Schedule
1
SCHEDULE Date of lesson What scenes are being filmed? Where will the filming take place? What crew and cast are needed? What props and classroom s are needed? What equipment will be used? 29 th November 2012 Scene 1 On the school filled. Nathan Dion No props or classroom s Camera and a tripod. 4th December 2012 Scene 2 In the classroom . Nathan ,Ryan No props needed. Camera and a tripod. 3rd December 2012 Scene 3 On the school filled. Nathan,ryan,Di on No props needed. Camera and a tripod. 6th December 2012 Scene 4 Running around school. Ryan and Random person. No props needed. Camera and a tripod. 11 th December 2012 Scene 5 and 6 In a smalls and dark classroom . Nathan,Ryan,Ra ndom person No props needed. Camera and a tripod.
-
Upload
mdrummond13 -
Category
Education
-
view
62 -
download
0
Transcript of Schedule
![Page 1: Schedule](https://reader036.fdocuments.us/reader036/viewer/2022082921/555a20afd8b42ab3088b4610/html5/thumbnails/1.jpg)
SCHEDULE
Date of lesson
What scenes are being filmed?
Where will the filming take place?
What crew and cast are needed?
What props and classrooms are needed?
What equipment will be used?
29th
November2012
Scene 1 On the school filled.
Nathan Dion No props or classrooms
Camera and a tripod.
4thDecember2012
Scene 2 In the classroom.
Nathan ,Ryan No props needed.
Camera and a tripod.
3rdDecember2012
Scene 3 On the school filled.
Nathan,ryan,Dion No props needed.
Camera and a tripod.
6thDecember2012
Scene 4 Running around school.
Ryan and Random person.
No props needed.
Camera and a tripod.
11th
December2012
Scene 5 and 6
In a smalls and dark classroom.
Nathan,Ryan,Random person
No props needed.
Camera and a tripod.