![Page 1: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/1.jpg)
1
Please be advised that calculations in this material are based on limited available data and intended to serve informational purposes only.
Drawing or document is the property of DSEC Co., Ltd. and must not be partially or wholly copied or used for any other purpose without prior written permission of DSEC.
Total Solution Provider Ship & Power
![Page 2: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/2.jpg)
DSME Group Introduction
DSEC Overview
Ship and Power Plant Business
Contents
![Page 3: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/3.jpg)
DSEC Company Overview
February, 1993 2,000
2002 Renamed to DSEC
2009 Launching Logistics Center
2012 1st LNG fueled Containership
2013 Launching R&D Center
Persons including in house subcontractors
Engineering based Ship & Power Plant
1.
Procurement Quality
Assurance
Ship & Power Plant Engineering
Procurement & Logistics
Quality Management
Commissioning & Bunkering
Shipyard Construction Consulting
~
Engineering Arm of DSME Engineering for Power Plant & Overseas Shipyards
![Page 4: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/4.jpg)
Organization DSEC Company Overview 1.
AdministrationQuality
ManagementBusiness Design & Engineering Technology & Procurement
QualityBusiness
ManagementResearch &
Development Center
Hull
Procurement #1
Procurement #2
Procurement #3
Basic Performance R&D
Structure R&D
System R&D
Procurement NDT QM
Basic
Detail
Production
NDT #1
NDT #1
Structure
Outfitting
Painting
EM Group
Ship Marketing
Outfitting
Hull Piping
Hull Outfitting
Accommodation
Machinery Piping
MachineryOutfitting
Electric
Ship
Power PlantMarketing
Power Plant
Tech Manage
Division
Bunkering Business
Ship-Repair Business
Commissioning Business
Management #1
Finance
Management #2
President & CEO
Team
Group
![Page 5: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/5.jpg)
Engineering
Advanced Shipbuilding & Offshore Engineering Technology sharing with DSME
Various ship & offshore reference
Abundant experience
Co-operating global shipyards
Eco Friendly Design
Reliable & Proven Design
Research & Development
Easy Maintenance & Operation
Low Fuel consumption
Optimized Structure & System
State-of-Art and Green Technology
Operating Cost Saving
Leading Edge Technology
Tailor-made Engineering
1.1
![Page 6: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/6.jpg)
Sharing buying Power with DSME By $6billion per annum By Same supplier pool
FAT before shipment Quality warranty after ship delivery Real time supplier monitoring
Procurement & Logistics
Expediting from A to Z
1.2
Date of Establishment: Mar. 2006 Total Area: 103,681m2 Warehouse: 43, 589 m2
Biggest Logistics Center in Busan New Port
E-SCM
Economy of Scale World Wide
Procurement
![Page 7: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/7.jpg)
Quality Management
Non Destructive Testing
Quality Inspection
LNG Carrier & LNG Tank (Repair & Test)
1.3 Integrated inspection services, using the most advanced equipment and World class inspection & Commissioning Services by highly trained ASNT certified inspectors.
