SCOPE OF WORKS

CONSULTING 14210.R05Geotechnical offshore investigations and consulting, Roskilde Fjord connectionFrederikssund – Elverdam

SEPTEMBER 2014

Page 2: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

MARINE GROUND INVESTIGATION TECHNICAL SPECIFICATIONS 1. GENERAL PROJECT INFORMATION AND PREREQUISITES 1.1 Introduction

The Danish Road Directorate (Vejdirektoratet) is hereafter referred to as VD, while the Roskilde Fjord Link (Roskilde Fjordforbindelsen) is hereafter referred to as the ‘Project’. A major part of the project is the Roskilde Fjord High Bridge, a 1360m long bridge crossing the fjord. This document provides the scope of the geotechnical investigations required for evalu-ating the design and construction of the foundations for the High Bridge. Most of the in-vestigations will be carried out offshore. This document should be read together with the “Provisions applicable to contracts and tenders (BUT)” and the following Contract Doc-uments: A. Bill of Quantities (TBL) B. Method of Measurement (TAG) C. Scope of Works (YB, this document) D. Management and Cooperation (Styring og Samarbejde) E. Special Conditions for Advisory Services (SBR) F. Drawings Appendix (Tegningsbilag) G. Factual Reports of Previous Ground Investigations (Datarapporter)

As the geological and geotechnical conditions along the bridge alignment are known on-ly approximately, the objective of this campaign of geotechnical field and laboratory in-vestigations is to establish the geological and geotechnical situation and to identify the geotechnical design parameters which are needed for evaluation of different foundation alternatives. The final geometric and structural configuration of the bridge (span, width etc.) have not been decided yet so it may be necessary to modify and/or complement the present scope of investigations with additional field and laboratory investigations post tender award. This specification is based on a short span pier layout and as such the investi-gations locations herein are a possible upper-bound option – that is, the design option which requires the greatest number of foundation elements and thus investigation loca-tions. Should the alternate High bridge option be selected by VD, the scope of works may reduce. The requirement for a reduction of the scope will be subject to confirmation by VD.

Page 3: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

The following documentation has been supplied in the Drawings Appendix and in Con-tract Document G to provide Contractors with additional information: • Bathymetric drawing • Conceptual ground model drawing • Factual reports of previous ground investigations These documents have been provided for information only and the Contractor should not rely on the information contained within. It is noted that the Project mostly falls in Natura 2000 areas.

1.2 Basis The purpose of this document is to describe the services the site investigation contrac-tor should expect to provide and to specify certain requirements to be met by the site in-vestigation contractor, hereafter referred to as the ‘Contractor’. This document address-es the geotechnical investigations needed for the design of the bridge pier foundations offshore and onshore as well as the associated abutments. The services described in the following sections are scheduled to be performed during the period 2014 - 2015. The services to be provided comprise geotechnical investigations for the bridge founda-tions in the design of the Roskilde Fjord High Bridge.

1.3 The Objective of the Geotechnical Investigations This section presents a description of the scope of the offshore and onshore geotech-nical field and laboratory investigations to be completed for the High Bridge section of the Roskilde Fjord Link project. The proposed investigations are necessary to acquire data on which to base the pier and abutment foundation design and choice of founda-tion type, dimensioning, selection of construction process and operational integrity of the High Bridge structure. The data required includes site-specific information on: • Geological soil and rock formations, stratification and variability. • Geotechnical soil classification and index properties. • Soil strength, deformation and consolidation characteristics. • Rock strength and deformation characteristics.

1.4 Scope of Geotechnical Investigation The scope of the geotechnical investigation program, discussed in Section 4 has been developed to assess the vertical and horizontal variability of the seabed soils and to es-tablish the geological origin of soil and rock formations.

Page 4: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

The full Scope of Works and the obligations of the Contractor are to be ascertained by reference to the Contract Documents as a whole. The following is an overview of the scope: • Liaison with the relevant Authorities and Statutory Authorities as necessary to ob-

tain permits and licences to allow the works to be completed. • Survey fieldwork locations • Field investigations: borings for core recovery, downhole geophysical investiga-

tions, soil and rock sampling and standard/cone penetration tests including pore water pressure dissipation test.

• Routine laboratory testing: soil classification testing and determination of index properties.

• Advanced laboratory testing: determination of strength, compression and consoli-dation properties.

• Data reporting of results of geotechnical technical testing. • Provision of draft logs and factual reports • Provision of AGS data. The water depth and environment of the fjord may require specialised equipment, and the tenderer must select the appropriate equipment and methods to achieve the speci-fied investigation outlined herein. The investigation has been designed with the aim of providing factual information for the study and evaluation of different foundation alternatives. As the design of the bridge structure has not been finalised, the design solution with the greatest number of founda-tion elements was selected and the scope of the geotechnical site investigation de-signed accordingly.

1.5 Time Schedule for Investigations A Gantt chart with the programme of fieldworks, laboratory testing and reporting is en-closed in Appendix B. There are two Contract Milestones for the project which are:

• Start date scheduled for borehole drilling, in-situ testing etc (ID 4 on the at-tached programme)

• Delivery of final factual report (ID 11 on the attached programme) It is envisaged that the offshore geotechnical investigations shall be started by Novem-ber 2014 and finished by January 2015. Particular attention should be paid to potential access / egress issues and water depths in the fjord.

Page 5: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

The available time period for the investigations shall be considered in the submission when planning the offshore campaign, selecting vessels, platforms and testing equip-ment, as well as the type and number of investigation units required to complete the campaign in time. A total of 20 investigation locations are planned. These allow for one field investigation per high bridge foundation element: 18no. piers, and 2no. abutments.

1.6 European Standards on Geotechnical Investigation and Testing Geotechnical investigations and testing shall be performed according to the following standards: • EN 1997-1:2004. Eurocode 7- Geotechnical design – Part 1: General Rules. In-

cluding Danish NA:2013. • EN 1997-2:2007. Eurocode 7- Geotechnical design – Part 2: Ground investigation

and testing. Including Danish NA: 2013. • EN ISO 14689-1:2003 “Geotechnical investigation and testing. Identification and

classification of rock. Identification and description” • EN ISO 22475-1:2006 “Geotechnical investigation and testing - Sampling methods

and groundwater measurements” • DGF Bulletin 1 “A guide to engineering geological soil description” • DGF Bulletin 14 “Felthåndbogen” • BS 7022:1989 Guide to Geophysical Logging of Boreholes for Hydrogeological

Purposes A list of applicable CEN ISO/TS Geotechnical Investigation and Testing Standards is provided in Appendix A.

1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance document prepared by Technical Committee 1 of the International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE) gives useful information on executing near-shore and/or off-shore geotechnical projects “Geotechnical & Geophysical Investigations for Offshore and Nearshore Developments”, September 2005.

1.8 Investigations Offshore VD will determine access to the site and location of all exploratory holes. The final bore-hole locations may change on site from those appearing in contract documents. Final locations will be advised by the Engineer. A notice period of five working days before entry is required.

Page 6: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

The order of exploratory holes shall be decided by the VD Representative on site. Once an exploratory hole has commenced, it shall be completed continuously and without un-due delay. The Engineer’s approval is required before commencement and backfilling of each exploratory hole. Geotechnical investigations can be performed from purpose-built drill ships or geotech-nical jack-up platforms. This document does not address the specific types and re-quirements of vessels or drilling platforms needed for the implementation of the pro-posed investigations. Tenderers should include details of their proposed vessels in their tender return. It is anticipated that the primary method for drilling boreholes in water will be with a Ge-obor S rig, for example on a jack-up drilling platform. Generally, the water depth in the fjord ranges between 1 and 8 m deep and the equipment chosen should reflect this. Particular care should be taken in areas of soft soils (for example, gyttja anticipated be-tween approximately Ch 6+200 to 7+100) where leg penetration could be very high and appropriate equipment should be chosen to account for this. Platforms should be capable of supporting both rotary and percussive drilling tech-niques, high-quality sampling and in-situ testing. When selecting a jack-up unit, consid-eration should include predicting leg penetration, to ensure that the rig has sufficiently leg length, and that the legs will not punch through during installation. This is of particu-lar importance in areas where soft soils or thin, hard layers overlying softer soils are an-ticipated. Selection of the vessel or drilling platform is to be made by the contractor, with special consideration given to the above mentioned environments. Additionally, the water depth on the west side of the fjord is low (approximately 1m or less) for up to 200m away from the shoreline, and the contractor must ensure that the selected vessel is capable of car-rying out the investigation in shallow waters. Ships conducting coring, or in-situ testing operations, must maintain station vertically above the core/test site. Where water depths are limited and the sea is moderately calm, spud legs may be suitable for keeping a barge in position.

1.9 Positioning System Modern GPS with high accuracies of ±0.01m in X, Y and Z directions (which can be achieved by including signals from existing reference stations, correcting local errors) is required. Such systems are named Differential Global Positioning System (DGPS). In order to limit the necessary number of radio frequencies and for improved reliability and accuracy, it is recommended to use a project specific Global Navigation Satellite System (GNSS) with four reference or relay stations around the project area. These sta-tions would be transmitting signals to a control centre that is transmitting Real Time Kinematic (RTK) data to surveyors working in the project area.

