Design approaches to LNG bunkering vessels, LNG carriers and...
Transcript of Design approaches to LNG bunkering vessels, LNG carriers and...
Fabrizio Visco
Port & Shipping Tech 2015 - Genova
Design approaches to LNG bunkering vessels, LNG carriers and LNG powered ships
M.E.S.
MARINE ENGINEERING SERVICES
M.E.S. – Marine Engineering Services S.r.l.
Established on 1986 by Ing Giorgio La Valle
(40 years experience in gas carriers design)
Specialized in gas carriers, chemical tankers and
bitumen carriers
About 100 ships built with MES design
Market: worldwide
Headquarters: Trieste (Italy)
INTRODUCTION
ESTABLISHMENT
1986
SPECIALIZED
Gas Carriers
Chemical Tankers
Bitumen Carriers
MARKET
Italy
Turkey
Vietnam
China
Korea
Indonesia
Poland
The Netherlands
Finland
Introduction
Head office
COMPANY PROFILE
See VIDEO
See some Picture
HEAD OFFICE
HEAD OFFICE
Trieste (ITALY)
•500 m2
•Abt. 30 workstations
Head Office – TRIESTE 500 m2 – abt. 30 workstations
Activity
ACTIVITY
DESIGN
SURVEY DURING SHIP CONSTRUCTION
CONSULTANCY
SPECIALISTIC CALCULATIONS
LOADING COMPUTER
OTHERS…
ACTIVITY
ACTIVITY
Design:
•Concept Design
•Basic Design
•Detailed Engineering
•Specialistic Calculation
Survey:
•On-site (up to 18 surveyors at full capacity)
Activity
ACTIVITY
10 x 25000 dwt – AVIC DINGHENG SHIPYARD
ACTIVITY
ACTIVITY
Design:
•Concept Design
•Basic Design
•Detailed Engineering
•Specialistic Calculation
Survey:
•On-site (up to 18 surveyors at full capacity)
Activity
ACTIVITY
2 x 19800 dwt – NINGBO XINLE SHIPYARD
ACTIVITY
ACTIVITY
Design:
•Concept Design
•Basic Design
•Detailed Engineering
•Specialistic Calculation
Survey:
•On-site (up to 18 surveyors at full capacity)
Key points
KEY POINTS
HIGH PERFORMANCES speed-power ratio (low consumptions, up to 25÷30%less than
competitors)
main dimensions optimization (reduce total ship cost)
QUALITY
Drawings / Documentation
Details
Support / Assistance
ISO9001
CONTINUOUS FEEDBACK
Production (Shipyard)
Production (Survey activity)
During ship’s life (Shipowners)
Production & Survey
Assistance for equipment tenders (Shipyard/Shipowner)
EXPERIENCE 40 years in ship design
Gas carriers Management
Survey
Innovation
KEY POINTS
KEY POINTS
•HIGH
PERFORMANCE
•QUALITY
•CONTINUOUS
FEEDBACK
•EXPERIENCE
Products
PRODUCTS
see the complete REFERENCE LIST on our web page:
www.mes.it
Chemical tankers:
from 5500 dwt up to 40000 dwt
Gas carriers:
from 2500 cbm up to 12000 cbm
40000 cbm
Bitumen carriers:
from 6000 dwt up to 7000 dwt
LNG bunkering vessels
PRODUCTS
PRODUCTS
•Gas carriers
•Chemical tankers
•Bitumen carriers
•Ro-Ro
•Ferry
•Various
Products
PRODUCTS
see the complete REFERENCE LIST
on our web page:
www.mes.it
PRODUCTS
PRODUCTS
•Gas carriers
•Chemical tankers
•Bitumen carriers
•Ro-Ro
•Ferry
•Various
Gas carriers:
2500 cbm ÷ 12000 cbm
40000 cbm
Bunkering vessels:
600 cbm ÷ 40000 cbm
bunkering vessel
3000 m3 LNG bunkering vessel
MAIN DIMENSIONS
Lenght overall : abt. 90.0 m
Lenght between perpendiculars : abt. 85.0 m
Breadth : abt. 15.0 m
Installed Power : 2700 kW
Service Speed : 14.3 knots @ 1570 kW
3000 m3 LNG
Bunkering Vessel
MAIN
CHARACTER.
• LNG (-163°C) at 5 bars
bunkering vessel
3000 m3 LNG bunkering vessel
3000 m3 LNG
Bunkering Vessel
MAIN
CHARACTER.
• steel grade selection
• insulation
• single or twin screw twin skeg
bunkering vessel
3000 m3 LNG bunkering vessel
3000 m3 LNG
Bunkering Vessel
REFERENCES
•8 sisterships already built (3300 cbm LPG)
bunkering vessel
7500 m3 LNG bunkering vessel
7500 m3 LNG
Bunkering Vessel
Lpp = 111.0m
B = 18.6m
TDES = 6.0m
SpeedSERV = 13 kn
with
Power = 1500 kW
PowerINST = 3180 kW
.
