater Based DeterrentsAmphibious WarfareMine and Mine Countermeasure WarfareInshore WarfareTactical and Strategic Oper. Support CapabilitiesCommand/Control/CommunicationsSurveillance/Reconnaissance/IntelligenceElectronic Warfare and Nuc/Bio/Chemical DefenseLogistics/SealiftOther SupportShip System ManagementProject ManagementGeneral Administrative RequirementsLife Cycle CostingShip OperationShip System PerformanceShip System Performance ConceptsShip Subsystem Performance Concepts Selected ConceptsComponent DevelopmentSubsystem Characteristics (Interfaces and CNO Cont.)Hull StructurePropulsion PlantElectric PlantCommand and SurveillanceAuxiliary SystemsOutfittingWeaponsIntegration and Engineering
Appendix E - 1
![Page 2: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/2.jpg)
SHIP WORK BREAKDOWN STRUCTURE TITLE
069070071072073074075076077078079080081082083084085086087088089090091092093094095096097098099
100101110111112113114115
Ship AssemblyGeneral Requirements for Design and ConstructionAccessShockNoise and VibrationCasting, Welding, Riveting, Allied Processes (General)Threaded Fasteners StandardsReliability ad MaintainabilitySafetyMaterialsSeaworthinessIntegrated Logistic Support RequirementsMaintenanceSupport and Test Equipmentsupply supportTransportation and HandlingEngineering DrawingsTechnical Manuals and Other DataFacilitiesPersonnel and TrainingTraining EquipmentQuality Assurance RequirementsShip InspectionsShip TestsCombat Systems CheckoutRegular Ship TrialsWhole Ship TestingWeight ControlInclining Experiment and Trim DiveModels and MockupsPhotographs
Group 1 Hull Structure
Hull Structure, GeneralGeneral Arrangement-Structural DrawingsShell and Support StructureShell Plating, Surf. Ship and Submarine Press. HullShell Plating, Submarine Non-pressure HullInner BottomShell AppendagesStanchions
Appendix E - 2
![Page 3: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/3.jpg)
SHIP WORK BREAKDOWN STRUCIURE TITLE
116117118119120121122123124125126130131132133134135136137138139140141142143144145149150151152153154155156157158159160161162163164
Longit. Framing, Surf. Ship and Submarine Press. HullTransv. Framing, Surf. Ship and Submarine Press. HullLongit. and Transv. Submarine Non-press. Hull FramingLift System Flexible Skirts and SealsHull Structural BulkheadsLongitudinal Structural BulkheadsTransverse Structural Bulkheads Trunks and EnclosuresBulkheads in Torpedo Protection SystemSubmarine Hard TanksSubmarine Soft TanksHull DecksMain Deck2nd Deck3rd Deck4th Deck5th Deck and Decks Below01 Hull Deck (Forecastle and Poop Decks)02 Hull Deck03 Hull Deck04 Hull Deck and Hull Decks AboveHull Platforms and Flats1st Platform2nd Platform3rd Platform4th Platform5th PlatformFlatsDeck House StructureDeckhouse Structure to First Level1st Deckhouse Level 2nd Deckhouse Level3rd Deckhouse Level4th Deckhouse Level5th Deckhouse Level6th Deckhouse Level7th Deckhouse Level8th Deckhouse Level and AboveSpecial StructuresStructural Castings, Forgings, and Equiv. WeldmentsStacks and Macks (Combined Stack and Mast)Sea ChestsBallistic Plating
Appendix E-3
![Page 4: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/4.jpg)
SHIP WORK BREAKDOWN STRUCTURE TITLE
165166167168169170171172179180181182183184185186187190191192195198199
200201202210211212213214215216217218219220221222
Sonar DomesSponsonsHull Structural ClosuresDeckhouse Structural ClosuresSpecial Purpose Closures and StructuresMasts, Kingposts, and Service platformsMasts, Towers, TetrapodsKingposts and Support FramesService PlatformsFoundationsHull Structure FoundationsPropulsion Plant FoundationsElectric Plant FoundationsCommand and Surveillance FoundationsAuxiliary Systems FoundationsOutfit and Furnishings FoundationsArmament FoundationsSpecial Purpose SystemsBallast, Fixed or Fluid, and Buoyancy UnitsCompartment TestingErection of Sub Sections (Progress Report Only)Free Flooding LiquidsHull Repair Parts and Special Tools
Group 2 Propulsion Plant
Propulsion Plant, GeneralGeneral Arrangement-Propulsion DrawingsMachinery Plant Central Control SystemsEnergy Generating System (Nuclear)(Reserved)Nuclear Steam GeneratorReactorsReactor Coolant SystemReactor Coolant Service SystemReactor Plant Auxiliary SystemsNuclear Power Control and InstrumentationRadiation Shielding (Primary)Radiation Shielding (Secondary)Energy Generating System (Non-Nuclear)Propulsion BoilersGas Generators
