STATE ENTERPRISE «UKRAINIAN SEA PORTS AUTHORITY» SKADOVSK SEA PORT AUTHORITY SKADOVSK’S SEA PORT.
Sea Port Construction, Project Execution Plan
-
Upload
david-h-moloney -
Category
Engineering
-
view
1.988 -
download
69
Transcript of Sea Port Construction, Project Execution Plan
![Page 1: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/1.jpg)
David H Moloney
14th August 2016
Sea Port Construction, Project Execution PlanDetails of how a Sea Port is constructed, and how the progress, safety and quality will be monitored and controlled. Also the measures to ensure that the site is environmentally friendly.
http://www.slideshare.net/DavidHMoloney/sea-port-construction-project-execution-plan
Brief Description
The purpose of this presentation is to give an understanding of the Methods, Plant and Sequence to construct a Sea Port .
This presentation can be used to engage Stakeholders and to get the Site Teams commitment to the programme. Also can be used for Induction Training and as a way to capture and share knowledge.
Project Execution Plan (PEP) details how a project will be executed, monitored and controlled.
High in Educational Value and easily understood. Recommended for Continuing Professional Development (CPD)This Video Presentation is innovative and has many beneficial uses.
Video https://www.youtube.com/watch?v=6_Aco_GPO8I
![Page 2: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/2.jpg)
Contents
ⓒ David H Moloney
![Page 3: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/3.jpg)
Introduction
![Page 4: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/4.jpg)
Quay WallQ
uay W
all
![Page 5: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/5.jpg)
Quay WallQ
uay W
all
Brief Description
The quay wall is constructed using precast reinforced concrete hollow blocks that weigh up to 160 tonnes. The blocks were cast in the on-site precast yard and loaded onto barges at the temporary loading jetty that had a 200 tonne capacity gantry crane.
A screeding frame that extended from the sea bet to above water was used to place the bedding layer to the correct level.Up to 22 blocks were placed per day using a barge with a crane.Part of the coping beam was cast in-sit-u in sections using concrete pumps positioned on the reclaimed land behind the quay wall.
![Page 6: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/6.jpg)
Sequence & Methods to Construct Quay WallQ
uay W
all
3D Animation
![Page 7: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/7.jpg)
Quay-wall
ⓒ David H Moloney
Placing Precast Quay Blocks Placing Precast Quay Blocks
Screed Frame for preparing Granular Foundation Placing Precast Quay Blocks
![Page 8: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/8.jpg)
Quay Wall Beam
![Page 9: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/9.jpg)
Screed FrameM
iscella
ne
ous
Brief Description
Duqm, Oman
![Page 10: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/10.jpg)
Mooring Bollards & Marine FendersM
iscella
ne
ous
![Page 11: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/11.jpg)
Marine Equipment ⓒ David H Moloney
![Page 12: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/12.jpg)
Drawing – Quay Wall Cross Section
![Page 13: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/13.jpg)
Breakwater & WavewallB
reakw
ate
r &
Wavew
all
![Page 14: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/14.jpg)
Breakwater & WavewallB
reakw
ate
r &
Wavew
all Brief Description
The breakwater is constructed using core rock, rock armour, precast armour units and geotextile.The core rock is placed using split hopper barges in deep water and by lorry tipping and dozers in shallow water where the risk of slippage is minimal.The precast armour units are placed using crawler cranes fitted with a real-time visual aid system that enabled 70 placements per day.The wave wall is cast in-sit-u in 6 metre long sections.
![Page 15: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/15.jpg)
Sequence & Methods to Construct Breakwater & WavewallB
reakw
ate
r &
Wavew
all
![Page 16: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/16.jpg)
Breakwatersⓒ David H Moloney
Filling Barge with Rock – Temporary Jetty Placing Rock Fill
Breakwater under Construction Placing Rock Armour
![Page 17: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/17.jpg)
Breakwaters
Placing Rock Fill
Breakwater under Construction
![Page 18: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/18.jpg)
Barges for Rock Fill
![Page 19: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/19.jpg)
Geotextile
![Page 20: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/20.jpg)
Precast Sea Armour
Placing Armour
![Page 21: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/21.jpg)
Rock Sea Armour
Placing Armour
![Page 22: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/22.jpg)
Sea Wall
![Page 23: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/23.jpg)
Drawing – Breakwater Cross Section
Quarry Run Rock Fill
![Page 24: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/24.jpg)
Drawing – Breakwater Cross Section
Quarry Run Rock Fill
Wave Wall
Geotextile
Rock Armour 0.5 - 1 ton
Precast Armour
Rock Armour 1 - 3 ton
![Page 25: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/25.jpg)
Precast Yard & Loading JettyP
recast Y
ard
& L
oadin
g J
etty
![Page 26: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/26.jpg)
Precast Yard & Loading JettyP
recast Y
ard
& L
oadin
g J
etty Brief Description
Full-scale sample castings are constructed to demonstrate and document that all the requirements of the concrete and the execution of the work are fulfilled using the actual methods and performed by personnel that will carry out the future castings. One concrete component of each type is produced for approval. The approved castings were retained in a dedicated area for quality assurance purposes.