Super Green Ship
SUPER GREEN SHIP – 40.000 m3 LNG
Super Green Ship
40,000 m3 LNG
Lpp =179.7 m
B = 30.0 m
DraftDES = 8.50 m
SpeedSERV=16.0 kn
PowerINST= 7700 kW
• Medium Size
• Worldwide navigation
harbours with limitations (max dimensions; low draft; etc..)
• USE: Gas distribution door2door
• Terminal on-shore
• FSRU
MAIN CHARACTER.
•Bilobe tanks
•9% Nickel
•Insulation: poliurethane
•Onboard regasification plant unit
•Twin screw / twin skeg
•Higher safety
•Low draft
•Slow steaming
•Low consumption
•Dual Fuel
Super Green Ship
40,000 m3 LNG
Lpp =179.7 m
B = 30.0 m
DraftDES = 8.50 m
SpeedSERV=16.0 kn
PowerINST= 7700 kW
• Medium Size
• Worldwide navigation
harbours with limitations (max dimensions; low draft; etc..)
• USE: Gas distribution door2door
• Terminal on-shore
• FSRU
Super Green Ship
SUPER GREEN SHIP – 40.000 m3 LNG
MAIN CHARACTER.
•Bilobe tanks
•9% Nickel
•Insulation: poliurethane
•Onboard regasification plant unit
•Twin screw / twin skeg
•Higher safety
•Low draft
•Slow steaming
•Low consumption
•Dual Fuel
CONVERSION
CONVERSION LPG LNG CARRIER
DUAL FUEL PROPELLED
EXISTING SHIP
• 3000 m3 LPG carrier (-48°C)
SHIP MODIFIED
• 3700 m3 LNG carrier (-163°C)
3700 m3 LNG
Bunkering Vessel
PRESENT WORK
• LPG LNG
• new bilobes
2 3 tanks
• lenghtening (+20m)
• D.F. M.E.
• D.F. A.E.
• GVU
• LNG plant
CONVERSION
CONVERSION LPG LNG CARRIER
DUAL FUEL PROPELLED
EXISTING SHIP
• 3000 m3 LPG carrier (-48°C)
SHIP MODIFIED
• 3700 m3 LNG carrier (-163°C)
3700 m3 LNG
Bunkering Vessel
PRESENT WORK
• LPG LNG
• new bilobes
• 2 3 tanks
• lenghtening (+20m)
• D.F. M.E.
• D.F. A.E.
• GVU
• LNG plant
CONVERSION
CONVERSION LPG LNG CARRIER
DUAL FUEL PROPELLED
SHIP MODIFIED
• General Arrangement
• Capacity Plan
• Midship Section
• Stability
• Longitudinal Strenght
• Scantling Plans
• Freeboard
• E.N.
• E.R. arrangement (new M.E., GVU, LNG propulsion plant)
• F.E.M. thermal calculations
3700 m3 LNG
Bunkering Vessel
PRESENT WORK
• LPG LNG
CONVERSION
CONVERSION LPG LNG CARRIER
DUAL FUEL PROPELLED
SHIP MODIFIED
• General Arrangement
• Capacity Plan
• Midship Section
• Stability
• Longitudinal Strenght
• Scantling Plans
• Freeboard
• E.N.
• E.R. arrangement (new M.E., GVU, LNG propulsion plant)
• F.E.M. thermal calculations
3700 m3 LNG
Bunkering Vessel
PRESENT WORK
• LPG LNG
Double Wall tank for D.F. propulsion
150 cbm double wall tank for dual fuel propulsion
Dual Fuel Propulsion
Double wall tank (150 cbm)
• Inner vessel
• Outer vessel
• Vacuum +MLI
Tank Connection Space
Double Wall Pipes Connection
Outer shell
Inner shell
Cradle
WARTSILA & FINCANTIERI
CO-OPERATION WITH WARTSILA & FINCANTIERI
Necessity to reduce at minimum possible the B.O.G. and maximixe the holding time
double wall tank (vacuum insulation + M.L.I.)
cooling down calculations and FEM process simulations (Transient thermal analysis)
thermal stress analysis
RO-RO PAX
DUAL FUEL
SOLUTIONS FOR D.F. PROPULSION
• Double wall tanks 9%Nickel
• Insulation:
Vacuum +
M.L.I.