Global Standard Quality
![Page 8: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/8.jpg)
Commissioning & Bunkering 1.4
Bunkering Service
- Marine Gas oil & HFO supply to offshore drillship, fixed platform, FPSO and Commercial ships
Offshore Project Commissioning by Highly Trained personnel
Quality Service
- Pre-commissioning - Marine & Drilling system Commissioning - Equipment Preservation & Maintenance
![Page 9: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/9.jpg)
Shipyard Construction Consulting 1.5
Investment Plan Operating Plan Safety Plan
Layout Design
• Feasibility Study • Production Flow Study • Facility Arrangement
Procurement
• Equipment • Facility • Raw Material
Supervision
• Yard Construction • Commissioning
Optimized Shipyard
Client Objective
DSEC
![Page 10: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/10.jpg)
DSEC
Quality
Cost
Delivery
DSEC Integrated Service
2. Ship Business
Advanced
Engineering
Procurement
Logistics Inspection
Production
Technology
![Page 11: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/11.jpg)
LNG Fueled Containership 2.1 Length
Breadth
Deadweight
Speed
Cargo Capacity
Range
Fuel Consumption
: approx. 233.0 m
: 32.2 m
: 31,830 MT
: 22.0 knots (at 10.5m draft with 15% sea margin)
: 3,100 TEU (Nominal)
* Reefer: 74(40ft) + 84(45ft) + 108(53ft)
: 10,000nm (HFO 6,000nm + LNG 4,000nm)
: 85.82MT/day @NCR (MAN B&W 8L70ME-C8.2-GI )
World First LNG Fueled Panamax class Containership
![Page 12: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/12.jpg)
ECO Tanker Design 2.2
Length
Breadth
Deadweight
Speed
Cargo Capacity
Range
Fuel Consumption
: approx. 186.0 m
: 32.0 m
: 49,600 MT @ scantling draft
: 14.5 knots (at 75% MCR with 15% sea margin)
: 54,000 m3
: 13,500nm
: 22.2MT/day @NCR (MAN B&W 6G50ME-B9.3)
LNG Ready Design
![Page 13: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/13.jpg)
3. DSEC Power Plant Business
Environment Regulation
Energy Consumption 67% up
by 2030 (IEA)
Convergent Technology with
Shipbuilding & Power Plant
Mobility Fast Track Environmental
Friendly Fuel
Compatibility Economical Proven
Technology
![Page 14: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/14.jpg)
Power Plant
Regasification Unit Onboard
Power Plant Product
LNG Logistics Today
LSRBTM (LNG Storage and Regasification Barge)
GE BMPP (LNG Storage Barge with Gas Engine BMPP)
FLPPTM (Solution as “All in One”-Floating LNG Power Plant)
LNG Electricity NG
RE-GAS Unit Gas Distribution
Gas Distribution
Power Plant
LNGC
LNGC LNG
Storage Barge
LNGC GE BMPP
FLPPTM
Power Generation Onboard
3.1
LSRBTM LNGC
LNG Storage Barge
LNG Storage Barge
LNGC
LNGC
Storage
![Page 15: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/15.jpg)
3.2 Floating LNG Power Plant
FLPPTM L200 (Floating LNG Power Plant, 200~400MW)
Power Plant + LNG Receiving Terminal + Storage Tanks + Electric Transmission & Distribution Function + LNG & NG Supply
Length Breadth Depth Generator Engine Endurance Cargo Containment System Nominal Voltage Frequency Complement Construction Terms
: approx. 276.0 m : 44.0 m : 26.0 m : 24 Gas Engines : abt. 68days (for 200MW) : Membrane Type, GTT NO96 (or equivalent) : 132kV (Can be adapted to cater for national grid)
: 50 or 60Hz : 17 persons : 30 months (From Contract to Sail Away)
![Page 16: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/16.jpg)
3.3 LNG Storage and Regasification Barge LNG Receiving Terminal + Storage Tank + Regasification
LSRBTM 180K (LNG Storage and Regasification Barge, 135~180K cbm)
Length Breadth Depth LNG Storage Capacity Regasification Capacity
Cargo Containment System Complement Construction Terms
: approx. 278.0 m : 44.0 m : 26.0 m : 180,000 ㎥ (45,000㎥ x 4 Tanks) : 100mmscfd (abt.2,100 ton LNG/day) Up to 500mmscfd as per client requirement
: Membrane Type, GTT NO96 (or equivalent)
: 15 persons : 27 months (From Contract to Sail Away)
![Page 17: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/17.jpg)
