SEPTEMBER 24-26, 2018 SPE Annual Technical Conference and ... · And Visual Analytics for Improved...
Transcript of SEPTEMBER 24-26, 2018 SPE Annual Technical Conference and ... · And Visual Analytics for Improved...
S E P T E M B E R 2 4 - 2 6 , 2 0 1 8
SPE Annual Technical Conference and Exhibition
ATCE 2018B O O T H # 1 7 3 5 A N D 6 2 1
bhge.com
BHGE 2018 World Oil Awards Finalists• Best Data Management and Application Solution:
IntelliStream™ Production Optimization Solution
• Best Deepwater Technology: DEEPFRAC™ Deepwater Multistage Fracturing Service
• Best Deepwater Technology: Light Weight Compact Tree
• Best EOR Technology: OptiStriker™ Straddle Packer System
• Best Exploration Technology: FASTrak™ Prism Fluid Analysis and Sampling While Drilling
• Best Production Chemicals: FATHOM™ XT SUBSEA226 Black Oil Foamer
• Best Well Integrity: SealBond™ Ultra Cement Spacer System
• Best Well Intervention Technology: Intelligent Injector Control System
• Best Well Intervention Technology: xSight™ Smart Intervention Services
• Best Outreach Program: BHGE Partnership with FIRST
• Innovative Thinker: Dr. Sven Krueger
• Lifetime Achievement: Dr. Lev Tabarovsky
• Lifetime Achievement: Frank Walles
Flow sooner:Accelerate plug-and-perf completions with advanced materials science and versatile plug milling solutions
M 9:30 | M 4:00 | T 11:30 | W 10:30
Drill faster: Achieve superior, record-setting drilling performance with remote operations support
M 2:30 | T 1:30
Drill better:Pair your fluids system with an innovative commercial model to drive performance
M 1:30 | T 10:00 | T 4:00 | W 9:30
I N - B O O T H P R E S E N T A T I O N S
Flow sooner and produce longer: Deliver targeted treatments to accelerate operations and enhance recovery
M 1:00 | T 9:30 | T 3:30 | W 11:00
Short-circuit the big loop:A faster, more flexible approach for integrating subsurface to surface
M 3:30 | T 11:00 | T 4:30
Produce longer:Ensure reliable production flow over the life of your field
M 11:30 | M 5:00 | T 3:00 | W 10:00
Drill faster:Extend bit life in extreme drilling operations
M 11:00 | M 4:30 | T 1:00
Boost efficiency and reliability:Gain higher performance and reliability with integrated, frac-focused technologies and services
M 3:00 | T 10:30 | W 11:30
IN-B
OO
TH
PR
ES
EN
TA
TIO
NS Monday, September 24
Time Title
9:30 Flow sooner: Accelerate plug-and-perf completions with advanced materials science and versatile plug milling solutions
11:00 Drill faster: Extend bit life in extreme drilling operations
11:30 Produce longer: Ensure reliable production flow over the life of your field
1:00 Flow sooner and produce longer: Deliver targeted treatments to accelerate operations and enhance recovery
1:30 Drill better: Pair your fluids system with an innovative commercial model to drive performance
2:00 SNACK BREAK: FRESH BAKED COOKIES
2:30 Drill faster: Achieve superior, record-setting drilling performance with remote operations support
3:00Boost efficiency and reliability: Gain higher performance and reliability with integrated, frac-focused technologies and services
3:30 Short-circuit the big loop: A faster, more flexible approach for integrating subsurface to surface
4:00 Flow sooner: Accelerate plug-and-perf completions with advanced materials science and versatile plug milling solutions
4:30 Drill faster: Extend bit life in extreme drilling operations
5:00 Produce longer: Ensure reliable production flow over the life of your field
Tuesday, September 25Time Title
9:30 Flow sooner and produce longer: Deliver targeted treatments to accelerate operations and enhance recovery
10:00 Drill better: Pair your fluids system with an innovative commercial model to drive performance
10:30Boost efficiency and reliability: Gain higher performance and reliability with integrated, frac-focused technologies and services
11:00 Short-circuit the big loop: A faster, more flexible approach for integrating subsurface to surface