All works were inspected in accordance with the Inspection & Test Plan on an ongoing basis, in accordance with the site Project Quality Plan. The ITP set out in matrix form the sequence of inspection steps, the governing document (specification, standards), the standard to be achieved, the persons witnessing and the supporting documents to be produced.
![Page 27: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/27.jpg)
Precast Yard & Loading JettyP
recast Y
ard
& L
oadin
g J
etty
![Page 28: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/28.jpg)
Precast Yard & Loading JettyP
recast Y
ard
& L
oadin
g J
etty
![Page 29: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/29.jpg)
Precast Yard & Loading JettyP
recast Y
ard
& L
oadin
g J
etty
![Page 30: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/30.jpg)
Pre-casting Quay Blocks
![Page 31: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/31.jpg)
Precast Sea Armour
Shutters for Precast Sea Armour Shutters for Precast Sea Armour
![Page 32: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/32.jpg)
Quarry & Aggregate Production
3D image to show Sequence, Method & Plant.
ⓒ David H Moloney
![Page 33: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/33.jpg)
Quarry
![Page 34: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/34.jpg)
Concrete Batching Plant David H Moloney
ⓒ David H Moloney
Concrete batching plant comprises - concrete mixer, control cabin, silos for cement and fly ash, aggregate bins and conveyor belt system to feed the mixer. Also aggregate storage bays and water storage tanks. The mixing is computer controlled and has a dynamic screen display, showing the process. Material storage capacity to match two days concrete production
![Page 35: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/35.jpg)
Concrete Batching Yard
Silos, Ice Flake Plant, Chilled water, Mixer
Storage bays for aggregates
![Page 36: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/36.jpg)
Reinforcement Cutting & Bending Yard David H Moloney
ⓒ David H Moloney
Reinforcement in 12 m lengths. Delivery in 3 ton Bundles Reinforcement cut to length by Shearing Machine
Reinforcement Bent to Shape by Bending Machine Reinforcement that is cut and bent is Bundled for delivery to work site
![Page 37: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/37.jpg)
Reinforcement Cutting & Bending
ⓒ David H Moloney
Concre
te
![Page 38: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/38.jpg)
Reinforced Wall Construction Sequence
ⓒ David H Moloney
Concre
te
Brief Description
The sequence to construct a reinforced concrete wall is as
follows:
Tie the reinforcement.
Erect stop-ends and the wall shutters.
Pour and vibrate the concrete mix.
Remove the shutters after the concrete has hardened.
.
Cycle Time Pour per Day
![Page 39: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/39.jpg)
Reinforced Wall Construction Sequence
ⓒ David H Moloney
Concre
te
![Page 40: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/40.jpg)
Concrete MixG
enera
l Item
s
A concrete mix contains 5 major
elements: cement, water, coarse
aggregates, fine aggregates (sand) and
air in different proportion. Additional
elements such as pozzolanic materials (fly
ash, silica fumes or slag) and chemical
admixtures can also be incorporated to
the mix to increase its properties.
![Page 41: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/41.jpg)
Vibrating Concrete
ⓒ David H Moloney
Concre
te
![Page 42: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/42.jpg)
Dredging & ReclamationD
red
gin
g &
Recla
ma
tion
![Page 43: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/43.jpg)
Dredging & ReclamationD
red
gin
g &
Recla
ma
tion Brief Description
Dredgers are marine vessels used to excavate and fill under water.
Types
1. Cutter Suction Dredgers are used to dredge hard soils by cutting
and breaking up the soil using a rotating head at the end of a pipe
which is lowered onto the sea bed. The fragmented material is
sucked and pumped either into a hopper barge or through a floating
pipeline. During operation the dredger is anchored by a spud that
allows the cutting head to swing in an arc.
2. Trailing Suction Hopper Dredgers are used to dredge soft and
loose soils, gravels and silts. There are two suction drag heads
which are lowered onto the sea bed. These move with the dredger
along the sea bed. The dredged material is sucked and pumped
either into the hopper or through a floating pipeline to a discharge
area.