Page 7: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

The approximate coordinates of the investigations locations are provided in Drawing no. 2 of the Drawings Appendix (Tegningsbilag). The final investigation locations shall be determined by the Contractor within a 6m radius from the coordinates provided in Draw-ing no. 2 of the Drawings Appendix (Tegningsbilag).

1.10 Real-time Data Provision The contractor must have the capability of providing the in situ testing data from CPTu in real-time for the Engineer to view online. Borehole field logs must be scanned and emailed to the VD Representative and the Engineer at the end of each working day.

1.11 General conditions The Contractor is required to provide and maintain adequate traffic safety and man-agement measures to safeguard the public and site works both during mobilisation and execution of the site investigation works. Measures shall be taken in accordance with any statutory requirements and recommendations contained in the other Contract Doc-uments and any amendments thereto. Where the circumstances of any particular case are not covered by the recommenda-tions, proposals for dealing with this situation should be issued by the Contractor for the approval of the VD Representative a minimum of one week before it is proposed to car-ry out the works. The Contractor shall provide all lighting, safety barriers, fencing, hand-rails, notice-boards, watchmen and other things necessary to ensure the protection and security of the works and the public, throughout the duration of the Contract. The Contractor is responsible for assessing and providing all necessary support craft, safety barriers, fencing, hand rails etc. to ensure the safety of its operatives and preven-tion of equipment falling into the sea. The pontoon / barge should be capable of safely operating in the depths of water that are shown in the bathymetric survey in Drawing no.2 of the Drawings Appendix (Te-gningsbilag). The contractor should note that this bathymetric survey is only indicative of the seabed at the time survey and no guarantee for its accuracy is provided. A manned safety boat with rescue equipment shall be in attendance whenever personnel are pre-sent on the pontoon / barge. The Contractor shall provide the name and contact number of a member of staff who can be contacted (24 hours) by VD in the event of an emergency in connection with the works. The Contractor’s Project Leader shall be able to take mobile phone calls from the VD Representative and the Engineer during working hours for the entire duration of the Services. Drilling shall be stopped at any depth at which the Engineer shall be satisfied that suffi-cient information has been obtained about the subsurface conditions.

Page 8: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

VD reserves the right to discontinue the work at any time, if in the opinion of the Engi-neer or the VD Representative, the depth is likely to be excessive or if the sub-surface conditions are such that further drilling would not be beneficial to the project. The Contractor shall obtain approval to proceed from the VD Representative or Engi-neer prior to moving the drilling/investigation equipment to another investigation loca-tion.

1.12 VD Representative’s Facilities The VD Representative’s Facilities are described in the Contract Document ‘Styring og Samarbejde’.

1.13 Transport Transport is described in the Contract Document ‘Styring og Samarbejde’.

1.14 Marine Safety Requirements Marine Safety Requirements are described in the Contract Document ‘Styring og Sa-marbejde’.

1.15 Contractors Professional Attendance The Contractors Professional Attendance requirements are described in the Contract Document ‘Styring og Samarbejde’.

2. DESCRIPTION OF PROJECT Roskilde Fjord Link at Frederikssund is a dual carriageway highway which includes a high bridge over Roskilde Fjord (henceforth ‘the Fjord’), as described in the Project’s Environmental Impact Assessment (EIA) Report under solution S1. The offshore investigation specified herein investigates the crossing of the fjord by the proposed High Bridge. The High Bridge has a length of approximately 1,360m between the abutments and a clear navigation height of 22m above the water.

Page 9: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Figure 1 - Aerial view of one of the design solutions considered for the EIA highway scheme in the area of the Fjord [Rambøll EIA 2009, 2010 and 2013]

2.1 Bridge

In Figure 2, a representative section of the 1,360 m long bridge is shown, indicating an assumed distance between piers of 73.5 m: this corresponds to “Option 2”. There are two options currently under consideration: Options 1 and 2 which have pier spans of 82m and 73.5m respectively.

Figure 2 - Elevation view of Option 2 for High Bridge, with spans of 73.5m The geotechnical site investigation has been scoped based on the above design option with the greatest number of foundation elements required and the scope of the ge-otechnical site investigation designed accordingly.

2.2 Bridge Foundations It is generally expected that the bridge piers will be founded on either floating or end bearing pile groups of a number of piles potentially ranging between 12 and 45. The pil-ing technology has not been selected yet. The final design has not yet been established; however the two options being consid-ered have, respectively, 16no. piers with 82m spans or 18no. piers with 73.5m spans.

Page 10: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

The foundations are estimated to have an area ranging between 60 and 100m2 each, and the foundations and piers are subject to ship impact loads of 5MN applied at 1.5m DVR90.

2.3 Abutment foundations The abutment designs have not been finalised, however both the eastern and the west-ern abutment of the bridge are anticipated to be on shallow foundations, based on the preliminary investigations and calculations carried out. Further investigations in the area are necessary and therefore these have been incorporated into this Geotechnical Inves-tigation.

3. PREVIOUS INVESTIGATIONS Several geotechnical and geophysical investigations have been carried out in the area of the fjord for this project. These are enclosed as Contract Document G (Datarapport-er) and are summarised in the following sections. These documents have been provided for information only and the Contractor should not rely on the information contained within.

3.1 Geotechnical investigations The known scope of activities undertaken by COWI comprised among others: borehole drilling, in-situ tests (field vane tests (FVT), SPTs and CPTs), geophysical logging, soil sampling (both disturbed and undisturbed), groundwater sampling for chemical analysis, standpipe installation for groundwater monitoring purposes, limited scope of laboratory classification tests, and pumping tests. Previous investigations include the following: a) COWI: Set of the documents dated 2009 (see Contract Document G). These were

supplemented with a number of older archive borehole logs sourced from previous investigations within the project area.

3.2 Geophysical Surveys

The purpose of geophysical survey undertaken to date has been to document the na-ture and elevation of the seabed and any objects thereon. In addition, geophysical in-formation can help establishing general geological conditions by identifying various soil and rock layers. Furthermore, these surveys contributed to archaeological and environ-mental information. The implementation of geophysical measurements and the results are described in the report “Roskilde Fjord Connection. Geophysical Seabed and Deep Seismic Survey 2014”, Roskilde Fjordforbindelsen. Rambøll, Rev 1, 27-05-2014 (see Contract Document G). The seismic investigations were limited to water depth of at least 1 m and comprised: • Bathymetric measurements using multibeam echo sounder (MBES)

Page 11: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

• Establishment of seabed using Side Scan Sonar and localisation of abnormal ob-jects at sea bottom (for instance cables).

• Sub Bottom Profiler to map the top of glacial sediment and internal post-glacial layers

• Magnetometer to detect anomalies • Seismic investigations with GEP Sparker.

For details about the investigation methods, reference is made to Rambøll Factual Re-port enclosed in Contract Document G (Datarapporter). The results of the investigation were summarized as follows.

3.2.1 Bathymetry The area covered by the main lines was limited to areas with a seabed depth of -1m DVR90 or deeper. Sea bed varies between -1 and -10 m DVR90 within the investi-gated area, however based on other investigations it is anticipated to have a greatest depth of approximately -7.5m DVR90. The deepest area corresponds to the N-S running fault through the centre of the Fjord. All depth references are given as m DVR90.

3.2.2 Side Scan Sonar The following soil types were identified: Seaweed, Gyttja with shells, Excavation (uncer-tain sediment type) and Dunes (uncertain sediment type). Two seabed scars were iden-tified and one unknown object. The Dunes identified could be build ups of sand deposits however the sonar indicated the sediment is similar to Gyttja with shells, thus the uncertainty in sediment type. Simi-larly, the Excavation is delineated by an increase in water depth and thus reveals deep-er sediments not possible to classify by side scan sonar.

3.2.3 Magnetometer The magnetometer detected anomalies on the seabed however did not provide infor-mation as to their origins other than to determine their likelihood of being geological.

3.2.4 Seismic Profiling In general, the subsurface in the study area is characterized by glacial deposits at depths from -5 to -20m DVR90 which are covered by postglacial marine deposits. The limestone surface was interpreted and showed some good correlation with the boreholes carried out within the fjord, however it determined the depth to limestone in the centre of the fault as approximately 10m lower than identified in boreholes.

Page 12: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

3.3 Geological Model Based on past geological, geotechnical and geophysical investigations, the following geological model has been established. It should be noted that the below given descrip-tion of soil layers is based on limited information obtained from locations in the vicinity of the proposed bridge structure and must therefore be interpreted with care. It is expected that the site investigation contractor is familiar with Danish geology and has past experience in working in the expected soil types. The preliminary Ground Conceptual Model is enclosed as Drawing no. 2 of the Draw-ings Appendix (Tegningsbilag), and combines information from previous investigations including the geophysical survey. A summary of the geological strata is provided below. The information below is based on data currently available and is expected to be updat-ed based on the results of this investigation. The information below and the preliminary Ground Conceptual Model have been pro-vided for information only and the Contractor should not rely on the information con-tained within and below.