11:30 Flow sooner: Accelerate plug-and-perf completions with advanced materials science and versatile plug milling solutions
1:00 Drill faster: Extend bit life in extreme drilling operations
1:30 Drill faster: Achieve superior, record-setting drilling performance with remote operations support
2:30 SNACK BREAK: ICE CREAM SOCIAL
3:00 Produce longer: Ensure reliable production flow over the life of your field
3:30 Flow sooner and produce longer: Deliver targeted treatments to accelerate operations and enhance recovery
4:00 Drill better: Pair your fluids system with an innovative commercial model to drive performance
4:30 Short-circuit the big loop: A faster, more flexible approach for integrating subsurface to surface
FRESH BAKED COOKIESMonday, September 24th at 2:00 p.m. in the Presentation Area
ICE CREAM SOCIALTuesday, September 25th at 2:30 p.m. in the Hospitality Area
Wednesday, September 26Time Title
9:30 Drill better: Pair your fluids system with an innovative commercial model to drive performance
10:00 Produce longer: Ensure reliable production flow over the life of your field
10:30 Flow sooner: Accelerate plug-and-perf completions with advanced materials science and versatile plug milling solutions
11:00 Flow sooner and produce longer: Deliver targeted treatments to accelerate operations and enhance recovery
11:30Boost efficiency and reliability: Gain higher performance and reliability with integrated, frac-focused technologies and services
JOIN US FOR AN AFTERNOON
SNACK IN THE BOOTH
1
2
3
6
7
8
9
10
111214 1315
16
17
18
19
20
21
22
23
4
5
1. Artificial Lift Systems
2. Magnefficient™ Permanent Magnet Motor
3. Zenith™ E-Series ESP Gauge with Motor Diagnostics
4. Stimulation Optimization Services
5. International Cementing Services
6. ProductionLink™ Artificial Lift Monitoring Solutions
7. Production Chemicals
8. VACS™ Wellbore Cleanup Service
9. BLITZ™ Coiled Tubing Frac Sleeve System
10. OptiStriker™ Straddle Packer System
11. Versa-Drive™ Plug Milling Service
12. SPECTRE™ LT Low-temperature Disintegrating Frac Plug
13. IntelliStream™ Production Optimization Solution
14. WellLink™ Digital Solutions
15. JewelSuite™ Software
16. Riser Speedhead™ (RSH) Wellhead Systems
17. ImageTrak™ Ultrasonic Imaging Service
18. Production Array Imager
19. Surface Logging Services
20. AutoTrak™ Rotary Steerable Systems
21. FASTrak™ Prism Fluid Analysis and Sampling While Drilling Service
22. Drilling and Completion Fluids
23. Drill Bits • Dynamus™ Extended-life Drill Bit • TerrAdapt™ Adaptive Drill Bit • Kymera™ Mach 4 Hybrid Drill Bit
Current as of September 14, 2018
T E C H N I C A L P A P E R S Monday, September 24Time Paper Number, Title and Authors
Session 01: Wellbore Integrity and Barrier Elements
TBD
191594 - Deployment of Liner Systems in Extreme High Mud Weight Environments in Gas WellsAl Oqayli, P. Ezi, A. Alluhaydan, Saudi Aramco D&WO; A.E. Tirado, Baker Hughes, a GE Company (BHGE)
Session 03: Optimizing Production through Surveillance
15:45 - 16:10
191659 - Upconversion Nanoparticles as Tracers for Production and Well MonitoringS. Murugesan, D.K. Agrawal, R. Suresh, V.N. Khabashesku, Q. Darugar, BHGE
16:35-17:00
191626 - Integrating Downhole Temperature Sensing Datasets And Visual Analytics for Improved Gas Lift Well Surveillance O.O. Bello, D. Bale, L. Yang, D. Yang, A. Kb, M. Lajith, S. Lazarus, BHGE
Session 04: Fracture Modeling and Diagnostics
14:00-14:25
191753 - Quantifying the Probability of Success of Stimulation Treatments When Information is Limited T. Hoeink, E. Odusina, S. Ghorpade, D. Cotrell, BHGE
Session 05: Artificial Lift Technology and Applications
15:45 - 16:10
191522 - Using Variable Frequency Drive (VFD) for Preheating the Induction Motor (IM) of Electric Submersible Pump (ESP) to Extend its Deepwater Run Life M.D. Rojas, Royal Dutch/Shell Group; L. Yong, BHGE; R. Martinez, Siemens Industry, Inc.