![Page 44: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/44.jpg)
Dredging & ReclamationD
red
gin
g &
Recla
ma
tion
![Page 45: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/45.jpg)
Dredger - Trailing Suction D
red
gin
g &
Recla
ma
tion
Boskalis Netherlands
![Page 46: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/46.jpg)
Dredger - Cutter Suction D
red
gin
g &
Recla
ma
tion
Boskalis Netherlands
![Page 47: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/47.jpg)
Dredger - Backhoe D
red
gin
g &
Recla
ma
tion
![Page 48: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/48.jpg)
Rock - Excavability
The excavability of rock depends mainly on the rock strength and the layer thickness. This diagram shows excavation methods for rock of various strengths and thicknesses, with a free face.
ⓒ David H Moloney
![Page 49: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/49.jpg)
Vibro Compaction - Fill behind Quay
![Page 50: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/50.jpg)
Vibro Compaction - Fill behind Quay
Ground Improvement using deep vibro-compaction.
Purpose is to provide protection against liquefaction during a seismic
event. Also to provide a specified minimum ground bearing capacity.
Vibro-compaction was use to compact the Dubai man made islands
that were constructed from dredged sand.
Equipment.
Vibroflot with extension tube, hydraulic power pack mounted on crane,
diesel engine driven water jetting pumps, compressors, crawler cranes
60 tonne capacity, water tank, de-watering pump
![Page 51: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/51.jpg)
Vibro Compaction - Fill behind Quay
3D image to show Sequence, Method & Plant.
David H Moloney
ⓒ David H Moloney
![Page 52: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/52.jpg)
Vibro CompactionV
ibro
Com
pa
ction
![Page 53: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/53.jpg)
Surv
eyin
g &
settin
g O
ut
Survey & Setting Out
![Page 54: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/54.jpg)
Surv
eyin
g &
settin
g O
ut
Brief Description
Ope
Survey & Setting Out
Survey Tower
![Page 55: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/55.jpg)
Setting out & Surveying
![Page 56: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/56.jpg)
Setting out & Surveying
![Page 57: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/57.jpg)
Port OperationP
ort
Opera
tio
n
![Page 58: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/58.jpg)
Port OperationP
ort
Opera
tio
n
![Page 59: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/59.jpg)
Port OperationP
ort
Opera
tio
n
![Page 60: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/60.jpg)
Port OperationP
ort
Opera
tio
n
![Page 61: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/61.jpg)
Site Facilities & Temporary WorksS
ite F
acili
tie
s &
tem
pora
ry W
ork
s
![Page 62: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/62.jpg)
Site Facilities & Temporary WorksS
ite F
acili
tie
s &
tem
pora
ry W
ork
s
![Page 63: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/63.jpg)
Welfare Facilities
ⓒ David H Moloney
Genera
l Item
s
Toilets – Washing
Canteen, Drying Room, Toilet & Generator
![Page 64: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/64.jpg)
Site Hoarding examples
ⓒ David H Moloney
Genera
l Item
s
![Page 65: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/65.jpg)
Wheel Wash Drive-through
ⓒ David H Moloney
Genera
l Item
s
![Page 66: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/66.jpg)
Wheel Wash Drive-throughG
enera
l Item
s
![Page 67: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/67.jpg)
Temporary Electricity Supply & Tower Lights
Generators
Genera
l Item
s
![Page 68: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/68.jpg)
Dewatering
ⓒ David H Moloney
Genera
l Item
s
![Page 69: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/69.jpg)
Concrete Batching Yard 3 Nr MixersG
enera
l Item
s
![Page 70: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/70.jpg)
Health, Safety & EnvironmentalH
ealth, safe
ty &
environ
menta
l
![Page 71: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/71.jpg)
Emergency Phone Numbers & Response
![Page 72: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/72.jpg)
HSE Monitoring & Reporting - Dashboard Dashboard is a single page, graphical representation of
current HSE Issues and historical trends
![Page 73: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/73.jpg)
Site Safety Posters examples
![Page 74: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/74.jpg)
Safety Precautions
![Page 75: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/75.jpg)
Personal Protective Equipment (PPE)H
ealth,
Safe
ty &
Environm
ent
Personal protective equipment (PPE) is protective clothing, helmets, goggles, or other garments or equipment designed to protect the wearer from injury or infection
![Page 76: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/76.jpg)
Safety Training on Site M
iscella
ne
ous
The purpose of safety training is to provide the knowledge necessary to
perform a job safely
![Page 77: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/77.jpg)
Safety Training Matrix M
iscella
ne
ous
The purpose of safety training is to provide the knowledge necessary to
perform a job safely
![Page 78: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/78.jpg)
Emergency Response Drill H
SE
Drills and exercises are used to rehearse anticipated emergency scenarios
![Page 79: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/79.jpg)
Environmentally Friendly Site Air, Noise, Water & Soil Pollution
![Page 80: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/80.jpg)
Hazardous Substances Symbols H
ealth,
Safe
ty &
Environm
ent
COSHH stands for the Control of Substances Hazardous to Health
Shown are the new hazard symbols
![Page 81: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/81.jpg)
Water Pollution PreventionG
enera
l Item
s
![Page 82: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/82.jpg)
Segregation of Waste H
ealth,
Safe
ty &
Environm
ent
Segregation of waste for proper disposal and recycling. Less waste goes to landfill and hazardous waste is treated to make it safe.