Appendix E -4
![Page 5: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/5.jpg)
SHIP WORK BREAKDOWN STRUCTURE TITLE
223224230231232233234235236237238239240241242243244245246247248250251252253254255256258259260261262263264290298299
300
Main Propulsion BatteriesMain Propulsion Fuel CellsPropulsion UnitsPropulsion Steam TurbinesPropulsion Steam EnginesPropulsion Internal Combustion EnginesPropulsion Gas TurbinesElectric PropulsionSelf-Contained Propulsion SystemsAuxiliary Propulsion DevicesSecondary Propulsion (Submarines)Emergency Propulsion (Submarines)Transmission and Propulsor SystemsPropulsion Reduction GearsPropulsion Clutches and CouplingsPropulsion ShaftingPropulsion Shaft BearingsPropulsoryPropulsor Shrouds and DuctsWater Jet PropulsoryLift System Fans and DuctingPropulsion Support Sys. (Except Fuel and Lube Oil)Combustion Air SystemPropulsion Control SystemMain Steam Piping SystemCondensers and Air EjectorsFeed and Condensate System Circulating ad Cooling Sea Water SystemH.P. Steam Drain SystemUptakes (Inner Casing)Propulsion Support Systems (Fuel and Lube Oil)Fuel Service SystemMain Propulsion Lube Oil SystemShaft Lube Oil System (Submarines)Lube Oil Fill, Transfer, and PurificationSpecial Purpose SystemsPropulsion Plant Operating FluidsPropulsion Plant Repair Parts and Special Tools
Group 3 Electric Plant
Electric Plant, General
Appendix E-5
![Page 6: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/6.jpg)
SHIP WORK BREAKDOWN STRUCTURE TITLE
301302303304305310311312313314320321322323324330331332340341342343390398399
400401402403404405406407408410411412413414
General Arrangement-Electrical DrawingsMotors and Associated EquipmentProtective DevicesElectric CablesElectrical Designating and Marking Electric Power GenerationShip Service Power GenerationEmergency GeneratorsBatteries and Service FacilitiesPower Conversion EquipmentPower Distribution SystemsShip Service Power CableEmergency Power Cable SystemCasualty Power Cable SystemSwitchgear and PanelsLighting SystemLighting DistributionLighting FixturesPower Generation Support SystemsSSTG Lube OilDiesel Support SystemsTurbine Support SystemsSpecial Purpose SystemsElectric Plant Operating FluidsElectric Plant Repair Parts and Special Tools
Group 4 Command and Surveillance
Command and Surveillance, GeneralGeneral Arrangement-Command and SurveillanceSecurity RequirementsPersonnel SafetyRadio Frequency Transmission LinesAntenna RequirementsGrounding and BondingElectromagnetic Interference Reduction (EMI)System Test RequirementsCommand and Control SystemsData Display GroupData Processing GroupDigital Data SwitchboardsInterface Equipment
Appendix E -6
![Page 7: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/7.jpg)
SHIP WORK BREAKDOWN STRUCTURE TITLE
415417420421422423424425426427428430431432433434435436437438439440441442443444445446450451452453454455456459460461462463464465470
Digital Data CommunicationsCommand and Control Analog SwitchboardsNavigation SystemsNon-Electrical/Electronic Navigation AidsElectrical Navigation Aids (Incl Navig. Lights)Electronic Navigation Systems, RadioElectronic Navigation Systems, AcousticalPeriscopesElectrical Navigation SystemsInertial Navigation SystemsNavigation Control MonitoringInterior CommunicationsSwitchboards for I.C. SystemsTelephone SystemsAnnouncing SystemsEntertainment and Training SystemsVoice Tubes and Message Passing SystemsAlarm, Safety, and Warning SystemsIndicating, Order, and Metering SystemsIntegrated Control SystemsRecording and Television SystemsExterior CommunicationsRadio SystemsUnderwater SystemsVisual and Audible SystemsTelemetry SystemsTTY and Facsimile SystemsSecurity Equipment SystemsSurveillance Systems (Surface)Surface Search RadarAir Search Radar (2D)Air Search Radar (3D)Aircraft Control Approach RadarIdentification Systems (IFF)Multiple Mode RadarSpace Vehicle Electronic TrackingSurveillance Systems (Underwater)Active SonarPassive SonarMultiple Mode SonarClassification SonarBathythermographCountermeasures
Appendix E -7
![Page 8: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/8.jpg)
SHIP WORK BREAKDOWN STRUCTURE TITLE
471472473474475476480481482483484489490491492493494495498499
500501502503504505506507508509510511512513514515516517520