3.3.1 Limestone (prequaternary) The limestone surface along the proposed alignment of the Project is influenced by the Fjord fault where it causes a depression in the limestone surface. Within the fjord itself, the limestone surface reduces from approximately level -9.2m DVR90 to level -43.0m DVR90. Experience on other projects suggests that the Danish limestone is mainly composed of a carbonate mud with a variable content of flint either as nodules or layers. Its mechani-cal properties are largely determined, on a site specific basis, by the degree of indura-tion and the degree and character of fracturing. The degree of induration is an expres-sion of the degree of calcite cementation and silicification.

3.3.2 Glacial Deposits (quaternary) Moraine sediments were deposited in the form of clay, silt, fine to coarse sand and gravels. The thickness of these deposits range from 10 up to 25m on both sides of the Fjord, with greater variability observed within the Fjord itself. The recognised thickness of glacial deposits in the Fjord reaches about 1m in the cen-tral part (the lowest thickness) while in the eastern side of the Fjord, probably near the Roskilde Fjord fault, it reaches nearly 25m.

3.3.3 Late-glacial deposits When historically the Fjord was a large melt river, considerable amounts of late-glacial sediments in form of sands, gravels and locally clays and silts, were deposited. There-fore late glacial deposits were encountered in the Fjord area, the thickness of which var-ies from approximately 1m up to 12m.

Page 13: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

3.3.4 Post-glacial Deposits Post-glacial deposits in the form of freshwater gyttja (mud), peat and shellbanks are present across the fjord. Within the post-glacial shellbanks, muds and peats, sands and clays were also deposited. The thickness of these post-glacial deposits varies between 1 and 10m. The lowest lev-el of post-glacial deposits (where they exist) is approximately -15m DVR90.

3.4 Geotechnical Parameters The previous investigations, along with historical data and literature on the soil types in the area, have been used to establish preliminary geotechnical parameters for the ma-terials present. In most cases, direct calculation or assessment of the parameters was not possible, and have been estimated based on published correlations for the particu-lar or similar soil types. These geotechnical parameters have been provided for information only and the Con-tractor should not rely on the information provided below.

Page 14: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON August 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Table 1 - Preliminary Geotechnical Parameters

Water content

Plasticity index

Bulk unit weight

Hydraulic conductivity

Friction an-gle

Effective Cohesion

Undrained shear strength

Young’s modulus in drained conditions

Young’s modulus in undrained conditions

Preconso-lidation pressure

Material w PI γ k ϕ’ c’ cu E’ Eu σ’p

[%] [%] [kN/m3] [m/s] [°] [kPa] [kPa] [MPa] [MPa] [kPa]

Topsoil 12-38 - 18*** - 25*** - 16-17 - 10*** -

Made Ground 11-16 - - - - - - - - -

Peat 50-500* - 10-12* 10-3 to 10-2* - - 15-20* -

Gyttja 48-289 - 12-16* 10-6 to 10-5* 25-30* - 8-9 - - -

Shell Material - - - - - - - - - --

Post-glacial sand

8.5 - 17-20 10-4* 32-36 - - 13-23 - -

Late-glacial Sand

6-28 - 20.7 10-5 to 10-1* 31-37 - - 20-84 - -

Page 15: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Water content

Plasticity index

Bulk unit weight

Hydraulic conductivity

Friction an-gle

Effective Cohesion

Undrained shear strength

Young’s modulus in drained conditions

Young’s modulus in undrained conditions

Preconso-lidation pressure

Material w PI γ k ϕ’ c’ cu E’ Eu σ’p

[%] [%] [kN/m3] [m/s] [°] [kPa] [kPa] [MPa] [MPa] [kPa]

Late-glacial Clay

12-24 - 19.4 10-6 to 10-4* 33 (4<PI<7%)** 22 (20<PI<43)**

0 (4<PI<7%)** 7.2 (20<PI<43)**

72 36-69 45-86 -

Glacial Co-hesive Till

9-22 13.9 15.8-23.2 (21.5)****

10-7 to 10-5* 33 (4<PI<7%)** 22 (20<PI<43)**

0 (4<PI<7%)** 9.0 (20<PI<43)**

90 45-121 57-151 400-600

Glacial Co-hesionless Till

2-34 - 16.7-22.8 (20.5)****

- 29-39 - - 32-100 - 400-600

Limestone - - 21 (+) 45 100 - 400 - -

(*) value given in the COWI Technical Note supporting Phase 2; (**) value based on Sorensen & Okkels (2013); (***) provisionally assumed on the basis of experience; (****) suggested value; (+) highly dependent on the degree of fracture etc.

Page 16: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON August 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

3.5 Summary of Geological Model The geological formations along the high bridge route can be summarized as follows: • Gyttja is generally found across the fjord seabed surface at thicknesses from near

zero up to 10m. • Shell banks are found on the western side of the fjord with thicknesses up to 5m. • Post- and late-glacial deposits of sand, silt and clay are found in depths up to ap-

proximately 10m. • Below, under gyttja and sand, there are glacial layers, mostly in the form of glacial

till (moraine), but also in the form of melt water sand, silt and clay. The glacial lay-ers are highly variable in composition.

• At -15m to -45m DVR90, limestone is encountered. The upper layer of the lime-stone is likely to be weathered.

A graphical representation of the preliminary Ground Conceptual Model is provided in Drawing no.2 of the Drawings Appendix (Tegningsbilag).

4. PROGRAMME OF GEOTECHNICAL INVESTIGATION This section describes geotechnical field and laboratory tests to be carried out. Ge-otechnical investigations shall use a combination of the following techniques: • Coring and sampling. • Down the hole geophysics in the limestone. • In-situ testing for accurate stratification and determination of engineering parame-

ters: – CPTu in all investigation locations, seismic flat dilatometer testing, Field Vane Test (FVT) and SPT where appropriate

• Routine laboratory testing where index properties and engineering parameters shall be determined.

• Advanced laboratory testing for determination of strength and deformation proper-ties.

• An indicative graphical programme of testing in each borehole is provided in Ap-pendix C and the final schedule of testing will be decided on site in agreement with the Engineer and VD Representative.

4.1 VD Representative

VD reserves the right to send an Engineer or Representative to attend the data collec-tion in the field / on board and to observe the progress and continually in cooperation with the Contractor to optimize data quality or to take the decision to put the investiga-tions on hold due to weather, waves or other circumstances beyond the Contractor’s control. VD reserves the right to discard tests that are sub-standard and have them redone at no cost.

Page 17: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

4.2 Particular borehole requirements As the method of drilling will be proposed by the Contractor, a number of particular re-quirements have been highlighted here, relevant to different types of encountered soil/rock formations. The relevant information below will be valid based on the final method chosen. Boreholes over water shall be advanced to penetrate the limestone bedrock by 10m or the depth anticipated in Table 2 has been reached. Boreholes on land shall be ad-vanced to penetrate the limestone bedrock by 5m. The minimum nominal casing diam-eter shall be 200 mm. At ground level before boring commences, the initial casing di-ameter shall be sufficiently large to ensure that the borehole can be completed to its scheduled depth. Rotary core drilling shall produce cores of circular cross section not less than 102mm diameter throughout the core length. The type and state of drill bit, feed rates and management of the drill shall be such that 100% core recovery in any single run can be obtained where the condition of the rock permits. Core recovery less than 90% in any drill run will not normally be acceptable unless the Engineer is satisfied that a greater recovery than 90% is impractical under the prevailing conditions. The En-gineer is to be informed when core recovery is less than 90%. When any recovery is less than 90% from a drill run then the next drill run shall be re-duced to 50% of the previous length, unless otherwise agreed by the Engineer, and so on down to a minimum length of 0.5 m. This procedure will be followed during drilling. Open hole “ODEX” or rotary percussive drilling may be carried out where core drilling proves ineffective or is instructed by the Engineer. Where required by the Contract, or where requested by the Engineer, SPT's shall be carried out. All coring rigs shall be capable of performing SPTs. Depth shall be indicated on the core box by durable markers of a type approved by the Engineer at one metre intervals and at all significant changes of strata and at the end of each drill run. Where there is failure to achieve recovery, the core boxes shall be la-belled to indicate what depth and quantity the core loss occurred. The location, explora-tory hole number and the depth of coring relating to the contents of each box shall be clearly indicated in indelible ink on labels, inside the box, on the top and on each end of the box. All markers and labels shall be such as to facilitate subsequent photography. Boreholes on land shall be backfilled with cement/bentonite grout. All cores shall be transported to the Contractors premises and stored in a protected, se-cure, dry storage space for a minimum period of 12 months after completion of the final factual report. The cores shall be stored in such a fashion that all cores shall be easily accessible for viewing. After this period the Contractor shall carefully deliver all cores to VD’s premises at a location directed by the VD Representative.

