Second LHC Splice Review Welcome and information on the organization of the MSC group
description
Transcript of Second LHC Splice Review Welcome and information on the organization of the MSC group
Second LHC Splice ReviewWelcome and information on the organization
of the MSC group
L. Bottura
LS1 project
• Priorities– LHC beam to maximum energy (up to 6.5 … 7 TeV)– reliable operation– other interventions
• Key drivers– Circuit (splice) consolidation– R2E– Maintenance
• 20 months from beam off to beam on• Project leader: F. Bordry (TE-DL)
Group structure as of July 2011
Magnet design and technology
Magnet and circuits
integration aspects (e.g. feed-boxes)
Main changes w/r to October 2010
• Change in group structure with modest, but significant, modification of the section mandates
• Large rotations in section leaders (5/7) • Circuit consolidation is one of the main
missions – Large contribution to the work (approx. 70 FTE
concerned as of today)– Project leader: Jean-Philippe Tock (in GLO)
Welcome !
• Jean-Philippe will guide you through the details of the review
• This is an important step in the life of the LHC: the circuit consolidation must be done well…
• … and hopefully only once !
• Thank you for your availability and contribution