Colour Code for Skips & Bins
![Page 83: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/83.jpg)
Putting Waste Concrete to use
ⓒ David H Moloney
Health,
Safe
ty &
Environm
ent
Precast bases for signs and hoarding, Precast blocks for walls.
![Page 84: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/84.jpg)
AdministrationA
dm
inis
tration
![Page 85: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/85.jpg)
Organogram
Brief Description
Shown are the line and
lateral relationships
between the various team
members and their relative
position in the site
organisation.
![Page 86: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/86.jpg)
Staff Responsibility Matrix
![Page 87: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/87.jpg)
Staff Directory
Brief Description
List of staff and their
contact details
![Page 88: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/88.jpg)
Daily Work Record
Brief Description
Daily Work Records showing the
allocation of resources, materials and
work activities carried out daily.
![Page 89: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/89.jpg)
Quotations Comparison Sheet
![Page 90: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/90.jpg)
Filing System
![Page 91: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/91.jpg)
Quality AssuranceQ
ualit
y A
ssura
nce
![Page 92: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/92.jpg)
Quality Assurance Dashboard Dashboard is a single page, graphical representation of
current statistics and historical trends
![Page 93: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/93.jpg)
Laboratory
ⓒ David H Moloney
Asphalt P
avin
g
![Page 94: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/94.jpg)
Programme & Progress MonitoringP
rogra
mm
e &
Pro
gre
ss M
onitori
ng
![Page 95: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/95.jpg)
Progress Monitoring & Reporting - Dashboard
ⓒ David H Moloney
Dashboard is a single page, graphical representation of current progress and historical trends
![Page 96: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/96.jpg)
Histogram Charts for Resources & Outputs
Manpower per Discipline Concrete per Location
Numbers for each month of the Project Quantity for each month of the Project
ⓒ David H Moloney
![Page 97: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/97.jpg)
Plant & Equipment List & Worker’s Job Titles
ⓒ David H Moloney
![Page 98: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/98.jpg)
Other ProjectsO
ther
Pro
jects
![Page 99: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/99.jpg)
Brief Description
Jetty for Kuwait Causeway
Other Projects
![Page 100: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/100.jpg)
Jetty for Kuwait Causeway
Other Projects
![Page 101: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/101.jpg)
Brief Description
Concrete Batching Plant on Barge.
Kuwait Causeway
Other Projects
![Page 102: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/102.jpg)
Kuwait Causeway Offshore Piling
Other Projects
![Page 103: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/103.jpg)
Concrete Batching Plant on Barge. Kuwait Causeway
Other Projects
![Page 104: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/104.jpg)
Pile Driving
Other Projects
![Page 105: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/105.jpg)
Temporary Bridge
Other Projects
![Page 106: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/106.jpg)
Temporary Bridge Piling
Other Projects
![Page 107: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/107.jpg)
Brief Description
Marine Piles
Other Projects
![Page 108: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/108.jpg)
Brief Description
Screed Frame. Morocco
Other Projects
![Page 109: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/109.jpg)
Brief Description
Quay Wall Ruwais UAE
Other Projects
![Page 110: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/110.jpg)
Brief Description
Dubai Palm Island, Rock Armour
Other Projects
![Page 111: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/111.jpg)
Brief Description
Dubai Creek, strengthen
quay wall with sheet piles and
ground anchors
Other Projects
![Page 112: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/112.jpg)
Brief Description
Abu Dhabi Quay Wall
Other Projects
![Page 113: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/113.jpg)
Brief Description
St. Croix Bridge
Other Projects
![Page 114: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/114.jpg)
Brief Description
Cofferdams examples
Other Projects
![Page 115: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/115.jpg)
Jebel Ali DubaiOther Projects
![Page 116: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/116.jpg)
Jebel Ali Dubai
Ports
Muscat Omani
Dublin Cork
![Page 117: Sea Port Construction, Project Execution Plan](https://reader031.fdocuments.us/reader031/viewer/2022031604/58f9ad7a760da3da068b98a5/html5/thumbnails/117.jpg)
Production by David H Moloney