Page 18: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Access for the inspection of the cores by the VD Representative or Engineer shall be provided by the Contractor for the duration of the Contract. All core boxes used to store core shall become property of VD. In addition to the requirements of the Specification, the Contractor shall photograph cores where required in fresh condition prior to logging, preferably on the day of recov-ery, but always within a maximum of 72 hours of recovery. All cores shall be photo-graphed with a colour and grey scale (e.g. Kodak), appropriate liner scale and depth no-tations. Each core box shall be represented on a 175mm x 125mm sized photograph. Where boulders, rock and other hard strata are encountered, percussion boring using a chisel shall take place in an attempt to penetrate the obstruction and break it up suffi-ciently for fragments to be recovered and identified. A detailed record shall be kept of the time spent chiselling and the rate of penetration through the obstructing object. The maximum time spent chiselling at any one obstruction shall be two hours unless ex-pressly permitted by the Engineer or VD Representative. Where artesian water is encountered the Contractor shall immediately inform the Engi-neer and shall attempt to contain the artesian head by extending the casing above the existing ground surface by a maximum of 1 m. Where an artesian head greater than 1 m above ground surface is encountered the Contractor shall cap the boring and fit a pressure gauge and by-pass to measure the pressure head of the artesian water.

4.3 Identification of Testing Methods The following abbreviations will be used in this document and the Bill of Quantities (Til-budsliste) to identify field investigation methods: BH Borehole. CPT Cone Penetration Test. CPTu Cone Penetration Test with pore water pressure measurement (Piezo-cone

Penetration Test). sDMT Seismic Flat Dilatometer test. RQD Rock Quality Designation. SPT Standard Penetration Test. VST Lab Vane Shear Test. FVT Field Vane Test The following abbreviations will be used in the document to identify laboratory investiga-tion methods: CID Isotropically consolidated, drained triaxial compression / extension. CIU Isotropically consolidated, undrained triaxial compression / extension. UU Unconsolidated, undrained triaxial compression. CAU/CK0U Anisotropic/K0 consolidated undrained triaxial compression. CAD/CK0D Anisotropic/K0 consolidated drained triaxial compression. DSS Direct simple shear test. ILOed Incrementally Loaded Oedometer test

Page 19: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Planning, execution and documentation of field and laboratory tests shall comply with Eurocode 7 – Part 2, incorporating DK NA: 2013. It is important that all equipment used during the course of the investigations is in excel-lent operating condition. All electronic and mechanical devices shall be calibrated prior to their use and relevant certificates provided to the VD Representative.

4.4 Geological Profiles The geological profiles which can be expected have been described in Section 3.3. It is important that appropriate investigation methods (or a combination of different methods) are used to obtain the required information.

4.5 Test Locations and Testing Depth The final layout of the bridge structure and thus of the foundation locations is not decid-ed yet. Therefore, it is proposed that offshore investigations be carried out for the bridge structure according to Drawing no. 2 of the Drawings Appendix (Tegningsbilag) and the arrangement depicted in Figure 3. Based on the previously performed investigations discussed in previous sections, the following information has been interpreted for the borehole of this GI, cf. Table 2. The identification of investigation points (ID No.) is based on the bridge span width as shown in Figure 2. Table 2 - Estimated seabed level, water depth, depth to top of limestone and soil layer thickness. Borehole ID

Estimated Seabed level [mDVR90]

Estimated Water depth [m]

Estimated Level of top of Limestone [mDVR90]

Estimated Soil Layer Thickness [m]

Required penetration of limestone [m]

BHA1 land boring 0 -20 23 5 BH1 land boring 0 -21 23 5 BH2 -1 1 -21 20 10 BH3 -1 1 -22 21 10 BH4 -1 1 -22 21 10 BH5 -1 1 -23 22 10 BH6 -2 2 -25 23 10 BH7 -3 3 -30 27 10 BH8 -6 6 -35 29 10 BH9 -5 5 -38 33 10 BH10 -5 5 -41 36 10 BH11 -4 4 -43 39 10 BH12 -4 4 -35 31 10 BH13 -4 4 -28 24 10 BH14 -3 3 -26 23 10 BH15 -2 2 -21 19 10 BH16 -1 1 -16 15 10 BH17 land boring 0 -15 18 5

Page 20: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Borehole ID

Estimated Seabed level [mDVR90]

Estimated Water depth [m]

Estimated Level of top of Limestone [mDVR90]

Estimated Soil Layer Thickness [m]

Required penetration of limestone [m]

BH18 land boring 0 -15 22 5 BHA2 land boring 0 -14 21 5 It should be noted that this information is given for guidance only and actual values may deviate from those given in Table 2. At each investigation location, the sampling and testing shall be carried out according to the following tentative scheme: • Identification of test location. • Determination of position and elevation. • Start and termination time of each test. • Measurement of water depth (to seabed). • Standard penetration tests (SPT). • Static penetration tests (CPTu) with two pore water pressure dissipation tests per

CPTu location. • Seismic flat dilatomer tests (sDMT) at selected locations. • Boring and/or coring. • Sampling of soil and/or rock. As stated above, all tests shall be performed according to most recent versions of EN standards, see Appendix A, “CEN ISO/TS Standards - Geotechnical Investigation and Testing”. In Figure 3, the tentative arrangement of tests in each test location is shown.

Figure 3 - Arrangement of investigation locations.

Page 21: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

4.6 In-situ Testing It is important that all test data are evaluated and interpreted on site in order to verify that the anticipated data have been obtained. All data shall be stored electronically and made available in AGS format. Details for each test are provided below.

4.6.1 PiezoCone Penetration Testing (CPTu) In general, and unless not practicable, it is recommended to start investigations in each test location with the Seabed CPTu test. The tests are likely to penetrate through the soft and medium stiff soil layers. The minimum depth of cone penetration shall be to the weathered limestone. If refusal is reached at shallower depths than required, in the glacial till for example, the contractor shall carry out the borehole for that location. The contractor will then carry out a downhole CPTu, the termination depth of which will be informed by the depth to bedrock determined from the borehole. The downhole CPTu tests will be started every 1.5m. The contractor shall check and record the base of the cone following each of these pushes and record any residual material attached to it as an indication of the ter-mination material, the cone shall be cleaned after each test. The rated capacity of the Seabed and downhole CPT equipment shall be 20 tonnes un-less otherwise agreed. Two pore water pressure dissipation tests shall be carried out per CPTu location to es-tablish the ground water conditions and pore water pressure distribution in different soil formations. Considering the moderate water depth it is considered that conventional penetration testing equipment can be used at most test locations. However, specialized CPT equipment has been developed for off shore investigations at greater water depth. Ref-erence is made to the ISSMGE TC 1 Guidance document mentioned in section 1.8.

4.6.2 Standard Penetration Tests (SPT) Standard Penetration Tests will be carried out every 0.5m at the locations of the land boreholes. These will be carried out to a depth of 20m, or may be terminated at a shal-lower depth upon instruction from the Engineer. They will only be carried out in cohe-sionless material.

4.6.3 Field Vane Tests (FVT) Field Vane Tests will be carried out every 1m in cohesive material encountered during the investigations. Reference is made to DGF Bulletin 14 “Felthåndbogen” for the pro-cedure to be followed for the execution of this test.

Page 22: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

4.6.4 Seismic Flat Dilatometer (sDMT) Flat dilatometer testing with shear wave velocity measurements will be carried out at se-lected locations on land and/or over water. An indicative location of these tests is shown in the graphical borehole programme provided in Appendix C. Reference is made to ISSMGE TC 16 Guidance document on “The Flat Dilatometer Test (DMT) in Soil Investigations” (2001) and to ASTM D 7400 -08 “Standard Test Methods for Downhole Seismic Testing” for the procedures to be followed for the execu-tion and reporting of these tests. An underwater seismic hammer shall be deployed for the generation of the energy source at investigation locations over water.

4.7 Downhole geophysical logging Downhole geophysical logging in the limestone is required in all boreholes in accord-ance with international best practise and BS 7022. A minimum of the following data shall be collected: • Dummy probe to confirm depth and stability of boring • Natural gamma • Density / porosity • Focussed resistivity • Calliper • Temperature / conductivity • Flow logs

4.8 Soil and Rock Sampling 4.8.1 General

Soil and rock samples shall be obtained from each geological formation in order to pro-vide representative information of soil and rock layers. Depending on soil type, undis-turbed (cohesive soils) and disturbed soil samples shall be obtained. The preparation for, frequency, and method of taking samples, together with their size, preservation and handling shall be in accordance with the recommendations of DGF Bulletin 14 “Felthåndbogen” and the requirements of EN ISO 14688-1. The Contractor shall supply to the Engineer, on a daily basis, a list of the samples taken from each exploratory hole. The information shall be presented in a table format with the sample details (BH, depth, type etc.) given in a vertical column on the left hand side of the table and a list of possi-ble laboratory tests given in a horizontal row at the top of the table. The laboratory tests to be undertaken on all collected samples will have to be agreed upon with the Engi-neer.

Page 23: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Disturbed and high quality samples are required to be taken from the boreholes for the purposes of geotechnical testing. In boreholes alternating samples and bulk samples at 1 m intervals will be recovered in the sea bed sediments and fine grained till deposits starting with a bulk sample at the top of the deposit. Small disturbed samples to be tak-en at each change in soil type or consistency and with each bulk sample in cohesive soil. Grab samplers are one of the most common methods of retrieving soil samples from the seabed surface. Grab samplers can be used to recover samples of most seabed soils, although care is needed in selecting the right size unit for the task. The information they provide, although coarse, can be applied in a number of applications such as: • Bulk sampling for seabed material identification • Environmental sampling • Pre-dredge investigations • Soil identification for morphological mapping and verification of geophysical sur-

veys. Grab samples will be taken at each of the offshore investigation locations, within 10m of the bridge centre line. The contractor may select the drilling method and equipment to obtain the specified samples, provided the methodology is outlined in the tender submission. Where artesian conditions are encountered, the Contractor shall inform the Engineer and consult and agree with him the measures to be taken. Samples of seawater shall be taken at locations specified by the Engineer.

