  • Slide 1
  • SHARJAH ELECTRICITY & WATER AUTHORITY BY : ASMA ALI HAJAR SAEED HESSA ELSHIBA NOURA ALI SHAIMA JUMA 2014
  • Slide 2
  • What is SEWA ? Sharjah Electricity And Water Authority (SEWA) is the providing services of electricity, water and natural gas to the residents of Sharjah city. It was established in the 1940 SEWA contain many departments such as : *Electricity and Desalination Plants on Abu Moussa, Wasir Bu Nair and Al Zubair Islands *Khorfakkan Electricity Generation and Water Desalination Plant *Zulal Water Factory *Al Layyah Electricity Generation and Water Desalination
  • Slide 3
  • Slide 4
  • Wasit Electricity Generation Plant Generate electricity only Contain 6 main departments *Administration department *Operation Room *Planning department *Electrical Maintenance Department (EMD) * Instrument Maintenance Department (IMD) * Mechanical Maintenance Department (MMD) Two main ways to generate power *Diesel Power Generation *Gas Power Generation. But other station can do also Steam Power Generation
  • Slide 5
  • Operation Room or Control
  • Slide 6
  • Gas Turbine Phases:. *Phase 1 o GT1, 2, 3 *Phase 2 o GT 4A,4B *Phase 3 o GT 5A, 5B *Phase 4 o GT 6A, 6B *Phase 5 o GT 7A, 7B *Two Roiss Roiss Total Power generated =1200 MW
  • Slide 7
  • Gas Turbine Two type *Frame 6 (10 compaction unite, Start motor work on diesel) *Frame 9 (14 compaction unite, Start motor work on electrical) Frame 9 Frame 6
  • Slide 8
  • Gas Turbine Component: *Filter filtering the air from humidity and dust *Air dust clean the air *Axial compressor Increase air pressure *Combustion chamber Increase the volume of air by heating it *Turbine Convert the thermal energy of gases in mechanical energy (as useful work on the rotor) *Generator generate the power from mechanical to electrical *Step up/ step down transformer SU increase the power while SD decrease the power. *Starting Device give power to unit to start
  • Slide 9
  • Gas Turbine
  • Slide 10
  • Elements for turbine running: *Cooling o reduce the temperature of gas *Supplying fuel o Such as gas or diesel *Atomizing air for combustion o Its used to convert the liquid fuel into small drops to go into the CC
  • Slide 11
  • Gas turbine Starting the turbine: *Electrical motor or diesel engine to start the unit as the routine reach 60% so the combustion chambers are fired. * As the turbine speed is higher than the start engine speed the engine is disconnected and shut down. *As the turbine reach the nominal speed, the unit is ready to be synchronized to the network so the starting is complete and the unit has reach full speed no load (FSNL).
  • Slide 12
  • Gas turbine Shutting Down: *Normal shutdown o Manually operation by stop switch or some mechanical or regulation problem through protection devices *Emergency shutdown (Trip) o Depressing the emergency stop button or by some mechanical or regulation important problem through special devices. o Trip is for two reason Human error Protection 1.Actual (Ex. problem in the Vibration device) 2.False (Ex. wrong reading from the Vibration device)
  • Slide 13
  • Cooling water System 1 1 3 3 4 4 2 2
  • Slide 14
  • Cooling water System process 1.The water is stored in the tank which is distilled water 2.The motor move the distilled water to two parts. Generator Oil temperature cooling and then to the atomizing air cooling So it will reduce the temperature for the two parts 3.The water is joined from the two part and then go to the fans. 4.The fans reduce the water temperature
  • Slide 15
  • Cooling down This step is Immediately following a shut down The rotor is rotated to provide uniform cooling. prevents rotor from bowing, rubbing and imbalance. The turbine can be: Started loaded at any time during the cooling down cycle.