• FEM analysis
FINCANTIERI
RO-RO FERRY - FINCANTIERI
SCOPE OF SUPPLY
• Scantling plans (Ship structure)
• Sistem schematics (P&ID)
• Ventilation
• Outfitting
• LNG Bunkering station
• Assistance & consultancy
• Hazid/Hazop assistance
• LNG tanks design + Temperature Distribution Analysis (Wartsila)
STQ QUEBEC FINCANTIERI
SCOPE OF SUPPLY
FINCANTIERI
RO-RO FERRY - FINCANTIERI
MAIN DIMENSIONS
Lenght overall : abt. 130.00 m
Lenght between perpendiculars : abt. 22.40 m
Breadth : abt. 22.40 m
Service Speed : abt. 20.0 knots
Installed Power : 20,000 kW
No. max passengers : 800
No. CEU (car equivalent units) : 180
Crew : 35
Ice Class : 1AS FS
STQ QUEBEC FINCANTIERI
MAIN
CHARACTER.
• Dual fuel Propulsion
• Transport of passengers
• Transport of cars/trucks
FINCANTIERI
RO-RO FERRY - FINCANTIERI
LNG TANKS
Capacity : 2 x 280 m3
Indipendent type IMO C
Support cradles
Max Pression : 9 bar
Double Wall
Insulation by vacuum in combination with M.L.I.
Double wall pipes
STQ QUEBEC FINCANTIERI
MAIN
CHARACTER.
• Dual fuel propulsion
• Transport of passengers
• Transport of cars/trucks
FINCANTIERI
RO-RO FERRY - FINCANTIERI
BUNKER STATION
• Bunkering by trucks
• Semi-enclosed space
• Airlock
• Hazardous Area
• Mechanical ventilation
• OCIMF Regulations
• Gas detection
• Dry Powder
STQ QUEBEC FINCANTIERI
MAIN
CHARACTER.
• Dual fuel propulsion
• Transport of passengers
• Transport of cars/trucks
FINCANTIERI
RO-RO FERRY - FINCANTIERI
LNG TANKS
Capacity : 2 x 280 m3
Indipendent type IMO C
Support cradles
Max Pression : 9 bar
STQ QUEBEC FINCANTIERI
F.E.M. thermal calculations
FINCANTIERI
Double wall pipes
STQ QUEBEC FINCANTIERI
F.E.M. thermal calculations
FINCANTIERI
http://www.rai.tv/dl/RaiTV/programmi/media/ContentItem-bebacf7c-d60e-47a1-bd9c-fd3a067ca7d4.html
STQ FERRY
FINCANTIERI
http://www.rai.tv/dl/RaiTV/programmi/media/ContentItem-bebacf7c-d60e-47a1-bd9c-fd3a067ca7d4.html
STQ FERRY
Dual fuel SOLUTIONS
DUAL FUEL PROPULSION – SOLUTIONS
ONBOARD ARRANGEMENT
TEMPERATURE DISTRIBUTIONS / HULL
STEEL PROPERTIES SELECTION
BOIL-OFF
BUNKERING
LNG SYSTEM LOGISTIC
SUPPLY CHAIN
PROBLEMS
F.E.M. THERMAL STRESS ANALISYS
Dual fuel SOLUTIONS
DUAL FUEL PROPULSION – SOLUTIONS
ONBOARD ARRANGEMENT (depending on kind of ships)
RoRo : trailers on weather deck + docking station, or
fixed tank + bunkering station
LNG
Dual Fuel propulsion
REQUIREMENTS
•LNG carriage
•Dual Fuel propulsion
•LNG capacity optimization
Dual fuel SOLUTIONS
DUAL FUEL PROPULSION – SOLUTIONS
ONBOARD ARRANGEMENT (depending on kind of ships)
Ferry / Cruise : in dedicated tank room
LNG
Dual Fuel propulsion
REQUIREMENTS
•LNG carriage
•Dual Fuel propulsion
•LNG capacity optimization
Dual fuel SOLUTIONS
DUAL FUEL PROPULSION – SOLUTIONS
ONBOARD ARRANGEMENT (depending on kind of ships)
Chemical/product/LPG&LEG: on deck / cargo area
(CHECK STABILITY!)
LNG
Dual Fuel propulsion
REQUIREMENTS
•LNG carriage
•Dual Fuel propulsion
•LNG capacity optimization
LNG Tanks capacity
0
500
1000
1500
2000
2500
0 1000 2000 3000 4000 5000 6000 7000
LNG navigation range [nm]
Tan
k ca
pac
ity
[m3
] 0% Port @ LNG
25% Port @ LNG
50% Port @ LNG
75% Port @ LNG
100% Port @ LNG
BILOBE TANKS
CONCLUSION
CONCLUSION
Gas handling needs specialistic knowledge: thermodynamics
safety concepts /Rules ….
materials / metallurgy / special welding
technological limits
assembly
gas carriers design
Designer to give specialistic assistance to the Client: HAZID (design) / HAZOP (operative risks)
transfer / bunkering
gas freeing / gassing-up / cooling down
CONCLUSION
Contacts
THANKS FOR THE ATTENTION
Visit us on the web : www.mes.it
Follow us on (Marine Engineering Services Srl)
M.E.S. – Marine Engineering Services S.r.l.