September 2008 QSEC auction - Allocations Transmission Workstream 04.12.08.
-
Upload
emma-beasley -
Category
Documents
-
view
221 -
download
0
description
Transcript of September 2008 QSEC auction - Allocations Transmission Workstream 04.12.08.
September 2008 QSEC auction - Allocations
Transmission Workstream 04.12.08
2
Introduction
Following November workstream, some Shippers expressed an interest in the 2008 QSEC allocation results
Aggregate results were published 14 November on Gemini, National Grid website and via Joint Office
Now taking the opportunity to run through these results and answer any questions you may have
3
Quick reminder - QSEC bidding
Demand driven price
Auction can close early if stability groups remain unchanged between interim bid windows – difficult to predict when this will happen
This year’s auction closed after interim bid window 2
Price Step (P0) = 90% baseline – minus anything sold in previous auctions + any unsold incremental
Price Steps P1 to P20 = Incremental Capacity offered (Available NTS Entry Capacity)
Incremental prices are based on the long run incremental cost of providing additional capacity above the obligated level
4
Allocations Overview
ASEP Total Allocated
(kWh)
Revenue (£)
Cleared Price Step
Clearing Price
Lowest Price
Highest Price
Avonmouth 219,803,250 20,031 P0 0.0001 0.0001 0.0001
Bacton 5,218,997,441 39,666,749 P0 0.0084 0.0084 0.0084
Barrow 2,179,490,000 13,779,413 P0 0.007 0.007 0.007
Burton Point
100,743,322 9,198 P0 0.0001 0.0001 0.0001
Cheshire 6,524,648,800 595,821 P0 0.0001 0.0001 0.0001
Dynevor 264,524,550 24,109 P0 0.0001 0.0001 0.0001
Hatfield Moor Stor.
259,200,000 655,273 P0 0.0028 0.0028 0.0028
5
Allocations Overview (cont…)
ASEP Total Allocated
(kWh)
Revenue (£)
Cleared Price Step
Clearing Price
Lowest Price
Highest Price
Hole House 6,399,923,044 584,415 P0 0.0001 0.0001 0.0001
Hornsea 19,620,000 159,805 P0 0.009 0.009 0.009
Grain 1,291,200,000 706,444 P0 0.0006 0.0006 0.0006
Partington 219,803,250 20,031 P0 0.001 0.001 0.001
St Fergus 1,691,670,286 58,409,444 P0 0.0378 0.0378 0.0378
Teesside 1,991,246,191 15,090,587 P0 0.0083 0.0083 0.0083
Theddlethorpe 359,579,060 2,692,577 P0 0.0082 0.0082 0.0082
6
Incremental Capacity Release - Caythorpe
Incremental signal received for 90 GWh
Obligated incremental until Dec 2015
Obligated Incremental allocated at price step P6 = 0.0094 p/kwh
After 5 years Obligated Incremental then becomes baseline
April 2020 to December 2024 allocated at P0 (along with some individual quarters earlier on in the transaction period)
Total revenue received = £19,305,720
7
Non Obligated Incremental Capacity Release - Easington
Allocations made of both Baseline and non obligated capacity
Aggregate Volume of Capacity sold 1,284,329,102 kWh
Total Revenue received - £11,297,469
Baseline Capacity Sold
1,060,599,012 kWh
Revenue - £8,984,488
Incremental signal received for some quarters :
Where NPV test not passed, National Grid can choose to release non obligated incremental inline with UNC section B2.6 (a) (iii)
National Grid released non-obligated incremental capacity at Easington in Q1 2011, Q1 2012, Q1 2013, Q1 2014 and Q1 2015
Total sold - 223,730,079 kWh
Revenue - £2,312,981
8
Conclusion
Currently the next QSEC auction should be held, in accordance with Code, in September 2009
2 UNC modification have been raised on Auction timing:
Modification Proposal 0230 is seeking to change this so that the next QSEC auction would be held in March 2010
Modification Proposal 230A seeks to maintain existing September QSEC Auction in September 2009 prior to transition to a March 2010 Auction
Full guide to the QSEC auction is available on National Grid’s website with contact details for the Capacity Auctions team and also for independent consultants, should you wish to obtain advice on bidding strategies
All of the information in today’s presentation is taken from the aggregate QSEC results published on National Grid’s website http://www.nationalgrid.com/uk/Gas/Data/CA/reports/Long+Term+System+Entry+Capacity+%28LTSEC%29.htm
ANY QUESTIONS?