  • Slide 16
  • Cool down operation: START UP : 1.COOL DOWN ON.( + EXECUTE). 2.AUXILIARY OIL PUMP AOP STARS ( CHECKS OIL PRESSURE 7 BAR) 3. LUBE OIL HEATER PRESSURE 1.3 BAR. 4.COOLING WATER PUMP START ( PRESSURE 4 BAR). 5.JACKING OIL PRESSURE: 80 -100 BAR. 6.MIST ELIMINATOR FAN STARTS. 7. BT FAN WILL START. 8.CHECK THE OIL FLOW IN ALL THE VIEW GLASS
  • Slide 17
  • Exhaust System The Exhaust systems have a fan. Exhaust systems are necessary to guide the exhaust flue gases and the toxic gases of the gas turbine into the atmosphere. It can cause to death.
  • Slide 18
  • Slide 19
  • Slide 20
  • Fire fighting system Most fires happens because of diesel leaking.
  • Slide 21
  • Slide 22
  • Electrical Maintenance Departments (EMD)
  • Slide 23
  • F-6 F-9 RR BE TY 2x33MW 11KV 8x109MW 15KV 2x47MW 11.5KV 1x23MW 11KV Monitoring Frequency 50 Hz 400 V 230 V Generating Sequence
  • Slide 24
  • 143 MVA GT 5B 220 KV 15/220 KV 282 MVA GT 6A 15 KV 100MW GT 6B IB 220/132 KV 132 KV 15/ 6.6 KV 4MVA GT 7A GT 7B SAJA1SAJA2SAJA3SAJA4 2x75 MVA 302 MVA Wasit Distribution Network ~ ~ ~ ~ ~ GT 5AGT 4A ~~ GT 4B ~ 33 KV XXXX X X X X X X X X X X XX XXX X ~ X GT1 30 MW ~ X GT2 30 MW XXXX ~ X GT3 20MW ~ X RR1 40MW ~ X RR2 40MW X X X AZRARMQGHFA UMKRRMTA X X IB 220/33 KV 3x75 MVA XXX Generator 220 KV 132 KV 33KV
  • Slide 25
  • Slide 26
  • MotorGenerator Electrical => MechanicalMechanical => Electrical Consume => Electricity Produce => Power Consume => Power Produce => Electricity
  • Slide 27
  • Transformers Dry type Oil Filed Low Capacity High capacity For Volt Transfer
  • Slide 28
  • Breakers Air circuit breakerOil circuit breakerGas circuit breaker Work byAirOilGas CostLowMediumHighest Specifications Large ( x10 ) Medium ( x2 ) Maintenance required Low size ( x1 ) No maintenance Efficient picture
  • Slide 29
  • Monitoring Start up Protection Cheap Monthly Maintenance No Maintenance Average costYearly Maintenance Highest cost
  • Slide 30
  • Filament lampCFL (Compact Filament Lamp) LED ( Light Emitting Diode ) Consumption100% ( Highest )40% ( Medium )10% ( Lowest ) Costx1 ( Cheap )x3 ( Average )x8 ( Highest ) Picture Lighting
  • Slide 31
  • HDSV (high main sodium vapor) -Yellow -As,much as its high, it covers more area -LED type HDMV (Mercury vapor) - White - Places where require more lights MHL (Metal halide lamp) -White -Used at workshops and for study FTL (fluorescent tube light) -White, yellow -Tube lights Lighting
  • Slide 32
  • Mechanical Maintenance Departments (MMD)
  • Slide 33
  • MMD: design and manufacturing, and installation, and operation of the engines, machinery, and manufacturing processes.
  • Slide 34
  • Gas system operation The two main valves : 1.GCV: set for gas control valve. 2.SRV: set for gas ratio valve. Operation: *Gas come from SAJAA (yellow pipe) and goes directly to SRV & GCV, which take the gas to combustion chamber if they open. If any trip happen they will close and solenoid gas valve open to let the gas which located between them to go to the atmosphere.