Session 08: Petroleum Advanced Analytics
14:25-14:50
191592 - Enabling Real-Time Asset Analytics for a Cloud- Based Fiber-Optic Data Management System L. Yang, D. Bale, D. Yang, O.O. Bello, R. Failla, D. Lerohl, BHGE; D.W. Knowles, Shell International E&P Co.
Tuesday, September 25Time Paper Number, Title and Authors
Session 09: Pushing the Limits: Advancements in Drilling Automation and Tools
TBD191705 - Case Studies In Deriving Holistic Insights From an Automated Drilling Optimization Platform C.R. Vempati, T. Dolezal, BHGE
Session 12: Applications of Well Stimulation Technology
TBD
191649 - First Successful Proppant Fracturing Treatment in Cretaceous Carbonate Formation in Kuwait M. Nagarkoti, S.A. Pooniwala, A. Alam, BHGE; S. Aloun, Kuwait Oil Company; M.R. Al-Othman, Kuwait Oil Company; E.P. Anthony, Staatsolie Maatschappij Suriname NV
Session 17: Cementing and Evaluation
TBD
191528- Perforate, Wash and Cement De-Risking, Qualification and Validation Using Cement Bond Logging and Post-Execution Barrier Verification Via the Use of Long-Term Annular Pressure Monitoring T.A. Stokkeland, Archer; A.S. Lucas, Maersk Oil; S. Ingram, BHGE
Session 18: Multi-Stage Completion Tools
16:35-17:00
191734 - The Ultra-expansion Completion Packer Integrated with Additive Manufacturing Technology G. Deng, A. Kendall, J. Wakefield, BHGE
Session 20: Stimulation Fluids
14:00-14:25
191751 - Unorthodox Fluids for Unconventional Completions: Maximizing Production and Avoiding PitfallsP.S. Carman, C. Li, R.S. Wheeler, BHGE
Wednesday, September 26Time Paper Number, Title and Authors
Session 26: Facility Design and Flow Assurance
09:20-09:45
191620 - Smart Fluid Processing at Reduced Footprint - Separation RedefinedM.L. Joshi, C. Wang, S. McCrackin, C.J. Manion, BHGE
11:05-11:30
191688 - Electrical Discharge Induced ESP Motor Bearing Failure Z. Ye, S. Wilcox, BHGE
Session 28: Proppant Selection and Placement for Unconventional Reservoirs
08:55-09:20
191585 - Ultra-Light Weight Proppants for Better PlacementN. Spurr, C. Li, BHGE
Session 32: Visualizing Clouds and Blockchains in Digital Energy
TBD
19146 - Drilling Performance Improvement in Marcellus Shale Play: A Case Study of Successful Implementation of Real-time Digital Solution A. Rimmey, G. Han, A. Poojari, H.S. Atwal, BHGE
Session 33: Drilling Optimization and Analytics
TBD
191734 - Self-Adaptive Depth of Cut Control Technology: A Path-breaking Approach to Address Torsional Dysfunction and Securing Drilling Performance Gain in Challenging Deepwater Gulf of Mexico Well A.R. Chowdhury, A.R. Serrano, B. Martin, BHGE; J. Landry, Talos Energy LLC
Session 37: Petrophysics of Unconventional Reservoirs
TBD19117 - Is “API” Enough for Gamma Ray Logs or Do We Need More? F. Inanc, BHGE
Baker Hughes, a GE company, LLC and its affiliates (“BHGE”) provides this information on an “as is” basis for general information purposes and believes it to be accurate as of the date of publication. BHGE does not make any representation as to the accuracy or completeness of the information and makes no warranties of any kind, specific, implied or oral, to the fullest extent permissible by law, including those of merchantability and fitness for a particular purpose or use. BHGE hereby disclaims any and all liability for any direct, indirect, consequential or special damages, claims for lost profits, or third party claims arising from the use of the information, whether a claim is asserted in contract, tort, or otherwise. The BHGE logo is a trademark of Baker Hughes, a GE company, LLC. GE and the GE monogram are trademarks of General Electric Company used under trademark license.
© 2018 Baker Hughes, a GE company, LLC - All rights reserved. 77779 09/2018
For more information: bhge.com