Definition
WBS is a deliverables-orientatedcollection of project components
It is a categorization and
decomposition of the projectdeliverables
WBS should be input for the cost
estimation, time planning, riskplanning, quality planning and
resource planning.
2
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 3/19
Why WBS is needed
WBS defines the required work tocomplete the project
WBS creates a sense of urgency
WBS can help prevent scope creep
WBS provides control
WBS is the scope baseline
3
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 4/19
Building WBS (1)
Divide your project into phases
Phase has deadline, portion of project
that must be complete before another
phase in begin
Define the work package in each
phase
4
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 5/19
Building WBS (2)
Work package is the smallestderiverable in WBS ( 8/80 rules!)
Main output : WBS and WBS
Dictionary At the WBS should get approval from
project sponsor to confirm the series
of activities and the mesh with anorganization.
5
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 6/19
Creating WBS
6
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 7/19
Intranet WBS
Organized by Phase
7
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 8/19
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 9/19
Intranet WBS in Tabular Form1.0 Concept
1.1 Evaluate current systems1.2 Define Requirements
1.2.1 Define user requirements
1.2.2 Define content requirements
1.2.3 Define system requirements1.2.4 Define server owner requirements
1.3 Define specific functionality
1.4 Define risks and risk management approach
1.5 Develop project plan
1.6 Brief Web development team2.0 Web Site Design
3.0 Web Site Development
4.0 Roll Out
5.0 Support 9
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 10/19
Intranet WBS and Gantt Chart in Project 2000
10
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 11/19
Intranet WBS and Gantt Chart Organized
by Project Management Process Groups
11
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 12/19
Intranet WBS and Gantt Chart Organized
by Project Management Process Groups
12
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 13/19
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 14/19
WBS Approach
Top Down
Bottom up
Analogy approach
Using Guidelines ( depend on the
organization SOP)
Mind Mapping Approach
14
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 15/19
Top Down Approach
Use deductive method
Start from general to spesific
Prefer
15
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 16/19
Bottom Up Approach
Use inductive method
From spesific to general
Ideal for brainstrorming problem
solving
16
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 17/19
Mind Mapping Approach
17
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 18/19
Another Example
Using Microsoft Project
WBS Interview
18
7/22/2019 05 Work Breakdown Structure
http://slidepdf.com/reader/full/05-work-breakdown-structure 19/19
Note !
The WBS is not the project plan, theschedule, or even the activity list. You
will use the WBS to help you schedule
and assign resources. A WBS is aprocess, as well as a visual
representation of the work, to help you
organize and plan the action that mustbe completed for the project to come
to an end.