  • Slide 35
  • Torque Converter operation Two motor to rotate the shaft: *Turbine gear motor (88TG 1, Turning gear) *Cranking motor (88CR 1) The torque converter transfer the speed from left side shaft to the right side shaft, if the left is running in 1000 rpm then the right should run at the same speed. Inside the torque converter there is two main things that transfer the speed between the motors 1.Solenoid valve turbine unit (20TU 1) 2.Limit switch turbine control (33TC 1) Both this thing are operate using oil wine the oil pass throw them they are connected and the operation starts.
  • Slide 36
  • Torque Converter
  • Slide 37
  • IGV operation IGV located before the compressor it take the air from filter and send 100% pure air which has no dust or moisture for compressor. If the IGV open with 34 degree it has zero loads (zero speed) the turbine not rotating. When the degree reaches 56 degree the chamber is firing this mean that its full speed with 3000 rpm.
  • Slide 38
  • IGV operation
  • Slide 39
  • Instrument Maintenance Departments (IMD)
  • Slide 40
  • IMD: reading the valves from the Gages Measure the temperature Detect the level of the valve Indicate the position of the valve Detect the gas How many rpm is a converter that measures a physical quantity and converts it into a signal measure temperature by correlating the resistance of the RTD element with temperature. Sensors that detect the presence of operators near hazardous machines of facilitates.
  • Slide 41
  • GCV and SRV instruments GCV *Solenoid valve fuel gas control (20FGC 1) SRV *Solenoid valve fuel gas start (20FGS 1) Solenoid valve gas (20VG 1) *Release the gas that is between SRV & GCV Pressure Transmitter fuel gas *To detect the gas pressure o 96FG 2A o 96FG 2B o 96FG 2C
  • Slide 42
  • Load Dispatch Center (LDC) SUPERVISE CONTROL AND DATA EQUATION
  • Slide 43
  • Fiber optic DEFINITION The medium and the technology associated with the transmission of information as light impulses along a glass or plastic wire or fiber. ADVANTAGE Fiber optic cables have a much greater bandwidth than metal cables. This means that they can carry more data. Fiber optic cables are less susceptible than metal cables to interference. Fiber optic cables are much thinner and lighter than metal wires. Data can be transmitted digitally (the natural form for computer data) rather than analogically.
  • Slide 44
  • RTU (Remote Terminal Unit) DEFINITION an electronic device that is controlled by a microprocessor. The device interfaces with physical objects to a Distributed Control System (DCS) or Supervisory Control and Data Acquisition (SCADA) system by transmitting telemetry data to the system. TYPES PDH (Plesiochronous digital hierarchy) 2 Mbps telecommunications network transmission technology designed for the transport of large data volumes across large scale digital networks. PDH uses ( E1) channels in Europe and 1.544 Mb/s ( DS1) channels in the US and Japan. Each E1 = 64Kbps
  • Slide 45
  • RTU (Remote Terminal Unit) TYPES SDH (Synchronous Digital Hierarchy) standard technology for synchronous data transmission on optical media. It is the international equivalent of Synchronous Optical Network. Synchronous Transport Modules (STM) STM-1 (155 Mbps) = 63*E1 DWDM (Dense wavelength division multiplexing) SDHS BENEFITS OVER THE PDH Reduce costs world standard digital format synchronous structure is flexible Easy traffic cross connection capacity and add and drop facility
  • Slide 46
  • SCADA (Supervisory Control and Data Acquisition) DEFINITION A category of software application program for process control, the gathering of data in real time from remote locations in order to control equipment and conditions Used to monitor and control a plant or equipment in industries such telecommunications water and waste control energy oil and gas refining and transportation SCADA systems include hardware and software components. The hardware gathers and feeds data into a computer that has SCADA software installed. The computer then processes this data and presents it in a timely manner. SCADA also records and logs all events into a file stored on a hard disk or sends them to a printer. SCADA warns when conditions become hazardous by sounding alarms.
  • Slide 47
  • Personal Protection Equipment (PPE)