SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

18
Date Department name Company name SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT 30.09.2020 Engine & APU Shop S7 Technics Prepared by: A. Starkov

Transcript of SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Page 1: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Department name Company name

SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP

PROJECT

30.09.2020 Engine & APU Shop S7 Technics

Prepared by: A. Starkov

Page 2: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

S7 Technics structure

DME

CFM56 engine repair shop Vladivostok LMS

Irkutsk LMS

OVB MRV

CFM56 engine repair shop

Aircraft painting facility Training aviation center

Page 3: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

Current State 15.09.21 Engine & APU Shop

3

Engine & APU

maintenance

directorate

Engine Shop DME Engine Shop MRV Sales, customer

support, engineering

250 sq.m

2 production lines

9 employees

>220 performed events

6 years of operation

900 sq.m

4 production lines

6 employees

>20 performed events

2 years of operation

6 employees

DME & MRV support

Customized solutions

Hospital (quick-turn)

repairs

On-wing maintenance

Sheremet’evo project

14600 sq.m

6 APU & 3 engine production lines

>100 production & engineering staff

>50 supporting staff

Since 2022

S7 Technics

(S7 Engineering)

Page 4: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

15.09.21 Engine & APU Shop

Engine Maintenance Shops CFM56-3;-5B;-7B Major Services

ON-WING & ON-SITE MAINTENANCE

Fan Disc Replacement

AGB / TGB Replacement

Lease Return Inspection

BSI

Re-Preservation

HOSPITAL (QUICK-TURN) SHOP VISITS

HPT Blades Replacement

LPT NGVs Stg.1 Replacement

HPT NGVs Replacement

HPC Top / Bottom Case Repairs

CC Replacement

State of the art Engine & Aircraft Maintenance Shops (DME, MRV) together with SR Technics

Industry leaders’ quality - zero incidents with released products

Page 5: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

History of SVO project 15.09.21 Engine & APU Shop

5

S7 Technics

selected by

Honeywell for the

APU 131-9A, 9B as

Channel Partner

End 2018 Start 2019 Mid 2019 Aug 2020 Oct 2021 I-II q.2022

Decision for CFM56-

5B, 7B overhaul

shop set-up

Engine & APU

project were

combined to reduce

investments and

operational costs

Start of building

reconstruction

Start of

equipment

mounting

EASA & FAA

certification

Total investments - $50 M

Page 6: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

15.09.21

6

Engine & APU Shop

Engines & APU Overhaul approvals & certification:

• Honeywell APU 131-9A;-9B, Overhaul – EASA & FAA I q. 2022

• CFM56-5B;-7B Overhaul – EASA & FAA II q. 2022

• Engine and APU Components Repairs – EASA & FAA II q. 2022

Joint lines for Engines & APU Overhaul Shops:

• Inspection Line

• Logistic Center & Main Store

• Piece-Parts Repair Lines

• Machining Line

• Cleaning Lines

• NDT Line

Engines and APU Overhaul Shops (14.600 sq.m) with built-in APU Test Cell with Max capacity:

• 100 APUs per year

• 42 Engines per year

New Engines & APU Overhaul Shops combined in one building in SVO

Basic concept

Page 7: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

15.09.21

7

Engine & APU Shop Engines & APU Overhaul Shops Layout

Engines and APU Overhaul Shops equipped with new state of the art machines placed on 6S & Lean principles

Centralized services (Cleaning, Inspection, NDT, Machining) for both, Engines and APU Overhaul

Page 8: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

15.09.21

8

Engine & APU Shop Engines & APU Overhaul Shops Layout

Centralized services (Cleaning, Inspection, NDT, Machining) for both, Engines and APU Overhaul

Engines and APU Overhaul Shops equipped with new state of the art machines placed on 6S & Lean principles

Page 9: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation Our strategy 15.09.21 Engine & APU Shop

