SCOOTER PARKING
1 Footing No. LF1
Excavation 4 1.2
conc.work 4 1.1
F2Excavation 8 1.4Conc. Work 8 1.3
Total Excavation Total Conc. Work
2 Footing reinforcement No. of Bars
Bars parallel to length 1.1/0.15= 7+ 1 BAR= 8 4 8Length=1.1-0.15-0.15= 0.8Bars parallel to breadth1.1/0.15= 7+ 1 BAR= 8 4 8Length=1.1-0.15-0.15= 0.8
Bars parallel to length1.3/0.15= 8 + 1 Bar = 9 8 9Length= 1.3-0.15-0.15 = 1Bars parallel to breadth1.3/0.15= 8 + 1 Bar = 9 8 9Length= 1.3-0.15-0.15 = 1
3 Surface dressing 16.46
4 Lean Conc In footing F1 4 1.1F 2 8 1.3
For plinth beam H 30.46V 25.44
5 Column above plinth level L
No. of column in footing
F1 10 tor 150 c/c
F2 10 tor 150 c/c
C1of Height 2.4 m 12 0.23
6 Reinforcement detail
C 1 of Height 2.4 m 22Length of Lateral Ties 2*(0.41)+4*(0.19) 1.58Spacing 16 Dia 75c/cHeight of column/752.4/0.075 = 32 Bar + 1= 33
HOOKS= 8*Dia 8*0.016 0.128
Total rmft in stirup of 16 Dia 33 1.708
Longitudinal bar length 2.4+.045+1.5+48*0.012(DIA) 8 4.521
7 Plinth beams LPB 1 Excavation
H PB 1 2 18.66VPB 1 2 6.26
Conc. Work HPB 1 2 30.46VPB 1 2 8.52
Reinf. Of 16 Dia 6
PB 2 Excavation
VPB 2 4 12.12
Conc Work VPB 2 4 16.92
Reinf. Of 12 Dia 6
8 Roof Beam LRB 1
HRB 1 2 30.46
Reinf. Of 12 Dia 6
RB 2 VRB 2 6 25.38
Reinf. Of 16 Dia 6
9 Shuttering
Ar of roof
Column C 1 of Height 2.4m 12 0.23
Plinth Beam PB 1
HPB 1 30.46VPB 1 8.52
PB 2 VPB 2 16.92
Column in footing F1 4 1.1F2 8 1.3
10 Wall Drawf wall 25.38
11 Roof Slab RS 1 1 15.23
13 Reinf in roof slab
RS 1 1Reinf. Of 8 Dia 150 c/c Spacing of bars Length /0.150 = 15.23/0.1515.23/0.15= 101 Bar + 1 = 102 102 4.23Breadth /0.15= 4.23/0.154.23/0.15= 28 Bar + 1 = 29 29 15.23
14 Flooring car parking 15.23
15 Ramp conc work 2 15.23
B H Quantity Unit
1.2 1.6 9.216 cum
1.1 1.5 7.26
1.4 1.6 25.0881.3 1.5 20.28
34.304 cum 27.54 cum
L
100.8 25.6 m 195.2
0.8 25.6 m
1 72 m
1 72 m
7.26 119.4996 sqm
1.1 0.15 0.726 cum 1.3 0.15 2.028 cum
0.23 0.15 1.05087 cum0.23 0.15 0.87768 cum
B H
no walls , no plaster
.1m added extra
0.45 2.4 2.9808 cum
121079.976
161626.168
1240.008 m
795.696 m
B H
0.23 0.6 2.57508 cum 0.23 0.6 0.86388 cum
0.23 0.6 4.20348 cum 0.23 0.6 1.17576 cum
233.88 m
0.23 0.45 1.25442 cum
0.23 0.45 1.75122 cum
101.52 m
B H
0.23 0.45 3.15261 cum
182.76 m
0.23 0.45 2.62683 cum
152.28 m
64.4229 sqm
0.45 2.4 39.168 2*(lh+bh)
0.23 0.6 36.828 sqm 0.23 0.6 10.5 sqm
0.23 0.45 15.435 sqm
1.1 1.5 26.41.3 1.5 62.4
Total 88.8 sqm
0.23 0.6 3.50244 cum
4.23 0.13 8.374977 cum
81746.26
431.46
441.67
1746.26 m
4.23 64.4229 sqm
0.9 0.6 8.2242 cum
2* becoz of bottom and top
PRICING OF SCOOTER PARKING AT TUGHALAKABAD
S. No. Description of item Qty1 Surface dressing not exceeding 15 cm deep in soft/loose soil 119.4996
2 38.99738
3 4.32692
4 234.78
5 83.85
6 64.4229
7 119.4996
8 Cement concrete in foundation filling and mass concrete type D2 1:4:8 4.68255
9 4314.376
10 190.731
11 51.6549
12 64.4229
13 8.374977
14 3.50244
15
16 Rendering 10mm thick in CM 1:6 finished even and smooth internal plaster
17 64.4229
18
19
20 Roof treatment21 Dry distemper 22 Three coats of white wash on ceiling 23 Three coats of lime wash on internal walls
Excavation in trenches n. exc. 1.5 m wide and n. exc. 1.5 m in depth for foundation n.exc. 10 sqm on plan and n. exc. 1.5 m depth and getting out in soft/loose soil.