Active ECM (Incl Combination Active/Passive)Passive ECMTorpedo DecoysDecoys (Other)DegaussingMine CountermeasuresFire Control SystemsGun Fire Control SystemsMissile Fire Control SystemsUnderwater Fire Control SystemsIntegrated Fire Control SystemsWeapon Systems SwitchboardsSpecial Purpose SystemsElectronic Test, Checkout, and Monitoring EquipmentFlight Control and Instrument Landing SystemsNon Combat Data Processing SystemsMeteorological SystemsSpecial Purpose Intelligence SystemsCommand and Surveillance Operating FluidsCommand and Surv. Repair Parts and Special Tools
Group 5 Auxiliary Systems
Auxiliary Systems, GeneralGeneral Arrangement-Auxiliary Systems DrawingsAuxiliary MachineryPumpsInstrument and Instrument BoardsGeneral Piping RequirementsOverflows, Air Escapes, and Sounding TubesMachinery and Piping Designation and MarkingThermal Insulation for Piping and MachineryThermal Insulation for Vent and A/C DuctsClimate ControlCompartment Heating SystemVentilation SystemMachinery Space Ventilation SystemAir Conditioning SystemAir Revitalization Systems (Submarines)Refrigeration SystemAuxiliary Boilers and Other Heat SourcesSea Water Systems
Appendix E-8
![Page 9: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/9.jpg)
SHIP WORK BREAKDOWN STRUCTURE TITLE
521522523524526527528529530531532533534535536540541542543544545549550551552553554555556557558560561562563564565566567568570571572
Firemain and Flushing (Sea Water) SystemSprinkler SystemWashdown SystemAuxiliary Sea Water SystemScuppers and Deck DrainsFiremain Actuated Services-OtherPlumbing DrainageDrainage and Ballasting SystemFresh Water SystemsDistilling PlantCooling WaterPotable WaterAux. Steam and Drains Within Machinery BoxAux. Steam and Drains Outside Machinery BoxAuxiliary Fresh Water CoolingFuels and Lubricants, Handling and StorageShip Fuel and Fuel Compensating SystemAviation and General Purpose FuelsAviation and General Purpose Lubricating OilLiquid CargoTank HeatingSpecial Fuel and Lubricants, Handling and StowageAir, Gas, and Misc. Fluid SystemsCompressed Air SystemsCompressed Gases02 N2 SystemLP BlowFire Extinguishing SystemsHydraulic Fluid SystemLiquid Gases, CargoSpecial Piping Systems.Ship Control SystemsSteering and Diving Control SystemsRudderHovering and Depth Control (Submarines)Trim System (Submarines)Trim and Heel Systems (Surface Ships)Diving Planes and Stabilizing Fins (Submarines)Strut and Foil SystemsManeuvering SystemsUnderway Replenishment SystemsReplenishment-At-Sea SystemsShip Stores and Equip. Handling Systems
Appendix E -9
![Page 10: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/10.jpg)
SHIP WORK BREAKDOWN STRUCTURE TITLE
573574580581582583584585586587588589590591592593594595596597598599
600601602603604605610611612613620621622623624625630
Cargo Handing SystemsVertical Replenishment SystemsMechanical Handling SystemsAnchor Handling and Stowage SystemsMooring and Towing SystemsBoats, Boat Handling and Stowage SystemsMechanically Operated Door, Gate, Ramp, Turntable Sys.Elevating and Retracting GearAircraft Recovery Support SystemsAircraft Launch Support SystemsAircraft Handling, Servicing and StowageMiscellaneous Mechanical Handling SystemsSpecial Purpose SystemsScientific and Ocean Engineering SystemsSwimmer and Diver Support and Protection SystemsEnvironmental Pollution Control SystemsSubmarine Rescue, Salvage, and Survival SystemsTowing, Launching and Handling for Underwater Sys.Handling Sys. for Diver and Submersible VehiclesSalvage Support SystemsAuxiliary Systems Operating FluidsAuxiliary Systems Repair Parts and Tools
Group 6 Outfit and Furnishings
Outfit and Furnishings, GeneralGeneral Arrangement-Outfit and Furn. DrawingsHull Designating and MarkingDraft MarksLocks, Keys, and TagsRodent and Vermin ProofingShip FittingsHull FittingsRails, Stanchions, and LifelinesRigging and CanvasHull CompartmentationNon-Structural BulkheadFloor Plates and GratingsLaddersNon-Structural ClosuresAirports, Fixed Portlights, and WindowsPreservatives and Coverings
Appendix E-10
![Page 11: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/11.jpg)
SHIP WORK BREAKDOWN STRUCIURE TITLE
631632633634635636637638639640641642643644645650651652653654655656660661662663664665670671672673690698699
700701702703