4.8.2 Sampling Equipment For the drilling of boreholes, it is recommended that all drilling be carried out with a Ge-obor S rig. Experience in the region would indicate that core samples can be retrieved from the medium to stiff soil deposits as well as the limestone rock. However, where core samples are not retrievable (such as in the very soft top layers of material, or in the gyttja), conventional shell and auger drilling with piston samples is recommended. The sampling equipment shall be to the approval of the VD Representative and the En-gineer. The Contractor shall state in his Tender the make and type of sampler he pro-poses to use. The Contractor shall also state in his Tender the range of soil strengths in which the system proposed can be used. The object is to obtain samples that are as nearly undisturbed as possible. The sample tubes shall be of a minimum length of 600mm and shall have a minimum in-ternal diameter of 100mm (UT100 or equivalent). Tubes shall be made of steel or alu-minium. Plastic lining tubes shall not be used in substitution for steel or aluminium sampling tubes. Tubes should possess a sharp cutting edge and provide suitable inside clearance.

Page 24: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

The interior of each sample tube shall be smooth, clean and resistant to corrosion. The cutting edge and the ring seals of the sampler (if any) shall be inspected for wear or ev-idence of any damage and rejected if worn or damaged. The interior face of the tube shall be parallel and the tube's area ratio (as referenced in EN ISO 22475-1:2006) shall lie in the range 10 to 15%. The tube should be lightly coated inside and out with either petroleum jelly or vegetable oil before use. The Contractor shall state which he intends to use prior to commence-ment of site works. A check shall be made that the various moving parts of the sampler function freely be-fore the sampler is lowered into the borehole.

4.8.3 Supervision When in use the piston sampler or thin-wall sampler shall be under the direct supervi-sion of an experienced technical assistant from the Contractor's staff who is fully expe-rienced in its use. The rig operator may take this role if suitably experienced in the sampling technique involved.

4.8.4 Pushing the Sampler For both piston sampling and thin-wall sampling, accurate measurement of the depth from which each sample is recovered, the length of sampling stroke and the length of sample recovered shall be made and recorded. If an obstruction is met the sampler shall be withdrawn and another sample taken when the obstruction has been removed. Immediately on completion of the sample stroke the sampler shall be withdrawn from the ground and the sample tube shall be separated from the sampler. Precautions shall be taken to ensure that there is no movement of the sample inside the sample tube or other mechanical disturbance. Any distortion or damage of the sampling tube greater than 1mm shall be noted. On the instruction of the Engineer, a hand vane test shall be carried out in the top and bottom of each sample prior to sealing. The Contractor shall push the sampler down to the intended sampling levels if this is practical. The sampler shall be advanced a minimum of 0.30m below the bottom of the boring be-fore sampling commences. The sampler shall be pressed down smoothly and continu-ously whilst the piston is firmly secured so that it remains stationary. The tubes shall be advanced into the clay by hydraulic means in a continual push over a period of between 10 minutes and 30 minutes. The time taken shall be recorded. The sample tube shall be left in the ground for a further 5 minutes and then withdrawn vertically without shear-

Page 25: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

ing the sample base by rod rotation. A means for measuring the exact penetration of the tube and the maximum thrust achieved shall be provided.

4.8.5 Sampling of Soft Soils For recovery and high sample quality appropriate equipment/methods shall be used in soft soils. Unless recovery of a quality Class 1 soils sample in accordance with EC7-2 is possible with a Geobor S rig, conventional shell and auger drill methods with piston sampling or thin walled sampling shall be employed. Samples from piston corers allow for recovery of better quality samples in accordance with EC7-2. Piston samples are to have a 100 mm internal diameter. Sample tubes shall be brand new (unused), made of steel or aluminium, plastic lining tubes shall not be used in substitution for steel or aluminium sampling tubes. The piston sampler shall have a cutting edge of 5º and soil samples shall be at least 300mm long. Piston samples are to be double sealed with wax, adhesive tape and caps after a visual description and vane tests have been undertaken. Piston samples are to be stored and transported in an upright position. Transport containers shall be constructed in such a way that each sample is isolated and padded to minimise disturbance from vibration. Where piston samplers cannot be used, thin walled push-samplers of minimum diame-ter 70mm should be used.

4.8.6 Medium to Stiff Soils (Glacial moraine) In medium to stiff clays, coring is required. Recovery is required to be at least 90%. If core loss is greater than 10% in any run, the subsequent runs’ lengths must be halved. If, after halving the subsequent run’s length core loss is still greater than 10% the sam-pling method may be changed, pending the Engineer’s approval. It may be preferable that sampling is completed with piston samplers. When piston samplers cannot be used, thin walled push-samplers (minimum diameter 70mm) should be used following the criteria outlined in section 4.8.5. When this is not possible, as in dense sand, hammer samplers may be used. Installation by hammering in a shallow water environment may use rods. Wire-line down-hole hammers can be used in greater water depths. Sample hammer blow-counts from such samplers generally do not correlate with SPT data largely due to energy losses. In some cases, such as in boulder clays or soils containing stones and boulders, rock-coring techniques may be necessary.

4.8.7 Rock Coring In the transition zone from soil to rock, it can be expected that rock fragments are en-countered. Also, the top layer of the limestone is likely to be fractured. It is important that rock samples are obtained to a depth of 10 m into the intact limestone layer. It is vi-tal to this project that the weathered/fractured zone of the limestone is sampled and de-lineated.

Page 26: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

If core loss is greater than 10% in any run, subsequent runs must be half the length. Underwater rotary rock corers can be used to recover undisturbed core samples of harder soils and rock, usually in shallow water. In order to recover a high quality and undisturbed core sample, the core tube has to be static. Rotary rock corers are designed as double or triple tube devices where the innermost tube acts as a core liner, the middle tube, if present, acts as a holder and the rotating outer tube carries the hollow drill bit. As the bit cuts down through the soils and rock, the core created passes into the liner in a relatively undisturbed state.

4.8.8 Handling of Soil and Rock Samples The sample handling and laboratory works shall include: Precautions shall be taken to ensure that there shall be no change in the moisture con-tent of the sample after it is obtained. A small amount of melted low melting point wax shall be poured over each end of the sample and a wax sealing disc laid in the wax within 30 minutes of the sample being removed from the ground. When the wax has stiffened more wax shall be added to complete the seal. Any space between the wax and the ends of the sample tubes shall be packed and secure end caps fitted. The sample shall be clearly labelled with the project name, borehole number, sample num-ber and sample depth. The top of the sample shall also be clearly labelled. The Contractor's technical assistant responsible for the supervision of the sampling shall complete a record sheet, such as that included in Table C1. This shall be submit-ted with the driller's daily record sheet. Table C1: Record Sheet

Page 27: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

All samples shall be removed from the site so as to reach the laboratory within four days of being taken: • On-site sample handling according to DGF Bulletin 14 “Felthåndbogen” and EN

ISO 22475-1:2006. • Storage of all samples and sub-samples in temperature-controlled environment

prior to testing. • Geological sample description in accordance with procedure described in DGF Bul-

letin 1. • Sample colour photography from the site borings. • Labelling and preservation of samples chosen for Advanced Laboratory Testing

and for geological dating. • Advanced testing of selected samples as specified by the Engineer. • Transportation/return of remaining sample material from the laboratories to sample

containers and stored at location as instructed. • Immediately after sealing, the sample tubes shall be placed upright in stout wood-

en boxes suitably divided and provided with resilient packing to prevent movement and damage of the samples during transportation to the laboratory. The boxes shall be handled to keep the samples upright until they are removed from the box-es for testing.

• Great care shall be taken to ensure that the boxes containing the samples are pro-tected from jarring, vibration and excessive temperature changes at every stage of transportation and storage.

• Regular reporting of test results. Unused sample material shall be stored for 1 (one) year (frost-free). The samples retrieved from the borings must be handled as follows: • After measurement of the recovery, hammer samples and push samples taken with

Shelby tubes shall be cleaned from drill cuttings. A vane shear test (VST) shall be carried out at each end of the sample, then sealed with plugs.

• Bailer and percussion samples taken with a split spoon shall be transferred to plas-tic bags and sealed.

• After removal from the barrel, core samples shall be immediately transferred to a split liner, cleaned (by removal of drill fluids and cuttings) and recovery can then be determined.

The objectives of laboratory testing are: • Classification of soil and rock type, including chemical attack according to EN 206-

1:2002. • Determination of index properties. • Determination of soil/rock strength. • Determination of soil/rock stiffness. • Determination of compression and consolidation properties of cohesive soils.

Page 28: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Laboratory tests shall be carried out on selected, representative samples. The quality of the samples for testing in the laboratory has a large influence on the reliability of the test results. The quality is determined by the sampling method and environment and the transport and storage conditions. Utmost care shall be applied to avoid sample disturb-ance during transportation, storage and handling.