Returning, filling, in including spreading, levelling, watering and well ramming in layers not exc. 25 cm in soft/loose soil.
M/L Treating the bottom and sides of excavation at the rate of 5 litres per sqm of surface area
Treating the back fill in contact with foundation at the rate of 7.5 litre of emulsion per sqm of vertical surface
Treating the top surface of filled earth at the rate of 5 litres of emulsion per sqm of surface.
Treating the soil along with external perimeter of building at the rate of 2.25 litre of emulsion per meter of perimeter of wall.
TMT bars 10 mm dia and over cut to length bent to shape required including cranking bending spirally for hooping for cloumns hooking ends and binding with mild steel wire not less than 0.9-0 mm dia
Formwork to sides of concrete in foundation footings bases of columns and plinth beams
Reinforced cement concrete (design mix) in foundation including footings foundation beams plinth beams bases of columns etc in M25
Formwork to soffits of suspended slabs such as roof slabs floor slabs landings and similar works
Reinforced cement concrete (design mix) in slabs simply supported on walls beams and columns in floor roof landings and balconies etc in M25
Modular bricks in cement mortar 1:6 with fly ash bricks straight or curved on plan not exc 6 m mean radius
Rendering 10mm thick in CM 1:4 second layer of 5 mm in CM 1:4 with water proofing compund sand finished external plaster
Rendering 5mm thick in CM 1:3 to RCC soffits bottom of beams lintal RCC chajjas slabs etc
20-25 mm thick kota stone flooring 600x600 over 20 mm screed in CM1:6 over 100 mm thick PCC Type D2 over 150 mm thick hard core
7-8 mm thick non skid ceramic tiles 300x300 mm laid over cement screed in CM 1:4 over 100 mm thick PCC 1:2:4
Grand total
Add 3% for unforeseen
items
Plinth area of building
Plinth area rate per Sqm
no plaster ?
Unit Rate Amount SSRSqm 7.9 944.04684 3011
Cum 115.2 4492.4982 3006
Cum 41.7 180.43256 3009 8 10
Sqm 80.6 18923.268 3047 0.39 0.61
Sqm 126.8 10632.18 3048
Sqm 80.6 5192.4857 3049 1746.26 195.2
Sqm 38.6 4612.6846 3051
Cum 2303.3 10785.317 4025
kg 48.6 209678.67 10034
Sqm 134.2 25596.1 7004
Cum 3482.2 179872.69 4053
Sqm 211.5 13625.443 7006
Cum 3770 31573.663 4055
Cum 255.3 894.17293 5019
Sqm 134.8 0 14001 & 14004 1746.26 195.2
Sqm 77.3 0 14001
Sqm 76.3 4915.467314001 & 14004 681.0414 119.072
Sqm 805.69 0 13013 & others
Sqm 520.4 0 13074
Sqm 300 0 AssessedSqm 31.1 0 15010Sqm 11.8 0 15006Sqm 11.8 0 15006Total 521919.13
15657.574
537576.7
Sqm
#DIV/0!
12 16 20 25
0.89 1.57 2.46 3.85
1079.976 1626.168
1079.976 1626.168 0 0
961.17864 2553.0838 0 0
4314.3758