E.4MODIFIED ROUTE DA · 2008-10-13 · Sweetwater River Modified Route D Substation Alternative 8 R...

1
# * # * # * Cleveland National Forest SVO-3.1 Cleveland National Forest Sweetwater River Modified Route D Substation Alternative 8 Road Palo Verde Lake SVO-2 SVO-3 SVO-1 SVO-0 I8-71 MRD-36 MRD-35 MRD-34 I8-74 A l p i n e R o a d B el l B l u f f T ru c k Tra i l O L D R A N C H FARLIN Star Valley Vieja s Cr e e k R o ad V i a P al o V e r d e L a g o Sunrise Powerlink Project Figure E.4.1-3 October 2008 Final EIR/EIS Modified Route D Alternative: Star Valley Option and Revision 0 2,000 Feet Environmental Planning Inc. ® N Sunrise Powerlink Project E.4 MODIFIED R OUTE D LTERNATIVE A SAN DIEGO COUNTY IMPERIAL COUNTY 500 kV Proposed Project 230 kV Proposed Project Alternative Routes Figure Extent Modified Route D Alternative: Star Valley Option, Overhead Portion Modified Route D Alternative: Star Valley Option, Underground Portion Modified Route D Alternative Western Modified Route D Alternative Reroute Interstate 8 Alternative, Underground Portion Substation Major Stream/River Major Water Body U.S. Forest Service Land Tribal Land Major Road Alternative Structures ! ( Overhead-Underground Alternative Transition Structures # * Milepost ) Star Valley Option Revision

Transcript of E.4MODIFIED ROUTE DA · 2008-10-13 · Sweetwater River Modified Route D Substation Alternative 8 R...

Page 1: E.4MODIFIED ROUTE DA · 2008-10-13 · Sweetwater River Modified Route D Substation Alternative 8 R o ad Palo Verde Lake SVO-2 SVO-3 SVO-1 SVO-0 I8-71 MRD-36 MRD-35 MRD-34 I8-74 Alpine

#*

#*#*

Cleveland National Forest

SVO-3.1

Cleveland National Forest

Sweetwater River

Modified Route DSubstation Alternative

���8

Road

Palo Verde Lake

SVO-2

SVO-3

SVO-1

SVO-0

I8-71MRD-36

MRD-35

MRD-34

I8-74

Alpine Road

Bell Bluff Truck Trail

OLD RANCH

FARLINS

tar V

alle

y

Vie

jas C

ree

k R

oa

d

V ia Palo V e rde Lago

Sunrise Powerlink Project

Figure E.4.1-3

October 2008 Final EIR/EIS

Modified Route D Alternative:

Star Valley Option and Revision

0 2,000

Feet

Environmental Planning Inc.

ÆN

Sunrise Powerlink ProjectE.4 MODIFIED ROUTE D LTERNATIVEA

SA

N D

IEG

O C

OU

NT

Y

IMP

ER

IAL

CO

UN

TY

500 kV Proposed Project230 kV Proposed ProjectAlternative Routes

Figure Extent

Modified Route D Alternative: Star Valley Option, Overhead Portion

Modified Route D Alternative: Star Valley Option, Underground Portion

Modified Route D Alternative

Western Modified Route D Alternative Reroute

Interstate 8 Alternative, Underground Portion

Substation

Major Stream/River

Major Water Body

U.S. Forest Service Land

Tribal Land

Major Road

Alternative Structures!(

Overhead-Underground Alternative Transition Structures

#*

Milepost�)

Star Valley Option Revision