4.9 Routine Laboratory Testing Laboratory testing for soil classification and determination of index properties shall be performed according to the respective CEN ISO/TS standards, cf. Appendix A. The fol-lowing tables identify which tests shall be carried out on cohesive and granular soils as well as rock samples. All samples shall be handled according to avoid soil disturbance. The contractor shall make provision for the presence of a mobile oven on site for the de-termination of moisture content on recovered samples agreed by the Engineer. Moisture Content and PI laboratory test results from the small disturbed samples are to be submitted to the Engineer on a weekly basis during the fieldwork period.

4.9.1 Cohesive Soils In addition to a visual description of each sample, the following routine tests are envis-aged for cohesive soils and are summarized in the following table: • Bulk density. • Water content. • Atterberg limits. • Clay content (on selected samples). • Particle mass density. • Organic content (loss on ignition). • Carbonate content. • Consolidated Anisotropic Undrained Triaxial compression (with local strain gaug-

es). • Incrementally Loaded Oedometer test. Additional tests, which may be required for selected samples, are: • Determination of undrained shear strength from fall-cone test on undisturbed sam-

ples. • Determination of sensitivity based on fall-cone test (remoulded samples). • Determination of undrained shear strength by laboratory vane test.

4.9.2 Cohesionless Soils In addition to a visual description of each sample, the following routine tests are envis-aged for granular soils: • Bulk mass density. • Water content/Moisture content. • Density index. • Particle size distribution (sieve and hydrometer), presented in grain size curves. • Particle mass density.

Page 29: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

• Carbonate content. • Consolidated Anisotropic Drained Triaxial Compression tests. • Incrementally loaded odometer tests. Additional tests, which may be required for selected samples, are: • Maximum density. • Minimum density. • Direct Simple Shear test.

4.9.3 Rock

In addition to a visual description of each sample, the following routine tests are envis-aged for rock (limestone): • Unconfined compressive strength. • Brazil tests. • Point Load tests. • Dry Density. • Bulk mass density. • Moisture content. • Carbonate content.

4.10 Advanced Laboratory Testing As outlined above, on selected samples from the boring campaign, advanced laboratory tests shall be performed for determining soils deformation and strength characteristics. During advanced testing, samples shall be restored to in situ stress conditions and thereafter loaded to simulate the anticipated stresses. The advanced laboratory tests comprise: • Determination of drained shear strength. • Determination of undrained shear strength. • Determination of compression properties. • Determination of consolidation properties. Detailed testing procedures shall be prepared for each test type and approved by the Engineer prior to start of the respective test. Consolidation and triaxial tests are to be undertaken using water that is chemically simi-lar to the natural pore water in the sample being tested. Full compliance testing and calibration of equipment, newly fabricated and existing, will be required to allow accurate assessment of soil stresses and strains.

Page 30: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

4.10.1 Strength Tests The following types of triaxial tests are envisaged: • CAU/CK0U with pore water pressure measurement on undisturbed cohesive soil

samples with diameter to height ratio of 1:2 and rough pressure heads. • CAD tests on specimens of undisturbed or reconstituted cohesionless soil samples

with diameter to height ratio of 1:2 and rough pressure heads. • UU tests on specimens of undisturbed or reconstituted soil samples with diameter

to height ratio of 1:2 and rough pressure heads. All of the above will be carried out with local strain gauges. Additional tests, which may be required for selected samples, are: • DSS (in constant volume mode or constant normal stiffness mode). • Swelling tests (mainly on high plasticity over-consolidated clay). Strength tests require samples to be consolidated to estimate in-situ stresses. Sample disturbance may be estimated from the void ratio change when consolidating the sam-ples back to the in-situ stresses. Whilst 100mm diameter samples are preferred, carrying out strength laboratory tests on 70mm diameter samples is also considered acceptable.

4.10.2 Compression and Consolidation Tests Compression and consolidation tests shall be carried out on undisturbed samples, using incremental loading (IL) oedometer. The maximum stress level has not yet been determined but is estimated to reach 10 MPa.

5. REPORTING 5.1 Daily reporting requirements

A daily report with a copy for the VD Representative shall be produced daily and shall be available for collection on site by the VD Representative. If the VD Representative does not collect the copy on the site then all copies shall be emailed to an approved list of recipients. The daily reports shall include at a minimum: i) driller‘s records for borehole and drillholes ii) a list of equipment, crews and supervisory personnel on site each day

Page 31: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

i) Drillers Daily Log Drillers daily log shall include: • Drillers name. • Start and completion time and water level at these times. • Depth of borehole at start and completion time. • Depth of casing relative to water level, seepage, in-site testing, borehole. • Blowback and measures to counteract same. • Casing size or sizes. • Addition of water. • In-situ tests. • Samples. • Time (clock time) chiselling and depths, nature of obstruction. • Soil strata depths and descriptions. • Instrumentation details including type, filter, seals and protective cover. • Standing time details, note all standing times to be agreed with the Engineer. ii) Preliminary Borehole Records Preliminary borehole records shall be delivered to the VD Representative and the Engi-neer within one week of completion of the exploratory hole and shall include all of the above and shall incorporate: • The results of the in-situ testing including the factual results e.g. N value = 11 and

factual results are 1, 2, 2, 3, 2, 4. • The results of the visual/manual examinations of samples conducted by the Con-

tractors Geotechnical or Engineering Geologist Representative in accordance with DGF Bulletin 1 “A guide to engineering geological soil description” and EN ISO 14688-1.

• Depths, sample numbers, types of samples. • Co-ordinates as established during setting out by GPS techniques.

5.2 Geo Information System Geo-related information shall be provided in print as well as in digital format. Measure-ment data shall also be provided in an open, user-friendly format (ASCI), which can be used for further analysis and data evaluation. All geo-related information shall be incor-porated in a Geo Information System (Geotechnical database), comprising the Geo Da-tabase and a Geo Archive. This system shall include modern facilities for Internet up-loading, storage, access and searching. The system shall be installed on a server and updated regularly. Access shall be grant-ed according to a permission hierarchy to relevant stakeholders upon request by mail to the system operator. The Contractor must provide the CPTu data in real-time to the Engineer to view online. This facility must have the function to allow VD and the Engineer to make edits and no-tations on the data online. Details of the programme to be used are to be provided in the tender return.

Page 32: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

5.3 Reporting 5.3.1 Final Records

Final Records shall include: • Strata description with variations noted. • All the items previously specified in section 5.1. • Co-ordinates of each exploration location related to DKTM3 control. • Ground level at each exploration related to DVR90. • Photographs of cores, trial pits and other items as per specification. Soil and rock logging shall conform to DGF Bulletin 1 and EN ISO 14688-1.

5.3.2 Geotechnical Factual Report The following factual reports should be delivered as part of this contract: • First Draft (in-situ tests and boreholes) • Second Draft (includes laboratory tests) • Final (incorporates VD comments to the first two drafts) These reports should be AGS compatible to allow import and manipulation. Before each report is finalised, consultation shall take place with the Engineer and VD Representa-tive on the format and layout of the report. These reports shall be the responsibility of the Contractor’s Project Leader who shall be approved by the VD Representative. The Contractor shall provide the Draft Factual Reports for approval and Final Factual Report to the VD Representative and the Engineer in paper and digital format. The Draft and Final Factual Report shall include: • Detailed diagrams of each borehole and giving dimensions, nature, description and

general classification in accordance with DGF Bulletin 14 of each strata, locations with reference numbers and samples, details of ground water observations and comprehensive field records.

• Marked up drawings showing exact position of boreholes, probes and other fea-tures.

• Level of top of each exploration location to DVR90; the locations of the exploratory holes shall be related to DKTM3.

• Triplicate colour prints measuring 150mm x 100mm of rock cores, trial pits and other soil materials of interest to the VD Representative. These photographs shall be mounted on A4 sheets of paper with typed locations and descriptions.

• A complete statement of all test results including probe and all laboratory test re-sults.

Page 33: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

All data shall be presented in print as well as digital format, which can be analysed by standard software (AGS format). Borehole and penetration test profiles showing the da-ta shall preferably be delivered in gINT. The gINT coding for geological strata shall be agreed with the Engineer prior to completion of the draft factual report. The Danish Road Directorate has a Data and drawing standard, see http://ts.vejdirektoratet.dk/SitePages/Startside.aspx, to be followed. The test data shall be presented according to Eurocode standards and using nomencla-ture given in DS/EN 1997-2. The data to be reported for each in-situ and laboratory test shall be consistent with the requirements of the standards and guidelines listed in Ap-pendix A. Specific test results shall be presented on plots as listed below; Soil • Moisture Content versus depth for each main soil type. • Atterberg Chart versus depth for each main soil type. • SPT versus depth for each main soil type or SPT versus depth only • FVT versus depth for each main soil type • Moisture Content versus depth for each main soil type • Atterberg Chart for each main soil type • Gradings with uniformity coefficient for each main soil type • pH versus depth • Shear strength versus depth for each main soil type Rock • Uniaxial Compressive Strength versus depth below top of rock • Point Load Index versus depth below top or rock for each rock type The Contractor shall submit samples of the format by which he proposes to present ex-ploratory hole records, in situ test results or other information of such nature to the VD Representative for approval. An interpretative report is required for the downhole geophysics, the sDMT and the CPTu testing.