9

1) Delivery of the product/service for the engine and APU repairs demandable by the customer (market):

a) Industry leaders’ quality level

b) Competitive pricing and repair time

2) Development of long term WIN-WIN partnership with customers and suppliers

3) Supporting of the Team and production culture

4) LEAN, CI & process approach

5) Continuous development and implementation of new products/repairs in-house

Page 10: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

Quality since early beginning 15.09.21

10

Cooperate with industry leaders & OEMs

• Honeywell - Channel partner

• CFM International - Parts & equipment

• Zeiss - Coordinate measuring machines

• SCHENCK - Balancing equipment

• DANOBAT - Grinding machines

• ATG - NDT line

Engine & APU Shop

• PJSC "UEC-Saturn“ - CFM56-5B;-7B Test Cell

• Safran Aircraft Engines - Test Cell equipment & correlation

• Safran Aero Boosters - Test Cell equipment

• MDS Aero - Test Cell upgrade

• FinnSonic - Engine & APU part/bearing cleaning line

• KOVOFINIŠ - Engine & APU parts cleaning line

First repairs will be done on S7 Technics’ own Engines

and APUs

Development of own ERP Engine & APU repair system

with mistakes prevention algorithms

Page 11: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

Challenge - People 15.09.21

11

Working with industry leaders consultants

Engine & APU Shop

Hiring of engineering and shop floor experienced staff

with valid licenses

Hiring of Russian experienced specialists:

• Assy/disassy

• Testing, balancing

• Grinding, milling, drilling, turning

• Welding, painting and etc.

Development of the own PART 145, 147 training school

focused on Engine & APU operations

Internal training of SVO project personnel started from 2019

External training of SVO project personnel at OEM and

MRO leaders

Page 12: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

Challenge - Cost 15.09.21

12

LABOR:

• Our model expectation is 20-30% less than in EU

• Maximizing of using CFM56 and 131-9A, 9B joint

lines

Engine & APU Shop

IN-HOUSE PIECE-PART REPAIRS DEVELOPMENT:

• Simple piece-part repairs to be done in SVO

• Complex piece-part repairs to be done together

with Russian companies which already have

competence and equipment

COST

Page 13: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

Challenge - Cost 15.09.21

13

Engine & APU Shop

PARTS SUPPLY/EXTERNAL REPAIR:

• Work with engine & APU teardown companies

• Own stock with competitively priced used

serviceable material

• Competitive contracts with Engine & APU parts

repair OEM and MRO

• Focused material supply approach for each

Customer’s engine

COST

Page 14: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

Challenge - Delivery 15.09.21

14

THE FOLLOWING IDEAS ARE BEING

IMPLEMENTED TO MAKE OUR PRODUCT

COMPETITIVE:

• Spare APU support – 4 ea in place now

• Spare Engine support – 2 ea in procurement

• Dedicated Logistics Team focused on parts

supply and turnover

• Sufficient parts stock level

Engine & APU Shop

TAT

Page 15: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

Challenge – Customs & VAT 15.09.21

15

CUSTOMS QUESTIONS:

• Location which is close to SVO customs terminal

• Dedicated company at S7 Group - S7 Cargo

which is experienced and focused on customs

questions

Engine & APU Shop

VAT:

• Russian customers: zero VAT rate for supplied

material in case the special conditions in

contract are agreed

• Foreign customers: free for the whole invoice

Page 16: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

Challenge – Engine & APU testing 15.09.21

16

APU Test Cell:

• Developed together with Honeywell

and at the final stage of installation

at SVO

Engine & APU Shop

Engine Test Cell:

• Under development together with ODK-

Saturn in Rybinsk (modification of Engine

Cell which was initially manufactured with

CFM56 testing capability)

Investments

Cost

Page 17: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

15.09.21

17

Engine & APU Shop Again, our message

We are here to support our customers with demandable and competitive

service and product

We are open to work with all companies which will help us to make

our service and product better

We are constantly looking for High Tech and implement the best

solutions, such as:

Movable coordinate inspection machine

3D Laser surface scanners

Paperless technologies

Process engineering tools and more…

Continuous improvement and fighting with losses are our key principles

Page 18: SHEREMETYEVO (SVO) ENGINE & APU OVERHAUL SHOP PROJECT

Date Name of presentation

Enter name of presentation

Thanks for your attention!

15.09.21

18