Senate Properties, Finland Sustainability Panel Intro TWN 2011 Kaj Hedvall.

12
Senate Properties, Finland Sustainability Panel Intro TWN 2011 Kaj Hedvall

Transcript of Senate Properties, Finland Sustainability Panel Intro TWN 2011 Kaj Hedvall.

Senate Properties, FinlandSustainability Panel Intro

TWN 2011

Kaj Hedvall

Senate Properties 2011 (budget)

• State owned enterprise• 11 300 buildings• 6,5 million m2

• Book EUR 4,2 billion• Turnover 520 M€• Staff-years 264• Investments 300 M€

Defence and Security

Offices

Ministry and Culture

Development Premises

Senate Properties - current issues1. Finland is part of EU and Eurozone2. EU wants to be a forerunner in sustainability3. Target is 20-20-204. The public sector has to show the way in EU5. EED proposal this summer6. The Nordic countries are a somewhat special case:

1. Less old stock2. Climate has forced to deal with energy issues

7. The existing stock is the challenge

27.9.2010 Laatijan nimi 4

Road map for energy efficiency in Senate´s investments 2011 - 2020

New buildingsRenovationsEmissionsRenewable energy

1.9.20115

1.9.20116

1.9.20117

150 km

18 m

Senate Properties

Senate Properties 2011 – 2020

Investments ( = construction)

25 kmRenovation

New projects3300 m

”Exit” 3,3 km

Energy data not available 21 km

Total area 8 milj. gross-m2

Consumption data available concerning 7 milj. gross-m2

!

1.9.20118

Senate Properties 2011 – 2020

Space efficiency

150 km

18 m

Senate Properties

25 kmRenovation

New projects3300 m

Improvement in space efficiency 30 %

Improvement in 50 % of projects and50 % of spaces in those projects

3070 m147,97 km

23,2 km

”Exit” 3,3+1,8 = 5,1 km

1.9.20119

Reducing energy consumption through investment projects (technical improvements and improved space efficiency)

Relative impact of new projects, renovation and space efficiency compared to existing consumption level of Senate´s portfolio (100 % = 2010)

%

201697,0%

202094,4%

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 202090

92

94

96

98

100

102

lämpösähkökokonais

heatelectricitytotal

1.9.201110

150 km

18 m

Senate Properties

Senate Properties 2011 – 2020

Energy purchase/production 2010

District heating (CHP) 91 km

Fossil fuels 22 km

Wood based 21 km

Peat 10 km

Electricity 6 km

Electricity (628 GWh):Average NordPool electricity: - renewable- nuclear- fossil

Heating 928 GWh

each about 1/3, can vary annually

What works?

• Corporate Sustainability reporting (Reputation)• End-user involvement:

• Co-operation contract with WWF to provide Green Office Service to our customers