5.3.3 Digital Data The Contractor shall provide exploratory hole, in-situ test, groundwater monitoring and laboratory test data in AGS digital form as ASCII format on virus free CD-ROM disks or other transmission media as agreed by the VD Representative. The files shall not be compressed. The data shall be prepared in accordance with a recognised Quality As-surance system and shall be in accordance with the Association of Geotechnical Spe-cialists (AGS) format for Electronic Transfer of Geotechnical Data from Ground Investi-gations (3rd Edition, 2004).

Page 34: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Preliminary digital data shall be provided with the draft report such that digital data is available for all data and results on hard paper copies within the interim report. For each data file, the index shall detail: • The file name, including the extension ‗AGS‘, • The date and time the file was created; • A general description of the data contained in each file. Plan drawings showing the locations of the exploratory holes shall be submitted along with an x-ref showing the same.

5.3.4 Delivery of Reports Seven fast-bound copies of each of the final factual reports are required. The copyright of the Report shall be deemed to be vested in VD. One copy of each of the factual re-ports shall be supplied loose unbound. A copy of the Contractors factual reports text shall be supplied electronically in Microsoft Word format, and all required graphs and tables shall be supplied in Microsoft Excel format, including the data and results of all laboratory tests. A final combined PDF copy of the report, graphs and tables shall also be supplied.

Page 35: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

APPENDIX A CEN ISO/TS STANDARDS - GEOTECHNICAL INVESTIGATION AND TESTING

Standard Reference Title

CEN ISO/TS 17892-1:2004 Geotechnical investigation and testing - Laboratory testing of soil - Part 1: Determination of water content (ISO/TS 17892-1:2004)

CEN ISO/TS 17892- 1:2004/AC:2005 Geotechnical investigation and testing - Laboratory testing of soil - Part 1: Determination of water content (ISO/TS 17892-1:2004)

CEN ISO/TS 17892-10:2004 Geotechnical investigation and testing - Laboratory testing of soil - Part 10: Direct shear tests (ISO/TS 17892-10:2004)

CEN ISO/TS 17892- 10:2004/AC:2005

Geotechnical investigation and testing - Laboratory testing of soil - Part 10: Direct shear tests (ISO/TS 17892-10:2004)

CEN ISO/TS 17892-11:2004 Geotechnical investigation and testing - Laboratory testing of soil - Part 11: Determination of permeability by constant and falling head (ISO/TS 17892-11:2004)

CEN ISO/TS 17892- 11:2004/AC:2005

Geotechnical investigation and testing - Laboratory testing of soil - Part 11: Determination of permeability by constant and falling head (ISO/TS 17892-11:2004)

CEN ISO/TS 17892-12:2004 Geotechnical investigation and testing - Laboratory testing of soil - Part 12: Determination of Atterberg limits (ISO/TS 17892-12:2004)

CEN ISO/TS 17892- 12:2004/AC:2005

Geotechnical investigation and testing - Laboratory testing of soil - Part 12: Determination of Atterberg limits (ISO/TS 17892-12:2004)

Page 36: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Standard Reference Title

CEN ISO/TS 17892-2:2004 Geotechnical investigation and testing - Laboratory testing of soil - Part 2: Determination of density of fine grained soil (ISO/TS 17892-2:2004)

CEN ISO/TS 17892- 2:2004/AC:2005 Geotechnical investigation and testing - Laboratory testing of soil - Part 2: Determination of density of fine grained soil (ISO/TS 17892-2:2004)

CEN ISO/TS 17892-3:2004 Geotechnical investigation and testing - Laboratory testing of soil - Part 3: Determination of particle density - Pyc-nometer method (ISO/TS 17892- 3:2004)

CEN ISO/TS 17892- 3:2004/AC:2005 Geotechnical investigation and testing - Laboratory testing of soil - Part 3: Determination of particle density - Pyc-nometer method (ISO/TS 17892- 3:2004)

CEN ISO/TS 17892-4:2004 Geotechnical investigation and testing - Laboratory testing of soil - Part 4: Determination of particle size distribution (ISO/TS 17892-4:2004)

CEN ISO/TS 17892- 4:2004/AC:2005 Geotechnical investigation and testing - Laboratory testing of soil - Part 4: Determination of particle size distribution (ISO/TS 17892-4:2004)

CEN ISO/TS 17892-5:2004 Geotechnical investigation and testing - Laboratory testing of soil - Part 5: Incremental loading oedometer test (ISO/TS 17892-5:2004)

CEN ISO/TS 17892- 5:2004/AC:2005 Geotechnical investigation and testing - Laboratory testing of soil - Part 5: Incremental loading oedometer test (ISO/TS 17892-5:2004)

CEN ISO/TS 17892-6:2004 Geotechnical investigation and testing - Laboratory testing of soil - Part 6: Fall cone test (ISO/TS 17892-6:2004)

CEN ISO/TS 17892- 6:2004/AC:2005 Geotechnical investigation and testing - Laboratory testing of soil - Part 6: Fall cone test (ISO/TS 17892-6:2004)

Page 37: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Standard Reference Title

CEN ISO/TS 17892-7:2004 Geotechnical investigation and testing - Laboratory testing of soil - Part 7: Unconfined compression test on fine-grained soil (ISO/TS 17892-7:2004)

CEN ISO/TS 17892- 7:2004/AC:2005 Geotechnical investigation and testing - Laboratory testing of soil - Part 7: Unconfined compression test on fine grained soils (ISO/TS 17892-7:2004)

CEN ISO/TS 17892-8:2004 Geotechnical investigation and testing - Laboratory testing of soil - Part 8: Unconsolidated undrained triaxial test (ISO/TS 17892-8:2004)

CEN ISO/TS 17892- 8:2004/AC:2005 Geotechnical investigation and testing - Laboratory testing of soil - Part 8: Unconsolidated undrained triaxial test (ISO/TS 17892-8:2004)

CEN ISO/TS 17892-9:2004 Geotechnical investigation and testing - Laboratory testing of soil - Part 9: Consolidated triaxial compression tests on water saturated soil (ISO/TS 17892-9:2004)

CEN ISO/TS 17892- 9:2004/AC:2005 Geotechnical investigation and testing - Laboratory testing of soil - Part 9: Consolidated triaxial compression tests on water saturated soil (ISO/TS 17892-9:2004)

CEN ISO/TS 22475-2:2006

Geotechnical investigation and testing - Sampling meth-ods and groundwater measurements - Part 2: Qualifica-tion criteria for enterprises and personnel (ISO/TS 22475-2:2006)

CEN ISO/TS 22475-3:2007

Geotechnical investigation and testing - Sampling meth-ods and groundwater measurements - Part 3: Conformity assessment of enterprises and personnel by third party (ISO/TS 22475-3:2007)

CEN ISO/TS 22476-10:2005 Geotechnical investigation and testing - Field testing - Part 10: Weight sounding test (ISO/TS 22476-10:2005)

Page 38: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Standard Reference Title

CEN ISO/TS 22476-11:2005 Geotechnical investigation and testing - Field testing - Part 11: Flat dilatometer test (ISO 22476- 11:2005)

EN ISO 14688-1:2002 Geotechnical investigation and testing - Identification and classification of soil - Part 1: Identification and description (ISO 14688-1:2002)

EN ISO 14688-1:2002/AC:2005 Geotechnical investigation and testing - Identification and classification of soil - Part 1: Identification and description (ISO 14688-1:2002)

EN ISO 14688-2:2004 Geotechnical investigation and testing - Identification and classification of soil - Part 2: Principles for a classification (ISO 14688-2:2004)

EN ISO 14689-1:2003 Geotechnical investigation and testing - Identification and classification of rock - Part 1: Identification and description (ISO 14689-1:2003)

EN ISO 22282-1:2012 Geotechnical investigation and testing - Geohydraulic test-ing - Part 1: General rules (ISO 22282-1:2012)

EN ISO 22282-2:2012 Geotechnical investigation and testing - Geohydraulic test-ing - Part 2: Water permeability tests in a borehole using open systems (ISO 22282-2:2012)

EN ISO 22282-3:2012 Geotechnical investigation and testing - Geohydraulic test-ing - Part 3: Water pressure tests in rock (ISO 22282-3:2012)

EN ISO 22282-4:2012 Geotechnical investigation and testing - Geohydraulic test-ing - Part 4: Pumping tests (ISO 22282-4:2012)

EN ISO 22282-5:2012 Geotechnical investigation and testing - Geohydraulic test-ing - Part 5: Infiltrometer tests (ISO 22282-5:2012)

Page 39: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Standard Reference Title

EN ISO 22282-6:2012 Geotechnical investigation and testing - Geohydraulic test-ing - Part 6: Water permeability tests in a borehole using closed systems (ISO 22282-6:2012)

EN ISO 22475-1:2006 Geotechnical investigation and testing - Sampling meth-ods and groundwater measurements - Part 1: Technical principles for execution (ISO 22475- 1:2006)