PaintingZinc CoatingCathodic ProtectionDeck CoveringHull InsulationHull DampingSheathingRefrigerated SpacesRadiation ShieldingLiving SpacesOfficer Berthing and Messing SpacesNoncommissioned Officer Berthing and Messing SpacesEnlisted Personnel Berthing and Messing SpacesSanitary Spaces and FixturesLeisure and Community SpacesService SpacesCommissary SpacesMedical SpacesDental SpacesUtility SpacesLaundry SpacesTrash Disposal SpacesWorking SpacesOfficesMachinery Control Centers FurnishingsElectronics Control Centers FurnishingsDamage Control Stat ions Workshops, Labs, Test Areas (Incl Portable Tools, Equip)Stowage SpacesLockers and Special StowageStorerooms and Issue RoomsCargo StowageSpecial Purpose SystemsOutfit and Furnishings Operating FluidsOutfit and Furnish. Repair Parts and Special Tools
Group 7 Armament
Armament, GeneralGeneral Arrangement-Weaponry SystemsArmament InstallationsWeapons Handling and Stowage, General
Appendix E -11
![Page 12: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/12.jpg)
SHIP WORK BREAKDOWN STRUCTURE TITLE
710711712713720721722723724725726727728729730731732733740741742743750751752753754760761762763770772773780782783790792793797798799
Guns and AmmunitionGunsAmmunition HandlingAmmunition StowageMissiles and RocketsLaunching Devices (Missiles and Rockets)Missile, Rocket, and Guidance Capsule Handling Sys.Missile and Rocket StowageMissile HydraulicsMissile GasMissile CompensatingMissile Launcher ControlMissile Heating, Cooling, Temperature ControlMissile Monitoring, Test and AlignmentMinesMine Launching DevicesMine HandlingMine StowageDepth ChargesDepth Charge Launching DevicesDepth Charge HandlingDepth Charge StowageTorpedoesTorpedo TubesTorpedo HandlingTorpedo StowageSubmarine Torpedo EjectionSmall Arms and PyrotechnicsSmall Arms and Pyrotechnic Launching DevicesSmall Arms and Pyrotechnic HandlingSmall Arms and Pyrotechnic StowageCargo MunitionsCargo Munitions HandlingCargo Munitions StowageAircraft Related WeaponsAircraft Related Weapons HandlingAircraft Related Weapons StowageSpecial Purpose SystemsSpecial Weapons HandlingSpecial Weapons StowageMisc. Ordnance SpacesArmament Operating FluidsArmament Repair Parts and Special Tools
Appendix E -12
![Page 13: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/13.jpg)
SHIP WORK BREAKDOWN STRUCTURE TITLE
800801802803804806810811812813820830831832833834835836837838839840841842843844845850851852853854855856857858859890891
Group 8 integration/Engineering (Shipbuilder Response)
Integration/Engineering (Shipbuilder Response)Shipbuilders Information DrawingsContract DrawingsStandard DrawingsType DrawingsStudy DrawingsProduction EngineeringConfiguration ManagementChange Proposals, Scoping and ShipcheckingPlanning and Production ControlSpecial Drawings for Nuclear Propulsion SystemsDesign SupportConstruction DrawingsSpecificationsWeight EngineeringComputer ProgramsEngineering CalculationsModels and MockupsPhotographsDesign/Engineering LiaisonLoftingQuality AssuranceTests and Inspection, Criteria, and ProceduresTrials Agenda Preparation, Data Collection ad Anal.Inclining Experiment and Trim DiveCombat Systems Checkout Criteria and ProceduresCertification StandardsIntegrated Logistic Support Engineering MaintenanceSupport and Test Equipmentsupply supportTransportationEngineering Drawings and SpecificationsTechnical Manuals and Other DataFacilitiesPersonnel and TrainingTraining EquipmentSpecial Purpose ItemsSafety
Appendix E -13
![Page 14: Ship Work Breakdown Structure Title](https://reader031.fdocuments.us/reader031/viewer/2022013114/545cb3b4b1af9f534f8b459b/html5/thumbnails/14.jpg)
SHIP WORK BREAKDOWN STRUCTURE TITLE
892893894895896897
900901980981982983984985986987988989990991992993994995996997
Human FactorsStandardizationValue EngineeringReliability and MaintainabilityData ManagementProject Management
Group 9 Ship Assembly and Support Services
Ship Assembly and Support Services901 Thru 979 Reserved for Ident. of AssembliesContractual and Production Support ServiceInsuranceTrialsDeliveryOpen and Inspect (Conversions Only)Fire and Flooding ProtectionTests and InspectionWeighing and RecordingContract Data Requirements (Administration)Fitting-OutConstruction SupportStaging, Scaffolding, and CribbingTemporary Utilities and ServicesMaterial Handling and RemovalCleaning ServicesMolds and Templates, Jigs, Fixtures, and Spec. ToolsLaunchingDrydocking
Appendix E-14