3.4 LNG Regasification Unit LNG Regasification
Length Breadth Depth Regasification Capacity
Electric Consumption Complement Construction Terms
: approx. 30.0 m : approx. 10.0 m : approx. 6.0 m : 100mmscfd Up to 500mmscfd as per client requirement
: abt. 1,500 kw : 6 persons : 14 months (From Contract to Sail Away)
![Page 18: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/18.jpg)
3.5 Barge Mounted Power Plant Power Plant + (Oil Storage) Fuel (HFO or NG)
Length Breadth Depth Generator Engine Endurance Nominal Voltage Frequency Complement Construction Terms
: approx. 77.5 m : 31.8 m : 6.4 m : 6 Diesel Engines (Can be replaced by Gas Engines)
: abt. 12days (for 50MW)
: 132kV (Can be adjusted to cater for national grid)
: 50 or 60Hz : 15 persons : 14 months (From Contract to Sail Away)
![Page 19: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/19.jpg)
Why DSEC Floating Power Plant? 3.6
2. Mobility
Site “A” Site “C”
Site “B”
- Continuous revenue stream by relocation
- Risk-free Asset from environmental effect
(Earthquake, Volcano, Typhoon, Fire) and civil war
1. Environmental Friendly
- Environmental Friendly fuel
- Negligible pollution at site by construction in shipyard
- No civil-complaint in local society
Coal
CO2 SOx NOx
40% 99.99% 80%
Oil
LN
G
![Page 20: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/20.jpg)
Why DSEC Floating Power Plant? 3.6 3. Fast Track
- BMPP 14 months form EPC Contract
- FLPPTM 30 months form EPC Contract
- Simple Installation
BMPP
FLPPTM
Land-Lock Power Plant
45~60 months
Commercial Operation
4. Lower CAPEX and OPEX - Curtailed Capital Expense, FLPPTM - All In ONE : Curtailed CAPEX by Power Station, Land Acquisition, LNG Re-Gas system, Terminal & Storage
- Curtailed operating expense
: Below 20 persons, Easy Operation & Maintenance & Low fuel cost
![Page 21: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/21.jpg)
Why DSEC Floating Power Plant? 3.6
5. Convergent Technology with Shipbuilding and Power Plant
- 65% of World LNG Carriers is delivered by DSME group
(82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO)
- 1st BMPP for EGAT (Thailand)
Site: Khanom, Thailand Capacity: 75MW Delivered: 1990
- Power Module in Pazflor FPSO for TOTAL
Fuel Gas Supply to Gas Turbine on topside module
Capacity: 125.2MW (31.3MWx4) + 31.3MW (emergency)
![Page 22: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/22.jpg)
Global Network
DSME Overseas Branches
Business Partners
3.7
Oslo
London
Greece
HOUSTON
DMHI Mangalia, Romania
NASSCO SAN DIEGO, USA
OSX Rio de Janeiro, Brazil
Kuala Lumpur
PAENAL Porto Amboim, Angola
ODC Oman
Singapore
Jakarta
Shanghai
DSSC Shandong, China Tokyo
Busan, Korea
ZVEZDA-DSME Vladivostok, Russia
Ecuador Rio de Janeiro
![Page 23: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/23.jpg)
4. DSME Okpo shipyard (Arial View)
Okpo Shipyard 4,879,000m
Dry Docks 530x131x14.5m 540x81x14.5m
Floating Docks 50K~120K ton (5)
45K ton L/B (1)
Floating Crane 2 x 3,600ton 1 x 1,800ton 1 x 1,200ton
2
Company Overview
![Page 24: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/24.jpg)
Delivered 1,421
* As of 31 July 2012
LNG Carrier
LPG Carrier
Oil Tankers
Full Containers
82
22
320
216
Ro/Ro, Car Carrier 62
Bulk Carrier 185
Ferries 10
Offshore Project & Plant
Fixed Platforms & FPUS
FPSO
Drill ships
438
32
4
12
Semi-Submersible Rigs 18
Onshore and Others 372
Naval & Special Ship 86 Commercial Ships 897
4. DSME Company Overview Performance Record
Frigate
Submarine
Patrol Boat
4
25
10
Offshore Patrol Vessel 7
Special Ship and Others 40
![Page 25: Ship & Power Total Solution Provider · - 65% of World LNG Carriers is delivered by DSME group (82 LNG Carriers, 8 LNG RV and 1 FSRU, 4 FPSO) - 1st BMPP for EGAT (Thailand) Site:](https://reader036.fdocuments.us/reader036/viewer/2022062603/5f0622ca7e708231d416786c/html5/thumbnails/25.jpg)
HEADQUARTER 74-1, Jungang-Dong 4-Ga, Jung-Gu, Busan, Korea TEL +82-(0)51-660-2114 FAX +82-(0)51-660-2288 www.idsec.co.kr