EN ISO 22476-1:2012 Geotechnical investigation and testing - Field testing - Part 1: Electrical cone and piezocone penetration test (ISO 22476-1:2012)

EN ISO 22476-1:2012/AC:2013 Geotechnical investigation and testing - Field testing - Part 1: Electrical cone and piezocone penetration test - Tech-nical Corrigendum 1 (ISO 22476-1:2012/Cor 1:2013)

EN ISO 22476-12:2009 Geotechnical investigation and testing - Field testing - Part 12: Mechanical cone penetration test (CPTM) (ISO 22476-12:2009)

EN ISO 22476-2:2005 Geotechnical investigation and testing - Field testing - Part 2: Dynamic probing (ISO 22476- 2:2005)

EN ISO 22476-2:2005/A1:2011 Geotechnical investigation and testing - Field testing - Part 2: Dynamic probing - Amendment 1 (ISO 22476-2:2005/Amd 1:2011)

EN ISO 22476-3:2005 Geotechnical investigation and testing - Field testing - Part 3: Standard penetration test (ISO 22476-3:2005)

EN ISO 22476-3:2005/A1:2011 Geotechnical investigation and testing - Field testing - Part 3: Standard penetration test - Amendment 1 (ISO 22476-3:2005/Amd 1:2011)

Page 40: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

Standard Reference Title

EN ISO 22476-4:2012 Geotechnical investigation and testing - Field testing - Part 4: Ménard pressuremeter test (ISO 22476-4:2012)

EN ISO 22476-5:2012 Geotechnical investigation and testing - Field testing - Part 5: Flexible dilatometer test (ISO 22476-5:2012)

EN ISO 22476-7:2012 Geotechnical investigation and testing - Field testing - Part 7: Borehole jack test (ISO 22476- 7:2012)

Page 41: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

APPENDIX B PROGRAMME FOR THE SERVICES

Page 42: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

ID Task Mode

Task Name Duration Start Finish

1 Start of Services 0 days Tue 04/11/14 Tue 04/11/14

2 Site Activities 74 days Tue 04/11/14 Fri 13/02/15

3 Mobilisation on‐site 15 days Tue 04/11/14 Mon 24/11/14

4 Borehole drilling, in‐situ testing, etc. 60 days Mon 17/11/14 Fri 06/02/15

5 Demobilisation 5 days Mon 09/02/15 Fri 13/02/15

6 Laboratory activities 80 days Tue 04/11/14 Mon 23/02/15

7 Reporting 90 days Tue 25/11/14 Mon 30/03/15

8 Delivery of Field Reports and Real‐time data 65 days Tue 25/11/14 Mon 23/02/15

9 Delivery of Factual Report (Draft 1) 0 days Mon 02/03/15 Mon 02/03/15

10 Delivery of Factual Report (Draft 2) 0 days Mon 16/03/15 Mon 16/03/15

11 Delivery of Final Factual Report 0 days Mon 30/03/15 Mon 30/03/15

12 End of Services 0 days Mon 06/04/15 Mon 06/04/15

04/11

02/03

16/03

30/03

06/04

F T S W S T M F T S W Sep '14 27 Oct '14 08 Dec '14 19 Jan '15 02 Mar '15 13 Apr

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration‐only

Manual Summary Rollup

Manual Summary

Start‐only

Finish‐only

Deadline

Progress

Appendix B

Page 1

Project: Roskilde Fjord ‐ ProgrammDate: Thu 11/09/14

Page 43: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

DATO DOKUMENT SAGSBEHANDLER MAIL TELEFON September 2014 Scope of Works Niels Jorgen Larsen [email protected] +45 72 44 22 58

APPENDIX C GRAPHICAL BOREHOLE PROGRAMME

Page 44: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

Roskilde Fjord Link Appendix CGraphical Borehole Programme

Marine GI Description of Services

mDVR907 topsoil topsoil6 IL oed5 IL oed CAU4 CAU diss3 topsoil Gl Coh2 PG CAD  CAD 1 diss diss0 PG water water water water water diss diss‐1 LG PG Gyttja CAD‐2 CAU Gyttja IL oed IL oed‐3 CAD LG nc CAD IL oed‐4 Gl coh LG nc CAD UU diss‐5 diss CAD CAU CAU UU IL oed‐6 CAD CAU UU UU UU‐7 IL oed diss UU Gl Coh IL oed‐8 IL oed LG noncoh diss CAD IL oed LG diss‐9 CAD IL oed UU diss

‐10 CAD CAD CAD diss IL oed CAU CAU‐11 CAD CAD CAU Gyttja‐12 diss CAD CAD Shells CAU diss diss Shells‐13 CAD diss Gl NC Post glacial Deposits‐14 diss CAU CAD Gl NC Late glacial cohensionless till‐15 CAU PG Late glacial Cohesive till‐16 CAU CAD diss UCS PLT Glacial Cohesionless Till‐17 diss diss CAU CAD IL Oed CAD PLT UCS Glacial Cohesive Till‐18 IL oed diss CAU Braz‐19 diss CAD UCS DD‐20 G

l c diss CAD CAD CAU CAU PLT‐21 G

l c diss IL oed Braz‐22 UCS DD diss CAU diss diss‐23 PLT UCS diss Braz UCS diss CAU DD DD DD‐24 diss diss UCS‐25 DD Braz UCS PLT DD CAD CAU IL oed CAU‐26 DD PLT diss Braz‐27 PLT Braz Braz diss CAU‐28 UCS Braz CAD CAU DD UCS PLT‐29 PLT UCS diss Braz‐30 UCS DD IL oed diss PLT PLT‐31 DD diss CAD CAU‐32 PLT UCS UCS DD‐33‐34 PLT Braz UCS‐35‐36 Braz PLT UCS‐37 CAU‐38 UCS UCS diss Braz‐39 UCS‐40 Braz diss Gl NC PLT‐41 DD‐42 PLT UCS Gl NC UCS‐43 DD DD‐44 Braz diss DD‐45‐46 UCS PLT UCS‐47‐48 Braz PLT‐49 DD‐50 UCS Braz‐51‐52 UCS

LST                   ?

Gl Coh

Glacial Non

cohe

sive

Gl Coh

 Till

LST                   

BH1/CPTu

LST                   

BHA1/CPTu BHA2/CPTu

Glacial Coh

esionless T

illGl Coh

esive Till ?

Gl Coh

Gl N

onCo

hesiv

eGl Coh

Glacial Non

CLST                   

Gl Coh

Glacial Non

cohe

sive

Glacial Coh

esive

Glacial Coh

esive

Glacial Non

Coh

LST                   

Gl N

onCo

hGl Coh

 Till

LST                   

water

Gyttja

LG non

Coh

Glacial Coh

esive Till

Gl NC

LST                   

water

Gyttja

PGLG

 NC

BH6/CPTu BH16/CPTu

LG coh

LG non

Glacial Coh

esive Till

LST                   

water

Gyttja

LG coh

LG NC

Glacial Coh

esive Till

Glacial Non

Coh

LST                   

water

Gyttja

Gyttja

Gl N

onCo

hLST                   

water

Gyttja

LG NC

Gl NC

Glacial Coh

esive Till

Gl NC

BH17/CPTu BH18/CPTu

topsoil

Gl Coh PG

BH13/sDMT BH14/CPTu BH15/CPTu

water

Shells

LG coh

esive

PG

BH7/CPTu BH8/CPTu BH9/sDMT

PG

LG coh

esive

BH10/sDMT BH11/CTPu BH12/CPTuBH2/CPTu BH3/CTPu BH4/CPTu BH5/CPTu

Gl Coh

esive Till ?

Gl Coh

LST                   ?

LG cohGl coh

esionless T

illGl Coh

esive Till ?

LST                   ?

Gl Coh

esionless T

ill

Gl Coh

esive Till ?

LST                   ?

LG Non

Coh

Gl Coh

esionless T

illLST                   ?

LG coh

esive

Gl N

onCo

h

LG Non

Coh

Gl N

onCo

hLST                   ?

water

Post Glacial

LG Coh

esionless

Gl N

onCo

hLST                   ?

LST                   ?

water

Shells

LG coh

esive

LG coh

esionless

Glacial Coh

esionless T

illLST                   ?

PGLG

 co h

LG coh

esionless 

Glacial Coh

esionless T

ill

LG non

coh

water

Gyttja

PGLG

 coh

LG coh

esionless

Shells

water

Gyttja

Shells

PG

LG coh

Glacial Coh

esive Till

Glacial Coh

Glacial Coh

esionless T

illLST                   ?

LST             

Rev.0 14210‐ARP‐SH‐CG‐009‐00002.xlsx Page 1 of 1

Page 45: SCOPE OF WORKS CONSULTING 14210.R05 Geotechnical …leverandorportal.vejdirektoratet.dk/Udbuds... · 1.7 Guidance Documents In addition to relevant geotechnical standards, the guidance

Vejdirektoratet har lokalkontorer i Aalborg, Fløng, Middelfart, Næstved og Skanderborg samt hovedkontor i København.

Find mere information på vejdirektoratet.dk.

VEJDIREKTORATETNiels Juels Gade 13Postboks 90181022 København KTelefon 7244 3333

[email protected]